Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BEAM MONITORING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Observation of electron cloud instabilities and emittance dilution at the Cornell electron-positron Storage ring Test Accelerator

Electron cloud related emittance dilution and instabilities of bunch trains limit the performance of high intensity circular colliders. One of the key goals of the Cornell electron-positron storage ring Test Accelerator (CesrTA) research program is to improve our understanding of how the electron cloud alters the dynamics of bunches within the train. Single bunch beam diagnostics have been developed to measure the beam spectra, vertical beam size, two important dynamical effects of beams interacting with the electron cloud, for bunch trains on a turn-by-turn basis. Experiments have been performed at CesrTA to probe the interaction of the electron cloud with stored positron bunch trains. The purpose of these experiments was to characterize the dependence of beam-electron cloud interactions on the machine parameters such as bunch spacing, vertical chromaticity, and bunch current. The beam dynamics of the stored beam, in the presence of the electron cloud, was quantified using: 1) a gated beam position monitor (BPM) and spectrum analyzer to measure the bunch-by-bunch frequency spectrum of the bunch trains, 2) an x-ray beam size monitor to record the bunch-by-bunch, turn-by-turn vertical size of each bunch within the trains. In this study we report on the observations from these experiments and analyze the effects of the electron cloud on the stability of bunches in a train under many different operational conditions.

43 PARTICLE ACCELERATORS↗

Overview of recent trends and developments for BPM systems

Beam position monitoring (BPM) systems are the workhorse of beam diagnostics for almost any kind of charged particle accelerator: linear, circular or transport-lines, operating with leptons, hadrons or heavy ions. BPMs are essential for beam commissioning, accelerator fault analysis and trouble shooting, machine optics, as well as lattice measurements, and finally, for accelerator optimization, in order to achieve the ultimate beam quality. This presentation summarizes the efforts of the beam instrumentation community on recent developments and advances on BPM technologies, i.e. BPM pickup monitors and front-end electronics (analog and digital). Principles, examples, and state-of-the-art status on various BPM techniques, serving hadron and heavy ion machines, sync light synchrotron's, as well as electron linacs for FEL or HEP applications are outlined.

43 PARTICLE ACCELERATORS↗

Portable emittance measurement device

In Institute for Theoretical and Experimental Physics (ITEP) the portable emittance measurements device is developed. It provides emittance measurements both with ''pepper-pot'' and ''two slits'' methods. Depending on the method of measurements, either slits or pepper-pot mask with scintillator are mounted on the two activators and are installed in two standard Balzer's cross chamber with CF-100 flanges. To match the angle resolution for measured beam, the length of the stainless steel pipe between two crosses changes is adjusted. The description of the device and results of emittance measurements at the ITEP ion source test bench are presented.

43 PARTICLE ACCELERATORS↗

A high-resolution multi-slit phase space measurement technique for low-emittance beams

Precise measurement of transverse phase space of a high-brightness electron beamis of fundamental importance in modern accelerators and free-electron lasers. Often, the transverse phase space of a high-brightness, space-charge-dominated electron beam is measured using a multi-slit method. In this method, a transverse mask (slit/pepperpot) samples the beaminto a set of beamlets, which are then analyzed on to a screen downstream. The resolution in this method is limited by the type of screen used which is typically around 20 {mu}m for a high-sensitivity Yttrium Aluminum Garnet screen. Accurate measurement of sub-micron transverse emittance using this method would require a long drift space between the multi-slit mask and observation screen. In this paper, we explore a variation of the technique that incorporates quadrupole magnets between the multi-slit mask and the screen. It is shown that this arrangement can improve the resolution of the transverse-phase-space measurement with in a short footprint.

