Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “reserves”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A regional analysis of excess capacity in China’s power systems

China's economy has entered a “new normal,” characterized by slower economic growth and widespread overcapacity in its industrial sectors. Nevertheless, construction of power plants, especially coal-fired plants, continues at a rapid pace. Our analysis examines the extent of overcapacity in China's regional electricity grids. We show that already in 2014, the average reserve margin across China's regional grids was roughly 28%, almost twice as high as a standard planning reserve margin in the U.S. In addition, we find large variations in reserve margins across regional power grids in China, with the highest reserve margin (64%) in the Northeastern grid. This paper examines future reserve margins across regions in China under three growth scenarios. The results suggest that the majority of China will not need new baseload coal power (at least for reliability purposes) before 2020, and potentially not until 2025, under the low- and mid-growth scenarios. Under the high-growth scenario, China's central and eastern regions will need to import more power or built new capacity by 2020. As China's energy sector enters this new normal, our results highlight the growing importance of establishing mechanisms — planning processes and markets — that coordinate generation and transmission investments across grid regions, and that align the country's energy sector investments with its longer-term air quality and climate goals.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Zinc promotes proliferation and activation of myogenic cells via the PI3K/Akt and ERK signaling cascade

Skeletal muscle stem cells named muscle satellite cells are normally quiescent but are activated in response to various stimuli, such as injury and overload. Activated satellite cells enter the cell cycle and proliferate to produce a large number of myogenic progenitor cells, and these cells then differentiate and fuse to form myofibers. Zinc is one of the essential elements in the human body, and has multiple roles, including cell growth and DNA synthesis. However, the role of zinc in myogenic cells is not well understood, and is the focus of this study. We first examined the effects of zinc on differentiation of murine C2C12 myoblasts and found that zinc promoted proliferation, with an increased number of cells incorporating EdU, but inhibited differentiation with reduced myogenin expression and myotube formation. Furthermore, we used the C2C12 reserve cell model of myogenic quiescence to investigate the role of zinc on activation of myogenic cells. The number of reserve cells incorporating BrdU was increased by zinc in a dose dependent manner, with the number dramatically further increased using a combination of zinc and insulin. Akt and extracellular signal-regulated kinase (ERK) are downstream of insulin signaling, and both were phosphorylated after zinc treatment. The zinc/insulin combination-induced activation involved the phosphoinositide 3-kinase (PI3K)/Akt and ERK cascade. We conclude that zinc promotes activation and proliferation of myogenic cells, and this activation requires phosphorylation of PI3K/Akt and ERK as part of the signaling cascade. - Highlights: • Zinc has roles for promoting proliferation and inhibition differentiation of C2C12. • Zinc promotes activation of reserve cells. • Insulin and zinc synergize activation of reserve cells. • PI3K/Akt and ERK cascade affect zinc/insulin-mediated activation of reserve cells.

60 APPLIED LIFE SCIENCES↗

Benefit Cost Analysis of Improved Forecasting for Day-Ahead Hourly Regulation Requirements

A benefit cost analysis (BCA) of the Day-Ahead Regulation Prediction (DARP) tool found substantial savings to providing an improved forecast of the California Independent System Operators (CAISO) reserve requirements for regulation services with increasing amounts of solar generation. DARP predicts day-ahead reserve requirements for Regulation Up (Reg Up) and Regulation Down (Reg Down) using the balancing authority’s Area Control Error (ACE) and actual frequency. The BCA approach statistically estimated the price-quantity relationships for Reg Up and Reg Down. The estimated changes in Regulation reserve prices along with the estimated changes in day-ahead reserve requirements, forecast by DARP, provide a cost savings estimate. The results indicate that more savings were found for reducing Reg Up than reducing Reg Down purchases. A similar approach may be used to estimate savings from improved forecasting of reserves for other ancillary services, or to estimate benefits from other forecasting tools and methodologies.

