Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “contractors”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Hanford Reach Fall Chinook Redd Monitoring Report for Calendar Year 2017

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). DOE/EIS-0222, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement (CLUP) evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site for at least the next 50 years, and ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2024

The U.S. Department of Energy, Hanford Field Office (HFO) conducts ecological monitoring at the Hanford Site to collect and maintain data to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under HFO stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities at the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land-Use Plan Environmental Impact Statement. HFO places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (i.e., federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Freshwater Mussel Monitoring Report for Calendar Year 2022

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and maintain data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provides baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site that is required for decision making under the National Environmental Policy Act of 1969 and Comprehensive Environmental Response, Compensation, and Liability Act of 1980. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or are of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Mule Deer Monitoring Report for Fiscal Year 2019

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with environmental laws, regulations, and policies governing Department of Energy activities. Ecological monitoring data provide baseline information about the plants, animals, and habitats under DOE-RL stewardship at the Hanford Site required for decision-making under the National Environmental Policy Act of 1969 (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act of 1980. The Hanford Site Comprehensive Land Use Plan (CLUP, DOE 1999), which is the Environmental Impact Statement that evaluates the potential environmental impacts associated with implementing a comprehensive land-use plan for the Hanford Site, ensures that DOE-RL, its contractors, and other entities conduct activities on the Hanford Site in compliance with NEPA.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2023: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under RL stewardship at the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species) or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Townsend’s Ground Squirrel Conservation on the Hanford Site for Calendar Year 2022: Translocation to Support At-Risk Ground Squirrel Populations

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing DOE-RL activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision-making under the National Environmental Policy Act (NEPA) and Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). In addition, ecological monitoring helps ensure that DOE-RL, its contractors and other entities conducting activities on the Hanford Site are in compliance with the Hanford Site Comprehensive Land Use Plan (DOE/EIS-0222-F). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; or that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Ground Squirrel Monitoring Report for Calendar Year 2021

The U.S. Department of Energy, Richland Operations Office (DOE-RL) conducts ecological monitoring on the Hanford Site to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing U.S. Department of Energy (DOE) activities. Ecological monitoring data provide baseline information about the plants, animals, and habitat under DOE-RL stewardship at the Hanford Site required for accurate ecological impact assessment decision making under the National Environmental Policy Act and Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that DOE-RL, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS- 0222-F, Hanford Site Comprehensive Land Use Plan (CLUP). DOE-RL places priority on monitoring those plant and animal species or habitats with specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or of significant interest to federal, state, or Tribal governments or the public.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2021

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to Mission Support Alliance (MSA) in 2017. These sites, along with sites revegetated by MSA between 2017 and 2020, were transitioned to Hanford Mission Integration Solutions (HMIS) in 2021. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2021 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 52 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2021.

54 ENVIRONMENTAL SCIENCES↗

Hanford Site Revegetation Monitoring Report for Fiscal Year 2020

This report describes the monitoring of areas revegetated by the River Corridor Closure Contractor (RCCC) and CH2M Hill Plateau Remediation Company (CHPRC) that were transitioned to and monitored by Mission Support Alliance (MSA) in 2020, along with sites revegetated by MSA. Site monitoring is a continuance of efforts performed by the RCCC from fiscal year (FY) 2007 through FY 2020. This report contains data collected in 2020 documenting the recovery of revegetation areas associated with the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 cleanup of National Priorities List waste sites and restoration of lands disturbed by ongoing Site mission activities at the Hanford Site in Richland, Washington. It contains vegetation monitoring data for 41 sites selected to be representative sites for areas planted between the years of FY 2007 and FY 2020.

54 ENVIRONMENTAL SCIENCES↗

SolarAPP+ Performance Review (2024 Data)