43 PARTICLE ACCELERATORS↗

The VEPP-2000 electron-positron collider: First experiments

In 2007, at the Institute of Nuclear Physics (Novosibirsk), the construction of the VEPP-2000 electron-positron collider was completed. The first electron beam was injected into the accelerator structure with turned-off solenoids of the final focus. This mode was used to tune all subsystems of the facility and to train the vacuum chamber using synchrotron radiation at electron currents of up to 150 mA. The VEPP-2000 structure with small beta functions and partially turned-on solenoids was used for the first testing of the 'round beams' scheme at an energy of 508 MeV. Beam-beam effects were studied in strong-weak and strong-strong modes. Measurements of the beam sizes in both cases showed a dependence corresponding to model predictions for round colliding beams. Using a modernized SND (spherical neutral detector), the first energy calibration of the VEPP-2000 collider was performed by measuring the excitation curve of the phimeson resonance; the phi-meson mass is known with high accuracy from previous experiments at VEEP-2M. In October 2009, a KMD-3 (cryogenic magnetic detector) was installed at the VEPP-2000 facility, and the physics program with both the SND and LMD-3 particle detectors was started in the energy range of 1-1.9 GeV. This first experimental season was completed in summer 2010 with precision energy calibration by resonant depolarization.

43 PARTICLE ACCELERATORS↗

Measuring orbit responses with oscillating trajectories in the Fermilab Linac

Recording changes in beam transverse positions and longitudinal phase reported by Beam Position Monitors (BPMs) in response to a beam deflection by an upstream dipole corrector or RF cavity phase (orbit response) is a powerful tool for analysis of accelerator optics and assisting with machine tuning. In Fermilab Linac, orbit responses were recorded by oscillating the corrector currents and cavity phases in a sinusoidal manner parasitically during regular operation, simultaneously oscillating up to 19 correctors and 7 cavities at distinct frequencies, providing faster, drift-resistant measurements through frequency-domain analysis. This report describes the technique, including error estimations and consistency checks and shows examples of the measurements.

Shemyakin, Alexander [Fermilab] (ORCID:00000001501↗

Measuring Orbit Responses with Oscillating Trajectories in the Fermilab Linac

Recording changes in beam transverse positions re-ported by Beam Position Monitors (BPMs) in response to a beam deflection by an upstream dipole corrector (orbit response) is a powerful tool for analysis of accelerator optics and assisting with machine tuning. In the Fermilab Linac, orbit responses are recorded by oscillating the currents of up to 19 correctors, providing faster, drift-resistant measurements through frequency-domain analysis. This report describes the technique, including error estimations and consistency checks and shows an example of the measurements.

Shemyakin, Alexander V. [Fermilab] (ORCID:00000001↗

Cherenkov Light-based Beam Profiling for Ultrarelativistic Electron Beams

We describe a beam profile monitor design based on Cherenkov light emitted from a charged particle beam in an air gap. The main components of the profile monitor are silicon wafers used to reflect Cherenkov light onto a camera lens system. The design allows for measuring large beam sizes, with large photon yield per beam charge and excellent signal linearity with beam charge. Furthermore, the profile monitor signal is independent of the particle energy for ultrarelativistic particles. Different design and parameter considerations are discussed. A Cherenkov light-based profile monitor has been installed at the FACET User Facility at SLAC. Finally, we report on the measured performance of this profile monitor.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Application of a phase space beam position and size monitor for synchrotron radiation

We report on a system (ps-BPM) that can measure the electron source vertical position and angular motion along with the vertical source size and angular size at a single location in a synchrotron bend magnet beamline. This system uses a combination of a monochromator and a filter with a K-edge to which the monochromator was tuned in energy. Measurement of the vertical beam location without the absorber and vertical edge location with the absorber allows measurement of the source position and angle. The beam width and edge width give information about the ver-tical electron source size and angular distribution. In this work, we show a typical measurement with the ps-BPM monitor and results that can be obtained from a single measurement. By combining the analysis in the time and frequency domain, information on beam motion and size can be extracted and identified. Examples of ps-BPM applications are given.

