Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “TIME”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Absolute Timing of the Crab Pulsar with RXTE

We have monitored the phase of the main X-ray pulse of the Crab pulsar with the Rossi X-ray Timing Explorer (RXTE) for almost eight years, since the start of the mission in January 1996. The absolute time of RXTE's clock is sufficiently accurate to allow this phase to be compared directly with the radio profile. Our monitoring observations of the pulsar took place bi-weekly (during the periods when it was at least 30 degrees from the Sun) and we correlated the data with radio timing ephemerides derived from observations made at Jodrell Bank. We have determined the phase of the X-ray main pulse for each observation with a typical error in the individual data points of 50 microseconds. The total ensemble is consistent with a phase that is constant over the monitoring period, with the X-ray pulse leading the radio pulse by 0.01025 plus or minus 0.00120 period in phase, or 344 plus or minus 40 microseconds in time. The error estimate is dominated by a systematic error of 40 microseconds, most likely constant, arising from uncertainties in the instrumental calibration of the radio data. The statistical error is 0.00015 period, or 5 microseconds. The separation of the main pulse and interpulse appears to be unchanging at time scales of a year or less, with an average value of 0.4001 plus or minus 0.0002 period. There is no apparent variation in these values with energy over the 2-30 keV range. The lag between the radio and X-ray pulses ma be constant in phase (i.e., rotational in nature) or constant in time (i.e., due to a pathlength difference). We are not (yet) able to distinguish between these two interpretations.

Rots, Arnold H.↗

Recent Cycle Time Reduction at Langley Research Center

The NASA Langley Research Center (LaRC) has been engaged in an effort to reduce wind tunnel test cycle time in support of Agency goals and to satisfy the wind tunnel testing needs of the commercial and military aerospace communities. LaRC has established the Wind Tunnel Enterprise (WTE), with goals of reducing wind tunnel test cycle time by an order of magnitude by 2002, and by two orders of magnitude by 2010. The WTE also plans to meet customer expectations for schedule integrity, as well as data accuracy and quality assurance. The WTE has made progress towards these goals over the last year with a focused effort on technological developments balanced by attention to process improvements. This paper presents a summary of several of the WTE activities over the last year that are related to test cycle time reductions at the Center. Reducing wind tunnel test cycle time, defined here as the time between the freezing of loft lines and delivery of test data, requires that the relationship between high productivity and data quality assurance be considered. The efforts have focused on all of the drivers for test cycle time reduction, including process centered improvements, facility upgrades, technological improvements to enhance facility readiness and productivity, as well as advanced measurement techniques. The application of internet tools and computer modeling of facilities to allow a virtual presence of the customer team is also presented.

Kegelman, Jerome T.↗

Efficient Multi-Stage Time Marching for Viscous Flows via Local Preconditioning

A new method has been developed to accelerate the convergence of explicit time-marching, laminar, Navier-Stokes codes through the combination of local preconditioning and multi-stage time marching optimization. Local preconditioning is a technique to modify the time-dependent equations so that all information moves or decays at nearly the same rate, thus relieving the stiffness for a system of equations. Multi-stage time marching can be optimized by modifying its coefficients to account for the presence of viscous terms, allowing larger time steps. We show it is possible to optimize the time marching scheme for a wide range of cell Reynolds numbers for the scalar advection-diffusion equation, and local preconditioning allows this optimization to be applied to the Navier-Stokes equations. Convergence acceleration of the new method is demonstrated through numerical experiments with circular advection and laminar boundary-layer flow over a flat plate.

