Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “System Operator”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

An assessment of flexibility reserves in stochastic modeling at multiple timescales

Due to recent technological achievements, stochastic optimization, which inherently captures the uncertainty of intermittent resources, is being used to capture the variability and uncertainty of wind and solar resources. However, due to persistent computational limitations, it is not practical to consider all possible variable generation scenarios. As a result, a reduced number of most likely scenarios is usually considered. While this helps reduce the computational burden, it also leaves the system operator vulnerable to some risk. In order to address this issue, this paper aims at providing insight into using an explicit reserve requirement in a stochastic modeling framework in order to provide system operators with greater confidence in stochastic dispatch solutions. This is accomplished by simulating a modified version of the IEEE 118 bus system in a fully stochastic, multi-timescale framework with flexibility reserve requirements. Results show that utilizing a stochastic flexibility reserve requirement within the stochastic modeling framework offers the most reliability benefit.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A Three-Stage Enhanced Reactive Power and Voltage Optimization Method for High Penetration of Solar

This paper presents a three-stage enhanced volt/var optimization method to stabilize voltage fluctuations in transmission networks by optimizing the usage of reactive power control devices. In contrast with existing volt/var optimization algorithms, the proposed method optimizes the voltage profiles of the system, while keeping the voltage and real power output of the generators as close to the original scheduling values as possible. This allows the method to accommodate realistic power system operation and market scenarios, in which the original generation dispatch schedule will not be affected. The proposed method was tested and validated on a modified IEEE 118-bus system with photovoltaic data.

photovoltaic, Volt/Var Control, indexes, simulatio↗

Post-Disturbance Dynamic Distribution System Restoration with DGs and Mobile Resources

Distributed generations (DGs) can act as emergency power supplies when distribution systems suffer from outages. However, the generation capabilities of DGs are generally limited by a number of factors including weather conditions, fuel limitations, etc. In this context, mobile resources that are able to reallocate resources to desired locations are regarded as important complements to conventional fixed DGs in assisting distribution system restoration. In this paper, a distribution system restoration model with DGs and mobile resources is proposed. Firstly, the dispatch and allocation of mobile resources are modeled with respect to the characteristics of the traffic network. Then the developed mobile resource models are integrated into the distribution system restoration model to co-optimize the scheduling of DGs and mobile resources. Uncertainty factors are managed by a model predictive control approach so that system operators can dynamically adjust the restoration strategy with the up-to-date information. The effectiveness of the proposed method is validated through an IEEE 13-bus test system.

distributed generations (DGs)↗

Disaggregated system domain

An approach is disclosed that configures a computer system node from components that are each connected to an intra-node network. The configuring is performed by selecting a set of components, including at least one processor, and assigning each of the components a different address range within the node. An operating system is run on the processor included in the node with the operating system accessing each of the assigned components.

Kahle, James A.↗

Linux Kernel Co-Scheduling and Bulk Synchronous Parallelism

This paper describes a kernel scheduling algorithm that is based on coscheduling principles and that is intended for parallel applications running on 1000 cores or more. Experimental results for a Linux implementation on a Cray XT5 machine are presented. The results indicate that Linux is a suitable operating system for this new scheduling scheme, and that this design provides a dramatic improvement in scaling performance for synchronizing collective operations at scale.

co-scheduling.↗

Impact of FERC Order 2222 on DER Participation Rules in US Electricity Markets

Electricity markets in the bulk grid are beginning to implement market mechanisms that support the procurement of flexible capabilities from wide range of technologies, including distributed energy resources (DERs). The flexibility of these resources will help counterbalance supply uncertainties from large-scale integration of variable renewable generation. To encourage development of distributed and aggregated market participants, FERC Order 2222 was issued in September 2020 to require each Independent System Operator (ISO) in the US to implement rules that enable broader participation from aggregations of DERs in the bulk market. The following paper first describes the generic design of ISO markets before introducing the new market participation rules that ISOs have proposed for compliance with Order 2222. The paper then describes how software performance issues may continue to affect the eligibility requirements and offer structures for DER aggregations participating in ISOs, noting that continued research on computational methods may help reduce burdens for DER integration. The prospects for transmission and distribution system coordination is second major issue discussed, which will require minor changes to existing processes in the short term. In the longer term, there is more opportunity for more wide-ranging reforms, such as the development of a Distribution System Operator (DSO) framework. Newly proposed market rules may affect how Transactive Energy Systems (TES) will help facilitate efficient formation of DER aggregations and operation of the individual DERs within an aggregation. Within the TES context, the challenge is to fully understand how resource eligibility and operational and planning coordination methods will affect the design and implementation of TES.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Towards a framework for selection of supervisory control for commercial buildings: HVAC system energy efficiency

This paper develops and utilizes an optimization based framework to investigate the maximal energy efficiency potentially attainable by HVAC system operation in a non-predictive context. Performance is evaluated relative to the existing state of the art set-point reset strategies. The expected efficiency increase driven by operation constraints relaxations is evaluated.

