Flight Set 360T004 (STS-30) Insulation Component, Interim Release, Volume 3

The insulation component of the Redesigned Solid Rocket Motor (RSRM) is discussed. The results of all visual evaluations and a thermal safety factor analysis are given. The data contained here supersedes the interim release and the insulation data presented in the Clearfield 10 day report. The objective is to document the postflight condition of the internal and external insulation of nozzle to case joints, the case field joints, the igniter to case joints, and the acreage insulation which made up RSRM-4A and RSRM-4B.

Passman, James A.↗

Flight Motor Set 360L003 (STS-29R)

The redesigned solid rocket motor (RSRM) flight set 360L003 was launched on March 13, 1989 as part of NASA space shuttle mission STS-29R. As was the case with flight sets 360L001 and 360L002 (STS-26R and STS-27R), both motors (360L003A and 360L003B) performed in an excellent manner. Evaluation of the ground environment instrumentation measurements verified thermal model analysis data and showed agreement with predicted environmental effects. The right-hand aft field joint primary heater failed during the countdown; the secondary heater was activated and performed as designed. All other field joint heaters and aft skirt thermal conditioning systems had no anomalies. Shuttle thermal imager infrared readings compared favorably with measured ground environment instrumentation data. No thermal launch commit criteria violations occurred at any time. Evaluation of the development flight instrumentation showed exceptional propulsion performance. All ballistic parameters closely matched the predicted values and were well within the required specification levels. Girth and biaxial strain gage measurements compared closely with corresponding gages on previous flight motors, static tests, and with preflight predictions. Adequate safety factors were verified. (Some ignition transient spiking was noted in a few girth gages; the spiking was determined not to be representative of actual case behavior, but an instrumentation phenomena.) The accelerometers again measured high vibration amplitude levels during the ignition transient and the reentry Max Q phases. Postflight inspection showed that all combustion gas was contained by the insulation in the field and case-to-nozzle joints. No anomalous insulation erosion patterns were found, and the seals that did directly contain motor pressure showed no heat effects, erosion, or blowby. All anomalies identified were a result of splashdown damage, with the exception of fretting in the case field joint interference (nonsealing) surfaces and a prelaunch field joint heater failure. The disposition of all anomalies and the complete results are reported.

Riehr, Glen A.↗

RSRM nozzle fixed housing cooldown test

Flight 5 aft segments with nozzles were exposed to -17 F temperatures while awaiting shipment to KSC in February, 1989. No records were found which show that any previous nozzles were exposed to air temperatures as low as those seen by the Flight 5 nozzles. Thermal analysis shows that the temperature of the fixed housing, and forward and aft exit cone components dropped as low as -10 F. Structural analysis of the nozzles at these low temperatures show the forward and aft exit cone adhesive bonds to have a positive margin of safety, based on a 2.0 safety factor. These analyses show the normal and shear stresses in the fixed housing bond as low values. However, the hoop and meridinal stresses were predicted to be in the 4000 psi range; the failure stress allowable of EA913NA adhesive at -7 F. If the bonds did break in directions perpendicular to the surfaces, called bond crazing, no normal bond strength would be lost. Testing was conducted in two phases, showing that no degradation to the adhesive bonds occurred while the Flight 5 nozzles were subjected to subzero temperatures. The results of these tests are documented. Phase 1 testing cooled a full-scale RSRM insulated fixed housing to -13 F, with extensive bondline inspections. Phase 2 testing cooled the witness panel adhesive tensile buttions to -13 F, with failure strengths recorded before, during, and after the cooldown.

Bolieau, D. J.↗

Flight motor set 360L001 (STS-26R). Volume 1: System overview, revision A

The NASA space shuttle flight STS-26R, launched at 11:37.00.009 am, EDT on 29 Sep. 1988, used the redesigned solid rocket motors (RSRM) 360L001A and 360L001B. Evaluation of the ground environment instrumentation (GEI) data recorded prior to flight showed no launch commit criteria violations; that the field joint heater and aft skirt thermal conditioning systems performed adequately; and that the GEI data showed good agreement with thermal model predictions. Evaluation of the developmental flight instrumentation (DFI) revealed excellent agreement with both the predicted and required ballistic specifications. All parameters were well within the GEI specification requirements including propellant burn rates, specific impulse values, and thrust imbalance. Recorded strain values also indicated satisfactory radial growth and stress levels, as well as verification of adequate safety factors. Postflight inspection of the insulation, seals, case, and nozzles showed overall excellent performance. Some thermal DFI protective cork was missing, and inoperative field joint vent valves on the thermal protection cork allowed water entry into the field joints upon splashdown. Evaluation of these anomalies, as well as complete evaluation of all Redesigned Solid Rocket Motor components, is contained.

