Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “grid optimization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A simple way to integrate distributed storage into a wholesale electricity market

Abstract Current plans to decarbonize the electric supply system imply that the generation from wind and solar sources will grow substantially. This growth will increase the uncertainty of system operations due to the inherent variability of these renewable sources, and as a result, more reserve capacity will be required to provide the ramping (flexibility) needed for reliable operations. This paper assumes that all of the increased uncertainty comes from wind farms on the grid, and it shows how distributed storage managed locally by aggregators can provide the ramping needed without introducing a separate market for flexibility. This can be accomplished when the aggregators minimize the expected daily cost of the energy purchased from the grid for their customers by submitting optimal bids into the wholesale market with high and low price thresholds for discharging and charging the storage. This model is illustrated using a stochastic multi-period security constrained optimal power flow together with realistic data for a reduction of the network in the Northeast Power Coordinating Council region of the United States. The results show that the bidding strategy for distributed storage provides ramping to the grid just as effectively as storage managed by a system operator.

Lamadrid, Alberto J.↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-tlie-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

28 EE - Advanced Manufacturing Office (EE-5A)↗

Probabilistic Resilience of DER Systems - A Simulation Assisted Optimization Approach

Energy systems resilience is becoming increasingly important as the frequency of major grid outages increases. In this work, we present a methodology to optimize a behind-the-meter distributed energy resource system to sustain a site's critical loads during a pre-defined outage period. With the fixed system design, we then propose an outage simulation approach to estimate the resilience potential of the DER system to sustain loads beyond the fixed outage period - a yearlong resilience performance analysis. We apply statistical analysis to assess the system's resilience performance over a broader parametric problem space on an hourly, monthly, and yearly basis. We demonstrate the impact of the pre-defined outage period on the resilience performance through a case study. Results show that the probability of surviving a random outage of a given duration changes from 20% to 95% when the outage is modeled for a weekday instead of a weekend for the given load-profile.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Solid State Power Substation DC Node Optimization and Controller Hardware-In-The-Loop Demonstration

A solid state power substation (SSPS) node is a microgrid that integrates distributed energy resources and loads and injects/absorbs power to/from the SSPS distribution network. It is an essential building block of a futuristic distribution grid network. This paper presents the development and demonstration of optimization use cases of a SSPS DC node. By adopting multi-layer hierarchical control architecture and developing automatic device identification and dynamic optimization formulation algorithms, the SSPS DC node can perform plug-and-play resource integration and seamless transition of the optimized node operation under on and off grid condition without sophisticated algorithms, control mode changes, and user interactions. Four optimization use cases including economic dispatches with price signal changes, a sudden PV power drop, and a single directional meter and its associated costs with sending power back to the grid, and resiliency under a grid inverter trip condition were demonstrated through the real-time controller hardware-in-the-loop simulation.

Kim, Namwon↗

An Optimized H5 Hysteresis Current Control with Clamped Diodes in Transformer-Less Grid-PV Inverter

With the rise of renewable energy penetration in the grid, photovoltaic (PV) panels are connected to the grid via inverters to supply solar energy. Transformer-less grid-tied PV inverters are gaining popularity because of their improved efficiency, reduced size, and lower costs. However, they can induce a path for leakage currents between the PV and the grid due to the absence of galvanic isolation. This leads to serious electromagnetic interference, loss in efficiency, and safety concerns. The leakage current is primarily influenced by the nature of the common mode voltage (CMV), which is determined by the switching techniques of the inverter. In this paper, a novel inverter topology of Hysteresis Controlled H5 with Two Clamping Diodes (HCH5-D2) is derived. The HCH5-D2 topology helps decouple the AC part (Grid) and DC part (PV) during the freewheeling period to make the CMV constant, thereby reducing the leakage current. Additionally, the extra diodes help reduce voltage spikes generated during the freewheeling period and maintain the CMV at a constant value. Finally, a 2.2 kW grid-connected single-phase HCH5-D2 PV inverter system’s MATLAB simulation is presented, showing better results compared to a traditional H4 inverter.

