Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “failure diameter”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Microstructural Characteristics of HIP-bonded Monolithic Nuclear Fuels with a Diffusion Barrier

Due to the limitation of maximum uranium load achievable by dispersion fuel type, the Global Threat Reduction Initiative (GTRI) is developing an advanced monolithic fuel to convert US high performance research reactors to low-enriched uranium. Hot-isostatic-press bonding was the single process down-selected to bond monolithic U-Mo fuel meat to aluminum alloy cladding. A diffusion barrier was applied to the U–Mo fuel meat by roll-bonding process to prevent extensive interaction between fuel meat and aluminum-alloy cladding. Microstructural characterization was performed on fresh fuel plates fabricated at Idaho National Laboratory. Interfaces between fuel meat, cladding, and diffusion barrier, as well as U–10Mo fuel meat and Al–6061 cladding were characterized by scanning electron microscopy. Preliminary results indicate that the interfaces contain many different phases while decomposition, second phases, and chemical banding were also observed in the fuel meat. The important attributes of the HIP-bonded monolithic fuel are • A typical Zr diffusion barrier of thickness 25 µm • Transverse cross section that exhibits relatively equiaxed grains with an average grain diameter of 10 µm • Chemical banding, in some areas more than 100 µm in length, that is very pronounced in longitudinal (i.e., rolling) direction with Mo concentration varying from 7–13 wt% • Decomposed areas containing plate-shaped low-Mo phase • A typical Zr/cladding interaction layer of thickness 1-2 µm • A visible UZr2 bearing layer of thickness 1-2 µm • Mo-rich precipitates (mainly Mo2Zr, forming a layer in some areas) followed by a Mo-depleted sub-layer between the visible UZr2-bearing layer and the U–Mo matrix • No excessive interaction between cladding and the uncoated fuel edge • Cladding-to-cladding bonding that exhibits no cracks or porosity with second phases high in Mg, Si, and O decorating the bond line. • Some of these attributes might be critical to the irradiation performance of monolithic U-10Mo nuclear fuel. There are several issues or concerns that warrant more detailed study, such as precipitation along cladding-to-cladding bond line, chemical banding, uncovered fuel-zone edge, and interaction layer between U–Mo fuel meat and zirconium. Future post-irradiation examination results will focus, among other things, on identifying in-reactor failure mechanisms and, eventually, directing further fresh fuel characterization efforts.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Benefits of Synchrotron Microangiography for Dynamic Studies of Smooth Muscle and Endothelial Roles in the Pathophysiology of Vascular Disease

Changes in endothelial and smooth muscle function compromise organ perfusion in the chronic disease states of diabetes, atherosclerosis and hypertension. Moreover, vascular dysfunction increases the likelihood of lethal acute events such as myocardial infarction and stroke, which are now leading causes of adult mortality. Many circulating and local tissue factors in these disease states contribute to impaired vasomotor regulation of the arterial vessels, leading to spasm, chronic constriction and eventually vessel remodelling. X-ray contrast absorption imaging allows assessment of vessel lumen diameter and the factors contributing to steady-state vessel calibre, however, conventional clinical devices (>200 {mu}m resolution) are not adequate to detect microvessels or accurately assess function in real time. Using synchrotron imaging we are now able to detect small vessel calibres ({approx}30 {mu}m) and quantify regional differences in calibre even under conditions of high heart rate (>500 bpm). Herein we describe recent experiments that were conducted at the Japanese Synchrotron, SPring-8 using anaesthetised Sprague-Dawley rats and C57Bl/6 mice and a synchrotron radiation contrast angiography (single narrow energy bandwidth) approach based on selective arterial injection of iodine contrast agents. Application of this approach to imaging of the heart and other vasculatures are described. Our studies show that within-animal comparisons of 3-4 branching orders of arterial vessels are possible using small bolus contrast injections and appropriate contrast washout times (15-30 min) in many organ systems. Determination of relative calibre changes before and after any treatment allows us to evaluate the contributions of different endogenous factors and ligand-receptor pathways in the maintenance of vasomotor tone. Finally, we will present our findings relating to novel therapies to prevent endothelial dysfunction in heart failure.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Out-of-plane properties