Garecht, Diane M.↗

Plate and butt-weld stresses beyond elastic limit, material and structural modeling

Ultimate safety factors of high performance structures depend on stress behavior beyond the elastic limit, a region not too well understood. An analytical modeling approach was developed to gain fundamental insights into inelastic responses of simple structural elements. Nonlinear material properties were expressed in engineering stresses and strains variables and combined with strength of material stress and strain equations similar to numerical piece-wise linear method. Integrations are continuous which allows for more detailed solutions. Included with interesting results are the classical combined axial tension and bending load model and the strain gauge conversion to stress beyond the elastic limit. Material discontinuity stress factors in butt-welds were derived. This is a working-type document with analytical methods and results applicable to all industries of high reliability structures.

Verderaime, V.↗

Flight set 360L007 (STS-33) insulation component. Volume 3: Final release

Volume 3 of this postfire report deals with the insulation component of the RSRM. The report is released twice for each flight set. The interim release contract date is on or before 60 days after the last field joint or nozzle to case joint is disassembled at KSC and contain the results of the KSC visual evaluation. The data contained in Volume 3 interim release supersedes the insulation data presented in the KSC 10 day report. The final release contract data is on or before 60 days after the last factory joint is disassembled at the Clearfield H-7 facility and contains the results of all visual evaluations and a thermal safety factor analysis. The data contained in the Volume 3 final release supersedes the interim release and the insulation data presented in the Clearfield 10 day report.

Hicken, Steve↗

Liquid hydrogen turbopump foil bearing

Space transfer vehicles and other power and propulsion systems require long-life turbopumps. Rolling element bearings used in current turbopumps do not have sufficient life for these applications. Process fluid foil bearings have established long life, with exceptional reliability, over a wide range of temperatures and fluids in many high-speed turbomachinery applications. However, liquid hydrogen turbopumps require high-load capacity bearings. An experimental study was conducted to measure foil journal bearing load capacity in liquid hydrogen, using a bearing designed specifically for cryogenic hydrogen turbopump applications. Additional performance parameters such as power loss, stability, cooling flow requirements, and bearing life were measured. These tests showed a load capacity safety factor of approximately 10 for liquid hydrogen turbopump applictions. These tests also demonstrated good rotor stability, low power loss and cooling flow, and long life.

Saville, M.↗

Rain compensation algorithm for ACTS mobile terminal

The initial advanced communication technology satellite (ACTS) mobile terminal (AMT) demonstrations will involve two-way communications between the high-bit-rate link evaluation terminal (HBR-LET), which is a fixed terminal (FT), and a van-housed mobile terminal (MT). The HBR-LET has the capability of adjusting its transmitted uplink power over an approximately 10-dB range to compensate for forward uplink rain attenuation. However, because of size and weight limitations, the MT cannot use power control as a rain compensation technique. Consequently, the AMT rain compensation algorithm (RCA) is based on a formula for varying the transmitted data rate in either direction to maintain link performance within acceptable limits. The objective of the AMT RCA is to ensure reliable operation in both the forward and return directions despite the possibility of uplink or downlink fading due to rain events in the vicinity of the FT or MT. In particular, the RCA must maintain at least a 3-dB link margin at the highest possible transmission rate (AMT can operate at 9.6, 4.8, or 2.4 kb/s) permitted by the prevailing channel conditions. The 3-dB minimum link margin is a system design safety factor to accommodate conceivable implementation losses.

Levitt, Barry K.↗

Structural development of Topex/Poseidon satellite

The Topex/Poseidon satellite's structural development approach adhered to more stringent requirements than previous efforts, since this spacecraft must withstand not only launch/flight loads but also those planned for the 'protoflight' vehicle's structural and environmental tests. There requirements encompassed conservatively estimated design loads, high safety factors, and extensive analytical simulations. The structural adequacy of the satellite was verified by means of a ground testing program to comply with both JPL institutional requirements and Arianespace requirements. Modal survey tests of the satellite have been successfully completed.

Lou, Michael C.↗

Improved inhalation technology for setting safe exposure levels for workplace chemicals

Threshold Limit Values recommended as allowable air concentrations of a chemical in the workplace are often based upon a no-observable-effect-level (NOEL) determined by experimental inhalation studies using rodents. A 'safe level' for human exposure must then be estimated by the use of generalized safety factors in attempts to extrapolate from experimental rodents to man. The recent development of chemical-specific physiologically-based toxicokinetics makes use of measured physiological, biochemical, and metabolic parameters to construct a validated model that is able to 'scale-up' rodent response data to predict the behavior of the chemical in man. This procedure is made possible by recent advances in personal computer software and the emergence of appropriate biological data, and provides an analytical tool for much more reliable risk evaluation and airborne chemical exposure level setting for humans.

