Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Sealing technology”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

XRD Analysis of Cement Paste Samples Exposed to the Simulated Environment of a Deep Repository - 12239

Portland cement materials are widely used as engineered barriers in repositories for radioactive waste. The capacity of such barriers to avoid the disposed of radionuclides to entering the biosphere in the long-term depends on the service life of those materials. Thus, the performance assessment of structural materials under a series of environmental conditions prevailing at the environs of repositories is a matter of interest. The durability of cement paste foreseen as backfill in a deep borehole for disposal of disused sealed radioactive sources is investigated in the development of the repository concept. Results are intended to be part of the body of evidence in the safety case of the proposed disposal technology. This paper presents the results of X-Ray Diffraction (XRD) Analysis of cement paste exposed to varying temperatures and simulated groundwater after samples received the radiation dose that the cement paste will accumulate until complete decay of the radioactive sources. The XRD analysis of cement paste samples realized in this work allowed observing some differences in the results of cement paste specimens that were submitted to different treatments. The cluster analysis of results was able to group tested samples according to the applied treatments. Mineralogical differences, however, are tenuous and, apart from ettringite, are hardly observed. The absence of ettringite in all the seven specimens that were kept in dry storage at high temperature had hardly occurred by natural variations in the composition of hydrated cement paste because ettringite is observed in all tested except the seven specimens. Therefore this absence is certainly the result of the treatments and could be explained by the decomposition of ettringite. Although the temperature of decomposition is about 110-120 deg. C, it may be initially decomposed to meta-ettringite, an amorphous compound, above 50 deg. C in the absence of water. Influence of irradiation on the mineralogical composition was not observed when the treatment was analyzed individually or when analyzed under the possible synergic effect with other treatments. However, the radiation dose to which specimens were exposed is only a fraction of the accumulated dose in cement paste until complete decay of some sources. Therefore, in the short term, the conditions deemed to prevail in the repository environment may not influence the properties of cement paste at detectable levels. Under the conditions presented in this work, it is not possible to predict the long term evolution of these properties. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Rock Melt Borehole Sealing System, Final Technical Report for SBIR Phase I Grant No. DE-SC0011888

Purpose of Research Deep borehole disposal is one option that has received attention in recent years as a possible strategy for long-term disposal of the tens of thousands of tons of spent nuclear fuel. The feasibility of the deep borehole option relies upon designing and constructing an effective seal within the borehole to ensure that the waste package does not communicate with the shallow subsurface biosphere through the borehole itself. Some of the uncertainty associated with the long-term suitability of the deep borehole option is related to (1) the degradation of traditional sealing materials over time and (2) the inability of traditional sealing methods to adequately seal a Disturbed Rock Zone surrounding the borehole. One possible system to address these concerns consists of encapsulating the waste in a melt generated from either the waste itself or a plug above the waste. This current project expanded on previous work to further advance the deep borehole disposal concept. Research Objectives & Findings The overarching objective of the study was to evaluate the feasibility of constructing a downhole heater that is capable of meeting the technical and logistical requirements to melt rock. This ultimate objective was accomplished by two primary approaches. The first approach was to define the heater requirements and conceptually design a system that is capable of melting rock. The second approach was to determine the feasibility of conducting an in situ, field-scale melting experiment to validate the suitability of the rock melt seal concept. The evaluation and conceptual design of the heater system resulted in the following primary findings: • Borehole wall temperatures capable of producing a partial melt are achievable under most expected thermal conductivities with a 12-kilowatt heater. • Commercially available components have been identified that meet the requirements of the heater system, including resistive elements that are capable of providing the required heat generation, container materials that can withstand the anticipated temperatures, and a system capable of providing power to the heater. Evaluating the feasibility of performing field-scale experiments resulted in the following major findings: • The Sanford Underground Research Facility (SURF) has been identified as a host site for field testing of prototype heaters. The technical and logistical requirements for performing the rock melt tests can be met by using or expanding the existing infrastructure at SURF with on-site personnel and contractors. • In situ hydraulic conductivity test using packers can test the effectiveness of the rock melt seal, while a mine back performed from a lower level can further evaluate the recrystallized melt. • Preliminary costing indicates that a field-scale melting experiment at SURF is feasible within a Phase II Small Business Innovation Research budget while allowing sufficient budget for refining the heater design, coordinating the test program, and interpreting the results. Application of Research The rock melt sealing concept has the potential to reduce uncertainty associated with the long-term storage of nuclear waste. Preliminary efforts of this study defined the requirements of a downhole heater system capable of melting rock and indicated that developing such a system is feasible using available technology. The next logical step is designing and manufacturing prototype heaters. Concurrent with prototype development is coordinating robust field-scale experiments that are capable of validating the design for marketing to potential users.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Small Hydropower Research and Development Technology Project (Final Scientific/Technical Report, Non-Limited Data Rights Version)