Kleb, William L.↗

Later endogenous circadian temperature nadir relative to an earlier wake time in older people

The contribution of the circadian timing system to the age-related advance of sleep-wake timing was investigated in two experiments. In a constant routine protocol, we found that the average wake time and endogenous circadian phase of 44 older subjects were earlier than that of 101 young men. However, the earlier circadian phase of the older subjects actually occurred later relative to their habitual wake time than it did in young men. These results indicate that an age-related advance of circadian phase cannot fully account for the high prevalence of early morning awakening in healthy older people. In a second study, 13 older subjects and 10 young men were scheduled to a 28-h day, such that they were scheduled to sleep at many circadian phases. Self-reported awakening from scheduled sleep episodes and cognitive throughput during the second half of the wake episode varied markedly as a function of circadian phase in both groups. The rising phase of both rhythms was advanced in the older subjects, suggesting an age-related change in the circadian regulation of sleep-wake propensity. We hypothesize that under entrained conditions, these age-related changes in the relationship between circadian phase and wake time are likely associated with self-selected light exposure at an earlier circadian phase. This earlier exposure to light could account for the earlier clock hour to which the endogenous circadian pacemaker is entrained in older people and thereby further increase their propensity to awaken at an even earlier time.

NASA Discipline Regulatory Physiology↗

Phase-shifting human circadian rhythms: influence of sleep timing, social contact and light exposure

1. Both the timing of behavioural events (activity, sleep and social interactions) and the environmental light-dark cycle have been reported to contribute to entrainment of human circadian rhythms to the 24 h day. Yet, the relative contribution of those putative behavioural synchronizers to that of light exposure remains unclear. 2. To investigate this, we inverted the schedule of rest, sedentary activity and social contact of thirty-two young men either with or without exposure to bright light. 3. On this inverted schedule, the endogenous component of the core temperature rhythm of subjects who were exposed to bright light showed a significant phase shift, demonstrating that they were adapting to the new schedule. In contrast, the core temperature rhythm of subjects who were not exposed to bright light moved on average 0.2 h later per day and after 10 days had not significantly adapted to the new schedule. 4. The direction of phase shift in the groups exposed to bright light was dependent on the time of bright light exposure, while control subjects drifted to a later hour regardless of the timing of their schedule of sleep timing, social contact and meals. 5. These results support the concept that the light-dark cycle is the most important synchronizer of the human circadian system. They suggest that inversion of the sleep-wake, rest-activity and social contact cycles provides relatively minimal drive for resetting the human circadian pacemaker. 6. These data indicate that interventions designed to phase shift human circadian rhythms for adjustment to time zone changes or altered work schedules should focus on properly timed light exposure.

Non-NASA Center↗

A Fast-Time Simulation Tool for Analysis of Airport Arrival Traffic

The basic objective of arrival sequencing in air traffic control automation is to match traffic demand and airport capacity while minimizing delays. The performance of an automated arrival scheduling system, such as the Traffic Management Advisor developed by NASA for the FAA, can be studied by a fast-time simulation that does not involve running expensive and time-consuming real-time simulations. The fast-time simulation models runway configurations, the characteristics of arrival traffic, deviations from predicted arrival times, as well as the arrival sequencing and scheduling algorithm. This report reviews the development of the fast-time simulation method used originally by NASA in the design of the sequencing and scheduling algorithm for the Traffic Management Advisor. The utility of this method of simulation is demonstrated by examining the effect on delays of altering arrival schedules at a hub airport.

Erzberger, Heinz↗

Digital Particle Image Velocimetry (DPIV) Used for Space-Time Correlations in Nozzle Flow

An optical measurement technique known as Digital Particle Image Velocimetry (DPIV) was used previously to characterize the first- and second-order statistical properties of both cold and hot jet flows from externally mixed nozzles in NASA Glenn Research Center's Nozzle Acoustic Test Rig. In this technique, an electronic camera records particles entrained in a flow as a laser light sheet is pulsed at two instances in time. Correlation processing of the recorded particle image pairs yields the two-component velocity field across the imaged plane of the flow. The information acquired using DPIV is being used to improve our understanding of the decay of turbulence in jet flows-a critical element for understanding the acoustic properties of the flow. Recently, two independent DPIV systems were installed in Glenn's Small Hot Jet Acoustic Rig, enabling multiplane correlations in time and space. The data were collected over a range of different Mach numbers and temperature ratios. DPIV system 1 was fixed to a large traverse rig, and DPIV system 2 was mounted on a small traverse system mounted on the large traverse frame. The light sheets from the two DPIV systems were aligned to lie in the same axial plane, with DPIV system 2 being independently traversed downstream along the flow direction. For each measurement condition, the DPIV systems were started at a fully overlapping orientation. A polarization separation technique was used to avoid cross-talk between the two systems. Then, the DPIV systems fields were shifted axially apart, in successively increasing steps. The downstream DPIV system 2 was triggered at a short time delay after the upstream DPIV system 1, where the time delay was proportional to the convective flow velocity in the shear layer of the jet flow and the axial separation of the two DPIV systems. The acquired data were processed to obtain the instantaneous velocity vector maps over a range of time delays and spatial separations. The velocity fields from the different DPIV systems were then cross-correlated to determine the degree of correlation remaining in the flow as the downstream convection distance was increased. The new data provide Lagrangian measurements of the convective turbulent structures in the shear layer of an exhaust nozzle. These measurements, obtained in both cold and hot flows, will be used to validate and correct models for space-time velocity correlations-long a missing key to predicting jet noise.