Ancillary Services, Benefit Cost Analysis, Frequen↗

New wholesale power market design using linked forward markets :

This report proposes a reformulation of U.S. ISO/RTO-managed wholesale electric power mar- kets for improved reliability and e ciency of system operations. Current markets do not specify or compensate primary frequency response. They also unnecessarily limit the participation of new technologies in reserve markets and o er insu cient economic inducements for new capacity invest- ment. In the proposed market reformulation, energy products are represented as physically-covered rm contracts and reserve products as physically-covered call option contracts. Trading of these products is supported by a backbone of linked ISO/RTO-managed forward markets with planning horizons ranging from multiple years to minutes ahead. A principal advantage of this reformulation is that reserve needs can be speci ed in detail, and resources can o er the services for which they are best suited, without being forced to conform to rigid reserve product de nitions. This should improve the business case for electric energy storage and other emerging technologies to provide reserve. In addition, the facilitation of price discovery should help to ensure e cient energy/reserve procurement and adequate levels of new capacity investment.

Silva Monroy, Cesar Augusto↗

Demand Response as a System Reliability Resource

The Demand Response as a System Reliability Resource project consists of six technical tasks: • Task 2.1. Test Plan and Conduct Tests: Contingency Reserves Demand Response (DR) Demonstration—a pioneering demonstration of how existing utility load-management assets can provide an important electricity system reliability resource known as contingency reserve. • Task 2.2. Participation in Electric Power Research Institute (EPRI) IntelliGrid—technical assistance to the EPRI IntelliGrid team in developing use cases and other high-level requirements for the architecture. • Task 2.3. Research, Development, and Demonstration (RD&D) Planning for Demand Response Technology Development—technical support to the Public Interest Energy Research (PIER) Program on five topics: Sub-task 1. PIER Smart Grid RD&D Planning Document; Sub-task 2. System Dynamics of Programmable Controllable Thermostats; Sub-task 3. California Independent System Operator (California ISO) DR Use Cases; Sub-task 4. California ISO Telemetry Requirements; and Sub-task 5. Design of a Building Load Data Storage Platform. • Task 2.4. Time Value of Demand Response—research that will enable California ISO to take better account of the speed of the resources that it deploys to ensure compliance with reliability rules for frequency control. • Task 2.5. System Integration and Market Research: Southern California Edison (SCE)—research and technical support for efforts led by SCE to conduct demand response pilot demonstrations to provide a contingency reserve service (known as non-spinning reserve) through a targeted sub-population of aggregated residential and small commercial customers enrolled in SCE’s traditional air conditioning (AC) load cycling program, the Summer Discount Plan. • Task 2.6. Demonstrate Demand Response Technologies: Pacific Gas and Electric (PG&E)—research and technical support for efforts led by PG&E to conduct a demand response pilot demonstration to provide non-spinning reserve through a targeted sub-population of aggregated residential customers enrolled in PG&E’s AC load curtailment program, the Smart AC™ Demand Response Program.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Natural Gas Value-Chain and Network Assessments

The current expansion of natural gas (NG) development in the United States requires an understanding of how this change will affect the natural gas industry, downstream consumers, and economic growth in order to promote effective planning and policy development. The impact of this expansion may propagate through the NG system and US economy via changes in manufacturing, electric power generation, transportation, commerce, and increased exports of liquefied natural gas. We conceptualize this problem as supply shock propagation that pushes the NG system and the economy away from its current state of infrastructure development and level of natural gas use. To illustrate this, the project developed two core modeling approaches. The first is an Agent-Based Modeling (ABM) approach which addresses shock propagation throughout the existing natural gas distribution system. The second approach uses a System Dynamics-based model to illustrate the feedback mechanisms related to finding new supplies of natural gas - notably shale gas - and how those mechanisms affect exploration investments in the natural gas market with respect to proven reserves. The ABM illustrates several stylized scenarios of large liquefied natural gas (LNG) exports from the U.S. The ABM preliminary results demonstrate that such scenario is likely to have substantial effects on NG prices and on pipeline capacity utilization. Our preliminary results indicate that the price of natural gas in the U.S. may rise by about 50% when the LNG exports represent 15% of the system-wide demand. The main findings of the System Dynamics model indicate that proven reserves for coalbed methane, conventional gas and now shale gas can be adequately modeled based on a combination of geologic, economic and technology-based variables. A base case scenario matches historical proven reserves data for these three types of natural gas. An environmental scenario, based on implementing a $50/tonne CO 2 tax results in less proven reserves being developed in the coming years while demand may decrease in the absence of acceptable substitutes, incentives or changes in consumer behavior. An increase in demand of 25% increases proven reserves being developed by a very small amount by the end of the forecast period of 2025.