The objective of this work was to investigate, develop, and validate the next generation of small hydroturbine generator designs that maximize the energy transfer from flowing water to electrical power generation. What resulted from this effort was the design of a new technology hydroturbine that Near Space Systems (NSS) has named the Star*Stream© Hydroturbine. Using a design that eliminates nearly all of the shortfalls of conventional hydroturbines, the Star*Stream© Hydroturbine employs a new mechanical-to-electrical energy transfer hydro design that operates without lubrication of any kind, and does not introduce foreign chemicals or particulate matter from oil or drive shaft seal degradation into the hydro ecology. In its unique configuration, the Star*Stream© Hydroturbine is nearly environmentally inert, without the negative aspects caused by interrupting the ecological continuity, i.e., disruptions to sedimentation, water quality, habitat changes, human displacement, fish migration, etc., - while it ensures dramatically reduced timeframes to project completion. While a remarkable reduction in LCOE resulting from application of the Star*Stream© Hydroturbine technology has been the core achievement of the this effort, there have been numerous technological breakthroughs from the development effort.

13 HYDRO ENERGY↗

Mask Free OLED Fabrication Process for Non-Tunable and Tunable White OLED Panels

In this program we demonstrated a method for mask free fabrication of OLEDs. Conventional OLEDs use at least 2 shadowmasks during the fabrication process to define the deposition pattern for the organic layers and for the cathode layer. Although effective, the use of masks requires mask handling and mask change equipment which increases the cost of the OLED deposition system. New sets of masks are required for every new product design, and the mask sets require frequent cleaning as organic material builds up on the masks over time and can be a source of particle defects resulting in yield loss. The method investigated in this program uses laser removal of organic material to pattern the organic layers and define a moisture impermeable seal region. This method is digital and can be applied to any new panel design, avoiding the costs of new masks sets and associated yield loss. In addition, we developed a platform technology for producing white color tunable or dim-to-warm white OLEDs and demonstrated patterning of tunable white OLEDs using the low-cost mask free fabrication process.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RANGERS: Methodology Report on Design and Performance Assessment of Engineered Barrier Systems in a Salt Repository for HLW/SNF

Salt formations are one of the potential host rocks for the final disposal of high-level radioactive waste (HLW) in deep geological repositories, both in Germany and the United States. The safe isolation of radioactive waste in these repositories relies on a multi-barrier system, combining engineered and natural barriers. The natural barrier is provided by the salt rock itself, known for its self-sealing properties and long-term stability. The engineered barrier, on the other hand, comprises sealing components strategically placed within the repository to enhance its containment capabilities. In both Germany and the United States, long-term safety assessments require demonstrating the integrity of the natural barrier for a period of up to 1 million years. Concurrently, the engineered barrier system (EBS) must maintain its structural and functional integrity until the long-term sealing, such as the granular salt backfill material, has re-consolidated to its final low porosity and permeability. Based on extensive expertise and experience with engineered barriers in salt formations, BGE TECHNOLOGY GmbH and Sandia National Laboratories have partnered to develop a robust methodology for the integrity and performance assessment of EBS in HLW repositories through the RANGERS project. This collaborative effort aims to establish a unified approach to geotechnical engineering, repository design, integrity and performance evaluation of EBS in salt repositories.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vapor crystal growth technology development: Application to cadmium telluride

Growth of bulk crystals by physical vapor transport was developed and applied to cadmium telluride. The technology makes use of effusive ampoules, in which part of the vapor contents escapes to a vacuum shroud through defined leaks during the growth process. This approach has the advantage over traditional sealed ampoule techniques that impurity vapors and excess vapor constituents are continuously removed from the vicinity of the growing crystal. Thus, growth rates are obtained routinely at magnitudes that are rather difficult to achieve in closed ampoules. Other advantages of this effusive ampoule physical vapor transport (EAPVT) technique include the predetermination of transport rates based on simple fluid dynamics and engineering considerations, and the growth of the crystal from close to congruent vapors, which largely alleviates the compositional nonuniformities resulting from buoyancy driven convective transport. After concisely reviewing earlier work on improving transport rates, nucleation control, and minimization of crystal wall interactions in vapor crystal growth, a detail account is given of the largely computer controlled EAPVT experimentation.