Ramachandran, Thiagarajan↗

Operation Optimization using Reinforcement Learning with Integrated Artificial Reasoning Framework

In large and complex systems, operational decision-making requires a systematic analysis with a vast amount of data from both process parameters and component status monitoring. In this paper, we present an integrated artificial reasoning approach for system state transition models that can help operational decision-making with explainable and traceable reasoning. The integrated artificial reasoning framework is a physics-based approach of defining the system structure in a Bayesian network, so we leveraged it in a Markov decision process (MDP) for finding optimal operational solutions. In our proposed framework, the MDP is implemented on a dynamic Bayesian network (DBN), which represents causalities in a system. The multilevel flow modeling was utilized in order to extract these causalities in a more efficient and objective manner. Since multilevel flow modeling is based on the fundamental energy and mass conservation laws, the target system is decomposed into several mass, energy, and information structures, which serve as the basis for a DBN. The MDP consists of the processes of finding a solution for the Bellman equation, which can be derived from the conditional probability equations of the constructed DBN. System operators can capture stochastic system dynamics as multiple subsystem state transitions based on their physical relations and uncertainties coming from the component degradation process or random failures. We analyzed a simplified example system to illustrate finding an optimal operational policy with this approach.

99 GENERAL AND MISCELLANEOUS↗

Five-year summary and evaluation of operations and performance of the Utica aquifer and North Lake Basin Wetlands restoration project in 2004-2009.

This document reviews the performance of the groundwater (and wetlands) restoration program implemented by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Utica, Nebraska, during the first five years (2004-2009) of this initiative. The report summarizes treatment system operational data and regulatory compliance monitoring results for the site during this period, together with the results of the targeted groundwater sampling and analysis for volatile organic compounds (VOCs) conducted in early 2010 (following completion of the fifth year of systems operation), to assess the initial five years of progress of the Utica remediation effort. On the basis of the 2003 groundwater sampling results, a remedial system employing 4 extraction wells (GWEX1-GWEX4), with groundwater treatment by spray irrigation and conventional air stripping, was implemented with the concurrence of the CCC/USDA and the agencies (Table 1.1). The principal components of the system are shown in Figure 1.3 and are briefly described in Section 1.2. Operation of well GWEX4 and the associated air stripper began on October 29, 2004, and routine operation of wells GWEX1-GWEX3 and the spray irrigation treatment units began on November 22, 2004.

54 ENVIRONMENTAL SCIENCES↗

Techniques for Achieving High Reliability Operation of the Spallation Neutron Source High Power Radio-Frequency System

The Spallation Neutron Source (SNS) high power radiofrequency (HPRF) system operates with high reliability to support the goals of the SNS user program. In recent operational periods the availability of the HPRF system has exceeded 97 percent while the neutron source availability overall is typically greater than 90 percent. SNS has a unique set of 92 HPRF stations that operate at either 402.5 MHz or 805 MHz with peak output power ranging from 550 kW to 5 MW and average power ranging from 49.5 kW to 450 kW. The HPRF transmitters consist of chassis-mounted power supplies, solid-state amplifiers and other equipment that support the operation of the klystrons that ultimately provide the RF power to the accelerating structures. Management of the operation and maintenance of the HPRF system has increasingly focused on reliability and sustainability in recent years. Techniques for klystron lifetime preservation and optimization of transmitter reliability have been developed and will be described.

Moss, John↗

Laboratory Evaluation of Federated, Hierarchical Controls for Distribution Power System Management: Preprint

The connection of more loads and distributed energy resources (DERs) to the distribution power system brings both challenges and opportunities to system operators. There are opportunities to aggregate flexible loads and DERs to provide transmission grid services, but the coordinated actions of DERs being managed by independent, third-party DER aggregators to support transmission system operations can present challenges. We developed a federated DER management architecture and control framework that aims to manage heterogeneous DERs to deliver reliable transmission grid services while respecting distribution system constraints. The controls include stochastic day-ahead optimization, model predictive control, and a simple real-time management scheme. We present simulation results obtained from a realistic laboratory test bed of federated controls managing DERs within a substation service area to make the substation net power follow the optimal net power determined by the day-ahead optimization based on cost and limiting reverse power flow.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Conversion of the LLNL/CAMS 1 MV biomedical AMS system to a semi-automated natural abundance 14C spectrometer: system optimization and performance evaluation

The Lawrence Livermore National Laboratory – Center for Accelerator Mass Spectrometry compact 1 MV biomedical accelerator mass spectrometer was repurposed and optimized for the semi-automated radiocarbon measurement of natural abundance environmental samples. Here we present results from 15 months of routine system operation and evaluate the system performance based on 30 sample wheels measured with consistent operating conditions over 7 months from August 2019 to March 2020. Additionally, the average measurement precision was 2.7 ± 0.7‰. System accuracy was assessed with measurements of 14 C-free materials, standard materials with 14 C-content spanning 0.5 to 1.5 F 14 C, and by comparison to split samples measured with the 10 MV AMS system. Overall, this system can routinely measure samples as small as 300 µgC and less than 33000 years without the need for size-specific correction protocols.