03 NATURAL GAS↗

Modeling the temporal dynamics of nonstructural carbohydrate pools in forest trees

Trees store carbohydrates, in the form of sugars and starch, as reserves to be used to power both future growth as well as to support day-to-day metabolic functions. These reserves are particularly important in the context of how trees cope with disturbance and stress—for example, as related to pest outbreaks, wind or ice damage, and extreme climate events. In this project, we measured the size of carbon reserves in forest trees, and determined how quickly these reserves are used and replaced—i.e., their “turnover time”. Our work was conducted at Harvard Forest, a temperate deciduous forest in central Massachusetts. Through field sampling, laboratory-based chemical analyses, and allometric modeling, we scaled these measurements up to whole-tree NSC budgets. We used these data to test and improve computer simulation models of carbon flow through forest ecosystems. Our modeling focused on the mathematical representation of these stored carbon reserves, and we examined the sensitivity of model performance to different model structures. This project contributes to DOE’s goal to improve next-generation models of the earth system, and to understand the impacts of climate change on terrestrial ecosystems.

59 BASIC BIOLOGICAL SCIENCES↗

Coeur d’Alene Tribe Benewah Market Energy Efficiency Project Final Technical Report

The Coeur d’Alene Reservation has been the home of the Coeur d’Alene Tribe since time immemorial and it is fitting that the Tribe’s name in the Coeur d’Alene language is schitsu’umsh, “the ones who were found here.” The Reservation is located in northern Idaho, is approximately 345,000 acres and is comprised of forest land, agricultural land, several streams, Coeur d’Alene Lake and the St. Joe River and a small amount of developed land. The project area was conducted within the boundaries of the Coeur d’Alene Reservation. The population of the Reservation is 6,760 (2010 Census). Currently, there are approximately 2,463 enrolled Coeur d’Alene Tribal members (Coeur d’Alene Tribe Enrollment 2016). The Benewah Market is a Tribally-owned and operated facility located at 1111 B St. Plummer, ID 83851. The Benewah Market is an approximately 23,500 square foot single-story structure. The majority of the building is occupied by a grocery store with a full meat department, deli, and bakery. Approximately 20% of the floor area at the northeast corner is occupied by an Ace Hardware retailer. The largest part of the building is approximately 17,000 square feet, is separately metered and houses the grocery store which was constructed in 1984. The market is the largest full service market serving the Coeur d’Alene Reservation and is the only full service market in a 35-mile radius. The Tribe has benefited greatly from the Benewah Market Energy Efficiency Project and will continue to do so for many years: The health and safety of the food has been improved greatly now that the refrigeration and freezer cases are at a constant and safe temperature on a monitoring and alarm system. There is no longer a thaw and freeze cycle that allows fluctuations in temperature. If the power goes out, there is an immediate alarm and contact so that time may be tracked and food kept safe during an outage. The overall annual energy use in the Benewah Market has dropped by 22.9% -Energy costs for the Market decreased by an estimated 11,620 dollars in one year due to this project. The Tribe has seen an increase in the cost of energy from Plummer Power and this was offset by the reduction in energy consumed. This estimate assumes that the Tribe would have consumed the same amount of energy as the prior year. -Maintenance costs are estimated to have decreased by $10,000 in just the one year since installation in contract repair and maintenance. The Tribe estimates that it has saved 24,000 dollars over a one-year time period in labor costs to maintain the older system. Due to having a more efficient store, with safer, more attractive display of food and lower energy and maintenance costs, the store is able to be more viable economically. The store has increased its sales and has been able to pass along operations and maintenance savings to its customers and employees. The Tribe hosted a ribbon-cutting ceremony on February 28, 2017 at the Benewah Market with Chris Deschene, then Office of Indian Energy Director, as well as representatives from the Coeur d’Alene Tribe and Bonneville Power Administration. While the ribbon-cutting ceremony was going on, the Tribe’s media outlets covered the ceremony and placed information about the project on the Tribe’s Facebook page on two separate occasions. The Coeur d’Alene Tribe’s Natural Resources Department and the Tribe’s Development Corporation are thankful for the opportunity that the Benewah Market Energy Efficiency Project has afforded the Coeur d’Alene Tribal community. Without the U.S. Department of Energy’s Indian Energy Program funding and its dedicated staff, this project would not have been completed. This has been a lot of work for all parties involved but has provided benefits to thousands of people for many years to come.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Bishop Paiute's Residential Solar Program Phase III