Samadi, N.↗

A NOVEL METHOD FOR QUASI-NON-INTERCEPTIVE BEAM PROFILE MEASUREMENT IN A LINAC

Beam profile diagnostics is an important tool for understanding beam dynamics in accelerators. Non-interceptive diagnostics have many great advantages but often are difficult in implementation. We suggest a method of measuring beam profiles that is not truly non-interceptive, because beam has to be intercepted at some point, preferably in the beginning of the linac. But significant difference from a conventional interceptive measurement is that beam is not intercepted at any of the points of measurement along the linac. One important application is measuring beam profiles within cryostats of a super-conducting linac. The equipment required for implementing this diagnostic is simple: a set of slits in the beginning of the accelerator, and a Beam Position Monitor (BPM) in the point of measurement. Beam profiles can be measured simultaneously at every BPM along the linac. In this paper we will discuss details of the method, its limitations, and effect of non-linearity, coupling and space charge. Results of a demonstration experiment at SNS will be presented and discussed.

43 PARTICLE ACCELERATORS↗

Study of Muon Monitor Data to Maintain the Quality of the NuMI Neutrino Beam at Fermilab [Poster]

A muon monitor which measures muon beam profile, is a key beam element to maintain the quality of muon neutrino beam. Three arrays of muon monitors located in the downstream of the hadron absorber provide the measurements of the primary beam quality. We studied the response of muon monitors with the proton beam profile changes and focusing horn current variations. The responses of muon monitors have been used to implement Machine Learning (ML) algorithms to monitor the beam quality.

43 PARTICLE ACCELERATORS↗

Time-Resolved Beam Position Measurements for the Scorpius Multipulse Linear Induction Accelerator

Beam position monitors (BPMs) provide time-resolved measurements of the current and centroid position of high-current electron beams in linear induction accelerators (LIAs). One of the types of detectors used in BPMs is the B-dot loop, which generates a signal from the EMF due to the time varying magnetic flux through the loop. If some of the boundaries of the loop are composed of thick metal walls with finite conductivity, the resulting signal must be corrected for the magnetic field diffusion into the metal. The theoretically predicted flux due to diffusion is in remarkable agreement with experimental measurements. Although accurate BPM measurements of beam current require correction of magnetic field diffusion, accurate measurement of beam position requires no correction. In this note, we present a theoretical derivation and the experimental validation of this result.

43 PARTICLE ACCELERATORS↗

Calibrating transport lines using LOCO techniques

With the 12GeV upgrade underway at CEBAF, there is a need to re-characterize the beamlines after the modifications made to it to accommodate running at higher energies. We present a linear perturbation approach to calibrating the optics model of transport lines. This method is adapted from the LOCO method in use for storage rings. We consider the effect of quadrupole errors, dipole construction errors as well as beam position monitors and correctors calibrations. The ideal model is expanded to first order in Taylor series of the quadrupole errors. A set of difference orbits obtained by exciting the correctors along the beamline is taken, yielding the measured response matrix. An iterative procedure is invoked and the quadrupole errors as well as beam position monitors and corrector calibration factors are obtained. Here we present details of the method and results of first measurements at CEBAF in early 2011.

43 PARTICLE ACCELERATORS↗

Design and Performance of the LCLS Cavity BPM System

In this paper we present the design of the beam position monitor (BPM) system for the LCLS undulator, which features a high-resolution X-band cavity BPM. Each BPM has a TM{sub 010} monopole reference cavity and a TM{sub 110} dipole cavity designed to operate at a center frequency of 11.384 GHz. The signal processing electronics features a low noise single-stage three-channel heterodyne receiver that has selectable gain and a phase locking local oscillator. We will discuss the system specifications, design, and prototype test results.

