Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “6.1”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 595 records · Page 33

Background Information on the Protection Requirements in IEEE Std 1547-2018

As the DER penetration level has risen significantly in recent times, parameter settings and configuration of installed DERs are having direct impact on local electric distribution utilities as well as bulk power systems during normal and abnormal grid conditions. On the other hand, all grid-connected DERs in the United States of America must conform to the interconnection requirements prescribed in the IEEE Std 1547-2018. Because of these reasons, it is crucial to understand the expected DER performance during abnormal grid conditions considering the requirements of the IEEE Std 1547-2018. The aim of this document is twofold: (1) to summarize requirements in IEEE Std 1547-2018 having direct implications in distribution network protection, and (2) to provide the reader with knowledge and information that will be required for users to apply the requirements specified. Since the focus of this document is on distribution network protection in the presence of DERs, it is assumed that the readers have basic understanding of distribution network protection as well as working principles of DERs. This document starts with a brief introduction on protection systems for distribution network followed by a discussion on the impact of DER on the protection systems. Current practices to provide network protection in the presence of DER is briefly discussed. The document then explores the DER performance requirements in IEEE Std. 1547-2018; especially on those related to distribution network protection. Section 6.1 in IEEE Std. 1547-2018 provides an overview of capabilities and control requirements for DER under abnormal operating conditions. This section also introduces abnormal operating performance categories I, II, III. The DER response to various types of faults and grid conditions such as short-circuit faults and open phase conditions are discussed in section 6.2 in the standard while requirements for coordination with the Area EPS reclosing scheme are provided in section 6.3. Section 6.4 in the IEEE Std 1547-2018 specifies requirements for mandatory voltage tripping and ride-through requirements during low and high voltage disturbances and section 6.5 specifies similar requirements for low and high frequency disturbances. IEEE Std. 1547 requires that the conformance of the DERs to IEEE Std 1547-2018 requirements should be verified in accordance with IEEE Std. 1547. 1. There are several parameters and settings of DERs that need to be properly selected for reliable operation during abnormal grid condition while applying the requirements of IEEE Std 1547-2018. Key decisions for proper selections of parameter and settings are: 1. Determination of required DER abnormal operating performance category, 2. Determination of DER response (shall trip) to abnormal voltages and 3. Determination of DER response (shall trip) to abnormal frequency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Submersible Multistage Centrifugal Pump for Versatile Test Reactor Cartridge Test Loop

Submersible multistage centrifugal pumps are ideal for pumping in narrow confined spaces and achieving necessary head pressures and flow rates. Once a diameter is determined then manipulation of the number of stages and motor speed are all that are required to meet desired flow conditions. The Versatile Test Reactor (VTR) closed loop cartridge systems will need forced convection cooling independent of the main reactor. A multistage centrifugal pump can meet the necessary flow rates and pumping pressures while minimizing space taken. The pump considered for this work was based off a deep well submersible pump, a variation of a multistage centrifugal pump. We experimented with two pump sizes, 5 cm (2 inch) and 7.5 cm (3 inch) diameters. These diameters were chosen to fit into the inner diameter of standard 5 and 7.5 (2 and 3 inch) Schedule 40 pipe, respectively. This made the design for the test loop both simpler and less expensive as the need for an engineered pump housing was eliminated. Initial test cartridge planning indicated space for only a 5 cm (2 inch) diameter pump, though early testing of this size showed the need for an abnormally high-speed and high-power motor. Fine tuning of the cartridge design allowed a pump size increase to 7.5 cm (3 inches), which was the pump size most extensively tested in this work. The test loop is composed of various sizes of PVC and aluminum piping components in a loop configuration. The pump is driven by a Pittman 250 W (1/3 horsepower) electric motor with maximum speed of 3,450 RPM. Testing consisted of running the pump at a constant motor speed while varying a control valve to restrict flow through the loop, with differential pressure and flow rate recorded. This was done for one and two stage configurations for the 5 cm (2 inch) diameter impeller design and one, two, and three stage configurations for the 7.5 cm (3 inch diameter) impeller design, respectively. Due to pumping power requirements, two and three stage 7.5 cm (3 inch) diameter impeller testing at higher flowrates lowered the motor speed substantially. In regions where motor speed could not be maintained constant, the data were discarded. The test loop was also reconfigured to allow for the pump to be tested for pressure drop in a stalled or inoperable (0 RPM) flow condition. Demonstration of adequate natural convection cooling of the test cartridge fuel type is necessary under accident conditions, and this will depend upon the flow resistance through the impeller assembly when the pump is not operating. Thus, accurate knowledge of the effective impeller assembly loss coefficient is important for safety evaluations. The test loop was modified to provide water inlet and outlets on either side of the pump impeller stack, and a metered flow of lab water was provided in order to measure the pressure drop across the cartridges as a function of flowrate. Data from the pump head curve testing developed as part of this work and supported by analysis using pump head affinity laws indicates that a three stage 7.5 cm (3 inch) pump impeller design will meet target requirements for coolant flow within the VTR cartridge sodium cartridge at full power conditions [1] with margin; this corresponds to a flowrate of 45 l/min (12 gpm) at a pressure drop of 6.1 m (20 feet) of water head. The results of the pressure loss measurements across the impeller assembly when the pump is stationary (i.e., at 0 RPM) indicate that the pressure loss coefficient is 0.921 for a two impeller stack configuration; this value is calculated based on the flow velocity through the minimum available flow area within a single stage of the impeller which corresponds to 1.4 cm2.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Hybrid Hydraulic-Electric Architecture (HHEA) for Mobile Machines (Final Report)

