Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Risk informed approach”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Operational Probabilistic Tools for Solar Uncertainty (OPTSUN) (Final Project Report for DOE Solar Forecasting II Project)

Increasing levels of solar PV can challenge system operations and may require novel methods to operate the power system reliably and efficiently. Power system operating plans generally use deterministic forecasts, in which the variable energy resources are represented by the expected value for each interval of the decision horizon. Probabilistic forecasts are relatively new but have the potential to address the shortfalls of deterministic forecasts. However, understanding how best to use such forecasts is still a key gap in industry and was the focus of this project. The project had three workstreams. In a forecasting workstream, improvements were made to baseline probabilistic forecasts using a number of new approaches such as machine learning methods and improved input data. In a design workstream, advanced simulation tools used these forecasts to investigate newly proposed reserve determination methods. Lastly, in a demonstration workstream a scheduling management platform (SMP) was developed to leverage probabilistic forecasts in a modular and customizable manner. In order to study the benefits that could be accrued, the project team collaborated with three utility partners (Duke Energy, Southern Company and Hawaiian Electric) to deliver improved probabilistic forecasts for each region and to model each region in case studies using advanced production cost modeling tools. Different methods to determine operating reserve requirements from probabilistic forecasts were developed, simulated, and tested across each region. The benefits of using these newly proposed methods varied by utility, but, in general, using probabilistic forecasts as well as historical data to set the reserve requirements seems to improve reliability related results, with less risk of reserve or supply shortfalls. The cost implications were not always straightforward; in some cases the new methods could show a reduction in expected operating costs, but often the increase in reserves associated with better risk mitigation using probabilistic forecasts could result in an increase in operating costs in the simulations. The SMP tool was developed to process probabilistic forecasts from their initial receipt through to scheduling decisions. This open-source tool consists of several modules for scenario development, reserve requirements calculation, and visualization. The SMP tool was demonstrated to a wide range of operators and stakeholders at all three utilities and further improved based on their feedback. The tool will be available on www.epri.com/optsun. The proposed probabilistic information-based reserve determination approaches have the potential to be implemented by different regions to ensure an economic and reliable power system operation on power systems integrating increasing levels of variable renewable resources. The innovative yet practical methods developed in this project demonstrated tangible benefits from using probabilistic forecasts beyond just study-based assessments to include three unique balancing areas. The demonstrated benefits across the multiple utility environments, are expected to provide system operators in all regions the confidence required and a platform to adopt the new forecasting and operating methods.

14 SOLAR ENERGY↗

The Near Earth Asteroid Medical Conditions List

Purpose: The Exploration Medical Capability (ExMC) element is one of six elements within NASA s Human Research Program (HRP) and is responsible for addressing the risk of "the inability to adequately recognize or treat an ill or injured crewmember" for exploration-class missions. The Near Earth Asteroid (NEA) Medical Conditions List, constructed by ExMC, is the first step in addressing the above-mentioned risk for the 13-month long NEA mission. The NEA mission is being designed by NASA's Human Space Flight Architecture Team (HAT). The purpose of the conditions list is to serve as an evidence-based foundation for determining which medical conditions could affect a crewmember during the NEA mission, which of those conditions would be of concern and require treatment, and for which conditions a gap in knowledge or technology development exists. This information is used to focus research efforts and technology development to ensure that the appropriate medical capabilities are available for exploration-class missions. Scope and Approach: The NEA Medical Conditions List is part of a broader Space Medicine Exploration Medical Conditions List (SMEMCL), which incorporates various exploration-class design reference missions (DRMs). The conditions list contains 85 medical conditions which could occur during space flight and which are derived from several sources: Long-Term Surveillance of Astronaut Health (LSAH) in-flight occurrence data, The Space Shuttle (STS) Medical Checklist, The International Space Station (ISS) Medical Checklist, and subject matter expert opinion. Each medical condition listed has been assigned a clinical priority and a clinical priority rationale based on incidence, consequence, and mitigation capability. Implementation: The conditions list is a "living document" and as such, new conditions can be added to the list, and the priority of conditions on the list can be adjusted as the DRM changes, and as screening, diagnosis, or treatment capabilities change. The NEA medical conditions list was used recently as the basis for identifying gaps in in-flight medical evaluation (screening) capabilities. Learning Objectives: The audience will become familiar with the approach taken by NASA's Exploration Medical Capability element in addressing the risk of inability to recognize and treat medical conditions in the setting of a Near Earth Asteroid mission. Which one of the following statements is incorrect? a) The Near Earth Asteroid (NEA) medical conditions list includes 85 medical conditions which could occur during space flight. b) Each condition on the NEA medical conditions list has been assigned a clinical priority and a clinical priority rationale. c) The NEA medical conditions list targets a mission to Mars. d) The NEA medical conditions list should be viewed as a "living document" where new conditions can be added and clinical priorities adjusted to address changes in the design reference mission or medical capabilities. The incorrect answer is c). The NEA medical conditions list targets a mission to a Near Earth Asteroid.

