Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “flexible operation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Universal Passive Synchronization Method for Grid-Forming Inverters Without Mode Transition

Power systems are transforming with increasing levels of inverter-based resources (IBRs). This transformation requires critical roles of grid-forming (GFM) inverters replacing synchronous generators for bulk power system stabilization and ancillary services, also allowing flexible power system operation, such as microgrid that is operated by multiple GFM IBRs to achieve system resilience against contingencies. To realize the resilient power systems allowing flexible in-and-out operation of GFM IBRs potentially programmed with different primary controls, a synchronization method universally applicable, i.e., independent of control types, would be beneficial to ease the integration process, but it has not been actively studied. To fill the gap, this paper proposes a universal synchronization method that achieves a passive synchronization to enable a smooth transition in a grid with off-nominal system parameters, i.e., voltage and frequency. The logic proposed requires no modification on the primary control, thus applicable to any type of GFMs with a voltage reference input. To validate the concept, a simulation of an IEEE 13-bus benchmark system modified with 3 GFM inverters is presented. It simulates an inverter-driven black start scenario in which GFM inverters autonomously turn on and connect to the grid under heavy loading, using the synchronization logic. The case study demonstrates that GFM inverters can tune their voltage reference to smoothly synchronize without severe transients, and contribute to a seamless black start of the grid under unbalanced load conditions. Two GFM methods - Droop and dispatchable virtual oscillator control - are used for the demo to validate feasibility and interoperability of the passive synchronization.

black start↗

Solar PV Curtailment in Changing Grid and Technological Contexts: Preprint

Solar photovoltaic (PV) systems generate electricity with no marginal costs or emissions. As a result, PV output is almost always prioritized over other fuel sources and delivered to the electric grid. At increasing levels of PV penetration situations arise where PV is curtailed, either because of local supply/demand imbalances or to maintain system flexibility. In 2018, we estimate that about 6.5 million MWh of PV output was curtailed in four key countries: Chile, China, Germany, and the United States. We find that PV curtailment peaks in the spring and fall, when PV output is relatively high but electricity demand is relatively low. Similar to the case of wind, some PV curtailment is attributable to limited transmission capacity connecting sparsely populated solar-heavy regions to load centers.Grid policies generally seek to minimize curtailment because it is viewed as an economic and environmental loss. However, we argue that changing grid and technological contexts warrant new thinking on PV curtailment. In the grid context, as grids integrate more PV and other renewable energy generation, seeking an optimal level of accepted curtailment becomes more efficient than preventing it. In the technological context, emerging technologies such as advanced inverters and low-cost battery storage are making PV systems more flexible. With flexible PV, grid operators can use withheld PV output to provide various non-generation grid services. This withheld PV output is a form of curtailment under prevailing definitions of the term. Hence, policies that aim to minimize curtailment may undercut the ability of grid operators to fully use the emerging capabilities of flexible PV systems. We argue that the changing grid and technological contexts require a re-examination of the curtailment paradigm. We argue that PV output that is withheld to provide grid services is fundamentally different from output that goes unused in response to system constraints. As a result, we propose a more exclusive definition of curtailment as unused PV output rather than the more expansive conventional definition as any reduction in system output from its technical potential. The terminological distinction is more than a question of semantics. Facilitating grid services by withholding PV output may increase the potential value of flexible PV systems to the grid. This shift in thinking may allow grid operators and policymakers to think in terms of PV curtailment management rather than minimization. Effective curtailment management may include policies that increase PV system dispatchability, alternative PV compensation schemes that decouple generator revenue from system output, and policies to increase grid flexibility.

Chile↗

Developing energy flexibility in clusters of buildings: A critical analysis of barriers from planning to operation

This paper examines building energy flexibility at an aggregated level and addresses the main barriers and research gaps for the development of this resource across three design and development phases: market and policy, early planning and design, and operation. We review methodologies and tools and discuss barriers, challenges, and opportunities, incorporating policy, economic, technical, professional, and social perspectives. Although various legal and regulatory frameworks exist to foster the development of energy flexibility for small buildings, financing mechanisms are limited with a significant number of perceived risks undermining private investment. For the early planning and design phase, planners and designers lack appropriate tools and face interoperability challenges, which often results in insufficient consideration of demand response programs. The review of the operational phase highlighted the socio-technical challenges related to both the complexity of deployment and communication, as well as privacy and acceptability issues. Finally, the paper proposes a number of targeted research directions to address challenges and promote greater energy flexibility deployments, including capturing building demand side dynamics, improving baseline estimations and developing seamless connectivity between buildings and districts.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Robust VAR Capability Curve of DER with Uncertain Renewable Generation

