Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scenario selection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Soil Moisture Data Assimilation in the NASA Land Information System for Local Modeling Applications and Improved Situational Awareness

As part of the NASA Soil Moisture Active Passive (SMAP) Early Adopter (EA) program, the NASA Shortterm Prediction Research and Transition (SPoRT) Center has implemented a data assimilation (DA) routine into the NASA Land Information System (LIS) for soil moisture retrievals from the European Space Agency's Soil Moisture Ocean Salinity (SMOS) satellite. The SMAP EA program promotes application‐driven research to provide a fundamental understanding of how SMAP data products will be used to improve decision‐making at operational agencies. SPoRT has partnered with select NOAA/NWS Weather Forecast Offices (WFOs) that use output from a real‐time regional configuration of LIS, without soil moisture DA, to initialize local numerical weather prediction (NWP) models and enhance situational awareness. Improvements to local NWP with the current LIS have been demonstrated; however, a better representation of the land surface through assimilation of SMOS (and eventually SMAP) retrievals is expected to lead to further model improvement, particularly during warm‐season months. SPoRT will collaborate with select WFOs to assess the impact of soil moisture DA on operational forecast situations. Assimilation of the legacy SMOS instrument data provides an opportunity to develop expertise in preparation for using SMAP data products shortly after the scheduled launch on 5 November 2014. SMOS contains a passive L‐band radiometer that is used to retrieve surface soil moisture at 35‐km resolution with an accuracy of 0.04 cu cm cm (exp -3). SMAP will feature a comparable passive L‐band instrument in conjunction with a 3‐km resolution active radar component of slightly degraded accuracy. A combined radar‐radiometer product will offer unprecedented global coverage of soil moisture at high spatial resolution (9 km) for hydrometeorological applications, balancing the resolution and accuracy of the active and passive instruments, respectively. The LIS software framework manages land surface model (LSM) simulations and includes an Ensemble Kalman Filter for conducting land surface DA. SPoRT has added a module to read, quality‐control and bias‐correct swaths of Level II SMOS soil moisture retrievals prior to assimilation within LIS. The impact of SMOS DA is being tested using the Noah LSM. Experiments are being conducted to examine the impacts of SMOS soil moisture DA on the resulting LISNoah fields and subsequent NWP simulations using the Weather Research and Forecasting (WRF) model initialized with LIS‐Noah output. LIS‐Noah soil moisture will be validated against in situ observations from Texas A&M's North American Soil Moisture Database to reveal the impact and possible improvement in soil moisture trends through DA. WRF model NWP case studies will test the impacts of DA on the simulated near‐surface and boundary‐layer environments, and precipitation during both quiescent and disturbed weather scenarios. Emphasis will be placed on cases with large analysis increments, especially due to contributions from regional irrigation patterns that are not represented by precipitation input in the baseline LIS‐Noah run. This poster presentation will describe the soil moisture DA methodology and highlight LIS‐Noah and WRF simulation results with and without assimilation.

Case, Jonathan L.↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

The HST quasar absorption line key project. 4: HST faint-object spectrograph and ground-based observations of the unusual low-redshift broad absorption-line quasi-stellar object PG 0043+039

Hubble Space Telescope Faint Object Spectrograph (HST FOS) observations have shown that the spectrum of the low-redshift (z(sub em) approximately equal to 0.384) QSO PG 0043+039 exhibits weak broad absorption lines (BALs). The BALs were discovered during the course of UV spectrophotometry made for the HST Quasar Absorption Line Key Project. The HST data are analyzed along with ground-based optical and IUE spectrophotometry. The object is found to have a number of atypical properties relative to normal non-BAL QSOs. The observed continuum is atypical in the sense that it is much weaker than that of a normal optically selected QSO at rest wavelengths approximately less than 2200 A. Intrinsic reddening of E(B-V) approximately equal to 0.11 mag by dust similar to that found in the SMC at the redshift of PG 0043+039 conservatively accounts for the observed continuum shape moderately well. These observed characteristics are typical of low-ionization BAL QSOs, but convincing evidence for BALs due to low-ionization transitions of Mg II, Al III, Al II, or C II does not exist. Therefore, this object may be a misaligned BAL QSO having many of the characteristics of low-ionization BAL QSOs with the sight line passing through a putative dusty region, but evidently missing clouds of high enough column density to produce observable low-ionization BALs. If the intrinsic dust-extinction model is correct, the observations suggest that the dust is not confined to the presumably higher density, low-ionization BAL clouds, but that it has drifted to nearby high-ionization BAL regions. We also consider other possible mechanisms for producing the shape of the continuous energy distribution which cannot be ruled out. We compare the Fe II emission in PG 0043+039 with that in another Key Project QSO, NGC 2841-UB 3, which has optical Fe II emission comparable in strength to that in PG 0043+039, but has anomalously weak UV Fe II emission. In addition, from an analysis of UV and optical spectrophotometric data at 5 epochs over approximately 11 yr, there is tentative evidence that PG 0043+039 has varied in brightness by as much as 1.1 mag during this time interval. Two different interpretations of PG 0043+039 and the low-ionization BAL QSOs are considered. Various model scenarios for explaining the weak narrow-line (O III) emission are considered, but there is no definitive explanation.

