Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “S-BAND”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

SEDS1 mission software verification using a signal simulator

The first flight of the Small Expendable Deployer System (SEDS1) is schedule to fly as the secondary payload of a Delta 2 in March, 1993. The objective of the SEDS1 mission is to collect data to validate the concept of tethered satellite systems and to verify computer simulations used to predict their behavior. SEDS1 will deploy a 50 lb. instrumented satellite as an end mass using a 20 km tether. Langley Research Center is providing the end mass instrumentation, while the Marshall Space Flight Center is designing and building the deployer. The objective of the experiment is to test the SEDS design concept by demonstrating that the system will satisfactorily deploy the full 20 km tether without stopping prematurely, come to a smooth stop on the application of a brake, and cut the tether at the proper time after it swings to the local vertical. Also, SEDS1 will collect data which will be used to test the accuracy of tether dynamics models used to stimulate this type of deployment. The experiment will last about 1.5 hours and complete approximately 1.5 orbits. Radar tracking of the Delta II and end mass is planned. In addition, the SEDS1 on-board computer will continuously record, store, and transmit mission data over the Delta II S-band telemetry system. The Data System will count tether windings as the tether unwinds, log the times of each turn and other mission events, monitor tether tension, and record the temperature of system components. A summary of the measurements taken during the SEDS1 are shown. The Data System will also control the tether brake and cutter mechanisms. Preliminary versions of two major sections of the flight software, the data telemetry modules and the data collection modules, were developed and tested under the 1990 NASA/ASEE Summer Faculty Fellowship Program. To facilitate the debugging of these software modules, a prototype SEDS Data System was programmed to simulate turn count signals. During the 1991 summer program, the concept of simulating signals produced by the SEDS electronics systems and circuits was expanded and more precisely defined. During the 1992 summer program, the SEDS signal simulator was programmed to test the requirements of the SEDS Mission software, and this simulator will be used in the formal verification of the SEDS Mission Software. The formal test procedures specification was written which incorporates the use of the signal simulator to test the SEDS Mission Software and which incorporates procedures for testing the other major component of the SEDS software, the Monitor Software.

Pierson, William E.↗

Pressurized Lunar Rover

The pressurized lunar rover (PLR) consists of a 7 m long, 3 m diameter cylindrical main vehicle and a trailer which houses the power and heat rejection systems. The main vehicle carries the astronauts, life support systems, navigation and communication systems, directional lighting, cameras, and equipment for exploratory experiments. The PLR shell is constructed of a layered carbon-fiber/foam composite. The rover has six 1.5 m diameter wheels on the main body and two 1.5 m diameter wheels on the trailer. The wheels are constructed of composites and flex to increase traction and shock absorption. The wheels are each attached to a double A-arm aluminum suspension, which allows each wheel 1 m of vertical motion. In conjunction with a 0.75 m ground clearance, the suspension aids the rover in negotiating the uneven lunar terrain. The 15 N-m torque brushless electric motors are mounted with harmonic drive units inside each of the wheels. The rover is steered by electrically varying the speeds of the wheels on either side of the rover. The PLR trailer contains a radiosotope thermoelectric generator providing 6.7 kW. A secondary back-up energy storage system for short-term high-power needs is provided by a bank of batteries. The trailer can be detached to facilitate docking of the main body with the lunar base via an airlock located in the rear of the PLR. The airlock is also used for EVA operation during missions. Life support is a partly regenerative system with air and hygiene water being recycled. A layer of water inside the composite shell surrounds the command center. The water absorbs any damaging radiation, allowing the command center to be used as a safe haven during solar flares. Guidance, navigation, and control are supplied by a strapdown inertial measurement unit that works with the on-board computer. Star mappers provide periodic error correction. The PLR is capable of voice, video, and data transmission. It is equipped with two 5 W X-band transponder, allowing simultaneous transmission and reception. An S-band transponder is used to communicate with the crew during EVA. The PLR has a total mass of 6197 kg. It has a nominal speed of 10 km/hr and a top speed of 18 km/hr. The rover is capable of towing 3 metric tons (in addition to the RTG trailer).