This paper summarizes three areas of research which were performed to characterize out-of-plane properties of composite materials. In the first investigation, a series of tests was run to characterize the through-the-thickness tensile strength for a variety of composites that included 2D braids, 2D and 3D weaves, and prepreg tapes. A new test method based on a curved beam was evaluated. Failures were significantly different between the 2D materials and the 3D weaves. The 2D materials delaminated between layers due to out-of-plane tensile stresses while the 3D weaves failed due to the formation of radial cracks between the surface plies caused by high circumferential stresses along the inner radius. The strength of the 2D textile composites did not increase relative to the tapes. Final failure in the 3D weaves was caused by a circumferential crack similar to the 2D materials and occurred at a lower bending moment than in other materials. The early failures in the 3D weaves were caused by radial crack formation rather than a low through-the-thickness strength. The second investigation focused on the development of a standard impact test method to measure impact damage resistance. The only impact tests that currently exist are compression after impact (CAI) tests which incorporate elements of both damage resistance and damage tolerance. A new impact test method is under development which uses a quasi-static indentation (QSI) test to directly measure damage resistance. Damage resistance is quantified in terms of the contact force to produce a unit of damage where a metric for damage may be area in C-scan, depth of residual dent , penetration, damage growth, etc. A final draft of an impact standard that uses a QSI test method will be presented to the ASTM Impact Task Group on impact. In the third investigation, the impact damage resistance behavior of a variety of textile materials was studied using the QSI test method. In this study, the force where large damage initiates was measured and the delamination size as a function of force was determined. The force to initiate large damage was significantly lower in braids and weaves. The delamination diameter - impact forace relationship was quanitfied using a damage resistance parameter, Q(*), which related delamination diameter to imapct force over a range of delamination sizes. Using this Q(*) parameter to rate the materials, the stitched uniweaves, toughened epoxy tapes, and through-the-thickness orthogonal interlock weave were the most damage resistant.

Jackson, Wade C.↗

Scaling of thermal stratification in outlet plena of SFRs with gallium as a surrogate fluid

Due to its high thermal diffusivity, liquid sodium can develop thermally stratified regions in the hot and cold pools of SFRs under certain off normal operating conditions. The temperature gradients in the fluid give rise to mixed convection flow in which flow velocities result both from pressure gradients and from volume forces induced by density gradients. High thermal diffusivity and low momentum diffusivity leads to reduced thermal mixing and enhanced stratification. Thermal stratification, if not looked carefully in the design, can lead to severe consequences in normal operation with forced coolant circulation and during off-normal natural circulation. The resulting hydraulic and thermal loads can cause the failure modes in structures and components critical for reactor safety. Thermal stratification in the SFR pools can lead to thermal fatigue, which can lead to structural and material failure, or pose serious concerns for the reactor safety. In addition to thermo-structural issues, the reactivity changes are significantly impacted due to density or temperature driven movement of liquid sodium. Temperature changes or gradients in the Upper Instrumentation Structures (UIS) of SFRs can lead to thermal contraction, a case that can lead to positive reactivity insertion after core shut-down. The motivation of this work is to design a scaled down experimental facility which can generate high fidelity data for thermal stratification physics to validate 3-dimensional (3D) Computational Fluid Dynamics (CFD) models. These validated CFD codes can be used to improve the 1-dimensional (1D) system level codes such as SAS4A/SASSYS-1 which are currently not capable of simulating thermal stratification accurately. These improvements in 1D system level SAS4A/SASSYS-1 codes can significantly improve the safety analyses and design of SFRs. The GaTE facility outlet plenum model is designed based on physics based similarities. Thermal stratification physics is governed primarily by the Richardson numbers (Ri). The expected low flow rates during off-normal conditions can lead to a high degree of thermal stratification in the outlet plenum with a corresponding Ri = 530. Therefore, the inlet flow velocities and inlet hydraulic diameter for the gallium coolant entering the test vessel are required to achieve same Ri. The design of test vessel in GaTE facility is finalized to a 1/20. scale outlet plenum height of the ABTR. This design of the test facility will allow the decoupling of the thermal stratification physics at low flow rates with the transient natural circulation. In other words, it will enable effective control to study thermal stratification at very low flow rates. Numerical studies are conducted with a 3D CFD code to examine the thermal behavior of the selected test design. Simulation results show that thermal gradients are present only in the vertical or axial direction which are similar to the behavior reported in previous studies on full scale SFR models. Future work will involve the experimental studies using the GaTE facility with the high fidelity instrumentation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Antifouling Properties of a Self-Assembling Glutamic Acid-Lysine Zwitterionic Polymer Surface Coating