Turnshek, David A.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

X-Ray Absorbed, Broad-Lined, Red AGN and the Cosmic X-Ray Background

We have obtained XMM spectra for five red, 2MASS AGN, selected from a sample observed by Chandra to be X-ray bright and to cover a range of hardness ratios. Our results confirm the presence of substantial absorbing material in three sources which have optical classifications ranging from Type 1 to Type 2, with an intrinsically flat (hard) power law continuum indicated in the other two. The presence of both X-ray absorption and broad optical emission lines with the usual strength suggests either a small (nuclear) absorber or a favored viewing angle so as to cover the X-ray source but not the broad emission line region (BELR). A soft excess is detected in all three Type 1 sources. We speculate that this soft X-ray emission may arise in an extended region of ionized gas, perhaps linked with the polarized (scattered) light which is a feature of these sources. The spectral complexity revealed by XMM emphasizes the limitations of the low S/N Chandra data. Overall, the new XMM results strengthen our conclusions (Wilkes et al. 2002) that the observed X-ray continua of red AGN are unusually hard at energies greater than 2 keV. Whether due to substantial line-of-sight absorption or to an intrinsically hard or reflection-dominated spectrum, these 'red' AGN have an observed spectral form consistent with contributing significantly to the missing had absorbed population of the Cosmic X-ray Background (CXRB). When absorption and or reflection is taken into account, all these AGN have power law slopes typical of broad-line (Type 1) AGN (Gamma approximately 1.9). This appears to resolve the spectral paradox which for so long has existed between the CXRB and the AGN thought to be the dominant contributors. It also suggests two scenarios whereby Type 1 AGN/QSOs may be responsible for a significant fraction of the CXRB at energies above 2 keV: 1) X-ray absorbed AGN/QSOs with visible broad emission lines; 2) AGN/QSOs with complex spectra whose hardness greater than 2 keV is not detectable in the typically low S/N data of X-ray surveys. Even if absorption is present in only half of the population, the large number of 'red' AGN suggests a development of unification models, where the continuum source is surrounded, over a substantial solid angle, by the wind or atmosphere of an accretion disk/torus. X-ray observations of such AGN not only provide a check on the presence of absorption, but also a unique probe of the absorbing material. Improved information on their space density, in particular as a function of redshift, will soon be provided by Spitzer-Chandra wide area surveys, allowing better estimates of both the importance of red AGN to the full AGN population and their contribution to the CXRB.

Mushotzky, Richard↗

Autonomous Lunar PNT Simulator (ALPS)

In this paper we present a simulation tool that has been used to develop an architecture for a low-cost Position, Navigation and Time (PNT) system to provide PNT services on and around the Moon using non-dedicated low-cost orbital and ground assets. The simulation tool has been developed to be flexible and is capable of modeling and analyzing the many different capabilities and configurations that the non-dedicated assets could support. The tool models the creation of an ad hoc swarm, the localization of this swarm and the subsequent provision of PNT services from this swarm. We present results from several studies of select configurations chosen to reflect existing and future real-world needs and capabilities. Over the next few decades there is expected to be a substantial increase in Lunar missions supporting and inspired by NASA’s Artemis Program. It is expected that a large fraction of these missions will be low cost, utilizing rideshares and CubeSats, just as has seen in Earth orbit over the past decade. Many of these missions will need navigation capabilities but may be unable to support the large power, mass and weight that a weak GNSS or DSN based navigation solution would entail. As Lunar PNT service demand is not likely to be needed over the entire lunar surface 24/7, the creation of a dedicated Lunar GNSS constellation cannot be justified. Hence, our proposed architecture envisions utilizing existing Lunar science and exploration assets to create ad hoc and on demand Lunar PNT swarms capable of providing PNT services to low cost missions. The simulation reflects the two distinct parts of the architecture: the creation of a Lunar PNT swarm using non-dedicated existing assets, and the quantitative modeling of the quality of the PNT services that this swarm provides. To support the former, the simulation supports various swarm localization techniques, including centralized and distributed EKFs both of which support pluggable dynamics models. In modeling the PNT service performance the simulation adopts standard techniques from the GNSS community, including providing degree of precision (DOP) estimates for theoretical end users. Crucially, all asset capabilities, including clock accuracy, independent location self-knowledge and timing measurement precision can be set independently for each asset, reflecting the key concept of utilizing non-dedicated assets. The simulation is predominantly implemented in MATLAB, with GMAT being used for the propagation of orbital assets. The paper will present results from the simulation reflecting the tool’s flexibility and focusing on scenarios that match real-world proposed missions, including scenarios designed to provide PNT support to lunar surface missions similar to NASA Ames' forthcoming VIPER mission. The performance of centralized and decentralized swarm configuration and localization techniques will be compared. Finally, performance of the PNT service provided by an autonomous Lunar PNT swarm will be compared to existing radiometric and weak GNSS methods.

Kelley Elizabeth Hashemi↗

Modular Growth NTR Space Transportation System for Future NASA Human Lunar, NEA and Mars Exploration Missions