Active distribution system with high penetration of inverter based distributed energy resources(DER), can be utilized for var-related ancillary services at the transmission side interface. In order to utilize the DER flexibility, transmission system operator must be presented the aggregated DER flexibility of distribution system. However, the uncertainty in renewable generation, questions the credibility of aggregated capability curve in practice. In this paper, we incorporate the uncertainty into aggregation process to develop capability curve while preserving the real physics (unbalance and lossy nature) of distribution system. The Resulting capability curve with the associated probability can be harnessed by the TSO for decision making for both planning and operation.

Kar, Aditya Shankar↗

Uprated OMS Engine Status-Sea Level Testing Results

The current Space Shuttle Orbital Maneuvering Engine (OME) is pressure fed, utilizing storable propellants. Performance uprating of this engine, through the use of a gas generator driven turbopump to increase operating pressure, is being pursued by the NASA Johnson Space Center (JSC). Component level design, fabrication, and test activities for this engine system have been on-going since 1984. More recently, a complete engine designated the Integrated Component Test Bed (ICTB), was tested at sea level conditions by Aerojet. A description of the test hardware and results of the sea level test program are presented. These results, which include the test condition operating envelope and projected performance at altitude conditions, confirm the capability of the selected Uprated OME (UOME) configuration to meet or exceed performance and operational requirements. Engine flexibility, demonstrated through testing at two different operational mixture ratios, along with a summary of projected Space Shuttle performance enhancements using the UOME, are discussed. Planned future activities, including ICTB tests at simulated altitude conditions, and recommendations for further engine development, are also discussed.

Bertolino, J. D.↗

DINGO: Digital assistant to grid operators for resilience management of power distribution system

With increasing adverse weather events and disasters, enabling resiliency of the power distribution system (PDS) is becoming increasingly important. Here in this work, resiliency is defined as the systems ability to keep supplying critical loads even with multiple contingencies. Resiliency may depend on: (a) advanced tools to assist operators in situational awareness and decision making with the increasing volume of data generated by the PDS, (b) visualization and ease of interaction with system resources and information, especially during extreme events and resulting human operator stress, and (c) flexible resources and autonomous control. Operators and support engineers need to interact with the system for key information and take action under stress, given the requirement for decisions in a short time. Integrated technological solutions are prevailing steps to support the most appropriate decision during critical times to serve essential loads. In order to meet the required goals, a Real-time Resiliency Monitoring and Operational Decision Support (RT-RMOD) tool have been developed. It supports various functionalities, including real-time monitoring, resilience assessment, and proactive decision support. However, this work makes advanced feature additions to the tool by developing data-enabled resilience management algorithms for (i) outage detection and localization, (ii) Resiliency-metric driven restoration and reconfiguration, and (iii) NLP based digital assistant for operators called DINGO (DIgital assistaNt to Grid Operators) to interact with Advanced Distribution Management System (ADMS) and RT-RMOD. The developed algorithm was validated for multiple cases of weather events using a real-world, off-grid microgrid system modeled in a real-time simulator, sensor data, and software tools.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A model to assess Zircaloy’s mechanical property changes following a transient beyond critical heat flux

Maintaining the integrity of nuclear fuel rods is essential for ensuring public health and safety in nuclear power generation. During reactor operation, this integrity is confirmed by demonstrating compliance with established regulatory acceptance criteria. For moderate-frequency events, such as limiting transients and anticipated operational occurrences (AOOs), the current fuel integrity criterion is based on preventing boiling transition. This criterion assumes that prevention of boiling transition will prevent excessive cladding heating and, thus, fuel failure during normal operations. While conservative, this approach places significant constraints on core design, fuel cycle economics, and a plant’s ability to perform major power uprates, leading to suboptimal fuel utilization and inefficient carbon-free energy production. A more efficient approach could be achieved by revising the failure criterion to a material-specific limit rather than strictly preventing the boiling transition, since boiling transition per se is not a cause of fuel cladding failure. Here, as a result, a new licensing framework based on material properties, termed time-at-temperature (t@T), is needed. This approach would allow for brief periods of post–critical heat flux operation during an AOO without compromising safety. Implementing the t@T licensing strategy requires a robust technical foundation in material properties, which must be established through comprehensive data collection on both unirradiated and irradiated fuel and cladding materials. This foundation would enable the development of a safety basis that ensures safe operation while providing greater flexibility and efficiency for reactor operation. This paper documents a thorough review of the available data to establish a baseline knowledge that can inform the development of cladding mechanical models, as well as identify experimental data gaps that need to be addressed in future research. Machine learning and data informatics were utilized to extract the importance of parameters on the t@T parameter. Industry tools were used to perform baseline analyses to define the relevant transient conditions for data analysis. The subsequent review successfully identified applicable experimental data, as well as sufficient data to evaluate changes in cladding mechanical properties following an AOO transient. Rather than developing new models, this work coupled existing irradiation annealing and recrystallization models to calculate changes in hardness, yield stress, and ultimate tensile stress following an AOO event. The findings from this review were summarized to highlight the experimental data needs required to fill remaining gaps and support the development of future t@T licensing methodologies.