Rosenberger, Franz↗

INITIAL EVALUATION OF A PULSED WHITE SPECTRUM NEUTRON GENERATOR FOR EXPLOSIVE DETECTION

Successful explosive material detection in luggage and similar sized containers is acritical issue in securing the safety of all airline passengers. Tensor Technology Inc. has recently developed a methodology that will detect explosive compounds with pulsed fast neutron transmission spectroscopy. In this scheme, tritium beams will be used to generate neutrons with a broad energy spectrum as governed by the T(t,2n)4He fission reaction that produces 0-9 MeV neutrons. Lawrence Berkeley National Laboratory (LBNL), in collaboration with Tensor Technology Inc., has designedand fabricated a pulsed white-spectrum neutron source for this application. The specifications of the neutron source are demanding and stringent due to the requirements of high yield and fast pulsing neutron emission, and sealed tube, tritium operation. In a unique co-axial geometry, the ion source uses ten parallel rf induction antennas to externally couple power into a toroidal discharge chamber. There are 20 ion beam extraction slits and 3 concentric electrode rings to shape and accelerate the ion beam into a titanium cone target. Fast neutron pulses are created by using a set ofparallel-plate deflectors switching between +-1500 volts and deflecting the ion beams across a narrow slit. The generator is expected to achieve 5 ns neutron pulses at tritium ion beam energies between 80 - 120 kV. First experiments demonstrated ion source operation and successful beam pulsing.

43 PARTICLE ACCELERATORS↗

Magnetic Gears: The Key to Robust, Cost-Effective Hydropower Drivetrains

Based on previous demonstrated success at fabricating 5 and 10 kW scale magnetic gearbox (MGB) prototypes, Emrgy and its partners (the project team) proposed to design and construct a 100 kW scale MGB with a 30:1 gear ratio for the low-head hydro applications. The Statement of Project Objectives included tasks covering: 1) Market Applicability; 2) Technical Metrics; 3) Design (initial); 4) Electromagnetic (EM) Load and Structural Analysis; 5) Modal Analysis; 6) Sealing Design and 7) Final Design during Budget Period 1. Budget Period 2 included tasks covering: 1) Materials Procurement and Test Plan Development; 2) Assembly; and 3) Testing. The Market Applicability study (Task 1) led to a clear conclusion and recommendation toward “Low Head” technologies for maximum market share of both New Stream Reach development as well as powering Non-Powered Dams. The findings of this study also identified the opportunity for a larger scale magnetic gearbox-based drive train as a function of increased torque, as opposed to increased speed. The Technical Metrics Study (Task 2) concluded a horizontal orientation was preferred, examined potential loss mechanisms, concluded that a Halbach Array magnetic design was preferred, established a 30:1 gear ratio as optimal, and established a power rating of 100 kW as optimal. The subsequent initial and final detailed design process included electro-magnetic (EM) load and structural analysis (Task 4), a Modal analysis (for vibration) (Task 5), and a sealing design (Task 6) to assure water impermeability. The final design package (Task 7) included 729 individual parts, 117 unique part numbers, and 15 assemblies. In order to facilitate procurement, the full bill of materials was broken down into several sub-components: 1) custom magnetic parts; 2) custom machined parts; 3) custom casted parts; and 4) commercial off the shelf (COTS) parts. The casted parts were fabricated by Oak Ridge National Laboratory (ORNL) via a Cooperative Research and Development Agreement (CRADA) with Emrgy and funded by the Advanced Manufacturing Office (AMO). The procurement effort (Task 8) ultimately covered three time periods based on challenges encountered in meeting the budgeted cost for the prototype. Following the first effort in the early stages of Budget Period 2 in 2017, a no-cost time extension was granted to seek alternative fabrication and procurement options. The project was re-booted in 2020 based on the new ORNL CRADA that would focus on five (5) of the more difficult and expensive parts using their advanced manufacturing expertise. Procurement efforts for the other custom machined parts resulted in quotations that still exceeded the budget by more than $\$$100k. This was, in part, also due to the concurrent COVID-19 pandemic that caused both supply chain disruptions and labor shortages. As the project continued, pricing and availability degraded further. In Q2 FY’22, it was decided to not proceed with the fabrication of the prototype (Task 9) based on budgetary limitations. Outcomes included a full and detailed design of a 100 kW magnetic gearbox and associated indented bill of materials (BOM) and CAD drawings, a full assembly instruction manual with an associated BOM for materials necessary to support assembly, the fabrication of the double Halbach magnetic array for the rotor/stator system, fabrication of five (5) sand-casted/machined parts (via CRADA with ORNL) and an initial draft of a comprehensive testing plan. The most significant non-outcome was the actual fabrication and testing of the prototype gearbox based on budget limitations. Lessons learned included the need for an Application / Design / Cost trade analysis to better elucidate the cost potential of the MGB in the projected volumes anticipated for future demand. This would better establish the efficacy of the original cost target ($\$$0.80/Watt) and/or the need for reconsideration of designs and applications. Likewise, additional consideration of the prototype nature of the gearbox – single use, short lifetime, etc. - either as a separate exercise or in place of the design process completed, to reduce the cost of the demonstration prototype device. Additionally, project continuity was cited as a significant risk based on the loss of the primary design engineering firm after Budget Period 1. A design analysis exercise was conducted at the conclusion of the project to identify potential areas for cost reduction. One concept considered was the removal of the inner ring of magnets (with associated changes in the outer ring magnets) to enable a horizontal collapse of the design. It was estimated this could reduce cost by 10-25% without impacting performance.