The nuclear thermal rocket (NTR) is a proven, high thrust propulsion technology that has twice the specific impulse (I(sub sp) approx.900 s) of today's best chemical rockets. During the Rover and NERVA (Nuclear Engine for Rocket Vehicle Applications) programs, twenty rocket reactors were designed, built and ground tested. These tests demonstrated: (1) a wide range of thrust; (2) high temperature carbide-based nuclear fuel; (3) sustained engine operation; (4) accumulated lifetime; and (5) restart capability - everything required for affordable human missions beyond LEO. In NASA's recent Mars Design Reference Architecture (DRA) 5.0 study, the NTR was selected as the preferred propulsion option because of its proven technology, higher performance, lower IMLEO, versatile vehicle design, and growth potential. Furthermore, the NTR requires no large technology scale-ups since the smallest engine tested during the Rover program - the 25 klb(sub f) "Pewee" engine is sufficient for human Mars missions when used in a clustered engine configuration. The "Copernicus" crewed Mars transfer vehicle developed for DRA 5.0 was an expendable design sized for fast-conjunction, long surface stay Mars missions. It therefore has significant propellant capacity allowing a reusable "1-year" round trip human mission to a large, high energy near Earth asteroid (NEA) like Apophis in 2028. Using a "split mission" approach, Copernicus and its two key elements - a common propulsion stage and integrated "saddle truss" and LH2 drop tank assembly - configured as an Earth Return Vehicle / propellant tanker, can also support a short round trip (approx.18 month) / short orbital stay (60 days) Mars reconnaissance mission in the early 2030's before a landing is attempted. The same short stay orbital mission can be performed with an "all-up" vehicle by adding an "in-line" LH2 tank to Copernicus to supply the extra propellant needed for this higher energy, opposition-class mission. To transition to a reusable Mars architecture, Copernicus' saddle truss / drop tank assembly is replaced by an in-line tank and "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. Shorter "1-way" transit time fast-conjunction Mars missions are another possibility using this vehicle configuration but, as with reusability, increased launch mass is required. "Scaled down" versions of Copernicus (sized to a SLS lift capability of approx.70 t - 100 t) can be developed initially allowing reusable lunar cargo delivery and crewed landing missions, easy NEA missions (e.g., 2000 SG344 also in 2028) or an expendable mission to Apophis. Mission scenario descriptions, key vehicle features and operational characteristics are provided along with a brief discussion of NASA's current activities and its "pre-decisional" plans for future NTR development.

Borowski, Stanley K.↗

Conventional and Bimodal Nuclear Thermal Rocket (NTR) Artificial Gravity Mars Transfer Vehicle Concepts

A variety of countermeasures have been developed to address the debilitating physiological effects of "zero-gravity" (0-g) experienced by cosmonauts and astronauts during their approximately 0.5-1.2 year long stays in LEO (Low Earth Orbit). Longer interplanetary flights, combined with possible prolonged stays in Mars orbit, could subject crewmembers to up to approximately 2.5 years of weightlessness. In view of known and recently diagnosed problems associated with 0-g, an artificial gravity spacecraft offers many advantages and may indeed be an enabling technology for human flights to Mars. A number of important human factors must be taken into account in selecting the rotation radius, rotation rate, and orientation of the habitation module or modules. These factors include the gravity gradient effect, radial and tangential Coriolis forces, along with cross-coupled acceleration effects. Artificial gravity (AG) Mars transfer vehicle (MTV) concepts are presented that utilize both conventional NTR, as well as, enhanced "bimodal" nuclear thermal rocket (BNTR) propulsion. The NTR is a proven technology that generates high thrust and has a specific impulse (I (sub sp)) capability of approximately 900 s - twice that of today's best chemical rockets. The AG/MTV concepts using conventional NTP carry twin cylindrical "ISS-type" habitation modules with their long axes oriented either perpendicular or parallel to the longitudinal spin axis of the MTV and utilize photovoltaic arrays (PVAs) for spacecraft power. The twin habitat modules are connected to a central operations hub located at the front of the MTV via two pressurized tunnels that provide the rotation radius for the habitat modules. For the BNTR AG/MTV option, each engine has its own "closed" secondary helium-xenon gas loop and Brayton rotating unit that can generate tens of kilowatts (kW (sub e)) of spacecraft electrical power during the mission coast phase eliminating the need for large PVAs. A single inflatable "TransHab-type" habitation module is also used with multiple vertical floors oriented radial to the MTV spin axis. The BNTR MTV's geometry - long and linear - is naturally compatible with AG operation. By rotating the vehicle about its center-of-mass and perpendicular to its flight vector at approximately 3.0 - 5.2 rpm, a centrifugal force and AG environment corresponding to approximately 0.38 - 1.0 g can be established to help maintain crew fitness out to Mars and back. Vehicles using NTP/BNTP can more readily accommodate the heavier payload mass and increased RCS propellant loading associated with AG operation, and can travel faster to and from Mars thereby reducing the crew's exposure to galactic cosmic radiation and solar flares. Mission scenario descriptions, key vehicle features and operational characteristics for each propulsion options are presented using the lift capability and payload volumes estimated for the SLS-1A and HLV.

Nuclear Propulsion↗

Conventional and Bimodal Nuclear Thermal Rocket (NTR) Artificial Gravity Mars Transfer Vehicle Concepts

A variety of countermeasures have been developed to address the debilitating physiological effects of zero-gravity (0-g) experienced by cosmonauts and astronauts during their approximately 0.5 to 1.2 year long stays in low Earth orbit (LEO). Longer interplanetary flights, combined with possible prolonged stays in Mars orbit, could subject crewmembers to up to approximately 2.5 years of weightlessness. In view of known and recently diagnosed problems associated with 0-g, an artificial gravity (AG) spacecraft offers many advantages and may indeed be an enabling technology for human flights to Mars. A number of important human factors must be taken into account in selecting the rotation radius, rotation rate, and orientation of the habitation module or modules. These factors include the gravity gradient effect, radial and tangential Coriolis forces, along with cross-coupled acceleration effects. Artificial gravity Mars transfer vehicle (MTV) concepts are presented that utilize both conventional NTR, as well as, enhanced bimodal nuclear thermal rocket (BNTR) propulsion. The NTR is a proven technology that generates high thrust and has a specific impulse (Isp) capability of approximately 900 s-twice that of today's best chemical rockets. The AG/MTV concepts using conventional Nuclear Thermal Propulsion (NTP) carry twin cylindrical International Space Station (ISS)- type habitation modules with their long axes oriented either perpendicular or parallel to the longitudinal spin axis of the MTV and utilize photovoltaic arrays (PVAs) for spacecraft power. The twin habitat modules are connected to a central operations hub located at the front of the MTV via two pressurized tunnels that provide the rotation radius for the habitat modules. For the BNTR AG/MTV option, each engine has its own closed secondary helium(He)-xenon (Xe) gas loop and Brayton Rotating Unit (BRU) that can generate 10s of kilowatts (kWe) of spacecraft electrical power during the mission coast phase eliminating the need for large PVAs. A single inflatable TransHab-type habitation module is also used with multiple vertical floors oriented radial to the MTV spin axis. The BNTR MTV's geometry-long and linear-is naturally compatible with AG operation. By rotating the vehicle about its center-of-mass (CM) and perpendicular to its flight vector at approximately 3.0 to 5.2 rpm, a centrifugal force and AG environment corresponding to approximately 0.38 to 1.0 g can be established to help maintain crew fitness out to Mars and back. Vehicles using NTP/ Bimodal Nuclear Thermal Propulsion (BNTP) can more readily accommodate the heavier payload mass and increased RCS propellant loading associated with AG operation, and can travel faster to and from Mars thereby reducing the crew's exposure to galactic cosmic radiation and solar flares. Mission scenario descriptions, key vehicle features and operational characteristics for each propulsion option are presented using the lift capability and payload volumes estimated for the Space Launch System (SLS)-1B and followon Heavy Lift Vehicle (HLV).