Cladding performance↗

Development of Digital Twin-Informed Predictive Maintenance for Critical Components in Advanced Reactors

Small modular reactors (SMRs) and microreactors, along with other advanced reactor (AR) technologies, are key to the future of nuclear energy. For these systems to achieve low operating costs, high reliability, and flexibility across applications, their operation and maintenance must be optimized. Digital twin (DT) technology is one of the technologies that enables real-time (or faster than real-time) monitoring and prognosis of critical components which are vital for operational efficiency, low costs, and enhanced safety of ARs, accelerating their deployment. DT technology provides dynamic virtual representation of physical assets by integrating real-time data, physics-based models, and advanced analytics, which is critical to optimizing the performance of the entire energy system throughout the life cycle. DTs empower engineers and operators to virtually explore different scenarios, configurations, and control strategies, allowing for the identification of optimal solutions that maximize reactor efficiency, safety, and economics.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Coordinated operation of pumped-storage hydropower with power and water distribution systems

Small pumped-storage hydropower (PSH) units have gained popularity as distributed energy storage options that can provide flexibility to the operation of power distribution systems. Optimal operation of small PSH units is not only dependent on the energy storage provided to power distribution system, but also on the inflow and outflow of water from and to the water distribution system. Here, in this context, this paper develops an optimization model for coordinated operation of PSH units with power and water distribution systems. The proposed model optimizes the operation of water tanks, variable-speed pumps and PSH in pumping and generating modes to minimize the operation cost of power distribution system, while respecting the power flow constraints of power distribution and hydraulic constraints of water distribution system. Appropriate electricity tariffs are implemented to avoid additional expenses in water distribution system that can be enforced by its coordinated operation in favor of power distribution system. The proposed model is implemented on a 33-bus and a 123-bus test power distribution system connected to a 16-node test water distribution system. Results demonstrate the effectiveness of proposed model in tapping PSH flexibility to reduce the operation cost of power and water distribution systems, while meeting the power and water demands.

13 HYDRO ENERGY↗

Flight motor set 36OH005 (STS-28R). Volume 5: (Nozzle component)

A review of the performance and post flight condition of the STS-28 redesigned solid rocket motor (RSRM) nozzles is presented in this document. Applicable discrepancy reports (DR's) and process departures (PD's) are presented in section 5.0. The nozzle component program team (NCPT) performance evaluation and the redesign program review board (RPRB) assessment is included in section 6.0. The STS-28 nozzle assemblies were flown on the RSRM fifth flight (Space Shuttle Columbia). The nozzles were a partially submerged convergent/divergent movable design with an aft pivot point flexible bearing. The nozzle assemblies incorporated the following features: (1) RSRM forward exit cone with snubber assembly; (2) RSRM fixed housing; (3) structural backup outer boot ring (OBR); (4) RSRM cowl ring; (5) RSRM nose inlet assembly; (6) RSRM throat assembly; (7) RSRM forward nose and aft inlet ring; (8) RSRM aft exit cone assembly with linear-shaped charge (LSC); (9) RTV backfill in joints 1, 3, and 4; (10) use of EA913 NA adhesive in place of EA913; (11) redesigned nozzle plug; and (12) carbon cloth phenolic (CCP) with 750 ppm sodium content. The RSRM fifth flight test objectives are as follows: (1) verify that flexible bearing seals operate within the specified temperature range; (2) verify that flexible bearing maintained a positive gas seal between its internal components; (3) inspect flexible bearing for damage due to water impact; (4) verify performance of the nozzle liner; (5) verify that nozzle parts are reusable; (6) verify through flight demonstration and a postflight inspection that the flexible bearing is reusable; (7) verify by inspection the remaining nozzle ablative thicknesses; and (8) verify the nozzle performance margins of safety.