The project consisted of the design, installation, inspection, interconnection and monitoring of 40 grid-tied solar electric systems, totaling up to 108 kW rated capacity, on qualified existing low-income single-family homes located within the Bishop Paiute Reservation. The systems are to provide at least 30-75% savings in displaced electricity totaling 175,000 kWh/year. After the DOE grant contract was signed, the Tribal Employment Rights Ordinance (TERO) board voted to reduce the tribal tax to work on the reservation for these low-income projects from 4% to 1%. This generous reduction was applied back into the community solar project and two additional tribal homes were added for a new total of 40 grid-tied solar electric systems, totaling up to 113 kW rated capacity (two more than originally planned) projects. Additionally, each homeowner was educated on energy efficiency and how solar works and saves them money. The estimated 75% savings on monthly electric bills brings financial relief to tribal homeowners and makes a significant difference on the reservation; giving low-income families money to spend on other essential items, while reducing their carbon footprint in this remote tribal reservation. The GRID IE program and this tribal project had a training component for tribal members to get free hands-on job training on 8 of the 40 homes. Those tribal members that came out to train with GRID IE could then be eligible for the “train to hire” portion of the program, on the remaining 32 homes. Overall, the triple impact of the Bishop Paiute Tribe Residential Solar Program Phase III—affordable energy for low-income families, on-site clean energy production, and hands-on solar installation jobs for local workers—these all help build the Tribe’s energy, economic, environmental goals and offers local self-sufficiency while supporting energy independence to the neediest on the Reservation.

14 SOLAR ENERGY↗

Stochastic Continuous-time Flexibility Scheduling and Pricing in Wholesale Electricity Markets

Large-scale integration of intermittent renewable energy sources (RES) is calling for additional flexibility resources as well as more advanced modeling and optimization techniques to account for the increasing uncertainty and variability in power systems operation. As the RES integration gains momentum, the magnitude and frequency of their variations increase, which may trigger ramping scarcity events in real-time power systems operation. This necessitates revisiting the present definition of power systems flexibility and reserve services to reflect their robustness and adequacy towards sub-interval variations of the load and RES, as well as adjusting the operation models to accommodate the new reserve services. This project took a fundamental approach and aimed at developing continuous-time scheduling and pricing model that accurately models the continuous-time variations of load and RES and efficiently deploys the ramping capability of flexible resources to compensate the sources of variability and uncertainty in the market. In this regard, this project pursued the following goals: Developing stochastic multi-fidelity continuous-time optimization models for scheduling of energy storage (ES) systems and flexible loads in wholesale energy markets; Developing the theory and practices of continuous-time locational marginal pricing for valuating energy storage systems and flexible loads in wholesale energy markets; Developing function space solution approach to convert the proposed stochastic multi-fidelity continuous-time optimization models into tractable mixed-integer linear optimization models; and Defining flexibility reserve as a new type of reserve in markets that would enable ultimate participation of energy storage devices in provision of services to compensate the variability and uncertainty of RES in electricity markets. This project successfully completed all five major tasks defined in the SOPO, and produced 8 high-impact journal papers, 6 conference papers, 3 published U.S. patents, and one web-based software for continuous-time operation optimization of power systems. The application of the proposed flexibility reserve and the stochastic multi-fidelity continuous-time operation scheduling models would modify the forward commitment and schedule of generating units, ES devices and flexible loads, and would line up the resources in such a way that the composition of available resources is better prepared to respond to the sub-hourly variations of the load and renewable resources in real-time operation. Therefore, this project paves the way to sustainable, reliable, and economic integration of renewable energy resources in power system, supporting the progress towards reaching the national targets on energy independence. Even if the proposed models offers a radically different point of view as compared to existing models, it does not alter fundamentally the architecture of power systems operations, nor the complexity of the scheduling problem, so the integration of this project in power systems is extremely practical.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Methods for Computing Physically Realistic Estimates of Electric Water Heater Demand Response Resource Suitable for Bulk Power System Planning Models