Nuclear Propulsion↗

Computing Proximity to Threat Along Uncertain Trajectory to Support Urban Air Mobility

Many airspace threats affect the selection of a flight route, such as terrain, physical obstacles, adverse weather, and special-use airspace, among others. Threat avoidance during Urban Air Mobility (UAM) and Low Altitude Mobility (LAM) flights is especially challenging due to their lower cruising altitudes. These operations may be exposed to buildings, towers, trees, terrain undulations, etc., along much of their flight route. Moreover, these low-altitude flights in urban environments are expected to encounter very busy airspace, increasing the workload associated with threat avoidance. The Proximity to Threat (PtT) function aims to support onboard or remote pilots by computing the risk from geospatial threats in the airspace along an aircraft’s flight path. The threats are both static entities and dynamic airspace restrictions that have been modeled and stored in geo-referenced mapping databases. The flight path may be specified by waypoints, airways, or similar discrete route elements or by a time series of closely spaced position and altitude points. Flight path uncertainty can also be taken into account by assuming both the position and altitude to be sampled from two normal distributions, each being specified by a mean and variance. PtT uses this additional information to verify that the flight path remains clear of threats along a wider path or if a position is reached earlier or later than anticipated, assuring the pilot or operator that there will be an available safety margin even if the aircraft deviates due to one or more occurrences of unexpected wind gusts, mechanical failures, airspeed changes, collision avoidance maneuvers, etc. The client can specify an uncertainty confidence level to bound the set of trajectories evaluated for threats so that the confidence level corresponds to the client’s risk tolerance under the expected conditions. PtT can be used as a pre-flight planning tool to determine a safe route through known threats and in-flight to avoid emerging or changing threats. In this report, we present the PtT function, discuss how the trajectory uncertainty is incorporated into the PtT function, and describe the use of this PtT function in a representative scenario.

urban air mobility↗

Analysis of Sample Acquisition Dynamics Using Discrete Element Method

The analysis presented in this paper is conducted in the framework of the Ocean Worlds Autonomy Testbed for Exploration Research and Simulation (OceanWATERS) project, currently under development at NASA Ames Research Center. OceanWATERS aims at designing a simulation environment which allows for testing autonomy of scientific lander missions to the icy moons of our solar system. Mainly focused on reproducing the end effector interaction with the inherent terrain, this paper introduces a novel discrete element method (DEM)-based approach to determine forces and torques acting on the lander’s scoop during the sample acquisition process. An accurate force feedback from the terrain on the scoop is required by fault-detection and autonomous decision-making algorithms to identify when the requested torque on the robotic arm’s joints exceeds the maximum available torque. Knowledge of the terrain force feedback significantly helps evaluating the arm’s links structural properties and properly selecting actuators for the joints. Models available in literature constitute a partial representation of the dynamics of the interaction. As an example, Balovnev derived an analytical expression of the vertical and horizontal force acting on a bucket while collecting a sample as a function of its geometry and velocity, soil parameters and reached depth. Although the model represents an adequate approximation of the two force components, it ignores the direction orthogonal to the scoop motion and neglects the torque. This work relies on DEM analysis to compensate for analytical models’ deficiencies and inaccuracies, i. e. provide force and torque 3D vectors, defined in the moving reference (body) frame attached to the scoop, at each instant of the sample collection process. Results from the first presented analysis relate to the specific OceanWATERS sampling strategy, which consists of collecting the sample through five consecutive passes with increasing depth, each pass following the same circularlinear- circular trajectory. Data is collected given a specific scoop design interacting with two types of bulk materials, which may characterize the surface of icy planetary bodies: snow and ice. Although specifically concerned with the OceanWATERS design, this first analysis provides the expected force trends for similar sampling strategies and allows to deduce phenomenological information about the general scooping process. In order to further instruct the community on the use of DEM tools as a solution to the sampling collection problem, two more analyses have been carried out, mainly focused on reducing the DEM computation time, which increases with a decrease in particle size. After running a set of identical simulations, where the only changing parameter is the size of the spherical particle, it is observed that the resulting force trajectories, starting from a given particle size, converge to the true trend. It is deducible that a further decrease in size yields negligible improvements in the accuracy, while it sensibly increases computation time. A final analysis aims at discussing limitations of approximating bulk material particles having a complex shape, e. g. ice fragments, with spheres, by comparing force trends resulting in the two cases for the same simulation scenario.