42 ENGINEERING↗

Analyzing and Minimizing Capacity Fade through Optimal Model-Based Control - Theory and Experimental Validation

In order to significantly expand the BEV market, and to increase the use of lithium-ion batteries in electric grids, there is a need to develop optimal charging strategies to utilize the batteries more efficiently and enable longer life. Advanced battery management systems that can calculate and implement such strategies in real time are expected to play a critical role for this purpose. This article investigates different approaches for determining model-based optimal charging profiles for batteries, and experimentally validates the gain obtained using such profiles. Optimal profiles that maximize the cycle life of the cells are implemented on 16 Ah NMC cells for 30 minutes of charge followed by 5C discharge, and the cycle life is compared to a standard 2C CC-CV charge and 5C discharge. An improvement of more than 100% in cycle life is observed experimentally, for our test conditions on this cell design. This study is the first to experimentally demonstrate that the improved extra knowledge obtained by sophisticated physics-based models results in significant improvements in battery performance when employed in a real time control algorithm.

25 ENERGY STORAGE↗

Distribution Grid Management in the Presence of Distributed Energy Resources

The global concerns over climate change, government policies, and incentives in support of distributed energy resources (DERs) are accelerating the growth of DERs in distribution networks. The growth in DER penetration levels can create various issues such as over/under voltages, reverse power flows, overloading, and protection miscoordination. State-of-the-art grid automation solutions such as advanced distribution management systems (ADMS) and distributed energy resource management systems (DERMS) can leverage the DERs to improve distribution grid operations. The ADMS offers advanced grid management functions such as Volt-VAR optimization (VVO), fault management, and outage management to the distribution operator to improve situational awareness and optimize network operations. The DERMS solutions aggregate the small-scale BTM DERs to provide grid services including demand response, voltage regulation, and situational awareness. In this presentation, distribution grid management approaches in the presence of DERs using ADMS and DERMS will be discussed.

ADMS↗

Scalable/Secure Cooperative Algorithms and Framework for Extremely-high Penetration Solar Integration (SolarExPert) (Final Technical Report)

This SolarExPert project has developed a Sustainable Grid Platform (SGP) with scalable architecture of distributed control and optimization. The SGP consists of the following major functions: 1) an advanced grid architecture with hierarchical and distributed communication and control, combined with the OpenFMB standard and implemented on the Multi-Agent OpenDSS (MA-OpenDSS) platform; 2) an online distributed stochastic optimal power flow; 3) an online distributed system state estimation algorithm; 4) the distributed Volt/VAR optimization and frequency control algorithms; 5) the distributed distribution system restoration strategy. The developed SGP together with advanced functions are tested in 1 million (1M)-node distribution system on the MA-OpenDSS platform. Furthermore, the models and algorithms are tested in 100,000-node system HiL simulation, and also in P-HiL implementation with 100 physical devices. The developed functions haven been validated and tested on the selected actual distribution feeder with the data collected from the field of Maui Meadows in Hawaii. The distributed PV hosting capacities with cooperative Volt/VAR and Volt/VAR/Watt control are estimated and compared to provide recommendations for customers and the utility company.

14 SOLAR ENERGY↗

Analysis of Cloud-Resolving Model Simulations for Scale Dependence of Convective Momentum Transport

Abstract We use 3D cloud-resolving model (CRM) simulations of two mesoscale convective systems at midlatitudes and a simple statistical ensemble method to diagnose the scale dependency of convective momentum transport (CMT) and CMT-related properties and evaluate a parameterization scheme for the convection-induced pressure gradient (CIPG) developed by Gregory et al. Gregory et al. relate CIPG to a constant coefficient multiplied by mass flux and vertical mean wind shear. CRM results show that mass fluxes and CMT exhibit strong scale dependency in temporal evolution and vertical structure. The upgradient–downgradient CMT characteristics for updrafts are generally similar between small and large grid spacings, which is consistent with previous understanding, but they can be different for downdrafts across wide-ranging grid spacings. For the small to medium grid spacings (4–64 km), Gregory et al. reproduce some aspects of CIPG scale dependency except for underestimating the variations of CIPG as grid spacing decreases. However, for large grid spacings (128–512 km), Gregory et al. might even less adequately parameterize CIPG because it omits the contribution from either the nonlinear-shear or the buoyancy forcings. Further diagnosis of CRM results suggests that inclusion of nonlinear-shear forcing in Gregory et al. is needed for the large grid spacings. For the small to median grid spacings, a modified Gregory et al. with the three-updraft approach help better capture the variations of CIPG as grid spacing decreases compared to the single updraft approach. Further, the optimal coefficients used in Gregory et al. seem insensitive to grid spacings, but they might be different for updrafts and downdrafts, for different MCS types, and for zonal and meridional components.