Wernet, Mark P.↗

(abstract) Short Time Period Variations in Jupiter's Synchrotron Radiation

The long term time variability of Jupiter's synchrotron radiation on yearly time scales has been established for some time. For many years, theorists have speculated about the effects variations in the solar wind, solar flux, Io, the Io torus, and Jupiter's magnetic field have on the ultra-relativistic electron population responsible for the emission. Early observational results suggested the additional possibility of a short term time variability, on timescales of days to weeks. In 1989 a program designed to investigate the existence of short term time variability using the 85 foot Hat Creek radio telescope operating at 1400 MHz was initiated. The availability of a dedicated telescope provided the opportunity, for the first time, to obtain numerous observations over the full Jupiter rotation period. These and future observations will enable two important studies, characterization and confirmation of possible short term variations, and the investigation of the stability of Jupiter's synchrotron emission beaming curve. Analysis of Hat Creek observations and early results from the Maryland Point Naval research Laboratory will be presented.

telescope magnetic field↗

Real-time data flow and product generating for GNSS

The last IGS workshop with the theme 'Towards Real-Time' resulted in the design of a prototype for real-time data and sharing within the IGS. A prototype real-time network is being established that will serve as a test bed for real-time activities within the IGS. We review the developments of the prototype and discuss some of the existing methods and related products of real-time GNSS systems. Recommendations are made concerning real-time data distribution and product generation.

GPS↗

Community Coordinated Modeling Center Support of Operations: Real-Time Simulations and V & V.

In support of Operations Community Coordinated Modeling Center (CCMC) performing validation and verification of space weather models. To identify suitable metrics the CCMC focus on parameters most useful to operations that CCMC resident models can provide. The real time simulations carried out at CCMC are an essential tool to test model performance and stability by using input conditions that may occur in nature at any time. Since 2001, the magnetospheric MHD model BATSRUS has been run in real time using ACE real time data. CCMC staff developed an experimental real-time system that controls uploading of the real-time ACE data, monitors continuous model execution, initiates automatic recovery procedure in case of data gaps or hardware failures, synchronizes BATSRUS and FRC runs, and periodically runs IDL based visualization software.

Kuznetsova, M.↗

Determinants of Time to Fatigue during Non-Motorized Treadmill Exercise

Treadmill exercise is commonly used for aerobic and anaerobic conditioning. During non-motorized treadmill exercise, the subject must provide the power necessary to drive the treadmill belt. The purpose of this study was to determine what factors affected the time to fatigue on a pair of non-motorized treadmills. Twenty subjects (10 males/10 females) attempted to complete five minutes of locomotion during separate trials at 3.22, 4.83, 6.44, 8.05, 9.66, and 11.27 km (raised dot) h(sup -1). Total exercise time (less than or equal to 5 min) was recorded. Exercise time was converted to the amount of 15 second intervals completed. Peak oxygen uptake (VO2) was measured using a graded exercise test on a standard treadmill, and anthropometric measures were collected from each subject before entering into the study. A Cox proportional hazards regression model was used to determine significant predictive factors in a multivariate analysis. Non-motorized treadmill speed and absolute peak VO2 were found to be significant predictors of exercise time, but there was no effect of anthropometric characteristics. Gender was found to be a predictor of treadmill time, but this was likely due to a higher peak VO2 in males than in females. These results were not affected by the type of treadmill tested in this study. Coaches and therapists should consider the cardiovascular fitness of an athlete or client when prescribing target speed since these factors are related to the total exercise time than can be achieved on a non-motorized treadmill.