Catanoso, Damiana↗

NASA Ares I Launch Vehicle First Stage Roll Control System Cold Flow Development Test Program Overview

The Ares I launch vehicle is the selected design, chosen to return humans to the moon, Mars, and beyond. It is configured in two inline stages: the First Stage is a Space Shuttle derived five-segment Solid Rocket Booster and the Upper Stage is powered by a Saturn V derived J-2X engine. During launch, roll control for the First Stage (FS) is handled by a dedicated Roll Control System (RoCS) located on the connecting Interstage. That system will provide the Ares I with the ability to counteract induced roll torque while any induced yaw or pitch moments are handled by vectoring of the booster nozzle. This paper provides an overview of NASA s Ares I FS RoCS cold flow development test program including detailed test objectives, types of tests run to meet those objectives, an overview of the results, and applicable lessons learned. The test article was built and tested at the NASA Marshall Space Flight Center in Huntsville, AL. The FS RoCS System Development Test Article (SDTA) is a full scale, flight representative water flow test article whose primary objective was to obtain fluid system performance data to evaluate integrated system level performance characteristics and verify analytical models. Development testing and model correlation was deemed necessary as there is little historical precedent for similar large flow, pulsing systems such as the FS RoCS. The cold flow development test program consisted of flight-similar tanks, pressure regulators, and thruster valves, as well as plumbing simulating flight geometries, combined with other facility grade components and structure. Orifices downstream of the thruster valves were used to simulate the pressure drop through the thrusters. Additional primary objectives of this test program were to: evaluate system surge pressure (waterhammer) characteristics due to thruster valve operation over a range of mission duty cycles at various feed system pressures, evaluate temperature transients and heat transfer in the pressurization system, including regulator blowdown and propellant ullage performance, measure system pressure drops for comparison to analysis of tubing and components, and validate system activation and re-activation procedures for the helium pressurant system. Secondary objectives included: validating system processes for loading, unloading, and purging, validating procedures and system response for multiple failure scenarios, including relief valve operation, and evaluating system performance for contingency scenarios. The test results of the cold flow development test program are essential in validating the performance and interaction of the Roll Control System and anchoring analysis tools and results to a Critical Design Review level of fidelity.

Butt, Adam↗

Predicting Airport Runway Configurations for Decision-Support Using Supervised Learning

One of the most challenging tasks for air traffic controllers is runway configuration management (RCM). It deals with the optimal selection of runways to operate on (for arrivals and departures) based on traffic, surface wind speed, wind direction, other environmental variables, noise constraints, and several other airport-specific factors. It affects the efficiency of the National Airspace System (NAS) and both surface and airspace operations can benefit from better understanding future runway configurations. In this paper, we present a comprehensive implementation of predictive models for runway configuration estimation from large volumes of historical data. Specifically, operational data from two full years (2018 and 2019) is collected, analyzed, and fused together to build the data product used in this work. The data set differs from prior work in the field in terms of its scope, resolution, and variety of factors collected and considered. Meteorological data is collected from two different sources – current weather conditions from METAR (Meteorological Terminal Aviation Routine Weather Report) and forecast weather conditions from Localized Aviation MOS Program (LAMP). Operational data from the Federal Aviation Administration (FAA) Aviation System Performance Metrics (ASPM) related to scheduled and actual number of arrivals and departures, average taxi times, etc. are collected. NASA’s Sherlock Data Warehouse is used to identify critical information such as go-arounds, and other events that might impact RCM decision-making. All data is collected and aggregated over 15-minute intervals throughout the two years. This provides a resolution like the timescales that might be necessary for runway configuration management decision-making. A variety of supervised learning algorithms are tested including Support Vector Machine, Random Forest, Gradient Boosting, etc. including tuning of the model hyperparameters. The modeling process is applied and presented on two representative U.S. airports – Charlotte Douglas International Airport (KCLT) and Denver International Airport (KDEN). The two airports present different levels of complexity in terms of the total number of configurations used and provide a balanced perspective on the generalizability of the developed approach to other airports in the NAS. Initial results are promising (F1 score of 0.91 at KCLT and 0.83 at KDEN) for data in the test set. The final paper will contain a comprehensive comparison between different models and model building strategies as well as further refined results. Most important predictors for each airport will be identified along with a discussion and recommendations on adapting the framework to other scenarios.