There is a necessity for the development of antifouling materials to resist adsorption of biomacromolecules. Here we describe the preparation of a novel zwitterionic block copolymer with the potential to prevent or delay the formation of microbial biofilms. The block copolymer comprised a zwitterionic (hydrophilic) section of alternating glutamic acid (negatively charged) and lysine (positively charged) units and a hydrophobic polystyrene section. Cryo-TEM and dynamic light-scattering (DLS) results showed that, on average, the block copolymer self-assembled into 7-nm-diameter micelles in aqueous solutions (0 to 100 mM NaCl, pH 6). Quartz crystal microbalance with dissipation monitoring (QCM-D), atomic force microscopy (AFM), and contact angle measurements demonstrated that the block copolymer self-assembled into a brush-like monolayer on polystyrene surfaces. The brush-like monolayer produced from a 100 mg/L block copolymer solution exhibited an average distance, d, of approximately 4-8 nm between each block copolymer molecule (center to center). Once the brush-like monolayer self-assembled, it reduced EPS adsorption onto the polystyrene surface by similar to 70% (mass), reduced the rate of bacterial attachment by >80%, and inhibited the development of thick biofilms. QCM-D results revealed that the EPS molecules penetrate between the chains of the brush and adsorb onto the polystyrene surface. Additionally, AFM analyses showed that the brush-like monolayer prevents the adhesion of large (>d) hydrophilic colloids onto the surface via hydration repulsion; yet, molecules or colloids small enough to fit between the brush polymers (<d) were able to be adsorbed onto the surface via van der Waals interactions. Overall, we found that the penetration of extracellular organelles, as well as biopolymers through the brush, is essential for the failure of the antifouling coating, and likely could be prevented through tuning of the brush density. Stability and biofilm development testing on multiple surfaces (polypropylene, glass, and stainless steel) support practical applications of this novel block copolymer.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

High reliability bond program using small diameter aluminum wire

The program was undertaken to characterize the performance of small diameter aluminum wire ultrasonically bonded to conductors commonly encountered in hybrid assemblies, and to recommend guidelines for improving this performance. Wire, 25.4, 38.1 and 50.8 um (1, 1.5 and 2 mil), was used with bonding metallization consisting of thick film gold, thin film gold and aluminum as well as conventional aluminum pads on semiconductor chips. The chief tool for evaluating the performance was the double bond pull test in conjunction with a 72 hour - 150 C heat soak and -65 C to +150 C thermal cycling. In practice the thermal cycling was found to have relatively little effect compared to the heat soak. Pull strength will decrease after heat soak as a result of annealing of the aluminum wire; when bonded to thick film gold, the pull strength decreased by about 50% (weakening of the bond interface was the major cause of the reduction). Bonds to thin film gold lost about 30 - 40% of their initial pull strenth; weakening of the wire itself at the bond heel was the predominant cause. Bonds to aluminum substrate metallization lost only about 22%. Bonds between thick and thin film gold substrate metallization and semiconductor chips substantiated the previous conclusions but also showed that in about 20 to 25% of the cases, bond interface failure occurred at the semiconductor chip.

Macha, M.↗

A New Approach to Micro-arcsecond Astrometry with SIM Allowing Early Mission Narrow Angle Measurements of Compelling Astronomical Targets

The Space Interferometry Mission (SIM) is capable of detecting and measuring the mass of terrestrial planets around stars other than our own. It can measure the mass of black holes and the visual orbits of radio and x-ray binary sources. SIM makes possible a new level of understanding of complex astrophysical processes. SIM achieves its high precision in the so-called narrow-angle regime. This is defined by a 1 degree diameter field in which the position of a target star is measured with respect to a set of reference stars. The observation is performed in two parts: first, SIM observes a grid of stars that spans the full sky. After a few years, repeated observations of the grid allow one to determine the orientation of the interferometer baseline. Second, throughout the mission, SIM periodically observes in the narrow-angle mode. Every narrow-angle observation is linked to the grid to determine the precise attitude and length of the baseline. The narrow angle process demands patience. It is not until five years after launch that SIM achieves its ultimate accuracy of 1 microarcsecond. The accuracy is degraded by a factor of approx. 2 at mid-mission. Our work proposes a technique for narrow angle astrometry that does not rely on the measurement of grid stars. This technique, called Gridless Narrow Angle Astrometry (GNAA) can obtain microarcsecond accuracy and can detect extra-solar planets and other exciting objects with a few days of observation. It can be applied as early as during the first six months of in-orbit calibration (IOC). The motivations for doing this are strong. First, and obviously, it is an insurance policy against a catastrophic mid-mission failure. Second, at the start of the mission, with several space-based interferometers in the planning or implementation phase, NASA will be eager to capture the public's imagination with interferometric science. Third, early results and a technique that can duplicate those results throughout the mission will give the analysts important experience in the proper use and calibration of SIM.