DeWitt, John K.↗

Comparison of Bystander Cardiopulmonary Resuscitation (BCPR) Performance in the Absence and Presence of Timing Devices for Coordinating Delivery of Ventilatory Breaths and Cardiac Compressions in a Model of Adult Cardiopulmonary Arrest

Astronaut crew medical officers (CMO) aboard the International Space Station (ISS) receive 40 hours of medical training during the 18 months preceding each mission. Part of this training ilncludes twoperson cardiopulmonary resuscitation (CPR) per training guidelines from the American Heart Association (AHA). Recent studies concluded that the use of metronomic tones improves the coordination of CPR by trained clinicians. Similar data for bystander or "trained lay people" (e.g. CMO) performance of CPR (BCPR) have been limited. The purpose of this study was to evailuate whether use of timing devices, such as audible metronomic tones, would improve BCPR perfomance by trained bystanders. Twenty pairs of bystanders trained in two-person BCPR performled BCPR for 4 minutes on a simulated cardiopulmonary arrest patient using three interventions: 1) BCPR with no timing devices, 2) BCPR plus metronomic tones for coordinating compression rate only, 3) BCPR with a timing device and metronome for coordinating ventilation and compression rates, respectively. Bystanders were evaluated on their ability to meet international and AHA CPR guidelines. Bystanders failed to provide the recommended number of breaths and number of compressions in the absence of a timing device and in the presence of audible metronomic tones for only coordinating compression rate. Bystanders using timing devices to coordinate both components of BCPR provided the reco number of breaths and were closer to providing the recommended number of compressions compared with the other interventions. Survey results indicated that bystanders preferred to use a metronome for delivery of compressions during BCPR. BCPR performance is improved by timing devices that coordinate both compressions and breaths.

Hurst, Victor, IV↗

Minimizing EVA Airlock Time and Depress Gas Losses

This paper describes the need and solution for minimizing EVA airlock time and depress gas losses using a new method that minimizes EVA out-the-door time for a suited astronaut and reclaims most of the airlock depress gas. This method consists of one or more related concepts that use an evacuated reservoir tank to store and reclaim the airlock depress gas. The evacuated tank can be an inflatable tank, a spent fuel tank from a lunar lander descent stage, or a backup airlock. During EVA airlock operations, the airlock and reservoir would be equalized at some low pressure, and through proper selection of reservoir size, most of the depress gas would be stored in the reservoir for later reclamation. The benefit of this method is directly applicable to long duration lunar and Mars missions that require multiple EVA missions (up to 100, two-person lunar EVAs) and conservation of consumables, including depress pump power and depress gas. The current ISS airlock gas reclamation method requires approximately 45 minutes of the astronaut s time in the airlock and 1 KW in electrical power. The proposed method would decrease the astronaut s time in the airlock because the depress gas is being temporarily stored in a reservoir tank for later recovery. Once the EVA crew is conducting the EVA, the volume in the reservoir would be pumped back to the cabin at a slow rate. Various trades were conducted to optimize this method, which include time to equalize the airlock with the evacuated reservoir versus reservoir size, pump power to reclaim depress gas versus time allotted, inflatable reservoir pros and cons (weight, volume, complexity), and feasibility of spent lunar nitrogen and oxygen tanks as reservoirs.