13 HYDRO ENERGY↗

Consolidation and Permeability of the B1 and D1 Gas Hydrate Bearing Sands and Associated Seal Sediments of the Extended-Duration Gas Production Test Site on the Alaska North Slope

Gas hydrate, a solid combination of gas (mostly methane in nature) and water molecules stable at low temperatures and elevated pressures, occurs naturally in marine and permafrost-associated environments. Gas hydrate reservoirs, such as those in the Alaska North Slope, have been considered potential energy resources for gas production. To understand the petrophysical and geo-mechanical characteristics of the reservoir, core samples retrieved from the site of the JOGMEC-DOE-USGS collaborative gas hydrate R&D project have been analyzed in the laboratory for their hydraulic and mechanical properties. This paper focuses on both seal and reservoir samples associated with the B1 and D1 sands, which are evaluated for index properties (including porosity, grain size distribution, liquid and plastic limits, specific surface area, and specific gravity), consolidation, permeability, and water retention. Furthermore, the reservoir core samples were tested with pore-filling, laboratory-grown tetrahydrofuran hydrate, in order to assess reservoir behavior during gas production from hydrates. Under simulated in situ stress conditions, the seal and hydrate-free reservoir cores had a permeability anisotropy ratio of k h /k v = 3.0−5.0, and k h /k v = 2.4−3.0 for the reservoir tetrahydrofuran hydrate-bearing cores. The data suggest that depressurizing the reservoir to induce hydrate dissociation alters the reservoir effective permeability in three ways: permeabilities decrease due to porosity lost (e.g., the initial reservoir thickness can decrease by up to 5% upon 7 MPa depressurization), permeability increases due to the loss of solid hydrate in the pore space, and permeability anisotropy k h /k v decreases in response to the evolving pore-space geometry. We show that given the simulated in situ gas hydrate saturations (i.e., S h = 32% in core 7P-2E and S h = 21% in core 20P-4), gas production from the dissociation of tetrahydrofuran hydrate in the two tested cores results in a net increase in effective permeability and a decrease in k h /k v . This study highlights the importance of investigating seal and reservoir sediments and the impacts of depressurization on the porosity and permeability responses during production.

Geological materials↗

Molecular Simulation Models of Carbon Dioxide Intercalation in Hydrated Sodium Montmorillonite

Carbon capture and storage (CCS) technologies provide effective options for reducing carbon dioxide (CO 2 ) emissions and mitigating global climate change. Geologic CO 2 storage involves the injection of supercritical CO 2 into deep geologic formations overlain by sealing formations and geologic traps that prevent the CO 2 from escaping. The ability of seals to retain injected CO 2 depends on their permeability and geomechanical property evolution. Caprocks are often comprised of shale or mudstone enriched with swelling clay minerals that can expand or contract upon interaction with CO 2 . Intercalation of CO 2 into interlayer of swelling clay causes evolution of the geomechanical stress and can promote fracture formation. The interlayer of expanded clay provides ample space for additional permanent CO 2 storage and its subsequent transformation into carbonates.