54 ENVIRONMENTAL SCIENCES↗

Microgrid Energy Management System Integration with Advanced Distribution Management System

The Integrated Distribution Management System (IDMS) project was initiated to demonstrate the interactive operation of microgrid systems and the distribution systems with which they interconnect. The key technologies for this are the microgrid management system and the utility distribution management system. The IDMS project successfully demonstrated that a utility’s advanced distribution management system/distributed energy resources management system (ADMS/DERMS) could effectively manage microgrids to provide visibility and control functionalities as well as use the microgrid as a dispatchable resource to support the utility grid. The DERMS accomplishes this by determining active and reactive power needs at the point of common coupling (PCC) using advanced applications like volt/VAR watt optimization (VVWO) and load relief (LR) with the underlying core applications state estimation (SE) and load flow (LF). The ADMS/DERMS can use the microgrid as a resource to resolve and prevent violations in the grid and to optimize the operational working state of the grid. The IDMS project demonstrated that a utility-operated ADMS with embedded DERMS functionality can flexibly manage a variety of microgrids and other aggregated distributed energy resources (DER) in concert with the wider distribution grid. Microgrids can provide grid services in any number of different ways to meet the operational needs of the distribution utility. The manner of aggregation — microgrid or virtual power plant — is not necessarily relevant to the utility as long as the grid services from the aggregated DER are available and can be managed by its ADMS/DERMS for the stability and reliability of the grid. The IDMS project demonstrated this integrated ADMS concept by combining hardware/software-in-the-loop testing with commercial products from different vendors and a utility’s network model. The project integrated the Schneider Electric EcoStruxure™ ADMS with DERMS with the Schweitzer Engineering Laboratories (SEL) POWERMAX ® Microgrid Control System, and the simulated resources with energy company PECO’s model of a utility-owned microgrid, establishing an operational relationship in which the utility manages the operational functionality of a microgrid at the PCC and that provides the utility with the capability to control the comprehensive power system, inclusive of the macrogrid and microgrid.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Resilience Assessment Framework For Electric Distribution Systems Performance Under Extreme Conditions

The devastating impact of extreme weather-related events is increasingly evident on power grids, especially on distribution grids. The severity of their potential impact calls for 1) developing a suitable resilience assessment framework to capture the system performance and 2) assessing relevant mitigative strategies to lessen the impact of such events. This paper proposes a framework to identify grid vulnerabilities using the energy-at-risk concept to select, disconnect and isolate grid portions due to a resilience event. The proposed framework mainly consists of two steps; i) processing the utility's available infrastructure, i.e., a network model, possible switching combinations, and outage information for those combinations, as a graph-based database, and ii) implementing a novel optimal switching algorithm leveraging database and grid simulated metrics. These switching actions are generated to implement load curtailment in a rolling manner during anticipated grid scarcity conditions. In this study, a test case is created using two taxonomy feeders and is simulated against an extreme temperature event, e.g., a long, relatively cold, and prolonged freeze peak, thereby creating stress on the grid. It is demonstrated that the proposed framework allows utilities to predict the energy-at-risk during such resilience events and design suitable outage management strategies.