Smith, Dan M., Jr.↗

DSN co-observing operations to support space VLBI missions

Reliable radio astronomy support of space very long baseline interferometry (VLBI) missions by ground radio telescopes is mandatory in order to achieve a high scientific return from the missions. The 70 m DSN antennas along with other ground radio telescopes will perform as the ground segment of the earth-space interferometer. Improvements of radio astronomy VLBI operations at the DSN to achieve higher reliability, efficiency, flexibility, and lower operations costs is a major goal in preparing for radio astronomy support of SVLBI. To help realize this goal, a remote control and monitoring mode for radio astronomy operations at the DSN has been developed.

Altunin, Valery I.↗

DSN Co-Observing Operations to Support Space VLBI Missions

Reliable radio astronomy support of Space Very-Long-Baseline- Interferometry missions by ground radio telescopes is mandatory in order to achieve high scientific return from missions, The 70m DSN antennas along with other ground radio telescopes will perform as the ground segment of the Earth-space interferometer. Improvements of radio astronomy VLBI operations at the DSN to achieve higher reliability, efficiency, flexibility, and lower operations costs is a major goal in preparing for radio astronomy support of SVLBI. To help realize this goal, a remote control and monitoring mode for radio astronomy operations at the DSN is being developed.

radio↗

Short-Term Load Forecasting Considering EV Charging Loads with Prediction Interval Evaluation

Short-term load forecasting plays a critical role in power system planning and operation. Along with the electrification of various loads, electricity demands are becoming increasingly hard to predict. Notably, the recent rise in electric vehicles (EVs) has further contributed to this unpredictability. To address this issue, this paper proposes a probabilistic load forecasting strategy utilizing Gaussian process regression, structured in a day-ahead manner. While many works focus on deterministic prediction, probabilistic forecasting offers additional insights into variability and uncertainty, enabling more flexible and reliable operation for power systems. To enhance the accuracy of the load forecasting model, the inputs include features related to EV charging habits as well as commonly used weather information. The load forecasting results are evaluated using various metrics, including conventional ones that assess the accuracy of point forecasts, as well as additional metrics that test the reliability of prediction intervals. The proposed load forecasting method is finally tested on real residential power consumption data and EV charging data sampled from real-world sources. The results prove that the new features can greatly improve the performance of the load forecasting method.

electrical vehicle↗

The Hidden Flexibility of the Natural Gas Network for Electric Power Operations: A Case Study of a Near-Miss Winter Event

The U.S. power sector has become increasingly reliant on gas pipeline networks to deliver fuel to natural gas power plants. In addition to supplying relatively low-cost fuel, gas networks offer generators flexibility in their operations through the ability to deliver fuel when needed by using gas storage facilities or linepack if the gas network is at an operating point below its design capacity. However, disruptions or stress events on the gas network - like those occurring in the Northeast and Texas in recent years - can result in limitations on gas availability to generators at times when generation is in short supply. Here we examine a period of stress that occurred in the winter of 2022 in the Western United States. Using data on the region's natural gas pipeline network and electric generators, we build an integrated gas and electric model that closely replicates the actual dispatch of the period. We then evaluate the implications of removing flexibility employed by the gas network operator, which during that period curtailed scheduled gas deliveries to other parties to increase deliveries to natural gas power plants, which requested more gas than initially forecasted. We find that without the flexibility supplied by the gas network operator, there would have been curtailment of gas generation due to gas offtake constraints, requiring the power system operator to redispatch relying on more expensive generation or to potentially shed load. A sensitivity exploring a wind drought further exacerbates the strain, illustrating the potential challenge of managing gas and grid interactions as systems move to higher shares of variable renewable electricity. Based on this example, we discuss potential coordination strategies between the two system operators to ensure that the power system can successfully utilize and rely on the flexibility offered by natural gas networks.

03 NATURAL GAS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Report

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of subcritical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Transient Efficiency, Flexibility, and Reliability Optimization of Coal-Fired Power Plants - Final Program Review