Tejas G Puranik↗

Exploring the Science Trade Space with the JPL Innovation Foundry A-Team

The JPL Innovation Foundry has established a new approach for exploring, developing, and evaluating early concepts with a group called the Architecture Team (A-Team). The A-Team combines innovative collaborative methods and facilitated sessions with subject matter experts and analysis tools to help mature mission concepts. Science, implementation, and programmatic elements are all considered during an ATeam study. In these studies, Concept Maturity Levels (CML) are used to group methods. These levels include idea generation and capture (CML 1), initial feasibility assessment (CML 2), and trade space exploration (CML 3). Methods used for exploring the science objectives, feasibility, and scope will be described including use of a new technique for understanding the most compelling science, called a Science Return Diagram (SRD). In the process of developing the SRD, gradients in the science trade space are uncovered along with their implications for implementation and mission architecture. Special attention is paid towards developing complete investigations, establishing a series of logical claims that lead to the natural selection of a measurement approach. Over 20 science-focused A-Team studies have used these techniques to help science teams refine their mission objectives, make implementation decisions and reveal the mission concept’s most compelling science. This paper will describe the A-Team process for exploring the mission concept's science trade space and the Science Return Diagram technique.In June of 2011 a new collaborative engineering approach forearly concept formulation began in the JPL InnovationFoundry [1], six months later becoming the “A-Team” [2].Responding to a need for exploring mission architecturelevel trades [3], the A-Team precedes Team X [4,5] in asequence of concurrent engineering teams at JPL that can beused to mature a concept from a “cocktail napkin” level ideato a complete mission point design. The A-Team efficientlyexplores the science, implementation, and programmatictrade space in early concept formulation. Small, facilitatedgroups of experts generate innovative ideas, quantitativelyassess feasibility, and discover key sensitivities in the tradespace through collaborative analysis and use of advancedmethods and tools. The A-Team process builds off theexperience within JPL and other recent approaches to earlyconcept formulation [6] including best practices of the JPLInnovation Foundry, Project Systems Engineering &Formulation Section, Team Eureka and the Rapid MissionArchitecture Team[7].The A-Team is a focal point for innovative formulationapproaches and people within JPL. It relies on a largebackground of study resources, creative thinkers and “greybeard” scrutinizers, advanced tools, and subject matterexperts with both breadth and depth in experience andexpertise that are all available at JPL. The A-Team isdesigned to be a rapid and efficient process takingapproximately 6 weeks (the entire process can be as short asjust a few days or as long as up to three months) and costingthe equivalent of a work-month of a full-time employee orless. Studies begin with detailed planning and client reviewfollowed by study sessions, analysis work, and reporting.The staffing on each study is customized to the study goalsand objectives, and it is addressed early in the A-Teamprocess. Sessions are generally half-day or whole-day eventsand conducted over a series of days with focused agendas thatare moderated by a trained facilitator. Preliminary results andknowledge capture are available within hours of each session,and a final report is generally available two weeks later.One of the biggest challenges facing early conceptdevelopment is understanding the gradient in science returnversus various available mission scenarios and payload options. Often times, major areas of scientific inquiry havealready been prioritized by science groups, including throughthe National Research Council’s Decadal Studies inAstronomy, Planetary, and Earth Science. Yet science teamscontinue to struggle, especially in competitive missionsolicitations, to capture the right amount of scope that’sachievable within the cost constraints of the opportunity.Often the desire to completely and comprehensively study ascience area in just one mission (after all, true missionopportunities are rare) drives teams to take on too much,providing requirements that are unachievable within theresources of the opportunity without inducing unacceptableimplementation risk. Alternatively, science teams can seekto reduce risk by using an established instrument, but havenot thought through the traceability and key aspects of thescience question to justify its use. Both scenarios lead to badassumptions at the beginning of the concept development thatcan then ripple through implementation option choices,potentially preventing what would have been a good scienceinvestigation from being selected.The purpose of this paper is first to provide some additionalbackground and summary of the A-Team process, tools,people, and facilities. We then focus on the A-Teammethodology for overcoming the barriers of defining thescience scope well at the early concept development stage.This includes understanding the science story andtraceability, and then examining the gradient in science returnversus key characteristics of observables, developing theright payload and mission requirement specification throughexamining the science and implementation trade space.

Ziemer, John K.↗

Nuclear Thermal Propulsion (NTP): A Proven, Growth Technology for Fast Transit Human Missions to Mars

The "fast conjunction" long surface stay mission option was selected for NASA's recent Mars Design Reference Architecture (DRA) 5.0 study because it provided adequate time at Mars (approx. 540 days) for the crew to explore the planet's geological diversity while also reducing the "1-way" transit times to and from Mars to approx. 6 months. Short transit times are desirable in order to reduce the debilitating physiological effects on the human body that can result from prolonged exposure to the zero-gravity (0-gE) and radiation environments of space. Recent measurements from the RAD detector attached to the Curiosity rover indicate that astronauts would receive a radiation dose of approx. 0.66 Sv (approx. 66 rem)-the limiting value established by NASA-during their 1-year journey in deep space. Proven nuclear thermal rocket (NTR) technology, with its high thrust and high specific impulse (Isp approx. 900 s), can cut 1-way transit times by as much as 50 percent by increasing the propellant capacity of the Mars transfer vehicle (MTV). No large technology scale-ups in engine size are required for these short transit missions either since the smallest engine tested during the Rover program-the 25 klbf "Pewee" engine is sufficient when used in a clustered arrangement of three to four engines. The "Copernicus" crewed MTV developed for DRA 5.0 is a 0-gE design consisting of three basic components: (1) the NTP stage (NTPS); (2) the crewed payload element; and (3) an integrated "saddle truss" and LH2 propellant drop tank assembly that connects the two elements. With a propellant capacity of approx. 190 t, Copernicus can support 1-way transit times ranging from approx. 150 to 220 days over the 15-year synodic cycle. The paper examines the impact on vehicle design of decreasing transit times for the 2033 mission opportunity. With a fourth "upgraded" SLS/HLV launch, an "in-line" LH2 tank element can be added to Copernicus allowing 1-way transit times of 130 days. To achieve 100 to 120 day transit times, Copernicus' saddle truss/drop tank assembly is replaced by a "star truss" assembly with paired modular drop tanks to further increase the vehicle's propellant capacity. The HLV launch count increases (from approx. 5 to 7) and a fourth engine is needed to reduce total mission burn time and gravity losses. Using a "split mission" approach, the NTPS, in-line tank and the saddle truss/LH2 drop tank elements can be configured as a pre-deployed Earth Return Vehicle/propellant tanker supporting 90-day crewed mission transits. The split mission approach also eliminates the need for on-orbit assembly. Mission scenario descriptions, key features and operational characteristics for five different vehicle configurations are presented.