Traditionally, off-road mobile machines such as excavators and wheel loaders are primarily powered by hydraulics, and throttling valves are used to control their work circuits. In recent years, two general trends are towards more energy efficient systems and electrification. With electrification, both efficiency and control performance can be improved by the elimination of throttling losses and the use of high-bandwidth inverter control. Electrification is generally accomplished with Electro-hydraulic actuators (EHA) but they are limited to lower powered systems due to the high cost of electric machines capable of high power or high torque. This project proposes a new system architecture for off-road vehicles - Hybrid Hydraulic Electric Architecture (HHEA) to improve efficiency and control performance without requiring large electric machines. The widely applicable architecture combines hydraulic power and electric power in such a way that the majority of power is provided hydraulically while electric drives are used to modulate this power. In particular, HHEA utilizes multiple common pressure rails to transmit the majority of power and small electric machines to modulate the power. The energy-saving potential of the the HHEA has been validated for the work circuits of a variety of mobile machines, from small 5-ton excavators to medium sized 20-ton excavators and wheel loaders, and representative duty cycles to reduce energy input by 50-80% compared to the commercial state-of-art load-sensing systems. In addition, the corner power requirements of the electrical machines can be downsized by 85% compared to the EHA approach. Various tradeoff studies have also been conducted, including sensitivities to individual components performances, controllers, accumulator sizes, and variations of the system architecture etc. A control strategy has been developed to maintain or exceed the motion control precision compared to current systems. The motion control strategy consists of a nominal controller, based on a passivity-based backstepping design, and a transition controller, based on least-norn feedforward design. The nominal controller is used in between common pressure rail switches whereas the transition controller compensates for any disturbance that common pressure rail switchings inflict on the system. The control strategy has been experimentally validated on both a medium pressure (200bar) hardware-in-the-loop (HIL) testbed and a high pressure (300+bar) HIL testbed. An efficient and power-dense integrated electric-hydraulic machine consisting of an axial flux electric machine and a radial hydrostatic piston hydraulic machine has been designed, constructed and tested. The machine has an active material power density of 6.1kW/kg, a rated speed of 12500 RPM, and a design efficiency of 85%. This is among the highest power density electric machines using conventional materials. While the integrated machine was designed for modulating the hydraulic power within the HHEA, it can also be used in other applications.

