Composite Analysis for Low-Level Waste Disposal in the Central Plateau of the Hanford Site (Annual Status Report FY 2022)

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2022. Originally reported in PNNL-11800 and PNNL-11800, Addendum 1 (hereinafter collectively referred to as the Hanford Site Composite Analysis), the Hanford Site Composite Analysis was approved through issuance of a 2002 memorandum.5 As required by DOE/RL-2000-29, an annual evaluation of new information and data developed by several onsite programs was completed. The reporting period for this annual evaluation is FY 2022 (October 1, 2021 through September 30, 2022).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 East Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the 200 East Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-SD-WM-TI-730). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fermilab’s Muon Campus: Status, Experiments, and Future

The Fermilab Muon Campus, repurposed Tevatron-era Antiproton Source facilities, is currently the home to the g-2 and Mu2e muon experiments. Collecting data since 2017, the g-2 experiment is wrapping up a final run before the Muon Campus transitions to Mu2e operation. Currently in the commissioning process, the Mu2e experiment is expected to begin calibration and data collection in fiscal year 2024. A majority of the Muon Campus is shared between the two experiments, however the modes of operation for each are significantly different. An 8 GeV primary proton beam strikes a target to produce a 3.1 GeV/c secondary muon beam for g-2, while the Mu2e experiment uses the Delivery Ring, formerly the Antiproton Accumulator Ring, for a pulsed, resonantly extracted, 8 kW, 8 GeV proton beam incident on a target in the experiment's target hall to produce a muon beam for the experiment. The design and current state of the Muon Campus and the current and future plans of the g-2 and Mu2e experiments, including the transition between operating modes, will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2022)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063) and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected. Within the active burial grounds, low-level and mixed low-level waste currently may be disposed only in two lined trenches in the 218-W-5 Burial Ground (Trenches 31 and 34) until they are either filled or a decision is made to close these trenches. Some mixed low-level waste is also disposed at the Environmental Restoration Disposal Facility in the 200 West Area (which is covered under a separate PA). During this (fiscal year 2022) reporting period (October 1, 2021, through September 30, 2022), waste was disposed to the 200 West Area LLBGs. Continued groundwater monitoring of the 200 West Area LLBGs indicates no groundwater contamination due to LLBG waste. Current assumptions about future land use at the Hanford Site are consistent with PA analysis assumptions of a postclosure facility that will not be degraded by human activity. The LLBGs are in an area identified for waste management and containment of residual contamination (DOE/EIS-0391). The current closure plan for the LLBGs (DOE/RL-2000-70) estimates that the 200 West LLBGs will be closed in the 2050 timeframe. The Disposal Authorization Statement, other technical basis documents, and the radioactive waste management basis are of continued adequacy to meet the performance objectives of DOE O 435.1. Overall, there are no substantive changes to primary PA assumptions and no changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the Disposal Authorization Statement is maintained. A new PA to evaluate the long-term impacts of three disposal trenches that are currently active within the 200 East and 200 West Areas (Trench 94 in the 200 East Area and Trenches 31 and 34 in the 200 West Area) was initiated in fiscal year 2019 and completed in fiscal year 2022. Corrective actions addressing 3 key issues and 31 secondary issues identified during the review process were developed and submitted to the Low-Level Waste Disposal Facility Federal Review Group Co-Chairs for review and approval. This PA provides additional technical basis for the continued adequacy of the existing Operating Disposal Authorization Statement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Status Report FY 2022)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA) (CP-60089), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and that the determination must consider the results of data collection and analysis from research, field studies, and monitoring as well as the need to update any Radioactive Waste Management Basis (RWMB) documents. Beginning in 1996, the Environmental Restoration Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2022, extending from October 1, 2021, through September 30, 2022), approximately 8.52E+04 metric tons (9.39E+04 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2022, approximately 17.0 million metric tons (18.7 million U.S. tons) of waste has been disposed at ERDF, which equates to consumption of approximately 89.1% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. As a condition of the DAS, disposal operations within ERDF must be in accordance with the waste acceptance criteria (ERDF-00011) that provide specific radionuclide disposal limits, waste form restrictions, and descriptions of acceptable waste packages in compliance with the requirements of DOE M 435-1.1. The ERDF waste acceptance criteria stipulate that waste destined for disposal at ERDF be controlled based on source, physical form, and contaminant concentration and activity levels. There have been no changes to the physical configuration of ERDF or to the waste forms (source, physical form, etc.). No new unreviewed disposal question screenings or evaluations have been generated in this reporting period. Therefore, there are no noted impacts to the PA, CA, DAS, or RWMB resulting from the evaluations and screenings. Sum-of-fractions analysis shows that the disposed inventory meets both the concentration and inventory threshold requirements. A sum-of-fractions value is computed for ERDF sensitive radionuclides contributing to the groundwater pathways and the air pathway inventory limits. Computed values were 5.50E-04 and 3.30E-03, respectively. The disposed waste inventory remained well under the PA imposed limits, as shown in Table 4 and Table 5 in the main text of this report. Required monitoring was satisfactorily completed during the fiscal year reporting period. Compliance with performance objectives were met as each of the reported values were well below the established limit. Overall, there are no substantive changes to primary PA assumptions or changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the DAS is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Disposal of Low-Level Waste in the 200 West Area Burial Grounds (Annual Status Report FY 2021)