Borowski, Stanley K.↗

The Utilization Profiles of the CCSDS Unified Space Link Protocol (USLP)

The purpose of this paper is to identify the utilization profiles for interfacing the Data Protocol Sublayer using the Unified Space Link Protocols (USLP) (reference 1) with the space link coding procedures as specified in the CCSDS Coding & Synchronization Blue Books (references 2 through 5), used in both telecommand and telemetry applications. This paper describes how the USLP Protocol utilizes the coding and synchronization sublayer to support: a. Direct to Earth (DTE) telemetry links for engineering and science data b. Direct to Earth (DTE) telemetry links for very high rate science data c. Direct from Earth (DFE) command, sequencing and flight software loads d. Space to Space Links (Proximity) utilized by orbiters for data exchange to/from surface bound assets. The CCSDS has divided the functions of the Data Link Layer into two sublayers: the Data Link Protocol Sublayer (DLP-SL) and the Coding and Synchronization Sublayer (CS-SL). The Data Link Protocol Sublayer (DLP-SL) interfaces to the users, accepting the data that is to be transported, on the sending side of the link, and delivering that data on the receiving end. The Transfer Frame is the data unit that is transferred across the Data Link Protocol Sublayer and the Coding and Synchronization Sublayer boundary. The Coding and Synchronization Sublayer (CS-SL) provides the encoding, randomization, and frame synchronization functions that prepares the USLP Transfer Frame for transport across the space link. The CS-SL is divided into 2 processes: 1) The Frame Interface Processes (FIP) performs the interface functions required to prepare the data for delivery to the Coding/Decoding Process (CDP). This process includes prepending a Frame Start Marker to the provided frame, when management has designated that the frame is not to be aligned to the codeblock or when there is no block code used. 2) The Coding/Decoding Process (CDP) performs the forward error correction processes that are used to optimize the performance of the link and minimize the error rate. The CDP creates the symbol stream that is delivered to the Physical Layer. The transfer of the USLP transfer frames across different types of space links is the focus of this paper. The Protocol Data Unit (PDU) that is passed in both directions between the Data Link Protocol Sublayer (DLP-SL) and Coding and Synchronization Sublayer (CS-SL) is the transfer frame. The USLP frame structure provides flexibility that can be constrained by the functions utilized within the CS-SL that prepare the transfer frame for transit. For example, the USLP transfer frame contains a length field that enables the frame to be of variable length but CS-SL under certain conditions may constrain the frame to be fixed in length. This paper describes 5 operational modes available for use by the Data Link Layer to provide data exchange across the USLP space link. These modes are different because different operational requirements apply to vastly different types of space links and thus the communications implementation requirements differ. The environmental issues include the power or energy available, the distance between the end points of the link, the complexity of the equipment available at those end points, the atmospheric conditions and radiometric frequency selection. The CS-SL utilizes different forward error correcting codes supported by specific operational modes to configure the data for transit. This paper describes all of the operational modes in a series of data models which decompose the functionality between the Data Link Protocol Sublayer and the Coding and Synchronization sublayer. The operational modes described are: 1. Uncoded Mode: has been used for short links that contain significant available power to provide an acceptable frame error rate. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 2. Convolutional Only Mode: is currently the prime forward error correction coding used for the proximity links. The frames in this mode can be variable in length and typically use an error detection algorithm (i.e., CRC) to determine if there are errors in the received frame. 3. Variable Length Frame Aligned to Variable Length Codeblock (TC): is used for Direct from Earth links were power levels are high and the simple, least complex code i.e., the BCH code is used. This mode has been in use since the early 1970s. The BCH code is a short code and the decoder is easy to implement. 4. Fixed Length Frame Aligned to Fixed Length Codeblock (AOS/TM): was introduced when the concatenated Convolutional and Reed-Solomon Code was formulated to provide significant reduction in link data error rate and the ability to determine if there was an error in the decoded codeblock. The frame is aligned to the codeblock so that there is a one to one relationship of frame errors to codeblock errors without additional error detection coding being added. This mode requires the protocol frames to be the exact size of the message portion of the codeblock. 5. Frames Unaligned to Fixed Length Codeblocks (Currently used for very high rates and space to space links): This mode is currently used for missions that have a very high data rate that can be controlled adaptively as the environment changes and as the next generation operating mode for the proximity link. This mode from a coded data stream point of view is exactly like that described in 4. above, except that the frame need not be aligned to the codeblock. There is no requirement on frame length when using this mode. Thus when using USLP it can be used to support links that require short or long frames. There is also no mandatory requirement that frames cannot be separated by idle data reducing the tight data rate connection requirements between the data link protocol sublayer and the coding & synchronization sublayer. In conclusion, how these operational modes can be put to use in mission operational scenarios is described for Direct from Earth links (DFE), Direct to Earth links (DTE), and Proximity links.

Greenberg, E.↗

LunaNet Position, Navigation, and Timing Services and Signal, Enabling the Future of Lunar Exploration

