Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “lessons learned process”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Challenges of SLOWPOKE-2 HEU Irradiated Fuel Transportation from Canada to USA - 19123(2)

The SLOWPOKE-2 (Safe Low-Power Kritical Experiment) was designed by AECL (Atomic Energy of Canada Limited) in the late 1960's. The core consists of HEU (highly enriched uranium) fuel with an enrichment of 93%. The fuel cage typically has approximately 300 fuel pins assembled in a triangular pitch between the two plates. The fuel pins are made from uranium-aluminum alloy cladded with aluminum. The SLOWPOKE-2 reactor is rated at a nominal 20 kW. with varying neutron flux, maximum being 1 E12 n/cm{sup 2}/s. The mass of the fuel cage is 5.06 kg. The life of the core can be extended by adding layers of beryllium reflector. The transportation flask for the irradiated fuel is a Type B(U)F. The shipment classification is UN3328 Class 7. To date, 4 SLOWPOKE-2 reactors have been decommissioned. The fuel from all these reactors was transported to the U.S. The CNSC (Canadian Nuclear Safety Commission) joint Canada-United States guide for approval of Type B(U) and fissile material transportation packages (RD-364) satisfies the requirements stipulated in International Atomic energy Agency (IAEA) TS-R-1 1996 edition (revised) and is acceptable to the DOT (Department of Transportation) and NRC (Nuclear Regulatory Commission) for complying with U.S. code of federal regulations 10 CFR Part 71. The export license is issued by the CNSC. The transportation licence is issued by CNSC after approval from TC (Transport Canada) and also by DOT after approval from NRC. The final home of the HEU SLOWPOKE-2 irradiated fuel is in Savannah River Site of DOE (Department of Energy). The transportation licence requires that the Type B(U)F flask is structurally sound in case of a crash. The US DOT provides a CAC (Competent Authority Certificate) which describes the irradiated fuel specifications that can be transported in the designated flask. The U.S. DOT also requires a leak test certification in accordance with ANSI N14.5-2014 to verify a leakage rate not to exceed 1 E-7 std-cm{sup 3}/s. As most SLOWPOKE-2 facilities are not located on the existing approved routes for nuclear fuel transportation, a route survey needs to be performed and submitted to the NRC. The route survey report is assessed by the NRC and issues a route approval for the transportation of the fissile material. This technical paper will discuss the detailed processes required to obtain approvals in order to transport the HEU SLOWPOKE-2 irradiated fuel from Canada to U.S. based upon recent experiences of decommissioning SLOWPOKE-2 reactors in Canada. It will provide details on the requirements of various regulators in Canada and the U.S. that govern and regulate this shipment including transportation, safety and security. It will also present lessons learned from previous experiences that can be utilized for best practice on other similar projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated distribution system and urban district planning with high renewable penetrations

Recent efforts to reduce energy consumption and greenhouse gas emissions have resulted in the development of sustainable, smart districts with highly energy efficient buildings, renewable distributed energy resources (DERs), and support for alternative modes of transportation. However, there is typically little if any coordination between the district developers and the local utility. Most attention is paid to the district's annual net load and generation without considering their instantaneous imbalance or the connecting network's state. This presents an opportunity to learn lessons from the design of distribution feeders for districts characterized by low loads and high penetrations of DERs that can be applied to the distribution grid at large. The aim of this overview is to summarize current practices in sustainable district planning as well as advances in modeling and design tools for incorporating the power distribution system into the district planning process. Recent developments in the modeling and optimization of district power systems, including their coordination with multi-energy systems and the impact of high penetration levels of renewable energy, are introduced. Sustainable districts in England and Japan are reviewed as case studies to illustrate the extent to which distribution system planning has been considered in practice. Finally, newly developed building-to-grid modeling tools that can facilitate coordinated district and power system design with utility involvement are introduced, along with suggestions for future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Hybrid Manufacturing of Conformal Cooling Channels for Tooling

Computer-aided manufacturing (CAM) techniques for hybrid manufacturing have led to new application areas in the manufacturing industry. In the tooling industry, cooling channels are used to enable specific heating and cooling cycles to improve the performance of the process. These internal cooling channels have been designed with limited manufacturing processes in mind, so, until recently, they were often straight in shape for cross-drilling operations and manufactured from a cast billet. To show a novel application of this common technology, a tool with integrated conformal cooling channels was manufactured using hybrid manufacturing (blown-powder DED and CNC machining) techniques. The computer-aided manufacturing strategy used, and the lessons learned are presented and discussed to enable future work in this industrial application space.