This program developed an advanced model-based monitoring and model-predictive control algorithms for a coal fired power plant (CFPP), and deployed these algorithms in a real-time platform to demonstrate performance benefits for transient flexibility and plant operation efficiency. More specifically, the objectives were successfully achieved through a combination of (i) developing a high-fidelity transient plant model in Apros, which was used as a high-fidelity plant simulation between $100-50\% TMCR$ where TMCR denotes the turbine maximum continuous rating, i.e., baseload, (ii) developing a very fast physics-based reduced-order model (ROM) of the plant, which ran more than $100\times$ faster than real-time, enabling its use as real-time embedded model for model-based estimation (MBE) and model predictive control (MPC) (iii) implementing a real-time MBE based on ROM using a robust unscented Kalman filter (UKF) to continuously tune the ROM to match the measurements from high-fidelity Apros plant model despite significant plant-model mismatch, and thus, obtain a Digital Twin of the plant (iv) designing and implementing a real-time MPC with dual objectives of transient plant load tracking with high ramp rates and minimizing coal consumption, i.e., improving plant efficiency in the baseload-partload operation range of $100-50\% TMCR$. Each key element above was developed and tested individually, and has been reported in corresponding Topical Reports. Finally, all the individual elements were integrated in an overall closed-loop system, that was successfully tested in desktop Simulink test harness simulations with ROM or high-fidelity model as the plant. Thereafter, the Simulink implementation was used to auto-generate C-code and deploy as real-time Docker microservice containers in Linux, and validate that they can run in real-time in the hardware-in-the loop (HIL) setup and produce the same results as in Simulink. The results of the integrated simulation tests in Simulink as well as the real-time HIL deployment are documented in this final report, showing good load tracking for load ramps at $3-4\%/min$ ramp rates, and achieving up to $5.5\%$ reduction in coal relative to baseline operation at $50\% TMCR$ load. The desktop and HIL simulations show successful performance of the overall model based estimation and control solution and achieve the key objectives of the program for flexible, efficient and reliable operation of sub-critical coal fired power plants.

20 FOSSIL-FUELED POWER PLANTS↗

Development of the Tensoral Computer Language

The research scientist or engineer wishing to perform large scale simulations or to extract useful information from existing databases is required to have expertise in the details of the particular database, the numerical methods and the computer architecture to be used. This poses a significant practical barrier to the use of simulation data. The goal of this research was to develop a high-level computer language called Tensoral, designed to remove this barrier. The Tensoral language provides a framework in which efficient generic data manipulations can be easily coded and implemented. First of all, Tensoral is general. The fundamental objects in Tensoral represent tensor fields and the operators that act on them. The numerical implementation of these tensors and operators is completely and flexibly programmable. New mathematical constructs and operators can be easily added to the Tensoral system. Tensoral is compatible with existing languages. Tensoral tensor operations co-exist in a natural way with a host language, which may be any sufficiently powerful computer language such as Fortran, C, or Vectoral. Tensoral is very-high-level. Tensor operations in Tensoral typically act on entire databases (i.e., arrays) at one time and may, therefore, correspond to many lines of code in a conventional language. Tensoral is efficient. Tensoral is a compiled language. Database manipulations are simplified optimized and scheduled by the compiler eventually resulting in efficient machine code to implement them.

Ferziger, Joel↗

ISS Payload Operations: The Need for and Benefit of Responsive Planning

International Space Station (ISS) payload operations are controlled through implementation of a payload operations plan. This plan, which represents the defined approach to payload operations in general, can vary in terms of level of definition. The detailed plan provides the specific sequence and timing of each component of a payload's operations. Such an approach to planning was implemented in the Spacelab program. The responsive plan provides a flexible approach to payload operations through generalization. A responsive approach to planning was implemented in the NASA/Mir Phase 1 program, and was identified as a need during the Skylab program. The current approach to ISS payload operations planning and control tends toward detailed planning, rather than responsive planning. The use of detailed plans provides for the efficient use of limited resources onboard the ISS. It restricts flexibility in payload operations, which is inconsistent with the dynamic nature of the ISS science program, and it restricts crew desires for flexibility and autonomy. Also, detailed planning is manpower intensive. The development and implementation of a responsive plan provides for a more dynamic, more accommodating, and less manpower intensive approach to planning. The science program becomes more dynamic and responsive as the plan provides flexibility to accommodate real-time science accomplishments. Communications limitations and the crew desire for flexibility and autonomy in plan implementation are readily accommodated with responsive planning. Manpower efficiencies are accomplished through a reduction in requirements collection and coordination, plan development, and maintenance. Through examples and assessments, this paper identifies the need to transition from detailed to responsive plans for ISS payload operations. Examples depict specific characteristics of the plans. Assessments identify the following: the means by which responsive plans accommodate the dynamic nature of science programs and the crew desire for flexibility; the means by which responsive plans readily accommodate ISS communications constraints; manpower efficiencies to be achieved through use of responsive plans; and the implications of responsive planning relative to resource utilization efficiency.

Nahay, Ed↗