The International Space Exploration Coordination Group established in 2018 the 3rd edition of the Global Exploration Roadmap (ISECG, 2018) that aims to achieve Mars human surface activities and identifies the exploration of the Moon as a critical intermediate step. A supplement covering updates on surface exploration scenarios was released in 2020 (ISECG, 2020). The Artemis Accords (NASA Artemis, 2020), first signed in October 2020, now includes over two dozen nations, in an agreement on the principles for best practices, including interoperability. September 2022 introduced the National Aeronautics and Space Administration’s (NASA) Moon to Mars Objectives highlighting recurring tenets of collaboration with international and industry partners and interoperability, along with infrastructure objectives for Position, Navigation, and Timing (PNT). The successful Artemis 1 mission paved the way to the ambitious plans to establish a sustainable human presence on the Moon. Just a few months after Artemis 1 launch (NASA, 2022), iSpace HAKUTO-R Mission1 (iSpace, 2022) launched, being the first-ever commercial mission, launched by a commercial launch service provider, aiming to land on the lunar surface. The NASA Artemis programme plans initial crewed landings and traverses in 2025, supported by the Lunar Gateway, followed by regular launches to build the lunar systems (NASA Artemis Plan, 2020), (NASA, 2022). NASA’s contracts with Commercial Lunar Payload Services (CLPS, (NASA, n.d.)) to deliver science and technology to the Moon, with launches starting in November 2023. The European Space Agency (ESA) Argonaut (ESA Argonaut, 2022) programme plans to have recurrent missions to bring payloads to the lunar surface, supporting lunar exploration. These are just a few examples of planned missions that will target the Earth’s natural satellite in the next decade, with forecasts of tens of missions per year (NSR, 2022), (Euroconsult, 2020). The large number of missions and the complexity of landing and operating are expected to demand a change of paradigm from the current Earth-based communication and navigation services. In recent years, several agencies have proposed to deploy cislunar communication and navigation services to support lunar missions (NASA LCRNS, 2022), (ESA Moonlight, 2022), (JAXA, 2022)). All these proposals seek to deploy service-providing satellites in lunar orbit to ease the user missions’ operations. The PNT services objective is to support all types of lunar users (e.g.: orbiters, landers, ascent vehicles, and surface crew and rovers). At the same time, NASA and ESA initiated an effort to define a common framework to ensure interoperability among different service providers: the LunaNet framework. The LunaNet Interoperability Specification (NASA and ESA, 2023) covers communication, PNT, and auxiliary services, by establishing a common set of requirements to ensure interoperability. This conference contribution will present the LunaNet PNT services, focusing on the Lunar Augmented Navigation Service (LANS) that resembles the Global Navigation Satellite System (GNSS) concept on Earth: constellations of satellites broadcasting a radio navigation signal synchronized to a common reference clock, with augmentations to accommodate users’ needs in an environment away from Earth. This includes a description of the high-level LANS concept and the basic principles defined to ensure interoperability. In addition, it will describe the common S-band PNT Augmented Forward Signal (AFS) and common messages to be adopted for compliance with the LunaNet framework, and the justification of the selected approach.

LunaNet↗

Extraterrestrial Helium (He@C60) Trapped in Fullerenes in the Sudbury Impact Structure

Fullerenes (C60 and C70) have recently been identified in a shock-produced breccia (Onaping Formation) associated with the 1.85-Ga Sudbury Impact Crater. The presence of parts-per-million levels of fullerenes in this impact structure raises interesting questions about the processes that led to the formation of fullerenes and the potential for delivery of intact organic material to the Earth by a large bolide (e.g., asteroid or comet). Two possible scenarios for the presence of fullerenes in the Sudbury impact deposits are that (1) fullerenes are synthesized within the impact plume from the C contained in the bolide; or (2) fullerenes are already present in the bolide and survived the impact event. The correlation of C and trapped noble gas atoms in meteorites is well established. Primitive meteorites contain several trapped noble gas components that have anomalous isotopic compositions, some of which may have a presolar origin. Several C-bearing phases, including SiC, graphite, and diamond, have been recognized as carriers of trapped noble gases. It has also been suggested that fullerenes (C60 and C70) might be a carrier of noble gas components in carbonaceous chondrites. Recently, fullerenes have been detected in separate samples in the Allende meteorite. Carbon-60 is large enough to enclose the noble gases He, Ne, Ar, Kr, and Xe, but it is too small to contain diatomic gases such as N2 or triatomic gases such as CO2. Recent experimental work has demonstrated that noble gases of a specific isotopic composition can be introduced into synthetic fullerenes at high temperatures and pressures; these encapsulated gases can then be released by the breaking of one or more C bonds during step-heating under vacuum. These thermal-release patterns for He encapsulated within the C60 molecule (He@C60) are similar to the patterns for acid residues of carbonaceous chondrites, suggesting that fullerenes could be an additional carrier of trapped noble gases in acid residues of meteorites. Analysis and Results: In order to characterize the noble gas compositions of the Sudbury fullerenes, we undertook a systematic study of acid-resistant residues throughout the C-rich layer (Black member) of the Onaping Formation. Samples were demineralized and extracted using standard techniques. The Onaping extracts were analyzed using several techniques, including UV-Vis adsorption, electro spray mass spectrometry, and laser desorption (linear and reflectron) time-of-flight (TOF) mass spectrometry (LDMS). The Sudbury fullerenes were then separated and purified using HPLC coupled with a photo diode array detector. The HPLC extracts containing the purified fullerenes were loaded into a metal tube furnace within a glove box under a N atmosphere in preparation for noble gas analyses. The 3-He and 4-He content of the fullerene extracts was measured using previously reported standard techniques . Discussion: Fullerenes (C60 and C70) in the Sudbury Impact Structure have been found to contain trapped He with a 3-He/4-He ratio greater than 5 x 10(exp -4). The 3-He/4-He ratio exceeds the accepted solar value by more than 30% and is more than 10x higher than the maximum reported mantle value. Terrestrial nuclear reactions or cosmic-my bombardment are not sufficient to generate such a high ratio. The 3-He/4-He ratios in the Sudbury fullerenes are similar to those determined for interplanetary dust particles. The greater-than-solar ratios of 3-He/4-He in the Sudbury fullerenes may indicate a presolar origin, although alternative mechanisms occurring in the ISM to explain these high ratios (e.g., spallation reactions, selective He implantation, etc.) cannot be entirely ruled out. We are currently attempting to isolate enough fullerene material to measure anomalous Ne (or Kr or Xe) contained within the C60 (e.g., the "pure" 22-Ne component) and thus determine whether the Sudbury fullerenes are indeed presolar in origin.

Becker, L.↗