Trevino, Luis A.↗

Real-Time Simulation of Ares I Launch Vehicle

The Ares Real-Time Environment for Modeling, Integration, and Simulation (ARTEMIS) has been developed for use by the Ares I launch vehicle System Integration Laboratory (SIL) at the Marshall Space Flight Center (MSFC). The primary purpose of the Ares SIL is to test the vehicle avionics hardware and software in a hardware-in-the-loop (HWIL) environment to certify that the integrated system is prepared for flight. ARTEMIS has been designed to be the real-time software backbone to stimulate all required Ares components through high-fidelity simulation. ARTEMIS has been designed to take full advantage of the advances in underlying computational power now available to support HWIL testing. A modular real-time design relying on a fully distributed computing architecture has been achieved. Two fundamental requirements drove ARTEMIS to pursue the use of high-fidelity simulation models in a real-time environment. First, ARTEMIS must be used to test a man-rated integrated avionics hardware and software system, thus requiring a wide variety of nominal and off-nominal simulation capabilities to certify system robustness. The second driving requirement - derived from a nationwide review of current state-of-the-art HWIL facilities - was that preserving digital model fidelity significantly reduced overall vehicle lifecycle cost by reducing testing time for certification runs and increasing flight tempo through an expanded operational envelope. These two driving requirements necessitated the use of high-fidelity models throughout the ARTEMIS simulation. The nature of the Ares mission profile imposed a variety of additional requirements on the ARTEMIS simulation. The Ares I vehicle is composed of multiple elements, including the First Stage Solid Rocket Booster (SRB), the Upper Stage powered by the J- 2X engine, the Orion Crew Exploration Vehicle (CEV) which houses the crew, the Launch Abort System (LAS), and various secondary elements that separate from the vehicle. At launch, the integrated vehicle stack is composed of these stages, and throughout the mission, various elements separate from the integrated stack and tumble back towards the earth. ARTEMIS must be capable of simulating the integrated stack through the flight as well as propagating each individual element after separation. In addition, abort sequences can lead to other unique configurations of the integrated stack as the timing and sequence of the stage separations are altered.

Tobbe, Patrick↗

Monitoring Phenology as Indicator for Timing of Nutrient Inputs in Northern Gulf Watersheds

Nutrient over-enrichment defined by the U.S. Environmental Protection Agency as the anthropogenic addition of nutrients, in addition to any natural processes, causing adverse effects or impairments to the beneficial uses of a water body has been identified as one of the most significant environmental problems facing sensitive estuaries and coastal waters. Understanding the timing of nutrient inputs into those waters through remote sensing observables helps define monitoring and mitigation strategies. Remotely sensed data products can trace both forcings and effects of the nutrient system from landscape to estuary. This project is focused on extracting nutrient information from the landscape. The timing of nutrients entering coastal waters from the land boundary is greatly influenced by hydrologic processes, but can also be affected by the timing of nutrient additions across the landscape through natural or anthropogenic means. Non-point source nutrient additions to watersheds are often associated with specific seasonal cycles, such as decomposition of organic materials in fall and winter or addition of fertilizers to crop lands in the spring. These seasonal cycles or phenology may in turn be observed through the use of satellite sensors. Characterization of the phenology of various land cover types may be of particular interest in Gulf of Mexico estuarine systems with relatively short pathways between intensively managed systems and the land/estuarine boundary. The objective of this study is to demonstrate the capability of monitoring phenology of specific classes of land, such as agriculture and managed timberlands, at a refined watershed level. The extraction of phenological information from the Moderate Resolution Imaging Spectroradiometer (MODIS) data record is accomplished using analytical tools developed for NASA at Stennis Space Center: the Time Series Product Tool and the Phenological Parameters Estimation Tool. MODIS reflectance data (product MOD09) were used to compute the Normalized Difference Vegetation Index, which is sensitive to changes in vegetation canopies. The project team is working directly with the Mississippi Department of Environmental Quality to understand end-user requirements for this type of information product. Initial focus areas are identification of time frames for pre-plant fertilizer applications (prior to start of season), side-dress fertilizer applications (during rapid green-up), and periods of plant decomposition (during and after senescence). Prototypical maps of phenological stages related to these time frames have been generated for watersheds in the northern Gulf of Mexico. Where feasible, these maps have been compared to existing in situ nutrient monitoring data, but the in situ data is temporally sparse (monthly frequency or less), which makes interpretation challenging. Future work will include integrating effects of rainfall and seeking couplings with estuarine remote sensing.