Creel, Kenneth↗

Study of narrow-band dichroic plates with circular, rectangular, or Pyleguide apertures

The dichroic plate considered in this article is a metal plate perforated with arrays of apertures such that electromagnetic waves of certain frequencies pass through the plate and other frequencies are reflected. The shape of the apertures is an important contributor to the performance of the dichroic plate. An S/X dichroic plate, which passes X-band (8.4-8.45 GHz) and reflects S-band (2.0-2.32 GHz), is chosen for a case study. A comparison of the performance of dichroic plates of the same thickness and array pattern is presented for three different aperture shapes: circular, Pyleguide, and rectangular.

Chen, J. C.↗

Correlated flux densities from VLBI observations with the DSN

Correlated flux densities of extragalactic radio sources in the very long baseline interferometry (VLBI) astrometric catalog are required for the VLBI tracking of Galileo, Mars Observer, and future missions. A system to produce correlated and total flux density catalogs was developed to meet these requirements. A correlated flux density catalog of 274 sources, accurate to about 20 percent, was derived from more than 5000 DSN VLBI observations at 2.3 GHz (S-band) and 8.4 GHz (X-band) using 43 VLBI radio reference frame experiments during the period 1989-1992. Various consistency checks were carried out to ensure the accuracy of the correlated flux densities. All observations were made on the California-Spain and California-Australia DSN baselines using the Mark 3 wideband data acquisition system. A total flux density catalog, accurate to about 20 percent, with data on 150 sources, was also created. Together, these catalogs can be used to predict source strengths to assist in the scheduling of VLBI tracking passes. In addition, for those sources with sufficient observations, a rough estimate of source structure parameters can be made.

Coker, R. F.↗

A method for modeling discontinuities in a microwave coaxial transmission line

A method for modeling discontinuities in a coaxial transmission line is presented. The methodology involves the use of a nonlinear least-squares fit program to optimize the fit between theoretical data (from the model) and experimental data. When this method was applied to modeling discontinuities in a slightly damaged Galileo spacecraft S-band (2.295-GHz) antenna cable, excellent agreement between theory and experiment was obtained over a frequency range of 1.70-2.85 GHz. The same technique can be applied for diagnostics and locating unknown discontinuities in other types of microwave transmission lines, such as rectangular, circular, and beam waveguides.

Otoshi, T. Y.↗

A functional description of the Buffered Telemetry Demodulator (BTD)

This article gives a functional description of the buffered telemetry demodulator (BTD), which operates on recorded digital samples to extract the symbols from the received signal. The key advantages of the BTD are as follows: (1) its ability to reprocess the signal to reduce acquisition time; (2) its ability to use future information about the signal and to perform smoothing on past samples; and (3) its minimum transmission bandwidth requirement as each sub carrier harmonic is processed individually. The first application of the BTD would be the Galileo S-band contingency mission, where the signal is so weak that reprocessing to reduce the acquisition time is crucial. Moreover, in the event of employing antenna arraying with full spectrum combining, only the sub carrier harmonics need to be transmitted between sites, resulting in significant reduction in data rate transmission requirements. Software implementation of the BTD is described for various general-purpose computers.

Tsou, H.↗

Differenced Doppler tracking in interplanetary navigation - The Magellan cruise reconstruction

The Magellan mission was the first in which Doppler and differenced Doppler tracking data were acquired at X-band uplink/downlink frequencies from the Deep Space Network (DSN). This paper describes a reconstruction of the Venus approach-phase navigation investigating the capabilities of these data types, which are up to an order of magnitude more precise than similar data acquired at S-band frequencies in previous missions. Comparisons of orbit solutions obtained with Doppler, Doppler plus differenced Doppler, and Doppler plus delta-differential one-way Range (DeltaDOR) data indicate that both differenced Doppler and DeltaDOR yield improvements of factors of 3 to 5 over the accuracy of the Doppler-only solutions obtained during Venus approach operations, in which the Doppler data were deweighted from their inherent accuracy due to mismodeling problems.