36 MATERIALS SCIENCE↗

Digitizing Today’s Buildings in the Real World: Lessons from Field Demonstrations

Digital twins, created by generating a virtual replica of a building, enable safe evaluation of operational scenarios and applications like fault detection and diagnosis and advanced controls. However, a prerequisite is the creation of a machine-readable digital representation of a building, currently hindered by fragmented information scattered across mechanical drawings, point lists, and natural language sequences. As a result, digital twin development remains labor-intensive, error-prone, and difficult to validate. To address these challenges, two efforts from ASHRAE aim to support the digitalization of buildings. ASHRAE s223 establishes a semantic model of buildings, representing system components, configuration, and data sources. ASHRAE s231 defines a vendor-neutral programming language for expressing their control logic. As the industry evaluates implementing them in their products, understanding the challenges that vendors and implementers may face is crucial. In this paper, we present findings and lessons learned from field demonstrations in five buildings that implemented control applications using ASHRAE s223 and s231. The demonstrations highlight how semantic modeling and formalized control descriptions can significantly reduce software development time, manual point mapping, and hard-coding. Beyond time efficiency, they enable reliable automation by minimizing human interpretation and providing a means for consistency across projects. We describe the processes and best practices for model creation and model usage, from translating heterogeneous building documentation into semantic representations to implementing control logic in real-world systems. Finally, we discuss the challenges that persist, including integration with legacy software environments, gaps in interoperability, and the level of expertise still required to effectively leverage semantic models.

Prakash, Anand Krishnan↗

Oak Ridge Cleanup Vision: Moving to the Future by Cleaning Up the Past - 13291

The Oak Ridge Office of Environmental Management (EM) strives to be the leader in the Department of Energy's (DOE's) EM Complex regarding successful and safe project execution and stakeholder interactions that yield positive results. EM's goal has been to become 'Investment Worthy' and, in order to accomplish that important objective, has also had to improve communications both within and outside of the Department. One of our most important missions is to assist the Department in achieving the sustainability goals set forth in Executive Order 13514. In this regard, EM's primary role is to return land to beneficial use and reduce energy impacts and maintenance costs by demolishing unneeded and deteriorating structures and remediating environmental contamination. Recent accomplishments toward meeting these goals include significant progress in the decontamination and demolition of the country's largest facility, the former K-25 Gaseous Diffusion Building, constructed in 1942 to enrich uranium to help end World War II; the disposition of the first phase of Uranium-233 material from the Oak Ridge National Laboratory (ORNL) which involved the transfer of Zero Power Reactor Plates to the National Nuclear Security Administration (NNSA); and a host of other project successes associated with transuranic (TRU) waste processing, hot cell decontamination and demolition, remediation of highly contaminated soils and burial grounds, and removal of mercury from storm sewers and surface waters. With regard to successful stakeholder interactions, recent accomplishments include a new method for collaboration that has renewed EM's working relationship with the regulators, and success in completing an extensive consultation process with over a dozen parties on the historic preservation of the former Oak Ridge Gaseous Diffusion Plant, which is now called the East Tennessee Technology Park (ETTP). Regarding improved communications, EM has successfully revised Program priorities and has received buy-in from the leadership in Headquarters, the regulators, and the community. Issues EM was facing in 2009 are presented. Resulting lessons learned and subsequent changes that the Office has gone through in the past several years in order to improve performance in the safe execution of work, relationships with external stakeholders, and communications both internally and externally are discussed. Results of these efforts are provided as a summary of Program accomplishments, including a strong focus on the future. EM's motto, Moving to the Future by Cleaning up the Past, will be demonstrated through the Program's mission, which includes protecting the region's health and environment; ensuring the continuation of ongoing vital missions being conducted by DOE on the Oak Ridge Reservation; and making clean land available for future use at all three sites, with a near-term focus on Re-industrialization of ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Solar Pathways in Federal Energy Assistance Programs: Expanding Low Income Home Energy Assistance Program (LIHEAP) and Weatherization Assistance Program (WAP)

How can solar best fit within your LIHEAP or WAP activities? Come join NREL and learn about the various pathways and new resources available to help implement solar in low-income programs. Panelists will share results from a multi-year research project, including survey results on LIHEAP and WAP solar adoption across the United States. This session will highlight case studies from early implementers, key lessons learned and resources developed based on stakeholder feedback for interested organizations. Attendees can expect gain a better understanding of the perceived barriers and opportunities to solar implementation, including the importance of partner coordination and complementary funding sources, and the next steps for how to get started. Additionally, attendees will hear from a local implementer of solar in WAP about their program and process.

