Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System study”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 1: Observatory system element specifications

The performance, design, and quality assurance requirements for the Earth Observatory Satellite (EOS) Observatory and Ground System program elements required to perform the Land Resources Management (LRM) A-type mission are presented. The requirements for the Observatory element with the exception of the instruments specifications are contained in the first part.

Source record↗

Earth Observatory Satellite system definition study. Report no. 5: System design and specifications. Part 2: Ground system element specifications

The Ground System requirements for the Land Resources Management (LRM) type-A and type-B missions of the Earth Observatory Satellite (EOS) program are presented. Specifications for the Thematic Mapper data processing are provided (LRM A mission). The specifications also cover the R and D instruments (Thematic Mapper and High Resolution Pointable Imager) data processing for the LRM type-B mission.

Source record↗

Multispectral scanner system parameter study and analysis software system description, volume 2

The author has identified the following significant results. The integration of the available methods provided the analyst with the unified scanner analysis package (USAP), the flexibility and versatility of which was superior to many previous integrated techniques. The USAP consisted of three main subsystems; (1) a spatial path, (2) a spectral path, and (3) a set of analytic classification accuracy estimators which evaluated the system performance. The spatial path consisted of satellite and/or aircraft data, data correlation analyzer, scanner IFOV, and random noise model. The output of the spatial path was fed into the analytic classification and accuracy predictor. The spectral path consisted of laboratory and/or field spectral data, EXOSYS data retrieval, optimum spectral function calculation, data transformation, and statistics calculation. The output of the spectral path was fended into the stratified posterior performance estimator.

Landgrebe, D. A.↗

Solar power satellite system definition study. Volume 3: Reference system description, phase 1

An analysis of the solar power satellite system is presented. The satellite solar energy conversion and microwave power transmission systems are discussed including the structure, power distribution, thermal control, and energy storage. Space construction and support systems are described including the work support facilities and construction equipment. An assessment of the space transportation system for the satellite and the ground receiving station is presented.

Source record↗

Shuttle-tethered satellite system definition study extension

A system requirements definition and configuration study (Phase B) of the Tethered Satellite System (TSS) was conducted during the period 14 November 1977 to 27 February 1979. Subsequently a study extension was conducted during the period 13 June 1979 to 30 June 1980, for the purpose of refining the requirements identified during the main phase of the study, and studying in some detail the implications of accommodating various types of scientific experiments on the initial verification flight mission. An executive overview is given of the Tethered Satellite System definition developed during the study. The results of specific study tasks undertaken in the extension phase of the study are reported. Feasibility of the Tethered Satellite System has been established with reasonable confidence and the groundwork laid for proceeding with hardware design for the verification mission.

Source record↗

An Electromagnetic Transient and Three-Phase Phasor Co-Simulation Platform for Studying Distribution System Transients with High Pentration of DERs

Inverter vendors usually have electro-magnetic transient (EMT) models of distributed energy resources (DERs) for validation purposes and these types of models are usually black-boxed considering intellectual property (IP) protection. Limited by small simulation time step for the entire power system network, studying the system-level responses of DERs in EMT simulators is more time-consuming as the network size increases. Meanwhile, vendors usually do not have inverter models that can be used in three-phase phasor-domain simulators. This paper proposes a platform that can dynamically co-simulate the EMT inverter models and three-phase phasor-domain distribution networks considering high penetration of inverter-based DERs. This platform is very useful for evaluating the impacts of vendor-provided black-box DER model on distribution system dynamics. The co-simulation platform is validated against the full EMT model using a simple two-inverter test system and tested using IEEE 34-node test feeder.

Liu, Yuan↗

Initial Results From The Jovian Electrodynamic Tether Systems (JETS) Study

The Jovian system with its rapid planetary rotation and strong magnetic field presents exciting opportunities for the use of electrodynamic (EM) tethers in system applications on a Jovian spacecraft. Previous analysis for a radial, 10-km length tether demonstrated the possibility of propulsive forces as large as 50 N and power generation levels as high as 10^6 W for low perijov passing trajectories. For orbital positions beyond approximately 15 Jovian radii, JETS can be used simultaneously for power and increases in the orbital altitude. Previous study demonstrated the physical feasibility of EM tether use at Jupiter, but did not address the issues of limited gravity gradient force for tether extension and power regulation needed before JETS can be implemented as a practical spacecraft system. This presentation will discuss these issues and current progress in an ongoing systems feasibility study.