The Solar Automated Permit Processing Plus (SolarAPP+) platform is an online portal to facilitate and expedite rooftop solar photovoltaic (PV) and battery storage permitting processes. SolarAPP+ allows PV contractors to upload system specifications, have that information automatically reviewed for code compliance, and receive instant approval for code-compliant systems, reducing authority having jurisdiction (AHJ) staff time needed for review. SolarAPP+ also provides inspection checklists to verify installation practices and adherence to approved designs. This report is part of an ongoing series of reviews of SolarAPP+ performance. Consistent with previous performance reviews, we summarize SolarAPP+ adoption trends to date and compare various metrics for PV systems permitted through SolarAPP+ versus systems permitted through traditional AHJ permitting processes. As of the end of 2024, 799 AHJs had expressed interest in the platform, with 264 fully adopting (215) or piloting (49) the platform. In 2024, 861 installers submitted 37,393 permits through the SolarAPP+ platform, including 27,375 permits for PV+storage systems. SolarAPP+ permits accounted for around 43% of all permits issued in all participating AHJs, and more than 60% of all permits in several participating AHJs. We compare permitting timelines through SolarAPP+ to traditional AHJ permitting processes to assess the platform's performance. Consistent with previous SolarAPP+ performance reviews, we find that permitting timelines are significantly shorter for SolarAPP+ projects. Based on median timelines, a typical SolarAPP+ project is permitted and inspected 12 business days sooner than traditional projects. We estimate that automatic SolarAPP+ permitting saved around 18,400 hours of AHJ staff time in 2024. Finally, we estimate that SolarAPP+ eliminated over 100,000 business days in permitting-related delays in 2024.

14 SOLAR ENERGY↗

Analysis of Persistent Soiling Losses: Cooperative Research and Development (Final Report)

The Contractor will analyze data from sensors and equipment provided by Participant in order to provide the basis for understanding of the processes and rates for the formation of 'persistent' soiling (soiling not removed by rain). The resulting, data, technical report, and publications will provide the basis for Participant to improve it's predictive soiling model.

14 SOLAR ENERGY↗

Floating Offshore Wind U.S. Manufacturing and Commercialization: Cooperative Research and Development (Final Report)

The American-Made FLoating Offshore Wind ReadINess (FLOWIN) Prize provides the Participant with a voucher technical support provided by DOE national laboratories, such as the Contractor. The primary goals include providing insights for the INO/INOC floating offshore wind platform on 1) an evaluation the workforce requirements for the full-scale production and deployment; and 2) an assessment of domestic supplier capabilities for the main components US regional and national supply chain constraints and gaps.

17 WIND ENERGY↗

Dynamic Wind Loading on Compliant, Floating PV Arrays: Cooperative Research and Development (Final Report)

PV panels are subjected to wind loads during normal outdoor operation, where th wind speed, wind direction, panel angle, and array layout play a large role in the overall loading magnitude. For floating PV systems, where panels are installed on floating rafts, these forces can lead to a dynamic displacement of the raft and mounted PV hardware. The Contractor and Participant will perform fluid-structure interaction simulations of this phenomenon for a variety of wind speeds, directions, and panel angles to characterize these forces and help design mooring/tethering lines to resist and anchor raft movement.

14 SOLAR ENERGY↗

Cost Effectiveness of Laser Powder Bed Fusion for Heavy Duty Applications

ORNL (Contractor) and Cummins Inc. (Participant) collaborated to determine the cost effectiveness of laser powder bed fusion (LPBF) for heavy duty applications. The team demonstrated that coupons can be fabricated with two distinct process parameters i.e., different process parameters for the bulk and surface of the material. This is important for enabling the manufacturing of components in a production environment where the bulk of the material can be processed rapidly while high quality surface finish can minimize post-process machining as well as enable superior fatigue performance if the material were to be used in as-deposited condition.

36 MATERIALS SCIENCE↗

Townsend's Ground Squirrel Conservation on the Hanford Site for Calendar Year 2025

The U.S. Department of Energy (DOE), Hanford Field Office (HFO) conducts ecological monitoring on the DOE-managed portion of Hanford Site (hereby referred to as Central Hanford) to collect and track data needed to ensure compliance with an array of environmental laws, regulations, and policies governing HFO activities. Ecological monitoring data provides baseline information about the plants, animals, and habitat under HFO stewardship on the Hanford Site, which is required for accurate ecological impact assessment decision making under the National Environmental Policy Act and the Comprehensive Environmental Response, Compensation, and Liability Act. In addition, ecological monitoring helps ensure that HFO, its contractors, and other entities conducting activities on the Hanford Site are in compliance with DOE/EIS-0222-F, Final Hanford Comprehensive Land Use Plan Environmental Impact Statement. HFO places priority on monitoring plant and animal species or habitats that have specific regulatory protections or requirements; that are rare and/or declining (federal or state listed endangered, threatened, or sensitive species); or are of significant interest to federal, state, or tribal governments or to the public.