Shaklan, Stuart↗

Chamber Interior Viewing System (CIVS 2.0)

The NIF facility is used to conduct fusion and high-density scientific research. The experiments are conducted inside of a 10-meter diameter vacuum chamber called the “Target Chamber”. The target chamber is covered in ports to permit adding equipment to the exterior. Some of this equipment extends into the target chamber such as the target positioners and diagnostics. Other equipment sits on the surface and looks inward, such as the CIVS system. CIVS stands for Chamber Interior Viewing System. The CIVS system provides simple black and white digital images of the interior of the target chamber in real time. These images are used for positioner alignment, trouble shooting and observing for positioner collision. The views through these cameras need to be clear enough for the operators to safely conduct these tasks. One of the products of the experiments conducted in the target chamber are neutrons. These neutrons expand outward from the center of the target chamber with great energy. If the neutrons hit the sensor chip on a digital camera they will “kill” the sensor pixel where they contact, and the result will be a permanently bright white pixel on the image. Over time these “dead” pixels will build up and make the camera less and less usable providing a “staticky” image. The current solution of replacing the cameras when they become damaged is unsustainable due to both the cameras being out of production and the increased rate of camera failure based upon the increased number and energy of neutrons being generated. Current supplies of the correct camera type are dwindling with no source of replacement and the projected rate of replacement is unsustainable. Without a redesign, the function provided by the current CIVS system will be lost.

42 ENGINEERING↗

Microstructural characterization of an irradiated RERTR-6 U-7Mo/AA4043 alloy dispersion fuel plate specimen blister-tested to a final temperature of 500°C

The Material Management and Minimization (M3) Reactor Conversion Program, in the past called the Reduced Enrichment for Research and Test Reactor (RERTR) Program, is developing low-enriched uranium (LEU) fuels for application in research reactors. U–Mo alloy dispersion fuel is one type being developed. Blister testing has been performed on different fuel plate samples to determine the margin to failure for fuel plates irradiated to different fission densities. Microstructural characterization was performed using scanning electron microscopy and transmission electron microscopy on a sample taken from a U-7Mo/AA4043 matrix dispersion fuel plate irradiated in the RERTR-6 experiment that was blister-tested up to a final temperature of 500°C. The results indicated that two types of grain/cell boundaries were observed in the U- 7Mo fuel particles, one with a relatively low Mo content and fission gas bubbles and a second type enriched in Si, due to interdiffusion from the Si-containing matrix, with little evidence of fission gas bubbles. With respect to the behavior of the major fission gas Xe, a significant amount of the Xe was still observed within the U-7Mo fuel particle, along with microns into the AA4043 matrix. For the fuel/matrix interaction layers that form during fabrication and then grow during irradiation, they change from the as-irradiated amorphous structure to one that is crystalline after blister testing. In the AA4043 matrix, the original Si-rich precipitates, which are typically observed in as-irradiated U-Mo dispersion fuel, get consumed due to interdiffusion with the U-7Mo fuel particles during the blister test. Lastly, the fission gas bubbles that were originally around 2 nm in diameter and resided on a fission gas superlattice in the intragranular regions of as-irradiated U-7Mo fuel grew in size (up to ~20 nm diameter) during blister testing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Asperity generation and its relationship to seismicity on a planar fault: A laboratory simulation

Earthquake faults, and all frictional surfaces, establish contact through asperities. A detailed knowledge of how asperities form will enable a better understanding of the manner in which they communicate during foreshock failure sequences that are observed, leading to the larger main shock. We present results of experiments where a pressure sensitive film was used to map, size and measure the magnitudes of the normal stresses at asperities along a seismogenic section of a laboratory simulated fault. We measured seismicity acoustically and foreshocks were found to be the result of localized asperity failure during the nucleation phase of gross fault rupture. Since surface roughness plays an important role in how asperities are formed, two Hurst exponents were measured to characterize a highly worn interface using roughness profiles: (i) long wavelength estimates (H ~ 0.45) and (ii) short wavelength estimates (H ~ 0.8-1.2). The short wavelength roughness estimates were computed at the scale of single asperity junction points. Macroscopically, the number of asperities and real contact area increased with additional application of normal force while the mean normal stress remained constant. The ratio of real to nominal contact area was low - ranging from 0.02 < A r /A 0 < 0.05-predicting that the asperities should be elastically independent of each other. Results from the pressure sensitive film showed that asperities were closely spaced and could not be treated as mechanically independent. Larger asperities carried both higher levels of average normal stress and higher levels of normal stress heterogeneity than smaller ones. Using linear stability theorem, the critical slip distance on foreshocking asperities was estimated to be d 0 ~ 0.65-3 μm. The critical slip distance d 0 was ~1.8-11.5 per cent of the premonitory slip needed to initiate gross fault rupture of the interface (20-40 μm) and the overall slip necessary to initiate gross fault rupture was on the order of the average asperity diameter (52 μm). In conclusion, foreshocks may be due to a change in the critical slip distance, at localized sections of the fault, caused by the two distinct roughness profiles measured at short and long length scales.