24 POWER TRANSMISSION AND DISTRIBUTION↗

SCALE Calculations Replicating ARH-600 Data

This report documents Standardized Computer Analyses for Licensing Evaluation (SCALE) calculations replicating data from the ARH-600 criticality handbook. These calculations complement those reproduced with MCNP in PRC-NS-00009. Calculations were performed with SCALE version 6.1, using the v7-238 cross section library. The original ARH-600 data were calculated by the Atlantic Richfield Hanford (ARH) Company starting in the 1960s, and Monte Carlo N-Particle (MCNP) calculations were performed by the Hanford Plateau Remediation Company in 2010. This report is not intended to replace final analysis of fissile systems by qualified criticality personnel.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Industrial Stormwater Pollution Prevention Plan (SWPPP) for SNL/CA Reporting Year 2022-2023

The Sandia National Laboratories, California (SNL/CA) site comprises approximately 410 acres and is located in the eastern portion of Livermore, Alameda County, California. The property is owned by the United States Department of Energy and is being managed and operated by National Technology & Engineering Solutions of Sandia, LLC. The facility location is shown on the Site Map(s) in Appendix A. This Stormwater Pollution Prevention Plan (SWPPP) is designed to comply with California’s General Permit for Stormwater Discharges Associated with Industrial Activities (General Permit) Order No. 2015-0122-DWQ (NPDES No. CAS000001) issued by the State Water Resources Control Board (State Water Board) (Ref. 6.1). This SWPPP has been prepared following the SWPPP Template provided on the California Stormwater Quality Association Stormwater Best Management Practice Handbook Portal: Industrial and Commercial (CASQA 2014). In accordance with the General Permit, Section X.A, this SWPPP contains the following required elements: Facility Name and Contact Information; Site Map; List of Significant Industrial Materials; Description of Potential Pollution Sources; Assessment of Potential Pollutant Sources; Minimum BMPs; Advanced BMPs, if applicable; Monitoring Implementation Plan (MIP); Annual Comprehensive Facility Compliance Evaluation (Annual Evaluation); and, Date that SWPPP was Initially Prepared and the Date of Each SWPPP Amendment, if Applicable.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Assessment of Light-Duty Plug-in Electric Vehicles in the United States, 2010 – 2021

The number of plug-in electric vehicles (PEVs) sold in the United States has consistently grown since 2010, reaching 4% of the light-duty vehicle market in 2021. This report examines how the characteristics for these PEVs has changed over this decade, evaluating range, energy efficiency, costs, and performance. Given the vehicle characteristics, this report estimates miles driven, electricity consumption, petroleum reduction, and greenhouse gas emissions attributable to electric vehicles. This report also explores vehicle manufacturing and battery production, considering supply chains from battery cells to assembly. Over 2.1 million PEVs have been sold in the United States through December 2021, with 1.3 million of these all fully-electric battery electric vehicles (BEV), and 800,000 plug-in hybrid electric vehicles (PHEV) which have the capability of using gasoline. The sales-weighted average range for BEVs reached 290 miles in 2021 and 28 miles for PHEVs. We estimate that electric vehicles have driven 68 billion miles on electricity since 2010, thereby reducing national gasoline consumption by 0.54% in 2021 and 2.5 billion gallons cumulatively through 2021. In 2021, PEVs used 6.1 terawatt-hours of electricity to drive 19.1 billion miles, offsetting 700 million gallons of gasoline. We find that this fuel switching reduced consumer fuel costs by $1.3 billion in 2021. Since 2010, 65% of PEVs sold in the United States have been assembled domestically, and over 110 gigawatt-hours of lithium-ion batteries have been installed in vehicles to date.

25 ENERGY STORAGE↗

Mechanisms Engineering Test Loop (METL) Experimenter's Guide

The Mechanisms Engineering Test Loop (METL) was built to streamline and accelerate the in-sodium testing of systems and components under conditions that simulate a sodium-cooled fast reactor pool environment. The METL team at Argonne National Laboratory (ANL) can assist experimenters in achieving their technical goals by providing liquid-metal expertise and access to infrastructure required for most alkali metal related research. This document offers a brief overview of METL and provides a basic design guide for researchers interested in conducting research at the facility. Additional information regarding the history and operations of METL can be found in §6.1. Furthermore, high resolution images found in this document as well as CAD files of aforementioned vessels can be provided upon request.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Advanced Manufacturing and Materials for Hydropower: Challenges and Opportunities