Stuart, Bruce O.↗

Using AI/expert system technology to automate planning and replanning for the HST servicing missions

This paper describes a knowledge-based system that has been developed to automate planning and scheduling for the Hubble Space Telescope (HST) Servicing Missions. This new system is the Servicing Mission Planning and Replanning Tool (SM/PART). SM/PART has been delivered to the HST Flight Operations Team (FOT) at Goddard Space Flight Center (GSFC) where it is being used to build integrated time lines and command plans to control the activities of the HST, Shuttle, Crew and ground systems for the next HST Servicing Mission. SM/PART reuses and extends AI/expert system technology from Interactive Experimenter Planning System (IEPS) systems to build or rebuild time lines and command plans more rapidly than was possible for previous missions where they were built manually. This capability provides an important safety factor for the HST, Shuttle and Crew in case unexpected events occur during the mission.

Bogovich, L.↗

Postflight hardware evaluation 360T025 (RSRM-25, STS-46)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the 360T025 (STS-46) Redesign Solid Rocket Motor (RSRM) flight set is presented. All observed hardware conditions were documented on PFOR's and are included in Appendices A through C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. Along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-60687), a summary of the 360T025 hardware evaluation is provided. The as-flown hardware configuration is documented in TWR-60470. Disassembly evaluation photograph numbers are logged in TWA-1986. The 360T025 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on 16 Mar. 1993. Detailed evaluations were performed in accordance with the Clearfield PEEP, TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Morgan, Ferral↗

Use of helium in airships

Economic and safety factors are discussed in relation to a switch from hydrogen to helium in airships.

HELIUM↗

Safety and design in airplane construction

The author gives a survey of the principles of stress analysis and design of airplane structures, and discusses the fundamental strength specifications and their effect on the stress analysis as compared with the safety factors used in other branches of engineering.

Teichmann, Alfred↗

Structural design/margin assessment

Determining structural design inputs and the structural margins following design completion is one of the major activities in space exploration. The end result is a statement of these margins as stability, safety factors on ultimate and yield stresses, fracture limits (fracture control), fatigue lifetime, reuse criteria, operational criteria and procedures, stability factors, deflections, clearance, handling criteria, etc. The process is normally called a load cycle and is time consuming, very complex, and involves much more than structures. The key to successful structural design is the proper implementation of the process. It depends on many factors: leadership and management of the process, adequate analysis and testing tools, data basing, communications, people skills, and training. This process and the various factors involved are discussed.

Ryan, R. S.↗

Effects of radiobiological uncertainty on vehicle and habitat shield design for missions to the moon and Mars

Some consequences of uncertainties in radiobiological risk due to galactic cosmic ray (GCR) exposure are analyzed for their effect on engineering designs for the first lunar outpost and a mission to explore Mars. This report presents the plausible effect of biological uncertainties, the design changes necessary to reduce the uncertainties to acceptable levels for a safe mission, and an evaluation of the mission redesign cost. Estimates of the amount of shield mass required to compensate for radiobiological uncertainty are given for a simplified vehicle and habitat. The additional amount of shield mass required to provide a safety factor for uncertainty compensation is calculated from the expected response to GCR exposure. The amount of shield mass greatly increases in the estimated range of biological uncertainty, thus, escalating the estimated cost of the mission. The estimates are used as a quantitative example for the cost-effectiveness of research in radiation biophysics and radiation physics.

Wilson, John W.↗

Postflight hardware evaluation 360T026 (RSRM-26, STS-47)

The final report for the Clearfield disassembly evaluation and a continuation of the KSC postflight assessment for the 360T026 (STS-47) Redesigned Solid Rocket Motor (RSRM) flight set is provided. All observed hardware conditions were documented on PFOR's and are included in Appendices A, B, and C. Appendices D and E contain the measurements and safety factor data for the nozzle and insulation components. This report, along with the KSC Ten-Day Postflight Hardware Evaluation Report (TWR-64203), represents a summary of the 360T026 hardware evaluation. The as-flown hardware configuration is documented in TWR-60472. Disassembly evaluation photograph numbers are logged in TWA-1987. The 360T026 flight set disassembly evaluations described were performed at the RSRM Refurbishment Facility in Clearfield, Utah. The final factory joint demate occurred on 12 April 1993. Detailed evaluations were performed in accordance with the Clearfield Postflight Engineering Evaluation Plan (PEEP), TWR-50051, Revision A. All observations were compared against limits that are also defined in the PEEP. These limits outline the criteria for categorizing the observations as acceptable, reportable, or critical. Hardware conditions that were unexpected and/or determined to be reportable or critical were evaluated by the applicable CPT and tracked through the PFAR system.

Nielson, Greg↗