58 GEOSCIENCES↗

Large Payload Ground Transportation and Test Considerations

During test and verification planning for the Altair lunar lander project, a National Aeronautics and Space Administration (NASA) study team identified several ground transportation and test issues related to the large payload diameter. Although the entire Constellation Program-including Altair-has since been canceled, issues identified by the Altair project serve as important lessons learned for payloads greater than 7 m diameter being considered for NASA's new Space Launch System (SLS). A transportation feasibility study found that Altair's 8.97 m diameter Descent Module would not fit inside available aircraft. Although the Ascent Module cabin was only 2.35 m diameter, the long reaction control system booms extended nearly to the Descent Module diameter, making it equally unsuitable for air transportation without removing the booms and invalidating assembly workmanship screens or acceptance testing that had already been performed. Ground transportation of very large payloads over extended distances is not generally permitted by most states, so overland transportation alone would not be an option. Limited ground transportation to the nearest waterway may be possible, but water transportation could take as long as 66 days per production unit, depending on point of origin and acceptance test facility; transportation from the western United States would require transit through the Panama Canal to access the Kennedy Space Center launch site. Large payloads also pose acceptance test and ground processing challenges. Although propulsion, mechanical vibration, and reverberant acoustic test facilities at NASA's Plum Brook Station have been designed to accommodate large spacecraft, special handling and test work-arounds may be necessary, which could increase cost, schedule, and technical risk. Once at the launch site, there are no facilities currently capable of accommodating the combination of large payload size and hazardous processing such as hypergolic fuels, pyrotechnic devices, and high pressure gasses. Ironically, the limiting factor to a national heavy lift strategy may not be the rocket technology needed to throw a heavy payload, but rather the terrestrial infrastructure-roads, bridges, airframes, and buildings-necessary to transport, acceptance test, and process large spacecraft. Failure to carefully consider where and how large spacecraft are manufactured, tested, and launched could result in unforeseen cost to modify existing (or develop new) infrastructure, or incur additional risk due to increased handling operations or eliminating key verifications.

Rucker, Michelle A.↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR) 5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) in support of the development and qualification of tri-structural isotropic (TRISO) low enriched fuel for use in high-temperature gas-cooled reactors (HTGR). The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR 5/6/7 experiment were to: 1. Irradiate reference-design fuel particles to support fuel qualification. 2. Establish operating margins for the fuel, beyond normal operating conditions. 3. Provide irradiated-fuel performance data and irradiated-fuel samples for post irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective is to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR 5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast (NE) flux trap of the ATR with a planned duration of 500 effective full-power days (EFPDs). The NE flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B?168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 EFPDs. Final burnup values, on a per-compact basis, ranged from 5.66% to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples (TC) had failed (the bottom three capsules lost all TCs). During the first five cycles (162B ? 165A), fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8?10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to the maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particle failures in Capsule 3, which was considered possible at the start of the irradiation, since the experiment was designed to operate beyond the high-temperature gas-cooled reactor (HTGR) normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

DCIF (Directional Cooling-Induced Fracturing) Westerly Granite AE Borehole Damage Effect Test (Task 3-0)

Directional Cooling-Induced Fracturing (DCIF) experiments were conducted on three rectangular Westerly granite blocks (width=depth=4.0", height=2.0") which were preheated to 200, 400, and 600 degree C to induce damage (microcracks) with varying degrees. Liquid nitrogen was poured in a small, 1"-diameter copper cup attached to the top of the sample, and the resulting acoustic emissions (AEs) and temperature changes on the surface of the sample were monitored. The experiments were conducted under one selected biaxial stress (5.8MPa). The obtained AEs were used to determine the microcracking source locations and amplitude, and the associated moment tensors. The onset time of the AEs was correlated with the cooling temperature, which was used to show that the temperature at the onset of microcracking is not affected significantly by the preexisting damage, compared to the impact of the stress in the sample. Included in this submission are the animations of the AE locations and graphics displaying the measured temperature-AE activity changes for samples with different degrees of microcrack damage.