54 ENVIRONMENTAL SCIENCES↗

Laser-optical blade tip clearance measurement system

The need for blade tip clearance instrumentation has been intensified recently by advances in technology of gas turbine engines. A new laser-optical measurement system has been developed to measure single blade tip clearances and average blade tip clearances between a rotor and its gas path seal in rotating component rigs and complete engines. The system is applicable to fan, compressor and turbine blade tip clearance measurements. The engine mounted probe is particularly suitable for operation in the extreme turbine environment. The measurement system consists of an optical subsystem, an electronic subsystem and a computing and graphic terminal. Bench tests and environmental tests were conducted to confirm operation at temperatures, pressures, and vibration levels typically encountered in an operating gas turbine engine.

Barranger, J. P.↗

Fiber optic, Fabry-Perot high temperature sensor

A digital, fiber optic temperature sensor using a variable Fabry-Perot cavity as the sensor element was analyzed, designed, fabricated, and tested. The fiber transmitted cavity reflection spectra is dispersed then converted from an optical signal to electrical information by a charged coupled device (CCD). A microprocessor-based color demodulation system converts the wavelength information to temperature. This general sensor concept not only utilizes an all-optical means of parameter sensing and transmitting, but also exploits microprocessor technology for automated control, calibration, and enhanced performance. The complete temperature sensor system was evaluated in the laboratory. Results show that the Fabry-Perot temperature sensor has good resolution (0.5% of full seale), high accuracy, and potential high temperature ( 1000 C) applications.

James, K.↗

SMR Containment Cable and Electrical Penetration Assembly System

GAIN Project CRADA Number NFE-21-08839, entitled “SMR Containment Cable and EPA System” was initiated by the partnership of Oak Ridge National Laboratory (ORNL) and Engineered Solutions Group (ESG) to test an ESG-designed Electrical Penetration Assembly and Containment Cabling System Qualified for not only SMR technologies, but also Advanced Reactors design. An Electrical Penetration Assembly (EPA) is a component used to allow electrical power and signal conductors as well as optical fiber through the nuclear reactor’s containment structure while maintaining a pressure barrier. The EPA ensures the containment's integrity both during the normal operation and also accident conditions by providing a sealed passage for power and signals. This project was undertaken to fill the equipment gap of EPA and Cabling Systems that require much more severe environmental requirements than legacy plant applications present due to their smaller containment volumes that result in high energy densities compared to legacy designs. This high energy density results in severe accident environments and also more severe normal operating conditions.This document describes cost effective approaches to qualify a unique EPA for Small Modular Reactor (SMR) technologies as legacy LWR EPA technologies will likely have inherent material performance insufficiencies. The DBA profiles for SMRs (and some Advanced Reactor Technologies) are more severe than the legacy qualification requirements making the design of the qualification testing system challenging as the temperatures and pressures can approach the limits permitted by ASME Pressure Vessel Code, as well as accident temperatures exceeding the capability of polymeric gaskets and dielectrics. Small Modular Reactors are designed to have, as the name suggests, modularity which implies sized for factory fabrication and subsequent assembly at the power plant site. SMR containment is much smaller than a legacy Light Water Reactor containment. The containment walls are likely to be comprised of stainless steel. Qualifying Electrical Penetration Assemblies (EPAs) through these steel vessels are of interest in this work. Methods are presented here that discuss critical safety and cost effectiveness for these SMR EPA’s test systems.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Active Reservoir Management Engineering and Evaluation Summary – Brine Extraction and Storage Test Phase II Final Report – Volumes 1-3

The Energy & Environmental Research Center (EERC) conducted a multiyear program over two phases to perform a field study of the potential efficacy of formation water extraction during carbon dioxide (CO 2 ) injection for CO 2 storage as a means of improving efficiency and/or effectiveness. Phase I was a 2-year study on potential methodologies for a field study of pressure management, culminating in site selection and experimental and site design. Phase II was a 7-year effort that involved constructing site facilities, conducting experiments, and evaluating collected field data. The experimental portion was split into two collaborative components, one for the active reservoir management (ARM) experiment and a second component to host and demonstrate potential water treatment technologies appropriate for high-saline brine at the project site. The results of the overall project are expected to benefit future saline storage projects through validation of techniques that may reduce stress on sealing formations, increase storage capacity, and reduce area of review. The following report focuses on the Phase II ARM experimental implementation and results. A second companion report summarizes the results of the high-saline brine demonstrations.