This annual review provides the projected dose estimates of radionuclide inventories disposed in the active 200 West Area Low-Level Waste Burial Grounds (LLBGs) since September 26, 1988. These estimates are calculated using the original dose methodology developed in the performance assessment (PA) analysis (WHC-EP-0645). The estimates are compared with the performance objectives defined in U.S. Department of Energy requirements (DOE O 435.1 and its companion documents DOE M 435.1-1 and DOE-STD-5002-2017). All performance objectives are currently satisfied, and operational waste acceptance criteria (HNF-EP-0063). and waste acceptance practices continue to be sufficient to maintain compliance with performance objectives. Inventory estimates and associated dose estimates from future waste disposal actions are unchanged from previous years’ evaluations that indicate potential impacts well below performance objectives; therefore, future compliance with DOE O 435.1 is expected.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Performance Assessment for the Environmental Restoration Disposal Facility (Annual Status Report FY 2021)

DOE O 435.1 and DOE M 435.1-1 require that a determination of continued adequacy of the performance assessment (PA) (CP-60089), composite analysis (CA), and disposal authorization statement (DAS) be made on an annual basis, and that the determination must consider the results of data collection and analysis from research, field studies, and monitoring as well as the need to update any Radioactive Waste Management Basis (RWMB) documents. Beginning in 1996, the Environmental Disposal Facility (ERDF) started accepting low-level radioactive, hazardous, and mixed wastes that were generated during cleanup activities at the Hanford Site. ERDF is composed of a series of cells or disposal areas and can accommodate future design expansions as needed. Currently, there are eight cells and two supercells in ERDF. Each supercell is the equivalent of two cells. During this reporting period (fiscal year 2021, extending from October 1, 2020, through September 30, 2021), approximately 9.14E+04 metric tons (1.01E+05 U.S. tons) of waste was disposed at ERDF. From ERDF inception through September 30, 2021, approximately 16.9 million metric tons (18.9 U.S. tons) of waste has been disposed of at ERDF, which equates to consumption of approximately 88.7% of the currently constructed disposal volume. According to the design of ERDF, the facility has the ability to be expanded as needed. As a condition of the DAS, disposal operation within ERDF must be in accordance with the waste acceptance criteria (ERDF-00011) that provide specific radionuclide disposal limits, waste form restrictions, and descriptions of acceptable waste packages in compliance with the requirements of DOE M 435-1.1. The ERDF waste acceptance criteria stipulate that waste destined for disposal at ERDF be controlled based on source, physical form, and contaminant concentration and activity levels. There have been no changes to the physical configuration of ERDF or to the waste forms (source, physical form, etc.). No new unreviewed disposal question screenings or evaluations have been generated in this reporting period. Therefore, there are no noted impacts to the PA, CA, DAS, or RWMB resulting from the evaluations and screenings. Sum-of-fractions analysis shows that the disposed inventory meets both the concentration and inventory threshold requirements. A sum-of-fractions value is computed for ERDF sensitive radionuclides contributing to the all pathways and the air pathway inventory limits. Computed values were 7.63E-03 and 1.49E-03, respectively. The disposed waste inventory remained well under the PA imposed limits, as shown in Table 4 and Table 5 in the main text of this report. Required monitoring was satisfactorily completed during the fiscal year reporting period. Compliance with performance objectives were met as each of the reported values were well below the established limit. Overall, there are no substantive changes to primary PA assumptions or changes to the PA analysis conclusion; therefore, compliance with DOE O 435.1 and the DAS is maintained.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FY 2020 Radionuclide Migration Project Status