Hydropower is a well-established industry that has been largely contributing to the global generation of clean and renewable energy for more than a century. In the United States in 2021, it accounted for 30% of all renewable energy generation and 6.1% of the total energy portfolio. Hydropower technology and designs have been optimized throughout the years, but manufacturing of hydropower components still relies heavily on traditional methods and materials. Changes in global energy production systems and international supply chain issues are inspiring the manufacturing sector to reconsider their processes. Similarly, the hydropower industry is facing manufacturing challenges stemming from well-known maintenance issues, environmental impact mitigations, and changes in operations. These challenges, along with continued innovation in new hydropower and pumped storage development and modernization of the fleet, present an opportunity for advanced manufacturing and materials (AMM) to provide immense value to the hydropower industry. In support of the US Department of Energy’s (DOE’s) Water Power Technologies Office (WPTO), this report aims to characterize the current and emerging manufacturing-related challenges in US hydropower and to identify the high-impact opportunities in AMM that could address these challenges. The results highlighted in this report were collected through literature review, individual stakeholder interviews, and an in-person workshop organized at DOE’s Oak Ridge National Laboratory Manufacturing Demonstration Facility that brought together hydropower industry stakeholders, advanced manufacturing R&D, and the government.

13 HYDRO ENERGY↗

ProtoDUNE-SP's Performance, Physics status, and Future Plans

The ProtoDUNE-SP detector is a single-phase liquid argon time projection chamber measuring$ 7.2 \times 6.1 \times 7.0 m^3$ in active volume. It is designed as a test bed and full-scale prototype for the elements of the first far detector module of the Deep Underground Neutrino Experiment (DUNE). Located at the CERN Neutrino Platform, the detector was exposed to a tagged and momentum-analyzed particle beam with momentum settings ranging from 0.3 GeV/c to 7 GeV/c and collected more than four million beam events. Additionally, the detector operated for approximately two years, continuously collecting cosmic ray events. We present the performance of the detector which has met or surpassed the specifications set for the DUNE far detector. The status of physics analyses including hadron-Ar cross sections and measurements of liquid argon properties will be summarized. Talk will conclude with plans for the coming Run2 with ProtoDUNE-HD (horizontal drift).

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Ventilation: Fume Hoods Self-Study Course # 48002

This course presents an overview of the requirements and safe work practices for the use of engineered ventilation controls (EVCs) at Los Alamos National Laboratory (LANL). EVCs addressed in this manual include fume hoods, local exhaust ventilation (LEV) systems other than fume hoods, portable and in-place high-efficiency particulate air (HEPA) filtration systems. Requirements from LANL Procedure P101-16, Industrial Ventilation (non-HVACR) that address EVC certification and use, along with responsibilities of workers who use EVCs and the responsible line managers (RLMs) of such workers, are also presented. Per 101-16, 6.1, workers who use, maintain, or certify (i.e., inspect and test) fume hoods, or Persons in Charge (PICs) who oversee others in those tasks, must complete this course.

42 ENGINEERING↗

Residential Solar-Adopter Income and Demographic Trends: 2023 Update [Slides]

The report describes income, demographic, and other socio-economic trends among U.S. residential rooftop solar adopters. The report is based on address-level data for roughly 3.4 million residential rooftop solar systems installed through 2022, representing 86% of all U.S. systems. With its unique size, geographic scope, and level of detail, this report is intended to serve as a foundational reference document for policy-makers, industry stakeholders, and researchers. Key findings include the following: (1) Median solar adopter income was about $\$117$k/year in 2022, compared to a U.S. median of about $\$69$k/year for all households and $\$86$k/year for all owner-occupied households; (2) The degree of income skew varies significantly across all states, but all exhibit some positive income skew relative to all households in the state, with median solar-adopter incomes ranging from 108-180% of the respective state-median income for all households; (3) Roughly 45% of solar adopters in 2022 had incomes below 120% of their area median income (AMI), a threshold sometimes used to define “low-and-moderate income” (or LMI), while 23% were below 80% of AMI, often used to define “low-income”; (4) Solar adoption continues to shift toward less affluent households, with the median current income of solar adopters dropping from $\$140$k for households that installed systems in 2010 to $\$117$k in 2022; (5) PV systems installed in 2022 by households earning less than $50k had a median size of 6.1 kW, 34% were third-party owned, and 5% included battery storage, compared to corresponding values of 7.6%, 17%, and 15% for households earning more than 200 dollars k; and (6) Compared to all households in their respective state, solar adopters tend to be negligibly more rural; have higher home values; and are more likely to be college educated, identify as non-Hispanic white, live outside a disadvantaged community (DAC), be middle-aged, work in a business or financial occupation, and own a single-family home In conjunction with the report, Berkeley Lab has published an updated accompanying set of online data visualizations that allow users to further explore the underlying data. Berkeley Lab is also offering related analytical support to states, local agencies, and other organizations on issues related to solar adoption among low-to-moderate income households.