15 GEOTHERMAL ENERGY↗

Design Optimization and Analysis of a Composite Honeycomb Intertank

Intertanks, the structure between tanks of launch vehicles, are prime candidates for weight reduction of rockets. This paper discusses the optimization and detailed analysis of a 96 in (2.44 m) diameter, 77 in (1.85 m) tall intertank. The structure has composite face sheets and an aluminum honeycomb core. The ends taper to a thick built up laminate for a double lap bolted shear joint. It is made in 8 full length panels joined with bonded double lap joints. The nominal load is 4000 lb/in (7 x 10(exp 5) N/m). Optimization is by Genetic Algorithm and minimizes weight by varying C, core thickness, number and orientation of acreage and buildup plies, and the size, number and spacing of bolts. A variety of cases were run with populations up to 2000 and chromosomes as long as 150 bits. Constraints were buckling, face stresses (normal, shear, wrinkling and dimpling, bolt stress, and bolt hole stresses (bearing, net tension, wedge splitting, shear out and tension/shear out). Analysis is by a combination of theoretical solutions and empirical data. After optimization, a series of coupon tests were performed in conjunction with a rigorous analysis involving a variety of finite element models. The analysis and test resulted in several small changes to the optimized design. The intertank has undergone a 250,000 lb (1.1 x 10(exp 6) N) limit load test and been mated with a composite liquid hydrogen tank. The tank/intertank unit is being installed in a test stand where it will see 200 thermal/load cycles. Afterwards the intertank will be demated and loaded in compression to failure.

Finckenor, Jeffrey↗

AGR-5/6/7 Irradiation Test Final As-run Report

This document presents the as-run analysis of the Advanced Gas Reactor (AGR)-5/6/7 irradiation experiment. AGR-5/6/7 is the last of a series of experiments conducted in the Advanced Test Reactor (ATR) at Idaho National Laboratory in support of the development and qualification of tri-structural isotropic low-enriched fuel for use in high-temperature gas-cooled reactors. The test train contained five separate capsules that were independently controlled and monitored. Each capsule contained multiple 24.91-mm-long and 12.25-mm-dimeter compacts filled with low-enriched uranium carbide/oxide tri-structural isotropic fuel particles. The objectives of the AGR-5/6/7 experiment were to: • Irradiate reference-design fuel particles to support fuel qualification. • Establish operating margins for the fuel, beyond normal operating conditions. • Provide irradiated-fuel performance data and irradiated-fuel samples for post-irradiation examination and safety testing. The primary objective of the AGR-5/6 test (Capsules 1, 2, 4, and 5) was to verify the successful performance of the reference-design fuel under normal operating conditions. The AGR-7 test (Capsule 3) was designed to explore fuel performance at higher temperatures. Its primary objective was to demonstrate the capability of the fuel to withstand conditions beyond normal operating conditions, in support of plant design and licensing. AGR-5/6/7 will also provide irradiated-fuel performance data based on the fission gas release from particles during irradiation. To achieve the test objectives, the AGR-5/6/7 experiment was irradiated in the northeast flux trap of the ATR with a planned duration of 500 effective full-power days. The northeast flux trap was selected because its larger diameter provided greater flexibility for test-train design compared to the Large B positions used for the AGR-1 and AGR-2 irradiations, significantly enhancing test capabilities for the combined irradiation campaigns. Due to delays in the ATR schedule, the AGR-5/6/7 irradiation was significantly shorter than the originally planned 13-cycle schedule. Irradiation began on February 16, 2018 and ended on July 22, 2020, spanning nine ATR cycles (162B–168A) over two and a half years. Thus, the AGR-5/6/7 fuel compacts were irradiated for a total of approximately 360.9 effective full-power days. Final burnup values, on a per-compact basis, ranged from 5.66 to 15.26% fissions per initial heavy metal atom, while fast fluence values ranged from 1.62 to 5.55 × 1025 n/m2 (E >0.18 MeV). Time-averaged volume-averaged fuel temperatures on a capsule basis at the end of irradiation ranged from 756°C in Capsule 5 to 1313°C in Capsule 3 excluding days with significantly lower temperature during the two short powered axial locator mechanism cycles, 163A and 167A. By the end of irradiation, 48 out of 54 installed thermocouples had failed (the bottom three capsules lost all thermocouples). During the first five cycles (162B – 165A), the fission-gas isotope release-rate-to-birthrate (R/B) ratios were stable in the 10-8–10-6 range, and no in-pile particle failures were observed based on the gross gamma counts. During this time, the high exposed kernel fraction and high fuel particle temperatures in Capsule 1 led to a maximum R/B value of around 2 ? 10-6 for Kr-85m. The fission gas release in all capsules started to increase from the second half of Cycle 166A, when a large number of in-pile particle failures occurred in Capsule 1 and a gas line problem in this capsule caused fission gas leakage at various degrees into the other four capsules. This gas line problem also prevented a fission gas release measurement for Capsule 1 during the last three cycles due to gas flow isolation. By the end of irradiation, it is estimated that approximately 15 particles failed in Capsule 3, which was considered possible because the experiment was designed to operate beyond the high-temperature gas-cooled reactor normal operating temperature range. A few hundred in-pile particle failures were estimated for Capsule 1 by the end of Cycle 166A, but the total number of failures is unknown due to the lack of fission gas release data in the later cycles. Additionally, four potential in-pile failures were identified for Capsule 2 during the last cycle, Cycle 168A. In contrast, no in-pile failures were identified in the top two capsules (4 and 5) based on the absence of the typical spikes in gross gamma counts and low failure estimates using the AGR-3/4 R/B per exposed kernel model.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Vertical Extraction Process Implemented at the 118-K-1 Burial Ground for Removal of Irradiated Reactor Debris from Silo Structures - 12431