54 ENVIRONMENTAL SCIENCES↗

Safety assessment for the radon-type surface disposal facility at Saakadze, Georgia - 15406

The Saakadze disposal facility is located about 40 km from Tbilisi and was planned and constructed during Soviet times as Radon-type surface facility to accommodate up to 600 m{sup 3} of low and intermediate level waste generated on the territory of Georgia. The disposal facility was operated from 1963 until its closure in 1995. The vast majority of waste in the Saakadze facility has been disposed of in two near surface concrete vaults with typical Radon-type dimensions, which cover layers already show significant structural damages. In order to assess the present safety of the site and provide the competent Georgian authorities with the necessary basis to take decisions in regard to the future of the repository, the European Commission launched and financially supported a project, which was assigned to a consortium of TUV-Nord ENSYS GmbH and DBE Technology GmbH. The safety assessment of Saakadze facility, which was an essential part of this project and which is the subject of this paper was carried out by DBE Technology GmbH. The Government of Georgia has been gradually increasing efforts to improve the regulatory processes and the legislation on nuclear and radiation safety, and, in particular, on safe management of radioactive waste and sealed radioactive sources. Currently, however, there are still areas where specific Georgian laws and regulations do not exist. Accordingly, in certain aspects IAEA recommendations and best practices were used as guidelines for the methodology of the safety assessment. In spite of the large uncertainties to be considered, especially in regard to the inventory, preliminary results of the safety assessment indicate that scenarios related to the groundwater pathway do not lead to radiological impacts that are above or near to limiting values. However, human intrusion scenarios might lead to dose rates for the critical group that are exceeding these values. This is mainly due to the fact that today there is no proper engineered cover on top of the concrete vaults. Based on the comparison of existing options and considering the results of the long-term safety assessment, it is recommended to backfill the remaining voids inside the concrete vaults and to construct an engineered cover to reduce the probability of human intrusion scenarios and to minimize their potential impact. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

42 ENGINEERING↗

Fabrication and Testing of DOE Standard Canister Closure Leak Test Assembly – 24139

DOE manages over 300 types of spent nuclear fuel (SNF), many of which are located at the Idaho National Laboratory (INL) site. Managing this large variety of SNF for storage, transportation, and disposal poses a challenge to DOE. The Idaho Cleanup Project and INL are collaborating on the DOE SNF Road-Ready Demonstration (“Road-Ready Demonstration”), which will develop and demonstrate the designs, technology, processes, and regulatory framework for packaging DOE-managed SNF for “road-ready dry storage.” Road-ready dry storage is an SNF management concept in which SNF is packaged into dry, sealed canisters that are then placed in onsite storage in anticipation of later transport and disposition. The forward-looking goal of the Road-Ready Demonstration is to establish the foundation for a large-scale road-ready dry storage program at the INL site. In support of establishing a large-scale road-ready dry storage program at the INL site, the Road-Ready Demonstration will first package Fort St. Vrain SNF currently in dry storage at INL into several DOE Standard Canisters (DOESCs). These DOESCs will in turn be loaded into another containment similar to commercial multi-purpose canisters. This multi-purpose canister will then be compatible with a transportation or storage system, such as a storage cask for interim storage or transportation package for offsite transport. These DOESCs will remain sealed over the course of their storage, transportation, and applicable disposal functions. The closure process for the DOESC will include fuel and basket loading, welding, inspection, leak testing, and, if needed, repair. As a follow-up to previous discussions on the design of the DOE Closure Leak Test Assembly (LTA), this report describes recent fabrication and testing efforts performed at INL. DOESCs are sealed by two sequential gas tungsten arc welds, both of which are performed by remotely operated and semiautomatic welding systems. The first weld is a circumferential pipe weld that completes the assembly of the canister body and lid assembly. The second and final closure weld attaches the vent plug to the vent socket via a butt joint. After the second weld is performed, the welds are helium leak tested using an evacuated envelope technique. The LTA was designed for both remote and manual operation. This report describes the fabrication and performance testing associated with the evacuated envelope technique. INL staff designed, fabricated, and tested the LTA at INL facilities. This testing included establishing technique and system sensitivities in accordance with ASME and American National Standards Institute N14.5 requirements. Forthcoming work will cover such areas as design optimization, process and personnel qualification, and implementation in Road-Ready Demonstration operations.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