14 SOLAR ENERGY↗

Mechanisms Engineering Test Loop (METL) Experimenter's Guide - Revision 2

The Mechanisms Engineering Test Loop (METL) was built to streamline and accelerate the in-sodium testing of systems and components under conditions that simulate a sodium-cooled fast reactor pool environment. The METL team at Argonne National Laboratory (ANL) can assist experimenters in achieving their technical goals by providing liquid-metal expertise and access to infrastructure required for most alkali metal related research. This document offers a brief overview of METL and provides a basic design guide for researchers interested in conducting research at the facility. Additional information regarding the history and operations of METL can be found in §6.1. Furthermore, high resolution images found in this document as well as CAD files of aforementioned vessels can be provided upon request.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Evaluation of the Potential for Precipitation of Solids during Storage of Non-Aluminum SNF Solutions

Non-aluminum clad spent nuclear fuels (NASNF) stored in the L-Area basin will be dissolved in H-Canyon using the 6.3D electrolytic dissolver. The solutions will be stored in either the hot or warm canyon until the preparation of a sludge batch for the Defense Waste Processing Facility. Spent nuclear fuel solutions could be stored for 1-2 years before transfer to the H-Area Tank Farm depending on the interval between sludge batches. The solution level in the storage tanks will be maintained; therefore, precipitation of solids due to evaporation is not an issue. However, the precipitation of solids from completely dissolved SNF due to solution instabilities has been observed during intermediate storage of solutions generating hydrated oxides.The presence of fissile material in these solids is generally associated with zirconium molybdate, which is known to act as a host lattice for Pu and can carry the actinides upon precipitation. The formation of zirconium molybdate solids which carry fissile material is a potential concern for the storage of NASNF solutions. To address this concern, the Savannah River National Laboratory performed a literature review to identify knowledge gaps which may require experimental work to determine if the formation of solids is a concern during storage of these solutions. Based on the literature review, the precipitation of zirconium molybdate solids from the Campaign 1 NASNF solutions during intermediatestorage is expected. This conclusion is supported by the identification of zirconium molybdate solids found on the H-Canyon 6.1D Dissolver MK-12 insert spacer. The formation of the zirconium molybdate solids is attributed to hydrolysis and radiolytic processes in the nitric acid solution. As the molybdate solids form, U and Pu can substitute for Zr in the crystal lattice resulting in co-precipitation. Generally, the Pu substitutes directly into the crystal lattice during precipitation while the U associated with the molybdate solids more likely absorbs from the solution. The U in the NASNF solutions is present as uranyl nitrate, a 2+ cation which will not substitute as easily into the molybdate crystal lattice for the Zr 4+ ion.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Understanding Biases in Sample Preparation Techniques for Coupled Scanning Electron Microscopy and MAMA PuO 2 Morphological Analysis