The primary objective of a remediation project is the safe extraction and disposition of diverse waste forms and materials. Remediation of a solid waste burial ground containing reactor hardware and irradiated debris involves handling waste with the potential to expose workers to significantly elevated dose rates. Therefore, a major challenge confronted by any remediation project is developing work processes that facilitate compliant waste management practices while at the same time implementing controls to protect personnel. Traditional burial ground remediation is accomplished using standard excavators to remove materials from trenches and other excavation configurations often times with minimal knowledge of waste that will be encountered at a specific location. In the case of the 118-K-1 burial ground the isotopic activity postulated in historic documents to be contained in vertical cylindrical silos was sufficient to create the potential for a significant radiation hazard to project personnel. Additionally, certain reported waste forms posed an unacceptably high potential to contaminate the surrounding environment and/or workers. Based on process knowledge, waste management requirements, historic document review, and a lack of characterization data it was determined that traditional excavation techniques applied to remediation of vertical silos would expose workers to unacceptable risk. The challenging task for the 118-K-1 burial ground remediation project team then became defining an acceptable replacement technology or modification of an existing technology to complete the silo remediation. Early characterization data provided a good tool for evaluating the location of potential high exposure rate items in the silos. Quantitative characterization was a different case and proved difficult because of the large diameter of the silos and the potential for variable density of attenuating soils and waste forms in the silo. Consequently, the most relevant information supporting job planning and understanding of the conditions was the data obtained from the gross gamma meter that was inserted into each casing to provide a rough estimate of dose rates in the tubes. No added value was realized in attempting to quantify the source term and/or associate the isotopic activity with a particular actual waste form (e.g., sludge). Implementing the WRM system allowed monitoring of worker and boundary exposure rates from a distance, maintaining compliance with ALARA principles. This system also provided the project team early knowledge of items being removed that had high exposure rates associated with them, thus creating an efficient method of acknowledging an issue and arriving at a solution prior to having an upset condition. An electronic dosimeter with telemetry capability replaced the excavator mounted AMP-100 system approximately half way through remediation of the silos. Much higher connectivity efficiency was derived from this configuration. Increasing the data feed efficiency additionally led to less interruption of the remediation effort. Early in system testing process a process handicap on the excavator operator was acknowledged. A loss of depth perception resulted when maneuvering the excavator and bucket using the camera feed to an in-cab monitor. Considerable practice and mock-up testing allowed this handicap to be overcome. The most significant equipment failures involved the cable connection to the camera mounted between the clamshell bucket jaws and the video splitter in the excavator cab. Rotation of the clamshell bucket was identified as the cause of cable connection failures because of the cyclic twisting motion and continuous mechanical jarring of the connection. In-cab vibration was identified as the culprit in causing connection failures of the video splitter. While these failures were repaired, substantial production time was lost. Ultimately, the decision was made to purchase a second cable and higher quality video splitter eliminate the down time. An engineering improvement for future operations would be inserting cable pig tails at more stressed cable connection points to facilitate rapid change out of the cable should that be required. Overall, the system performed better than expected in a safe and efficient manner. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

First Examination of Irradiated Fuel with Pulsed Neutrons at LANSCE (Preliminary Results)