43 PARTICLE ACCELERATORS↗

Free piston linear motor compressor and associated systems of operation

A linear motor compressor including a compressor housing and a cylinder housing having a plurality of opposing compression chambers. A piston freely reciprocates within the cylinder housing using a linear electric motor. A piston position feedback control system provides adaptive current output as a function of position feedback and/or velocity feedback from the piston and/or the electric motor, to directly power and control the electric motor, wherein the piston reciprocates without assistance from a mechanical spring or other equivalent centering force.

Stair, Jason↗

Development of a Conceptual Chum Salmon Emergence Model for Ives Island

The objective of the study described herein was to develop a conceptual model of chum salmon emergence that was based on empirical water temperature of the riverbed and river in specific locations where chum salmon spawn in the Ives Island area. The conceptual model was developed using water temperature data that have been collected in the past and are currently being collected in the Ives Island area. The model will be useful to system operators who need to estimate the complete distribution of chum salmon emergence (first emergence through final emergence) in order to balance chum salmon redd protection and power system operation.

Murray, Christopher J.↗

NSTX-U Control System Upgrades

The National Spherical Tokamak Experiment (NSTX) is undergoing a wealth of upgrades (NSTX-U). These upgrades, especially including an elongated pulse length, require broad changes to the control system that has served NSTX well. A new fiber serial Front Panel Data Port input and output (I/O) stream will supersede the aging copper parallel version. Driver support for the new I/O and cyber security concerns require updating the operating system from Redhat Enterprise Linux (RHEL) v4 to RedHawk (based on RHEL) v6. While the basic control system continues to use the General Atomics Plasma Control System (GA PCS), the effort to forward port the entire software package to run under 64-bit Linux instead of 32-bit Linux included PCS modifications subsequently shared with GA and other PCS users. Software updates focused on three key areas: (1) code modernization through coding standards (C99/C11), (2) code portability and maintainability through use of the GA PCS code generator, and (3) support of 64-bit platforms. Central to the control system upgrade is the use of a complete real time (RT) Linux platform provided by Concurrent Computer Corporation, consisting of a computer (iHawk), an operating system and drivers (RedHawk), and RT tools (NightStar). Strong vendor support coupled with an extensive RT toolset influenced this decision. The new real-time Linux platform, I/O, and software engineering will foster enhanced capability and performance for NSTX-U plasma control.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region

As electricity systems transition to higher levels of solar and wind generation, electric system operators will likely need to hold additional reserves to manage solar and wind forecast error. Because solar and wind forecast errors tend to be weakly correlated across space, system operators can reduce their reserve requirements by sharing reserves. This paper examines the benefits of forecast error reserve sharing among balancing areas in the Southeastern United States, in scenarios in which solar and wind generation ranges from 34% to 65% of total generation. It finds that day-ahead forecast error reserve requirements increase linearly with growth in solar and wind generation capacity (6%-10% of total capacity), but that reserve sharing can significantly reduce these requirements (by 6%-29%). It finds that, in economic terms, the value of forecast error reserve sharing ($\$$0.09-$\$$1.24 billion per year, $\$$0.12-$\$$1.68/MWh of load across scenarios) tends to decline with higher levels of solar and wind generation, due to lower reserve and energy prices. Even with declines in reserve prices, forecast error reserve sharing can still provide substantial value, though with higher levels of solar, wind, and electricity storage this value is increasingly tied to avoiding scarcity prices.

14 SOLAR ENERGY↗

Open-Source Steady-State Models for Integration of Wave Energy Converter into Microgrids

This paper proposes a software framework, WEC-Grid, for integrating wave energy converters (WECs) into power flow software, such as Siemens PSS®E, to aid the integration of alternative energy sources into Microgrids. While integrating alternative sources such as WECs presents specific challenges such as cost, power quality, and power variability, wave energy is a promising renewable energy resource. Evaluating the integration of WECs into the power grid is a complex and nuanced problem that requires seamless communication between a WEC model and power flow software. The presented WEC-Grid software framework bridges and extends the functionality of WEC-Sim, an open-source WEC modeling package for MATLAB, through a wave-to-wire (W2W) electro-mechanical power conversion and processing model. WEC-Grid acts as a software wrapper, handler, and communication layer between the W2W modeler and power flow software. The software is designed to represent each grid system as a class object, allowing power system operators to perform power system duties such as contingency planning and dispatch operations. The integration of WECs with PSS®E’s power flow calculations workflow is demonstrated with an IEEE RTS case study.

16 TIDAL AND WAVE POWER↗