Ross, Kenton W.↗

Machine-Checkable Timed CSP

The correctness of safety-critical embedded software is crucial, whereas non-functional properties like deadlock-freedom and real-time constraints are particularly important. The real-time calculus Timed Communicating Sequential Processes (CSP) is capable of expressing such properties and can therefore be used to verify embedded software. In this paper, we present our formalization of Timed CSP in the Isabelle/HOL theorem prover, which we have formulated as an operational coalgebraic semantics together with bisimulation equivalences and coalgebraic invariants. Furthermore, we apply these techniques in an abstract specification with real-time constraints, which is the basis for current work in which we verify the components of a simple real-time operating system deployed on a satellite.

Goethel, Thomas↗

Fast-Response-Time Shape-Memory-Effect Foam Actuators

Bulk shape memory alloys, such as Nitinol or CuAlZn, display strong recovery forces undergoing a phase transformation after being strained in their martensitic state. These recovery forces are used for actuation. As the phase transformation is thermally driven, the response time of the actuation can be slow, as the heat must be passively inserted or removed from the alloy. Shape memory alloy TiNi torque tubes have been investigated for at least 20 years and have demonstrated high actuation forces [3,000 in.-lb (approximately equal to 340 N-m) torques] and are very lightweight. However, they are not easy to attach to existing structures. Adhesives will fail in shear at low-torque loads and the TiNi is not weldable, so that mechanical crimp fits have been generally used. These are not reliable, especially in vibratory environments. The TiNi is also slow to heat up, as it can only be heated indirectly using heater and cooling must be done passively. This has restricted their use to on-off actuators where cycle times of approximately one minute is acceptable. Self-propagating high-temperature synthesis (SHS) has been used in the past to make porous TiNi metal foams. Shape Change Technologies has been able to train SHS derived TiNi to exhibit the shape memory effect. As it is an open-celled material, fast response times were observed when the material was heated using hot and cold fluids. A methodology was developed to make the open-celled porous TiNi foams as a tube with integrated hexagonal ends, which then becomes a torsional actuator with fast response times. Under processing developed independently, researchers were able to verify torques of 84 in.-lb (approximately equal to 9.5 Nm) using an actuator weighing 1.3 oz (approximately equal to 37 g) with very fast (less than 1/16th of a second) initial response times when hot and cold fluids were used to facilitate heat transfer. Integrated structural connections were added as part of the net shape process, eliminating the need for welding, adhesives, or mechanical crimping. Inexpensive net-shape processing was used, which reduces the cost of the actuator by over a factor of 10 over nonporous TiNi made by hot drawing of tube or electrical discharge machining. By forming the alloy as an open-celled foam, the surface area for heat transfer is dramatically increased, allowing for much faster response times. The technology also allows for netshape fabrication of the actuator, which allows for structural connections to be integrated into the actuator material, making these actuators significantly less expensive. Commercial applications include actuators for concepts such as the variable area chevron and nozzle in jet aircraft. Lightweight tube or rod components can be supplied to interested parties.

Jardine, Peter↗

A Singular Perturbation Approach for Time-Domain Assessment of Phase Margin

This paper considers the problem of time-domain assessment of the Phase Margin (PM) of a Single Input Single Output (SISO) Linear Time-Invariant (LTI) system using a singular perturbation approach, where a SISO LTI fast loop system, whose phase lag increases monotonically with frequency, is introduced into the loop as a singular perturbation with a singular perturbation (time-scale separation) parameter Epsilon. First, a bijective relationship between the Singular Perturbation Margin (SPM) max and the PM of the nominal (slow) system is established with an approximation error on the order of Epsilon(exp 2). In proving this result, relationships between the singular perturbation parameter Epsilon, PM of the perturbed system, PM and SPM of the nominal system, and the (monotonically increasing) phase of the fast system are also revealed. These results make it possible to assess the PM of the nominal system in the time-domain for SISO LTI systems using the SPM with a standardized testing system called "PM-gauge," as demonstrated by examples. PM is a widely used stability margin for LTI control system design and certification. Unfortunately, it is not applicable to Linear Time-Varying (LTV) and Nonlinear Time-Varying (NLTV) systems. The approach developed here can be used to establish a theoretical as well as practical metric of stability margin for LTV and NLTV systems using a standardized SPM that is backward compatible with PM.

Zhu, J. Jim↗