In this project, the scanning electron microscopy (SEM) sampling method used during the statistical design study (SDS) was investigated to determine if any sampling biases were present in the analyzed data. Using standard particle size distribution powders from the National Institute of Standards and Technology (NIST 1984 standard reference material) with the origin wet dispersion method, it was determined that a bias to smaller particles was present. This was supported by theoretical calculations using Stokes’ law to determine the settling rate of spherical particles of roughly the same size and mass as those found in the SDS. Based on the theoretical calculations, it was determined that the settling rate for each of the 76 powder sets in the SDS could be unique based on specific particle shape and mass distributions, making a universal correction factor/formula not applicable. Therefore, priority shifted to developing an improved wet dispersion method that significantly reduced the particle settling rate for all particle size and shapes. This was achieved by replacing the original solvent (isopropyl alcohol) with a heavy liquid (lithium heteropolytungstates), which dramatically slowed the settling rate and allowed for the capture of a suitable homogeneous aliquot. SEM imaging and Morphological Analysis for Material Attribution (MAMA) software analysis were conducted on the NIST standard, and the SEM/MAMA data were compared to data captured by a dynamic image analysis particle size analyzer. The resulting data confirmed that the new wet dispersion method does indeed deliver an improved representative aliquot to the SEM stub. For instance, in the NIST certificate, the average particle size is ~17.1 µm ± 2.2 µm with a normal distribution. The initial wet dispersion method resulted in a drastically reduced average particle size of 6.1 µm in addition to a non-representative heavy bi-modal distribution whereas the improved LST wet dispersion method resulting in an average particle size that was much closer to the NIST certificate (12.7 µm) with a similar normal distribution. Although the improved method was still short of the NIST certificate average, atomic force microscopy analysis determined that the resulting ~20-25% reduction in size was due to particles sinking into the carbon sticky tape used for SEM imaging. It is believed that that this bias can be calibrated in a much more predicable manner than the original settling rate bias. In addition, the matching normal distribution curves between the NIST certificate and the heavy liquid method indicate a much-improved representative aliquot has been sampled and imaged. A surrogate CeO 2 powder was used to reflect PuO 2 more accurately and to aid in implementing radiological controls and shielding. The resulting data sets from the SEM/MAMA method and the particle size analyzer give almost identical average particle sizes and particle distribution statistics. Future work will re-analyze several select runs from the SDS to determine if morphological signatures can be found with the improved sampling method.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Seismicity in the Vicinity of Yucca Mountain, Nevada, for the Period October 1, 2003 to September 30, 2004

This report describes the seismicity and earthquake monitoring activities within the Yucca Mountain region during fiscal year 2004 (FY2004 - October 1, 2003, through September 30, 2004) based on operation of the Southern Great Basin Digital Seismic Network (SGBDSN). Network practices and earthquake monitoring conducted at the Nevada Seismological Laboratory (NSL) under DOE directives for prior fiscal years are covered in similar yearly reports (see references). Real-time systems, including regional data telemetry and data management at NSL, provide for the automatic determination of earthquake locations and magnitudes and notification of important earthquakes in the region to UNR staff and DOE management. All waveform and meta-data, including automatic locations, phase arrival information, and analyst reviewed information, are managed through a relational database system allowing quick and reliable evaluation and analysis of ongoing earthquake activity near Yucca Mountain. This network, which contains weak-motion and strong-motion instrumentation, addresses the seismic hazard of the Yucca Mountain area by providing accurate earthquake magnitudes for earthquake recurrence estimates, spatial hypocentral control to very low magnitudes for identifying and assessing active faults and verifying tectonic models, true ground motions over the complete range of expected earthquake amplitudes for developing predictive models, and earthquake source information for characterizing active faulting. The Nevada Seismological Laboratory operated a 30-station monitoring network within a ring of approximately 50 km radius around Yucca Mountain during FY2004. This year showed the second-lowest seismic moment rate in the NTS and Yucca Mountain region for any fiscal year reporting period since prior to the 1992 M 5.6 Little Skull Mountain (LSM) earthquake. A total of 2180 earthquakes were located for FY2004. The largest event during FY2004 was M 2.99 and there were only 12 earthquakes greater than M 2.00. This is the second year since the LSM event that no M ≥ 3.00 earthquake was recorded within 65 km of Yucca Mountain. (FY2003 was the first.) For FY2004, focal mechanisms were developed for 24 earthquakes. These focal mechanisms show predominantly strike-slip motion with a tension axis oriented WNW-ESE. Four earthquakes in FY2004 were within 10 km of Yucca Mountain, all having M < 0. A total of 31 earthquakes have occurred in this immediate zone around Yucca Mountain since the digital network operations started in October 1995. Activity in the Death Valley area was monitored by several analog stations still maintained in conjunction with the Yucca Mountain monitoring. There is continuing aftershock activity in the zone of the 1993 M 6.1 Eureka Valley and 1999 M 5.6 Scotty’s Junction earthquakes. Overall, the seismicity level of the Death Valley area is significantly greater than that in the vicinity of Yucca Mountain.

58 GEOSCIENCES↗

Quantifying the Behavioral Response of Spawning Chum Salmon to Elevated Discharges from Bonneville Dam, Columbia River : Annual Report 2005-2006.