Demand response is commonly called on to reduce load during system peak times or to respond to contingency events. In future power systems with higher shares of wind and solar generation (which we describe together as variable generation [VG]), demand response could have more opportunities to provide energy shifting or operating reserve services. This report evaluates the ability of residential electric water heaters, both electric resistance water heaters (ERWHs) and heat pump water heaters (HPWHs), to provide such services starting from detailed whole-building energy models that realistically represent New England single family home stock. We use a parsimonious surrogate model to represent operational flexibility in a form suitable for linear and mixed integer programming. This enables relatively fast determination of aggregate contingency reserve resource, price-taking energy shifting outcomes, and in some cases the determination of aggregate models at the megawatt (MW) scale that can be directly included in large-scale grid models. After selecting modeling methods and parameters through various computational experiments, we find interquartile ranges of contingency reserve resource in ISO-NE for about 603,400 ERWHs of 45 MW - 69 MW for Claim10 (50 minute responses provided with 10 minutes of advanced notification) and 65 MW - 102 MW for Claim30 (30 minute responses provided with 30 minutes of advanced notification), and for about 619,000 HPWHs of 48 MW - 88 MW for Claim10 and 52 MW - 90 MW for Claim30. The overall reserve resource is up to 32% of total load for ERWHs providing Claim10 service, 47% for ERWHs providing Claim30 service, 93% for HPWHs providing Claim10 service, and 97% for HPWHs providing Claim30 service. More work is required to determine if HPWHs are inherently more suitable than ERWHs for providing contingency reserve or if these results reflect idiosyncrasies of the single family home stock model used in this study. The value of this contingency resource in a Near-term VG model of ISO-NE is $\$ 0.40$ to $\$1.20$ per water heater-year, and significantly larger, $\$ 3.80$ to $\$ 5.30$ per water heater-year in a Mid-term VG model of ISONE. Aggregating surrogate models to the MW-scale for energy shifting service is more challenging than for contingency service and we only present such results for ERWHs, because we were unable to determine satisfactory ways to deal with HPWHs' time-varying and path dependent operational characteristics. Individual surrogate models suitable for evaluating the energy shifting resource from both ERWHs and HPWHs are created, however, and dispatched against day-ahead prices from the Near-Term VG and Mid-Term VG models of ISO-NE. The individual surrogate models are able to access and potentially shift all 640 GWh of HPWH load and 1,547 GWh of ERWH load we modeled in two different single family home stock models. In contrast, the most effective model of aggregate ERWH shifting resource we created only captured 34.7% of the total ERWH load. Energy shifting affected by price-taking dispatch against modeled day-ahead energy prices produces per water heater year profits of $\$19.44$ - $\$22.93$ for individual HPWHs, $\$39.11$ - $\$40.54$ for individual ERWHs, and up to $\$4.00$ - $\$4.24$ for aggregated ERWHs, with the variations mainly due to grid conditions (more or less VG). When the supply-side response to these changes is accounted for, the per water heater year production cost savings for ISO-NE are $\$7.50$ to $\$17.70$ for the most effective set of endogenously dispatched aggregate ERWHs, $\$15.60$ to $\$15.70$ for individual ERWHs dispatched against the DA prices, and $\$10.70$ to $\$11.20$ for individual HPWHs dispatched against DA prices. Those ranges primarily represent the difference between Near-Term VG and Mid-Term VG grid conditions.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

PSH Assessment and Site Identification [Slides]

NLR's Pumped Storage Hydropower (PSH) geospatial and cost model algorithms are applied to the Chemehuevi Reservation to assess the potential for PSH within the reservation. The algorithm identifies both "open-loop" PSH opportunities formed by constructing a new reservoir within the reservation paired with bordering Lake Havasu and "closed-loop" systems formed by two new reservoirs within the reservation. Options range from 28 to 538 MW of electrical generation power at maximum generation and 10 hours of storage. CAPEX is estimates as 4422 2022 $\$$/kW of generating power, which is meaningfully higher than the lowest cost systems identified in NLR's national scale assessments. Further economic analysis is needed to fully evaluate whether this would be an attractive option to meet the Chemehuevi Reservation's goals.