Colorado↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

A NOVEL APPROACH TO SPENT FUEL POOL DECOMMISSIONING

The Idaho National Laboratory (INL) has been at the forefront of developing methods to reduce the cost and schedule of deactivating spent fuel pools (SFP). Several pools have been deactivated at the INL using an underwater approach with divers. These projects provided a basis for the INL cooperation with the Dresden Nuclear Power Station Unit 1 SFP (Exelon Generation Company) deactivation. It represents the first time that a commercial nuclear power plant (NPP) SFP was decommissioned using this underwater coating process. This approach has advantages in many aspects, particularly in reducing airborne contamination and allowing safer, more cost effective deactivation. The INL pioneered underwater coating process was used to decommission three SFPs with a total combined pool volume of over 900,000 gallons. INL provided engineering support and shared project plans to successfully initiate the Dresden project. This report outlines the steps taken by INL and Exelon to decommission SFPs using the underwater coating process. The rationale used to select the underwater coating process and the advantages and disadvantages are described. Special circumstances are also discussed, such as the use of a remotely-operated underwater vehicle to visually and radiologically map the pool areas that were not readily accessible. A larger project, the INTEC-603 SFP in-situ (grouting) deactivation, is reviewed. Several specific areas where special equipment was employed are discussed and a Lessons Learned evaluation is included.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Research Software Engineering at Oak Ridge National Laboratory

Research software engineers (RSE) play a vital role in scientific discoveries worldwide. They lead the core development of the applications, libraries, and tools that enable today’s supercomputers to process the vast volumes of data generated from the world’s most extensive and complicated scientific instruments and facilities. This article describes the mission, culture, and practices of RSE teams at Oak Ridge National Laboratory (ORNL), including their team dynamics and composition, work ethics, standard practices, and ever-evolving skill sets vital to pursuing scientific innovations and implementing novel ideas. We describe the lessons learned from specific activities that contribute to shaping the identity and growth of RSE roles at ORNL. Lastly, we provide our view for the near future on effective strategies for establishing, leading, and nurturing RSE teams and building a thriving community in collaboration with science stakeholders.

42 ENGINEERING↗

Cyber-Informed Engineering for Strategic Planning

The CIE Guide for Engaging Organizational Leadership: Board and C-Suite describes how to apply CIE at the senior-level of organizational management. This guidance integrates CIE concepts into theory and practice of guiding coalition leadership to improve permeation of CIE concepts throughout organizational culture. This guide incorporates feedback from CIE community of practice volunteers in a study of how business administrative and strategic planning and management guidance and course materials can be applied to CIE implementation throughout an organization's principles and processes. This guide defines the interests guiding senior leadership, managers and supervisors, and technicians and workers involved in creating and operating and maintaining systems, and cultural/ historical/ political assumptions or influences shaped the landscape that could facilitate or impede development of CIE. The included guidance for organizational strategic management and leadership can be imbedded into contract guidance based on the CIE implementation guide and lessons learned from industry application.

97 MATHEMATICS AND COMPUTING↗

Radiological Soil Sorting Pilot Study Results - Middlesex Municipal Landfill - 19394

The U.S. Army Corps of Engineers (USACE) conducted a pilot scale study of radiological sorting technology at the Formerly Utilized Sites Remedial Action Program (FUSRAP) Middlesex Municipal Landfill (MML) site in Middlesex, New Jersey. Residual uranium ore pieces or 'nuggets' and associated soil contamination are present at the MML site as a result of the nation's early atomic energy program. Study questions and objectives of the MML Pilot Study project were to 1) evaluate the accuracy with which contaminated soils can be separated from uncontaminated soils using a radiologic soil sorting system, 2) determine the optimal full-scale operational process throughput rate that might reasonably be achieved, 3) determine the waste volume reduction that might be expected when operating at full scale, and 4) help establish the feasibility of implementing soil sorting as a potential remedy to other areas of the site. To accomplish the objectives soils were processed through the sorting system in a series of 30 different sorting experimental (test) runs utilizing approximately 917 cubic meters [1200 cubic yards (CY)] of material. The test runs included varying parameters such as belt speeds, soil layer thicknesses, and alarm criteria, all in varying combinations. Test runs also included engineered tests to evaluate point source segregation issues. This paper presents the challenges, results, lessons learned, and recommendations of the radiological soil sorting pilot study. The technical aspects and evaluation of the results of the test runs will also be discussed. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Overview and Lessons Learned of the Jefferson Lab Cryomodule Production for the CEBAF 12 GeV Upgrade

The Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab is nearing completion of an energy upgrade from 6 to 12 GeV. An integral part of the upgrade is the addition of ten new cryomodules, each consisting of eight seven-cell superconducting radio-frequency (SRF) cavities. An average performance of 100+MV of acceleration per cryomodule is needed to achieve the 12 GeV beam energy goal. The production methodology was for industry to provide and deliver the major components to Jefferson Lab, where they were tested and assembled into cryomodules. The production process begins with an inspection upon receiving of all major components followed by individual performance qualification testing. The SRF cavities received their final chemical processing and cleaning at Jefferson Lab. The qualified components along with all associated hardware and instrumentation are assembled, tested, installed into CEBAF and run through an integrated system checkout in preparation for beam operations. The production process is complete and one of the first completed cryomodules has successfully produced 108 MV of acceleration with a linac beam current of 465 {micro}A.