Ryne, Mark S.↗

Multiple-access phased array antenna simulator for a digital beam-forming system investigation

Future versions of data relay satellite systems are currently being planned by NASA. Being given consideration for implementation are on-board digital beamforming techniques which will allow multiple users to simultaneously access a single S-band phased array antenna system. To investigate the potential performance of such a system, a laboratory simulator has been developed at NASA's Lewis Research Center. This paper describes the system simulator, and in particular, the requirements, design and performance of a key subsystem, the phased array antenna simulator, which provides realistic inputs to the digital processor including multiple signals, noise, and nonlinearities.

Kerczewski, Robert J.↗

Dual passband dichroic plate for X-band

A need arose in the NASA Deep Space Network, a worldwide tracking system, for a dichroic plate that would be transparent at two desired frequency bands in the X-band region and be totally reflective at S-band. The dual-passband dichroic plate that was developed to meet the technical requirements is a thick metallic plate having an array of periodic round holes filled with Teflon plugs. Test results on an experimental prototype plate indicate that it is technically possible to design a dielectrically filled dichroic plate that meets all of these technical requirements.

Otoshi, T. Y.↗

A high resolution gravity model for Venus - GVM-1

A spherical harmonic model of the gravitational field of Venus complete to degree and order 50 has been developed using the S-band Doppler tracking data of the Pioneer Venus Orbiter (PVO) collected between 1979 and 1982. The short wavelengths of this model could only be resolved near the PVO periapse location (about 14 deg N latitude), therefore a priori constraints were applied to the model to bias poorly observed coefficients towards zero. The resulting model has a half-wavelength resolution of 400 km near the PVO periapse location, but the resolution degrades to greater than 1000 km near the poles. This gravity model correlates well with a degree 50 spherical harmonic expansion of the Venus topography derived from a combination of Magellan and PVO data. New tracking data from Magellan's gravity mission should provide some improvement to this model, although a complete model of the Venusian gravity field will depend on tracking of Magellan after the circularization of its orbit using aerobraking.

Nerem, R. S.↗

A multiparameter radar examination of a mesoscale convective system

Differences in the rainrates of various cells embedded within a mesoscale convective system on July 13, 1986 during the Cooperative Huntsville Meteorological experiment are examined. The NCAR CP2 S-band polarimetric radar deployed near Huntsville, Alabama, is used to characterize the rainfall field. Rainfall estimates are compared and contrasted using the single-parameter Marshall and Palmer (1948) method with the Illingworth and Caylor (1989) dual-polarization technique (ILC). The primary differences in the rainrate estimates are shown to be associated with the differences in the drop size distributions, derived from the ILC technique, that occur within the various storms.

Wright, P. D.↗

An improved model of the Earth's gravity field - GEM-T3

An improved model of the Earth's gravitational field is developed from a combination of conventional satellite tracking, satellite altimeter measurements, and surface gravimetric data (GEM-T3). This model gives improved performance for the computation of satellite orbital effects as well as a superior representation of the geoid from that achieved in any previous Goddard Earth Model. The GEM-T3 model uses altimeter data directly to define the orbits, geoid, and dynamic height fields. Altimeter data acquired during the GEOS-3 (1975-1976), SEASAT (1978), and GEOSAT (1986-1987) missions were used to compute GEM-T3. In order to accommodate the non-gravitational signal mapped by these altimeters, spherical harmonic models of the dynamic height of the ocean surface were recovered for each mission simultaneously with the gravitational field. The tracking data utilized in the solution includes more than 1300 arcs of data encompassing 31 different satellites. The observational data base is highly dependent on SLR, but also includes TRANET Doppler, optical, S-Band average range-rate and satellite-to-satellite tracking acquired between ATS-6 and GEOS-3. The GEM-T3 model has undergone extensive error calibration.