25 ENERGY STORAGE↗

Acousto-ultrasonic evaluation of ceramic matrix composite materials

Acousto-ultrasonic nondestructive evaluation of ceramic composite specimens with a lithium-alumino-silicate glass matrix reinforced with unidirectional silicon carbide (NICALON) fibers was conducted to evaluate their reserve of strength. Ceramic composite specimens with different amount of damage were prepared by four-point cyclic fatigue loading of the specimens at 500 C for a different number of cycles. The reserve of strength of the specimens was measured as the maximum bending stress recorded during four-pointed bending test with the load monotonically increased until failure occurs. It was observed that the reserve of strength did not correlate with the number of fatigue cycles. However, it was also observed that higher values of the stress wave factor measurements correspond to higher values of the reserve of strength test data. Therefore, these results show that the acousto-ultrasonic approach has the potential of being used to monitor damage and to estimate the reserve of strength of ceramic composites.

Dosreis, Henrique L. M.↗

Structural Dynamics of Tropical Moist Forest Gaps

Gap phase dynamics are the dominant mode of forest turnover in tropical forests. However, gap processes are infrequently studied at the landscape scale. Airborne lidar data offer detailed information on three-dimensional forest structure, providing a means to characterize fine-scale (1 m) processes in tropical forests over large areas. Lidar-based estimates of forest structure (top down) differ from traditional field measurements (bottom up), and necessitate clear-cut definitions unencumbered by the wisdom of a field observer. We offer a new definition of a forest gap that is driven by forest dynamics and consistent with precise ranging measurements from airborne lidar data and tall, multi-layered tropical forest structure. We used 1000 ha of multi-temporal lidar data (2008, 2012) at two sites, the Tapajos National Forest and Ducke Reserve, to study gap dynamics in the Brazilian Amazon. Here, we identified dynamic gaps as contiguous areas of significant growth, that correspond to areas greater than 10 sq m, with height less than 10 m. Applying the dynamic definition at both sites, we found over twice as much area in gap at Tapajos National Forest (4.8%) as compared to Ducke Reserve (2.0%). On average, gaps were smaller at Ducke Reserve and closed slightly more rapidly, with estimated height gains of 1.2 m y-1 versus 1.1 m y-1 at Tapajos. At the Tapajos site, height growth in gap centers was greater than the average height gain in gaps (1.3 m y-1 versus 1.1 m y-1). Rates of height growth between lidar acquisitions reflect the interplay between gap edge mortality, horizontal ingrowth and gap size at the two sites. We estimated that approximately 10% of gap area closed via horizontal ingrowth at Ducke Reserve as opposed to 6% at Tapajos National Forest. Height loss (interpreted as repeat damage and/or mortality) and horizontal ingrowth accounted for similar proportions of gap area at Ducke Reserve (13% and 10%, respectively). At Tapajos, height loss had a much stronger signal (23% versus 6%) within gaps. Both sites demonstrate limited gap contagiousness defined by an increase in the likelihood of mortality in the immediate vicinity ((is) approximately 6 m) of existing gaps.

Structural Dynamics of Tropical Moist Forest Gaps↗

System and Method for Network Bandwidth, Buffers and Timing Management Using Hybrid Scheduling of Traffic with Different Priorities and Guarantees

Systems and methods for network bandwidth, buffers and timing management using hybrid scheduling of traffic with different priorities and guarantees are provided. In certain embodiments, a method of managing network scheduling and configuration comprises, for each transmitting end station, reserving one exclusive buffer for each virtual link to be transmitted from the transmitting end station; for each receiving end station, reserving exclusive buffers for each virtual link to be received at the receiving end station; and for each switch, reserving a exclusive buffer for each virtual link to be received at an input port of the switch. The method further comprises determining if each respective transmitting end station, receiving end station, and switch has sufficient capability to support the reserved buffers; and reporting buffer infeasibility if each respective transmitting end station, receiving end station, and switch does not have sufficient capability to support the reserved buffers.