We present preliminary results on the characterization of an irradiated U-lOZr-lPd fuel sample that was prepared from the irradiated AFC-3A-R5A sample. U-lOZr metallic fuels are researched as host materials for potential transmutation fuels and the addition of palladium strives to bind lanthanides, thus preventing fuel-cladding chemical interactions (FCCI). These interactions limit the lifetime of metallic fuels and are caused by migration of lanthanide fission products to the periphery of the fuel slug, where they start to interact with the D9 or HT9 steel cladding, ultimately leading to failure of the mechanical integrity of the cladding. Neutrons offer bulk characterization of irradiated materials for which X-ray tomography methods are not suitable due to the immense gamma background emitted from the samples. In particular pulsed neutrons provide information from the ability to resolve the neutron energy using their time-of-flight and thus the potential to utilize neutron absorption resonance to characterize the spatial distribution of isotopes. This, in turn, may allow to characterize the distribution of fission and neutron capture products non-destructively and may ultimately be applied to the bulk of an irradiation capsule prior to destructive post-irradiation examination to identify regions of interest. To allow the characterization of entire irradiation capsules, a cask is under development in the advanced post-irradiation work package at LANL and progress on this development was reported elsewhere. In parallel, an irradiated U-lOZr-lPd sample cut from the AFC-3AR5A irradiation was shipped to LANL and will be fully characterized with an NSUF funded rapid turnaround experiment (RTE) in the 2020 LANSCE run cycle. The sample emits at a dose rate of ~3R/hr on contact and is therefore manageable with remote handling, without requiring a cask. The disk-shaped material is larger than samples prepared for analysis using electron or X-ray methods and is therefore an intermediate step towards characterization of bulk samples at LANSCE. However, since it covers the full diameter of the irradiated fuel slug, some insight on redistribution of elements, spatially resolved information on microstructure, e.g. phase composition and texture, will be possible using the pulsed neutron-based methods developed for fuel characterization at LANSCE. This report describes the development of procedures to handle the sample at LANSCE as well as preliminary data and results from tests conducted in December 2019 on the energy-resolved neutron imaging (ERNI) beam line at flight path 5 and the high pressure-preferred orientation diffractometer (HIPPO) at LANSCE. This effort is a collaboration between LANL, INL, and ORNL. To compare our capabilities with prior work, we present an overview of previously reported bulk characterization of irradiated or spent fuels. The overview addresses neutron diffraction and neutron absorption resonance spectroscopy, both of which have only few reported applications on irradiated or spent nuclear fuel, as well as neutron radiography. This literature review was already described in a previous report but is repeated here to put our current efforts in context of previous work.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Unsupervised learning-enabled pulsed infrared thermographic microscopy of subsurface defects in stainless steel

Metallic structures produced with laser powder bed fusion (LPBF) additive manufacturing method (AM) frequently contain microscopic porosity defects, with typical approximate size distribution from one to 100 microns. Presence of such defects could lead to premature failure of the structure. In principle, structural integrity assessment of LPBF metals can be accomplished with nondestructive evaluation (NDE). Pulsed infrared thermography (PIT) is a non-contact, one-sided NDE method that allows for imaging of internal defects in arbitrary size and shape metallic structures using heat transfer. PIT imaging is performed using compact instrumentation consisting of a flash lamp for deposition of a heat pulse, and a fast frame infrared (IR) camera for measuring surface temperature transients. However, limitations of imaging resolution with PIT include blurring due to heat diffusion, sensitivity limit of the IR camera. We demonstrate enhancement of PIT imaging capability with unsupervised learning (UL), which enables PIT microscopy of subsurface defects in high strength corrosion resistant stainless steel 316 alloy. PIT images were processed with UL spatial–temporal separation-based clustering segmentation (STSCS) algorithm, refined by morphology image processing methods to enhance visibility of defects. The STSCS algorithm starts with wavelet decomposition to spatially de-noise thermograms, followed by UL principal component analysis (PCA), fine-tuning optimization, and neural learning-based independent component analysis (ICA) algorithms to temporally compress de-noised thermograms. The compressed thermograms were further processed with UL-based graph thresholding K-means clustering algorithm for defects segmentation. The STSCS algorithm also includes online learning feature for efficient re-training of the model with new data. For this study, metallic specimens with calibrated microscopic flat bottom hole defects, with diameters in the range from 203 to 76 µm, were produced using electro discharge machining (EDM) drilling. While the raw thermograms do not show any material defects, using STSCS algorithm to process PIT images reveals defects as small as 101 µm in diameter. To the best of our knowledge, this is the smallest reported size of a sub-surface defect in a metal imaged with PIT, which demonstrates the PIT capability of detecting defects in the size range relevant to quality control requirements of LPBF-printed high-strength metals.

36 MATERIALS SCIENCE↗