Nerem, R. S.↗

Cryogenic, low-noise high electron mobility transistor amplifiers for the Deep Space Network

The rapid advances recently achieved by cryogenically cooled high electron mobility transistor (HEMT) low-noise amplifiers (LNA's) in the 1- to 10-GHz range are making them extremely competitive with maser amplifiers. In order to address future spacecraft navigation, telemetry, radar, and radio science needs, the Deep Space Network is investing both maser and HEMT amplifiers for its Ka-band (32-GHz) downlink capability. This article describes the current state cryogenic HEMT LNA development at Ka-band for the DSN. Noise performance results at S-band (2.3 GHz) and X-band (8.5 GHz) for HEMT's and masers are included for completeness.

Bautista, J. J.↗

Modeling of the ground-to-SSFMB link networking features using SPW

This report describes the modeling and simulation of the networking features of the ground-to-Space Station Freedom manned base (SSFMB) link using COMDISCO signal processing work-system (SPW). The networking features modeled include the implementation of Consultative Committee for Space Data Systems (CCSDS) protocols in the multiplexing of digitized audio and core data into virtual channel data units (VCDU's) in the control center complex and the demultiplexing of VCDU's in the onboard baseband signal processor. The emphasis of this work has been placed on techniques for modeling the CCSDS networking features using SPW. The objectives for developing the SPW models are to test the suitability of SPW for modeling networking features and to develop SPW simulation models of the control center complex and space station baseband signal processor for use in end-to-end testing of the ground-to-SSFMB S-band single access forward (SSAF) link.

Watson, John C.↗

TDRS and the TDRS System

An overview of the Tracking and Data Relay Satellite (TDRS) system is given, including a brief history, the purpose of the TDRS, and who controls the satellite. The S-band and KU-band antennae are described. Footage of the TDRS-E (the fifth TDRS) deployment and images of various spacecraft from space are shown, along with computer simulations of the TDRS's operation.

Source record↗

Magellan Post Launch Mission Operation Report

Magellan was successfully launched by the Space Shuttle Atlantis from the Kennedy Space Center at 2:47 p.m. EDT on May 4, 1989. The Inertial Upper Stage (IUS) booster and attached Magellan Spacecraft were successfully deployed from Atlantis on Rev. 5 as planned, at 06:14 hrs Mission Elapsed Time (MET). The two IUS propulsion burns which began at 07:14 hrs MET and were completed at 07:22 hrs MET, placed the Magellan Spacecraft almost perfectly on its preplanned trajectory to Venus. The IUS was jettisoned at 07:40 hrs MET and Magellan telemetry was immediately acquired by the Deep Space Network (DSN). A spacecraft trajectory correction maneuver was performed on May 21 and the spacecraft is in the planned standard cruise configuration with all systems operating nominally. An initial attempt was made to launch Atlantis on April 28, 1989, but the launch was scrubbed at T-31 sec due to a failure of the liquid hydrogen recirculation pump on Space Shuttle Main Engine #1. The countdown had proceeded smoothly until T-20 min when the Magellan radio receiver "locked-on" the MIL 71 Unified S-Band (USB) transmission as the transmitter power was increased fro 2 kw to 10 kw in support of the orbiter launch. During the planned hold at T-9 min, the USB was confirmed as the source of the receiver "lock" and Magellan's launch readiness was reaffirmed. In addition a five-minute extension of the T-9 hold occurred when a range safety computer went off-line, creating a loss of redundancy in the range safety computer network. Following resumption of the countdown, both the orbiter and Magellan flows proceeded smoothly until the launch was scrubbed at T-31 sec.

Source record↗

Latitudinal Variation of Solar Wind Speed and Mass Flux in the Acceleration Region of the Solar Wind during Solar Minimum Inferred from Spectral Broadening measurements

In this paper, we use an aggregate of S-band 2.3 GHz (13 cm) spectral broadening observations conducted during solar minimum conditions by the Mariner 4, Pioneer 10, Mariner 10, Helios 1 & 2 and Viking spacecraft to infer the first measurements of the latitudinal variation of solar wind speed and mass flux in the acceleration region of the solar wind at 3-8 R(sub o).

latitudinal variation of solar wind mass flux in a↗