In unimpounded rivers, Pacific salmon (Oncorhynchus spp.) typically spawn under relatively stable stream flows, with exceptions occurring during periodic precipitation events. In contrast, hydroelectric development has often resulted in an artificial hydrograph characterized by rapid changes in discharge and tailwater elevation that occur on a daily, or even an hourly basis, due to power generation (Cushman 1985; Moog 1993). Consequently, populations of Pacific salmon that are known to spawn in main-stem habitats below hydroelectric dams face the risks of changing habitat suitability, potential redd dewatering, and uncertain spawning success (Hamilton and Buell 1976; Chapman et al. 1986; Dauble et al. 1999; Garland et al. 2003; Connor and Pflug 2004; McMichael et al. 2005). Although the direct effects of a variable hydrograph, such as redd dewatering are apparent, specific effects on spawning behavior remain largely unexplored. Chum salmon (O. keta) that spawn below Bonneville Dam on the Columbia River are particularly vulnerable to the effects of water level fluctuations. Although chum salmon generally spawn in smaller tributaries (Johnson et al. 1997), many fish spawn in main-stem habitats below Bonneville Dam near Ives Island (Tomaro et al. 2007; Figure 1). The primary spawning area near Ives Island is shallow and sensitive to changes in water level caused by hydroelectric power generation at Bonneville Dam. In the past, fluctuating water levels have dewatered redds and changed the amount of available spawning habitat (Garland et al. 2003). To minimize these effects, fishery managers attempt to maintain a stable tailwater elevation at Bonneville Dam of 3.5 m (above mean sea level) during spawning, which ensures adequate water is provided to the primary chum salmon spawning area below the mouth of Hamilton Creek (Figure 1). Given the uncertainty of winter precipitation and water supply, this strategy has been effective at restricting spawning to a specific riverbed elevation and providing minimum spawning flows that have the greatest chance of being maintained through egg incubation and fry emergence. However, managing the lower Columbia River for a stable tailwater elevation does not provide much operational flexibility at Bonneville Dam, which has little storage capacity. When river discharges increase due to rain events, the traditional approach has been to pass excess water at night to maintain stable tailwater elevations during the daytime. The underlying assumption of this strategy, referred to as reverse load following, is that fish do not spawn at night. However, Tiffan et al. (2005) showed that this assumption is false by documenting nighttime spawning by chum salmon in the Ives Island area. Similarly, McMichael et al. (2005) reported nighttime spawning by Chinook salmon (O. tshawytscha) in the Columbia River, indicating that diel spawning may be a common occurrence in Pacific salmon. During the latter portion of the chum spawning period in December 2003 and 2004, discharges from Bonneville Dam increased from an average of 3,398 m3/s (tailwater elevation {approx} 3.5 m above mean sea level) during the day to over 5,664 m3/s (tailwater elevation {approx} 5.1 m) at night, with peak discharges of 7,080 m{sup 3}/s (tailwater elevation {approx} 6.1 m). This caused concern among fishery managers regarding the potential effects of these high discharges on this population of spawning chum salmon, which is listed under the Endangered Species Act (National Oceanic and Atmospheric Administration 1999). We hypothesized that increased water velocities associated with elevated tailwaters might alter chum salmon spawning behavior if water velocities at redd locations increased beyond the range of suitability (>0.8 m/s; Salo 1991). In 2005, we investigated the movement and behavioral responses of spawning chum salmon at Ives Island to increased tailwater elevations at Bonneville Dam. We used acoustic telemetry to determine if the higher velocities associated with increased tailwater elevations caused fish to leave their redds. We related the duration fish were away from redds and the distances moved to water velocities estimated from a two-dimensional hydrodynamic model. Finally, we described specific changes in spawning behavior (e.g., nest digging; swimming activity) during elevated-tailwater tests using a dual-frequency identification sonar (DIDSON).