Gallagher, D. L.↗

Initial Results from the Jovian Electrodynamic Tether Systems (JETS) Study

The Jovian system with its rapid planetary rotation and strong magnetic field presents exciting opportunities for the use of electrodynamic (EM) tethers in system applications on a Jovian spacecraft. Previous analysis for a radial, 10 km length tether demonstrated the possibility of propulsive forces as large as 50 N and power generation levels as high as 10(exp 6) W for low perijov passing trajectories. For orbital positions beyond approximately 2.5 Jovian radii, JETS can be used simultaneously for power and increases in the orbital altitude. Previous study demonstrated the physical feasibility of EM tether use at Jupiter, but did not address the issues of limited gravity gradient force for tether extension and power regulation needed before JETS can be implemented as a practical spacecraft system. This presentation will discuss these issues and current progress in an ongoing systems feasibility study.

Gallagher, D. L.↗

Direct Air Capture Case Studies: Solvent System

This case study provides cost and performance estimates for a solvent-based direct air capture (DAC) system at varying scales. The performance of the DAC system is largely based upon vendor performance while the costs of the system were developed as independently as possible. This study is representative of an example DAC system configuration and is not an optimized design.

42 ENGINEERING↗

Shuttle-tethered satellite system definition study. Volume 1: Executive study

The Tethered Satellite System has great prospects for extending orbital operations capability of the Space Transportation System to science, applications, and technology projects not otherwise attainable. The system will installed in the Shuttle Orbiter and will have the capability to deploy a captive satellite up to 100 km away from the Orbiter. Control and retrieval of the satellite are accomplished by means of a tether line connecting the satellite and the cargo bay mounted equipment in the Orbiter. At low satellite altitudes, the system will permit investigations of a duration that could not be pursued with sounding rockets of free-flying spacecraft. The propose of the Shuttle/Tethered Satellite System Definition Study was to produce the preliminary design, preliminary specifications, gross program plans, and program cost estimate for a 1982 operational verification flight. This was accomplished during a fifteen month effort under by the NASA George C. Marshall Space Flight Center (MSFC). The MSFC Phase 1 and related studies demonstrated the feasibility of the system and served as a starting point for the Phase 2 definition study.

Source record↗

Methods for Probabilistic Fault Diagnosis: An Electrical Power System Case Study

Health management systems that more accurately and quickly diagnose faults that may occur in different technical systems on-board a vehicle will play a key role in the success of future NASA missions. We discuss in this paper the diagnosis of abrupt continuous (or parametric) faults within the context of probabilistic graphical models, more specifically Bayesian networks that are compiled to arithmetic circuits. This paper extends our previous research, within the same probabilistic setting, on diagnosis of abrupt discrete faults. Our approach and diagnostic algorithm ProDiagnose are domain-independent; however we use an electrical power system testbed called ADAPT as a case study. In one set of ADAPT experiments, performed as part of the 2009 Diagnostic Challenge, our system turned out to have the best performance among all competitors. In a second set of experiments, we show how we have recently further significantly improved the performance of the probabilistic model of ADAPT. While these experiments are obtained for an electrical power system testbed, we believe they can easily be transitioned to real-world systems, thus promising to increase the success of future NASA missions.

Ricks, Brian W.↗

Earth Observatory Satellite system definition study. Report no. 7: EOS system definition report

The design concept and operational aspects of the Earth Observatory Satellite (EOS) are presented. A table of the planned EOS missions is included to show the purpose of the mission, the instruments involved, and the launch date. The subjects considered in the analysis of the EOS development are: (1) system requirements, (2) design/cost trade methodology, (3) observatory design alternatives, (4) the data management system, (5) the design evaluation and preferred approach, (6) program cost compilation, (7) follow-on mission accommodation, and (8) space shuttle interfaces and utilization. Illustrations and block diagrams of the spacecraft configurations are provided.

Source record↗

Earth Observatory Satellite system definition study. Report no. 7: EOS system definition report. Appendixes A through D

An analysis of the systems involved in the operation and support of the Earth Observatory Satellite (EOS) is presented. Among the systems considered are the following: (1) the data management system, (2) observatory to primary ground station communications links, (3) local user system, (4) techniques for recognizing ground control points, (5) the central data processing-implementation concept, and (6) program effectiveness analysis.

Source record↗

Future space transportation systems analysis study. Phase 1 extension: Transportation systems reference data, volume 2

Transportation mass requirements are developed for various mission and transportation modes based on vehicle systems sized to fit the exact needs of each mission. The parametric data used to derive the mass requirements for each mission and transportation mode are presented to enable accommodation of possible changes in mode options or payload definitions. The vehicle sizing and functional requirements used to derive the parametric data are described.

Source record↗