Varadarajan, Srivatsan↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Observations on vapor pressure in SPR caverns : sources.

The oil of the Strategic Petroleum Reserve (SPR) represents a national response to any potential emergency or intentional restriction of crude oil supply to this country, and conforms to International Agreements to maintain such a reserve. As assurance this reserve oil will be available in a timely manner should a restriction in supply occur, the oil of the reserve must meet certain transportation criteria. The transportation criteria require that the oil does not evolve dangerous gas, either explosive or toxic, while in the process of transport to, or storage at, the destination facility. This requirement can be a challenge because the stored oil can acquire dissolved gases while in the SPR. There have been a series of reports analyzing in exceptional detail the reasons for the increases, or regains, in gas content; however, there remains some uncertainty in these explanations and an inability to predict why the regains occur. Where the regains are prohibitive and exceed the criteria, the oil must undergo degasification, where excess portions of the volatile gas are removed. There are only two known sources of gas regain, one is the salt dome formation itself which may contain gas inclusions from which gas can be released during oil processing or storage, and the second is increases of the gases release by the volatile components of the crude oil itself during storage, especially if the stored oil undergoes heating or is subject to biological generation processes. In this work, the earlier analyses are reexamined and significant alterations in conclusions are proposed. The alterations are based on how the fluid exchanges of brine and oil uptake gas released from domal salt during solutioning, and thereafter, during further exchanges of fluids. Transparency of the brine/oil interface and the transfer of gas across this interface remains an important unanswered question. The contribution from creep induced damage releasing gas from the salt surrounding the cavern is considered through computations using the Multimechanism Deformation Coupled Fracture (MDCF) model, suggesting a relative minor, but potentially significant, contribution to the regain process. Apparently, gains in gas content can be generated from the oil itself during storage because the salt dome has been heated by the geothermal gradient of the earth. The heated domal salt transfers heat to the oil stored in the caverns and thereby increases the gas released by the volatile components and raises the boiling point pressure of the oil. The process is essentially a variation on the fractionation of oil, where each of the discrete components of the oil have a discrete temperature range over which that component can be volatized and removed from the remaining components. The most volatile components are methane and ethane, the shortest chain hydrocarbons. Since this fractionation is a fundamental aspect of oil behavior, the volatile component can be removed by degassing, potentially prohibiting the evolution of gas at or below the temperature of the degas process. While this process is well understood, the ability to describe the results of degassing and subsequent regain is not. Trends are not well defined for original gas content, regain, and prescribed effects of degassing. As a result, prediction of cavern response is difficult. As a consequence of this current analysis, it is suggested that solutioning brine of the final fluid exchange of a just completed cavern, immediately prior to the first oil filling, should be analyzed for gas content using existing analysis techniques. This would add important information and clarification to the regain process. It is also proposed that the quantity of volatile components, such as methane, be determined before and after any degasification operation.

02 PETROLEUM↗

Stochastic risk-sensitive market integration for renewable energy: Application to ocean wave power plants

With the expected increase of intermittent renewable energy resources on the electric power grid, short-term reserve markets can prove to be a critical reliability asset. This paper introduces and tests a potential market structure that includes a short-term reserve market for renewable resources where the realized energy is drawn within the bounds of the hourly capacity offered. The study presents a risk-aware stochastic model that determines, based on the day-ahead offer derived using a classic newsvendor formula, the best intraday offers for a renewable energy power plant. The stochastic approach takes into account the uncertainties of energy production and market prices. The proposed risk-sensitive model aims to maximize the renewable power plant's revenues and minimize potential risks of loss in a multi-product multi-timescale market setup. To demonstrate the effectiveness of the proposed formulation, we study the case of a hypothetical 750-kW wave power plant coupled with energy storage. The study shows that the risk of profit loss is not uniformly distributed across the risk-aversion factor space. We also find that the introduction of the short-term reserve market results in a wider range of conditional value at risk while inducing 5% profit increase and a lower profit reduction across the risk range. In addition, the study reveals that the short-term reserve market is profitable for both the system operator and the wave energy power plant considered.

24 POWER TRANSMISSION AND DISTRIBUTION↗