The Waste Management Project provides safe, compliant, and cost-effective waste management services for the Hanford Site and the U.S. Department of Energy (DOE) complex. Part of these services includes safe disposal of low-level waste and mixed low-level waste at the Hanford Low-Level Waste Burial Grounds in accordance with the requirements of DOE Order 435.1, Radioactive Waste Management. To partially satisfy these requirements, performance assessment analyses were completed and approved. DOE Order 435.1 also requires continuing data collection to increase confidence in the critical assumptions used in these analyses to characterize the operational features of the disposal facility that are relied on to satisfy the performance objectives identified in the order.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Gripper Test Assembly Status Report (FY2020)

Refueling systems for fast reactors are designed to handle fresh and used core assemblies (fuel, reflector, and shield core assemblies) within the reactor vessel in an opaque coolant environment without visual reference. These refueling machines are designed to work in a sodium (or other fast reactor coolant) and argon vapor space environment and are engineered with the rotatable plug system to allow for the movement of fresh and spent fuel into and out of the reactor core. The refueling machines are a critical component in any reactor and thus need to undergo extensive testing in a prototypic environment to ensure that they will meet all of the system functions and requirements. Argonne has developed an innovative compact refueling system design for the Advanced Fast Reactor-100 that is based upon some mechanisms used in previous reactor designs, such as the U.K.’s Prototype Fast Reactor (PFR) and some mechanisms that have not been used in sodium. This compact refueling machine supports the reduction in size of the AFR-100’s reactor vessel, and if fully developed, would support and inform the development of the in-vessel refueling machines for such commercial reactors as the GEH PRISM reactor plant, the ARC Clean Energy’s ARC-100 reactor, and the Natrium reactor, among others. This refueling system is a vital component of a fast reactor that supports reducing the cost of the reactor and increasing its reliability. During the development of the compact fuel handling machine conceptual design for the AFR-100, a lack of testing data for many mechanical components in sodium under typical in-reactor loads and conditions was discovered. The reduction in lifetime of the various mechanical components in the liquid sodium environment needs to be quantified versus the calculated component lifetimes under normal conditions in the testing while they are subjected to typical loading profiles experienced in the past. The Gripper Test Assembly discussed here includes a full-size gripper device with appropriate mechanical features that will be tested in sodium to provide this testing data. The Gripper Test Assembly is used to test various mechanical fuel handling components submerged in high temperature liquid sodium. These mechanisms are gears, bearings, gripper jaws and head, universal joints and shafts, ball screws, among others. These components will be tested under the typical sodium environmental conditions experienced during refueling operations with appropriate loading conditions that simulate the removal and insertion of core assemblies into a fast reactor grid plate structure. This Gripper Test Assembly is the second in a series of refueling system mechanisms developed for testing in sodium. The first test assembly is the Gear Test Assembly (GTA) which was used to test the performance of gears and bearings operating in sodium. Because of the successful testing conducted with the GTA, it was decided to continue with the development of the Gripper Test Assembly which uses the same gears and bearings tested in GTA. Using the data collected during operation of this gripper test assembly, lifetime reduction factors of the various mechanical components can be calculated for the material combinations selected. These lifetime reduction factors can be used in the design of future mechanical systems which operate in these environments to accurately predict component end of life. In addition, an understanding of the ability of these components and mechanisms to operate under-sodium with the chosen materials will be accomplished. Again, this Gripper Test Assembly is the follow-on test article to the Gear Test Assembly which was testing the ability of gears and bearings operating in a sodium environment. Once fabricated and qualified, it will be tested in the Mechanism Engineering Test Loop (METL) facility located in Building 308 at Argonne National Laboratory.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Status and Trends in the U.S. Voluntary Green Power Market (2021 Data)

Voluntary green power, for the purposes of this report, refers to renewable energy procurement by retail electricity customers above state renewable energy mandates. In this report, we present data and key trends for voluntary green power markets, except for a small portion of voluntary purchasing where no data are available. In 2021, about 8 million retail electricity customers procured about 244 million megawatt-hours (MWh) of voluntary green power (Figure ES-1), representing about 27% of all U.S. renewable energy sales, about 39% of non-hydro renewable energy sales, and about 6% of all U.S. retail electricity sales. Most of the remainder of U.S. renewable energy sales reflects renewable energy procured by load-serving entities to comply with state renewable energy mandates, also known as compliance-based procurement.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

PIP-II Overview and Status

Explore the source record for details and available documents.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Hybrid Power Plants: Status of Operating and Proposed Plants, 2023 Edition [Slides]