36 MATERIALS SCIENCE↗

Individual Beam Size And Length Measurements at the SLC Interaction Point Derived From the Beam Energy Loss During a Beam Beam Deflection Scan

At the Interaction Point (IP) of the SLC Final Focus, beam-beam deflection scans routinely provide a measurement of the sum in quadrature of the electron and positron transverse beam sizes, but no information on the individual beam sizes. During the 1996 SLC run, an upgrade to the Final Focus beam position monitor system allowed a first measurement of the absolute beam energy loss of both beams on each step of the deflection scan. A fit to the energy loss distributions of the two beams provides a measurement not only of the individual transverse beam sizes at the IP but also of the individual bunch lengths.

43 PARTICLE ACCELERATORS↗

Ion beam mill etch depth monitoring with nanometer-scale resolution

A method for measuring conductance of a material real-time during etching/milling includes providing a fixture having a socket for receiving the material. The socket is attached to a printed circuit board (PCB) mounted on one side of a plate that has at least one opening for providing ion beam access to the material sample. Conductive probes extend from the other side of the PCB to contact and span a target area of the material. A measurement circuit in electrical communication with the probes measures the voltage produced when a current is applied across the material sample to measure changes in electrical properties of the sample over time.

Cybart, Shane A.↗

A simple crunching of the AGS 'bare' machine ORM data - February 2007 - to extract some aspects of AGS transverse coupling at injection and extraction

The objective of this note is to (once again) explore the AGS 'ORM' (orbit response matrix) data taken (by Operations) early during the 2007 run with an AGS bare machine and gold beam. Indeed the present motivation is to extract as much information about the AGS inherent transverse coupling as possible - from general arguments and the copious ORM data. And taking this one step further, (though not accomplished yet) the goal really should be to tell the model how to describe this coupling. 'Bare' as used here means the AGS with no quadrupole, sextupole or octupole magnets powered. Only the main (combined-function) magnet string and dipole bumps necessary to optimize beam survival are powered. 'ORM data' means the systematic recording of the equilibrium orbit beam position monitor response to powering individual dipole corrector magnets. The 'matrix' results from looking at the effect of each of the (12 superperiods X 4 dipoles per superperiod) 'kicks' on each of the (12 X 6) pick up electrodes (pues) in each transverse plane. So then we have two (48 X 72) matrices of numbers from the ORM data. (Though 'pue' usually refers to the hardware in the vacuum chamber and 'bpm' to the beam position monitoring system, the two labels will be used casually here.) The exercise is carried out at two magnet rigidities, injection (AGS field {approx}434 Gauss) and extraction to RHIC ({approx}9730 Gauss), - a ratio of rigidities of about 22.4. Since we stick with a bare machine, we are also stuck with the bare tunes which means the tunes are rather close together and near 8.75. Injection: (h,v) {approx} (8.73, 8.76).

43 PARTICLE ACCELERATORS↗

Proton beam position measurement in air using a BPM

A Beam Position Monitor (BPM) is potentially useful to measure the position and phase of the beam in air in a non-destructive way. An air-gap BPM in experiments, such as beam-induced radioactive waste management and dynamic radiography applications, where a so-called air gap is needed, can be utilized to measure the beam position and phase. In this study, a stripline BPM was used in the air-gap of an 800 MeV proton beam transport line. The downstream end of the primary beamline exit window was made of a thin aluminum plate and allowed the beam to travel 1.2 m in ambient air before re-entering into a vacuum drift section. Such a configuration was arranged to examine the BPM effectiveness in atmospheric temperature and pressure where ionization of air occurs. In this study, a high energy (800 MeV), high current (0.6 A beam peak current/pulse) proton beam of 5 mm radius was transported in the air. The beam position relative to the axis was measured by detecting the signature of the beam in a nanosecond scale. This nanosecond scale detection ability was useful to identify other signals such as plasma effects. The BPM signals were processed at a frequency of 201 MHz; thus, one gets a stronger response in a stripline pattern as it was used in this study instead of a dot-type BPM. Experimental data show that the BPM works well in air, but ionization of air or plasma formation could not be measured over the BPM signal. The design, construction, and performance of a BPM in air environment are presented.

43 PARTICLE ACCELERATORS↗