43 PARTICLE ACCELERATORS↗

Remediation of Temporary Storage Sites in Support of the Port Hope Area Initiative - 20295

The Port Hope Area Initiative is a community-based solution for the long-term management of historic low level radioactive waste (LLRW) resulting from 60 years of uranium and radium processing operations in the Town of Port Hope which is located in Ontario, Canada. The Eldorado refinery, on the north shore of Lake Ontario, began refining radium-226 from pitchblende ore, later transitioning to the refining of uranium. Through the history of the operation, LLRW was deposited throughout the town of Port Hope as a result of fugitive emissions from the plant and/or through the re-use of process residues as building material and backfill. Historical clean-up activities conducted in the late 1970's involved the remediation of approximately 400 properties and the relocation of 100,000 cubic metres of contaminated soil to a disposal facility in Chalk River operated by Atomic Energy of Canada Limited (AECL). Owing to space limitations at that disposal facility, any LLRW identified through construction monitoring since that time has been stored in the community at three temporary storage sites located throughout the town. These include: the Centre Pier mound that contained approximately of 19,800 m{sup 3} of LLRW-impacted soil that originated from the construction of a new water treatment plant; two mounds located at a licensed storage facility containing LLRW obtained from residential clean-up activities (11,000 m{sup 3}); and a small pad adjacent to the municipal sewage treatment plant containing 2200 m{sup 3} of LLRW-containing sludge. With the construction of a new long-term waste management facility (LTWMF) that has been designed to house all of the LLRW identified within Port Hope, the three sites were early candidates for remediation. The clean-up of the three temporary storage sites was a significant milestone for the Port Hope Area Initiative. After a decade of planning and consultation, this work represents the first sites in the municipality to be remediated with the waste being safety removed and transferred to the newly constructed LTWMF. This paper discusses the challenges associated with the clean-up activities for these three sites and the strategies employed to address those challenges. These included weather-related challenges, owing to the seasons over which the work was conducted as well as those associated with working within a closely-knit community. Canadian Nuclear Laboratories (CNL), working on behalf of the federal government, has worked diligently to develop a positive and trusting relationship with the community. Consequently, the successful execution of this project needed to be sensitive to, and respectful of the needs of the community. In addition to the usual Health, Safety and Environment training, project staff received community awareness training that spoke to the history of this community-based initiative and the expected behavior when working within the community. Transportation routes were defined based on safety and the need to minimize disruption to local traffic while haul-times where scheduled around school bus hours to enhance public safety. The successful completion of this first of many remediation projects to be completed under the Port Hope Area Initiative reflected years of careful planning. Nevertheless, there were a number of 'lessons learned' that have been applied on other ongoing projects be completed under the Port Hope Area Initiative. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Towards a Stronger Foundation: Digitizing Commercial Buildings with Brick to Enable Portable Advanced Applications

Most large commercial buildings have digital controls for their heating, ventilation, and air-conditioning (HVAC) and lighting systems with the potential to implement advanced control strategies and data analytics. However, advanced control strategies and data analytics are rarely deployed at scale due to non-standard naming conventions and heterogenous building configurations. Semantic metadata standards, like Brick, show promise to proliferate these applications across many buildings, but they have not been widely adopted by industry due to barriers such as perceived risk and unfamiliarity with the technology. This paper describes the workflow we established and evaluated while using it to develop over ten Brick models of existing buildings. Through this process, we observed that digitizing existing commercial buildings is a cost and labor-intensive effort in which understanding the buildings’ data streams is the major bottleneck. Yet, we conclude this investment is worthwhile since various use case applications such as fault detection and diagnostics, thermal comfort analysis, and HVAC control optimization can utilize the same Brick model. The paper also explores the challenges and lessons learned we encountered while creating these data models, such as: 1) difficulties in finding metadata descriptions and relationships for existing buildings; 2) handling missing concepts in the schema needed to model a building; 3) lack of guidance on how to structure the data model or how much detail to include; 4) unfamiliarity with technologies, which makes the learning curve steep for applications developers. Finally, we also describe future directions for semantic metadata research and development to make such transformative technologies more accessible to practitioners.