54 ENVIRONMENTAL SCIENCES↗

Mechanical Solution for Existing Conductors

The rapid growth in energy demand, driven by advancements in AI technology, renewable energy integration, and increased industrial activity, highlights the need for innovative solutions to improve the resiliency and efficiency of the power grid. This report details the fire testing of GridWrap’s Composite WiRe Wrap, to evaluate the wrap's ability to enhance conductor performance under wildfire-simulated conditions. Conductors were prepared and tested in a controlled environment at 400°C for 18 minutes, during which sag and temperature data were recorded. The results demonstrated that the unwrapped conductor sagged 3/16ths of an inch, while the WiRe Wrapped conductor sagged only 1/16th of an inch under identical conditions, indicating a significant improvement in mechanical performance. This project, conducted as part of a collaborative effort between BEA (Idaho National Laboratory’s managing contractor) and GridWrap, Inc., demonstrates the potential of grid-enhancing technologies like WiRe Wrap to reduce sag, increase grid resiliency, and support the future energy landscape. By validating the performance of such technologies in real-world scenarios, this work provides critical insights for industry adoption, benefiting both grid operators and U.S. taxpayers through improved reliability, reduced emissions, and enhanced energy delivery.

24 - POWER TRANSMISSION AND DISTRIBUTION↗

Reported Energy and Cost Savings from the DOE ESPC IDIQ Program: FY 2024

Energy Savings Performance Contracts (ESPCs)are a contractual mechanism that allow a federal agency to procure energy savings and facility improvements without upfront capital costs to reduce costs and resiliency. ESPCs are covered under FAR Part 23.2, and 42 USC § 8287. Section 8287(a)(2)(A) of Title 42 of the U.S. Code requires that each energy savings performance contract (ESPC) undergo an annual energy audit, resulting in a separate audit report for every project. The objective of the present report is to compile and analyze all annual ESPC audit reports issued between October 1, 2023, and September 30, 2024, for projects awarded under Generations 1, 2, and 3 of DOE’s ESPC IDIQ contracts. During this period, 205 measurement and verification (M&V) reports were produced for 200 projects; the total number of reports exceeds the number of projects because some projects generated more than one report(for example, a few projects measure savings twice per year and produce two audit reports annually, each covering a different six-month period). By aggregating the results from these individual audits, the report determines the portfolio-wide realization rate of energy and cost savings for all active ESPC projects awarded under DOE’s IDIQ program. For all 205audit reports, sufficient information was available to compare project-level estimated, reported, and guaranteed cost savings. Reported cost savings accounted for ESCO verified savings per each project’s M&V plan. The total reported cost savings for the period addressed were $\$$647.8million,compared with the total guaranteed cost savings of $\$$601.6million. On average across the reported projects: •ESPC contractors guaranteed 92.8% of the estimated cost savings• projects reported achieving 100.0% of the estimated cost savings• projects reported achieving 107.7% of the guaranteed cost savings. The M&V performed for the period indicated adjustments for government operations and maintenance impacts to savings amount to$\$$43.9millionandcould be restored with the original operational parameters for impacted projects. Accounting for this potential cost savings impact, these projects still realized 100.4% of the guaranteed cost savings. The information on estimated and reported energy savings was collected and compared for all 205of the reports examined. Based on site energy, estimated savings totaled 14.88million MMBtu, and reported savings were 15.33million MMBtu; 3.1% greater than the estimated energy savings. All of the reports examined contained sufficient information to calculate source energy savings. Based on site-adjusted source energy, total estimated energy savings were 20.90 million MMBtu, and reported savings were 21.22million MMBtu, 101.5% of the estimated energy savings. For water savings, the estimated savings were 11,539,055 kGal and the reported savings were 13,315,930 kGal. This means 1,776,875 kGal more water was saved than estimated, which is about 15% higher than the estimate. These results indicate that, overall, the reported energy savings slightly exceeded the estimated values, while estimated water savings significantly exceeded estimated values, suggesting that the projects achieved greater cost savings than originally projected. The total annual expense for the ESCOs to perform annual M&V audits and reporting was $\$$10.02million. Through this effort, $\$$647.8 million in annual cost savings was verified. The M&V results indicated that $\$$43.9 million of these verified savings reflected adjustments due to government operations A-6and maintenance impacts, which could be restored under the original operational parameters for the affected projects. These findings show the value of M&V that only costs 1.7%of the guaranteed cost savings to ensure guarantees are met.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