Improving battery technology and the growth of variable renewable generation are driving a surge of interest in “hybrid” power plants that combine, for example, wind or solar generating capacity with co-located batteries. While most of the current interest involves pairing photovoltaic (PV) plants with batteries, other types of hybrid or co-located plants with wide-ranging configurations have been part of the U.S. electricity mix for decades. This annually updated briefing tracks and maps existing hybrid or co-located plants across the United States while also synthesizing data from power purchase agreements (PPAs) and generation interconnection queues to shed light on near- and long-term development pipelines. The scope includes “co-located hybrids” that pair two or more resources (e.g., multiple types of generation and/or generation with storage) that are operated largely independently behind a single point of interconnection, and “full hybrids” that also feature coordinated operations of the co-located resources. The focus is on plants with one megawatt (MW) or more of capacity; smaller (often behind-the-meter) projects are also increasingly common, but are not included in this data synthesis. Key findings from the latest briefing include: -At the end of 2022, there were 374 hybrid plants (>1 MW) operating across the United States (+25% compared to the end of 2021), totaling nearly 41 GW of generating capacity (+15%) and 5.4 GW/15.2 GWh of energy storage (+69%/+88%). PV+storage plants are by far the most common, dominating in terms of plant number (213), storage capacity (4.0 GW/12.5 GWh), storage:generator capacity ratio (49%), and storage duration (3.1 hours). But there are nearly twenty other hybrid plant configurations as well, including several different fossil hybrid categories (each dominated by the fossil component) as well as wind+storage, wind+PV, wind+PV+storage, geothermal+PV, and others. -Last year was another strong year for PV+storage hybrids in particular: 59 of the 62 hybrids added in 2022 were PV+storage. As of the end of 2022, there was roughly as much storage capacity operating within PV+storage hybrid plants as in standalone storage plants (~4 GW each). In storage energy terms, however, PV+storage edged out standalone storage by ~2 GWh (12.5 GWh vs. 10.4 GWh, respectively). -Interconnection queue data show continued strong developer interest in hybridization. At the close of 2022, there were 51% more hybrid plants—representing 59% more generating capacity—in interconnection queues across the United States than there were at the end of 2021. Solar dominates these proposed plants as well: at the close of 2022, there were 457 GW of solar capacity proposed as a hybrid (representing ~48% of all solar capacity in the queues), most typically pairing PV with battery storage. At the same time, there were 24 GW of wind capacity proposed as a hybrid (representing ~8% of all wind capacity in the queues), again most-often pairing wind with storage. Meanwhile, more than half of all storage in the queues is estimated to be part of a hybrid plant. While many of the plants proposed in the queues will not ultimately reach commercial operations, the depth of interest in hybrid plants—especially PV+storage—is notable, particularly in certain regions. For example, in CAISO, 97% of all solar capacity and 45% of all wind capacity in the queues is proposed as a hybrid. -The report also surveys power purchase agreement (PPA) price data from a sample of operating and proposed PV+storage plants. Though PV+storage PPA prices have fallen over time, “levelized storage adders” have recently increased somewhat to ~$\$ $7000/MW-month, ~$\$ $60/MWh-stored (assuming one full cycle per day), or ~$\$ $15/MWh-PV. Some of the recent price increase could simply reflect a trend towards higher battery:PV capacity ratios over time, which increases costs, all else being equal. The well-publicized impact of inflationary and supply chain pressures on battery prices is no doubt a contributor as well.

25 ENERGY STORAGE↗

UCO TRISO Minifuel FY23 NSUF-Kairos Power Post-Irradiation Examination Status Report

Irradiation of miniature tristructural isotropic (TRISO)–coated particle fuel compacts at high-power particle was performed in the Oak Ridge National Laboratory’s (ORNL’s) High Flux Isotope Reactor (HFIR) using the MiniFuel irradiation capability. Each compact comprised 20 TRISO particles with a low-enriched uranium carbide uranium oxide (UCO), natural UCO, or low-enriched UO 2 kernel within a graphitic matrix. After irradiation, the MiniFuel targets and subcapsules were disassembled to recover the irradiated fuel specimens and pursue post-irradiation examination (PIE) to inform Kairos Power on the fuel specimen performance. This report describes the PIE results collected to date, including dilatometry on the passive thermometry to confirm the irradiation temperature, fission gas release measurements, and gamma counting. This work was funded by the Nuclear Science User Facilities program.