Roa, Carlos Duarte↗

Applying mobile technology to data collection for environmental characterization and remediation, beyond the science - 15453

The rapid advancements of our time bring us new methods of analysis that enhance the accuracy and sensitivity of measurement, improving the science used to solve problems and meet our objectives. What is often overlooked in our industry are the technology advancements that can dramatically improve the speed, accuracy and completeness by which those data can be collected, communicated, managed and reported. In addition, in the time used to generate and collect the analytical data, the technology collects, manages and reports other process data that can be used to better manage and facilitate our business process improving efficiency and communications as well as providing the information needed to track and manage cost and schedule. Good information management practices, including the use of innovative technology solutions like mobile data collection, are the drivers for project implementation. However, experience has highlighted key success factors that will maximize the level of success and benefit realized by the project. These factors include: -A comprehensive, working knowledge of operational objectives; - Detailed, documented process and data work-flows; - Effective technology selection and/or development (right tool for the job); - Complete integration of the technology into day to day work practice accomplished through effective training and implementation planning. Once this formula is in place, and executed consistently, it can be applied to any environmental investigation and/or remediation scenario. The proof is in the calculated return on investment and captured lessons learned for each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Successes and Lessons Learned in the Design, Construction and Use of a Tool for Sampling the WR-1 Reactor Core - 1900z

Whiteshell Laboratories, located in Manitoba, Canada, provided research facilities for the Canadian nuclear industry since the early 1960's. The facility was centered on an organically cooled, heavy water moderated nuclear reactor in the world, Whiteshell Reactor 1 (WR-1). WR-1 was safely shut down in 1985, de-fueled and drained, and has been in a safe Storage with Surveillance (Deferred Decommissioning) state until present day. In support of an Environmental Assessment for proposed In Situ Decommissioning of WR-1, detailed characterization information regarding the reactor core components (calandria, calandria tubes, pressure tubes) was necessary to verify inventory estimates and neutron activation models produced circa 1992. The Fuel Channels of WR-1 (pressure tubes) were expected to be the most activated components of the reactor core, and to account for about 60% of the reactor core inventory. The interior surface of the fuel channel is also the most readily accessible surface within the reactor core. As such the decision was made to collect a sample of one of each of 3 Fuel Channel material types (Stainless Steel, Zr-2.5Nb, Ozhenite) for comparison to modelled estimates of neutron activation of various core materials. The expected dose rates from the samples were between 5 and 100 mSv (500-10,000 mrem) on contact based on a 200 mg sample. Sampling the Fuel Channels required verification the Fuel Channel was drained of organic coolant, removal of residual organic coolant from the Fuel Channel wall, removal of material from the interior surface of the Fuel Channel at the centerline of flux (∼25' below the operator position), and extraction of that material from the core. Several options for existing tooling and technologies, including hydraulic scrapers, and horizontal drill technologies, were looked at for their applicability to WR-1. While suitable approaches to higher radiation field sample collection, they were overly complex, costly and time consuming for the configuration at WR-1. In an effort to reduce costs, and to simplify the sampling process, a specialized and simple tool was developed to mechanically scrape a small sample of the interior wall of the Fuel Channels, collect the sample into a vial, and remove the sample from the core for analysis. The tool was designed, constructed, tested and implemented in the field entirely by Canadian Nuclear Laboratories Staff. The tool required no powered components, or electronic guidance or measurements; and was designed and constructed for a fraction of the cost of other commercially available technologies for sample collection within reactor cores. The samples were successfully collected without any injuries, contamination events or equipment failures. The tool remains operational in the event additional sampling is required. This paper provides additional details of the design, construction, testing and use of the tool and the successes and lessons learned during the various stages of design and implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons Learned from Comprehensive Energy and Water Evaluations at U.S. Army Campus Installations

The U.S. Department of Energy’s Pacific Northwest National Laboratory has engaged in a multi-year collaboration with the U.S. Army to support comprehensive energy and water evaluations at large Army campus installations. Initiated to help the Army achieve compliance with facility evaluation requirements dictated by the Energy Independence and Security Act of 2007, this effort has resulted in the evaluation of 530 buildings at 14 installations across the U.S., and the identification of annual savings potential of over 212 billion Btu of energy and 29 million gallons of water. This paper highlights the nature of the evaluation process applied at these Army installations and discusses a number of key findings that can be considered for ongoing and future evaluations at Army and other federal agency facilities, particularly those buildings within campus settings.

Woodward, James C.↗