13 HYDRO ENERGY↗

Measurement of the top quark mass in the dilepton final state using the matrix element method

The top quark, discovered in 1995 by the CDF and D0 experiments at the Fermilab Tevatron Collider, is the heaviest known fundamental particle. The precise knowledge of its mass yields important constraints on the mass of the yet-unobserved Higgs boson and allows to probe for physics beyond the Standard Model. The first measurement of the top quark mass in the dilepton channel with the Matrix Element method at the D0 experiment is presented. After a short description of the experimental environment and the reconstruction chain from hits in the detector to physical objects, a detailed review of the Matrix Element method is given. The Matrix Element method is based on the likelihood to observe a given event under the assumption of the quantity to be measured, e.g. the mass of the top quark. The method has undergone significant modifications and improvements compared to previous measurements in the lepton+jets channel: the two undetected neutrinos require a new reconstruction scheme for the four-momenta of the final state particles, the small event sample demands the modeling of additional jets in the signal likelihood, and a new likelihood is designed to account for the main source of background containing tauonic Z decay. The Matrix Element method is validated on Monte Carlo simulated events at the generator level. For the measurement, calibration curves are derived from events that are run through the full D0 detector simulation. The analysis makes use of the Run II data set recorded between April 2002 and May 2008 corresponding to an integrated luminosity of 2.8 fb -1 . A total of 107 t$\bar{t}$ candidate events with one electron and one muon in the final state are selected. Applying the Matrix Element method to this data set, the top quark mass is measured to be m top Run IIa = 170.6 ± 6.1(stat.) -1.5 +2.1 (syst.)GeV; m top Run IIb = 174.1 ± 4.4(stat.) -1.8 +2.5 (syst.)GeV; m top comb = 172.9 ± 3.6(stat.) ± 2.3(syst.)GeV. Systematic uncertainties are discussed, and the results are interpreted within the Standard Model of particle physics. As the main systematic uncertainty on the top quark mass comes from the knowledge of the absolute jet energy scale, studies for a simultaneous measurement of the top quark mass and the b jet energy scale are presented. The prospects that such a simultaneous determination offer for future measurements of the top quark mass are outlined.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

VERIFICATION OF THE DEFENSE WASTE PROCESSING FACILITY PROCESS DIGESTION METHOD FOR THE SLUDGE BATCH 6 QUALIFICATION SAMPLE

For each sludge batch that is processed in the Defense Waste Processing Facility (DWPF), the Savannah River National Laboratory (SRNL) confirms applicability of the digestion method to be used by the DWPF lab for elemental analysis of Sludge Receipt and Adjustment Tank (SRAT) receipt samples and SRAT product process control samples.1 DWPF SRAT samples are typically dissolved using a room temperature HF-HNO3 acid dissolution (i.e., DWPF Cold Chem (CC) Method, see DWPF Procedure SW4-15.201) and then analyzed by inductively coupled plasma - atomic emission spectroscopy (ICPAES). In addition to the CC method confirmation, the DWPF lab's mercury (Hg) digestion method was also evaluated for applicability to SB6 (see DWPF procedure 'Mercury System Operating Manual', Manual: SW4-15.204. Section 6.1, Revision 5, Effective date: 12-04-03). This report contains the results and comparison of data generated from performing the Aqua Regia (AR), Sodium Peroxide/Hydroxide Fusion (PF) and DWPF Cold Chem (CC) method digestion of Sludge Batch 6 (SB6) SRAT Receipt and SB6 SRAT Product samples. For validation of the DWPF lab's Hg method, only SRAT receipt material was used and compared to AR digestion results. The SB6 SRAT Receipt and SB6 SRAT Product samples were prepared in the SRNL Shielded Cells, and the SRAT Receipt material is representative of the sludge that constitutes the SB6 Batch or qualification composition. This is the sludge in Tank 51 that is to be transferred into Tank 40, which will contain the heel of Sludge Batch 5 (SB5), to form the SB6 Blend composition. In addition to the 16 elements currently measured by the DWPF, this report includes Hg and thorium (Th) data (Th comprising {approx}2.5 - 3 Wt% of the total solids in SRAT Receipt and SRAT Product, respectively) and provides specific details of ICP-AES analysis of Th. Thorium was found to interfere with the U 367.007 nm emission line, and an inter-element correction (IEC) had to be applied to U data, which is also discussed. The results for any one particular element should not be used in any way to identify the form or speciation of a particular element without support from XRD analysis or used to estimate ratios of compounds in the sludge.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