Poudel, Shiva↗

Community Resilience Through Rapid Restoration Leveraging Distributed Energy Resources (DERs) and Low-Cost Sensors

Equitable and automated bottoms-up power restoration following an extreme event will be demonstrated at a site in Puerto Rico. To do so, the team will develop enhanced grid situational awareness techniques integrating behind-the-meter (BTM) distributed energy resources (DER) discovery, impedance sweeping based outage boundary detection, and feasible restoration path identification algorithms. Resilience metric will be developed and incorporated along with situational awareness information in a distributed Model Predictive Control (MPC)-based restoration optimization algorithm to control and mobilize grid assets. These algorithms will be validated through power hardware-in-the-loop experiments and ultimately, a site demonstration to show that outage recovery time and total recovered load could be improved by >20% over the baseline.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A grid-scale study of demand bidding by large industrial users

A demand bidding mechanism for engaging large industrial electricity users in the operation of the power grid is presented. Demand bidding is formulated as an optimization problem based on a modified version of the alternating current optimal power flow problem, and can be interpreted as a tâtonnement process between the grid operator and electricity users. Here, the work provides the first – to the authors’ knowledge – grid-scale case study of demand bidding, using a synthetic grid structure in the footprint of the grid of Texas. Results reveal that the demand bidding lowers overall power generation costs, but economic benefits plateau as the number of participants increases. Transmission line and transformer capacity constraints become the limiting factors, revealing that expanding and fortifying the transmission infrastructure is key to expanding demand-side participation. Demand bidding does not substantially alter the optimal operation of existing bidding entities when the number of bidders increases, thereby supporting existing bidders to stay in the system and encouraging new ones to join.

Chlor-alkali plant↗

Measurement placement in electric power transmission and distribution grids: Review of concepts, methods, and research needs

Sensing and measurement systems are quintessential to the safe and reliable operation of electric power grids. Their strategic placement is of ultimate importance because it is not economically viable to install measurement systems on every node and branch of a power grid, though they need to be monitored. An overwhelming number of strategies have been developed to meet oftentimes multiple conflicting objectives. The prime challenge in formulating the problem lies in developing a heuristic or an optimisation model that, though mathematically tractable and constrained in cost, leads to trustworthy technical solutions. Further, large-scale, long-term deployments pose additional challenges because the boundary conditions change as technologies evolve. For instance, the advent of new technologies in sensing and measurement, as well as in communications and networking, might impact the cost and performance of available solutions and shift initially set conditions. Also, the placement strategies developed for transmission grids might not be suitable for distribution grids, and vice versa, because of unique characteristics; therefore, the strategies need to be flexible, to a certain extent, because no two power grids are alike. Despite the extensive literature on the present topic, the focus of published works tends to be on a specific subject, such as the optimal placement of measurements to ensure observability in transmission grids. There is a dearth of work providing a comprehensive picture for developing optimal placement strategies. Because of the ongoing efforts on the modernisation of electric power grids, there is a need to consolidate the status quo while exposing its limitations to inform policymakers, industry stakeholders, and researchers on the research-and-development needs to push the boundaries for innovation. Accordingly, this paper first reviews the state-of-the-art considering both transmission and distribution grids. Then, it consolidates the key factors to be considered in the problem formulation. Finally, it provides a set of perspectives on the measurement placement problem, and it concludes with future research directions.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Effectively Considering the Distribution System in Integrated Resource Plans

While electricity planning practices vary by state and utility based on utility type and market structure, integrated resource planning (IRP) remains a prominent vehicle — even in states with centrally-organized wholesale electricity markets. IRP focuses on meeting forecasted long-term electricity needs. Typically, utilities have not considered impacts of design and operation of the low-voltage distribution network in IRP. With advanced capabilities of grid-edge technologies to generate and store electricity and provide load flexibility, and large utility investments in distribution systems, it's increasingly important to consider at least some distribution planning elements in IRP. This report considers the value proposition for doing so, such as reducing utility costs through resource co-optimization and strategic siting of grid-edge resources, and idenfities the most important touchpoints between planning for bulk power and distribution systems and provide a range of tactics for integrating these two processes.

Relf, Grace [Lawrence Berkeley National Laboratory↗