Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Allocation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

The telstar satellite system

This paper describes the Telstar system and discusses the over-all system design. System considerations, the orbit selection and frequency allocation considerations are covered. A general description of the Telstar satellite and Andover, Maine, ground station provides background for companion articles in this series. Finally, the transmission performance is given with some discussion of system parameters.

TELSTAR SATELLITE↗

A general description of the telstar spacecraft

The Telstar spacecraft design is discussed with emphasis on the electronics system. The description includes early planning, starting with frequency allocation considerations, and carries the program through electrical and mechanical design, construction and evaluation of the electronics system. The content is aimed at a broad introduction, depending on companion papers for many details of the spacecraft design.

TELSTAR SATELLITE↗

Probabilistic approach to long range planning of manpower

Publication presents a total long range planning model for project oriented organizations. The total model consists of planning systems which originate - /1/ at the project level and consolidate into an overall plan, and /2/ from a budetary ceiling and allocate to the individual projects. Analysis of /1/ and /2/ is provided for management decision making.

Lejk, R. A.↗

MOP /Matrix Operation Programs system/

MOP /Matrix Operation Programs/ system consists of a set of FORTRAN 4 subroutines which are related through a small common allocation. The system accomplishes all matrix algebra operations plus related input-output and housekeeping details.

Muller, P. M.↗

LABCON - Laboratory Job Control program

Computer program LABCON controls the budget system in a component test laboratory whose workload is made up from many individual budget allocations. A common denominator is applied to an incoming job, to which all effort is charged and accounted for.

Reams, L. T.↗

Information quality-control model

Model serves as graphic tool for estimating complete product objectives from limited input information, and is applied to cost estimations, product-quality evaluations, and effectiveness measurements for manpower resources allocation. Six product quality levels are defined.

Vincent, D. A.↗