Barr, Yael R.↗

Evaluating Process Effectiveness to Reduce Risk

It is well documented that government agencies do not have the same incentive as the private sector to focus on process effectiveness and continual improvement of those processes. It is also well documented whenever government agencies fail to deliver efficient, effective, consistent, and fair services to the citizens. In spite of the various "reinventing government" and "effectiveness initiatives" of the past decades, and in spite of the efforts on the part of many agencies to improve, government in general still lags behind industry in creating a culture of effective processes and systems. While the tragic events that unfolded recently in Flint, Michigan, teach us that running government "like a business" does not always take the needs of the citizenry into account, there are many lessons and techniques from the private sector that government agencies can use to improve. The incentive to improve, while mandated by various administrations1, needs to come from within the workforce, in order to effectively take root. The best, most effective incentive is to reduce, control or eliminate risk. Government agencies face some of the same risks as the private sector, while some are unique. While ISO 310002 has been around since 2009, risk has taken on increased visibility within the private sector with the advent of the emphasis on risk-based thinking in ISO 9001:20153. The relationship between risk-based thinking and effective processes is simple and direct. Those processes that are well thought out and standardized (i.e. Plan-Do-Check-Act), will have taken into account the applicable policy, statutory, regulatory, safety, quality and technical parameters, which may not occur to someone performing the process with minimal experience or training; and thus protect the employees, the public and the agency from statutory and regulatory violations; delay in providing services; non-delivery of services; harm to public or employee safety and health; cost overruns; breaches in security; loss of confidence in government; failure of publicly funded projects; damage to the environment; ethics violations, and the list goes on; with local, national and even international consequences. The Plan-Do-Check-Act process, also known as the "process approach" can be used at any time to establish and standardize a process, and it can also be used to check periodically for "process creep" (i.e., informal, unauthorized changes that have occurred over time), any necessary updates and improvements. While ISO 9001 compliance is not mandated for all government agencies, if interpreted correctly, it can be useful in establishing a framework and implementing effective management systems and processes.4 Another method that can be used to evaluate effectiveness is the scorecard definitions in Mallory's Process Management Standard5 as a basis for evaluating work on the process level on effective, and continuously improved and improving processes. With processes on the lower end of the scale, agencies are vulnerable to a great many risks, with employees and managers making up many of the rules as they go, leading to the above listed negative results. Without clear guidance for nominal operations, off-nominal situations can, and do, increase the likelihood of chaos. In an increasingly technical environment, with inter-agency communication and collaboration becoming the norm, agencies need to come to grips with the fact that processes can become rapidly outdated, and that the technical community should take on an increased role in the maturation of the agency's processes. Industry has long known that effective processes are also efficient, and process improvement methods such as Kaizen, Lean, Six Sigma, 5S, and mistake proofing lead to increased productivity, improved quality, and decreased cost. Again, government agencies have different concerns, but inefficiencies and mistakes can have dire and wide reaching consequences for the public that they serve. While no one goes to work planning to cause harm, it is up to agencies to establish upper level systems, which make establishment and compliance with processes possible. Again, Mallory provides us with a Systems Management Standard6, similar to the Process Management Standard, with a scale of 0-5 for systems effectiveness and maturity. Deming determined that "eighty-five percent of the reasons for failure are deficiencies in the systems and process rather than the employee. The role of management is to change the process rather than badgering individual employees to do better." 7 It is not just the working level employees who need effective processes, but the mid-and upper level managers as well. A disciplined management culture sets the tone for the employees, aids both routine and off-nominal decision-making, and incorporates risk -based thinking into the systems and processes as a matter of normal activity. Figure 1, illustrates the relationship between ineffective and effective processes and risk, through the use of the "stoplight" colors that are commonly used to show serious situations (red), situations which may be improving or deteriorating depending on trends (yellow), and situations that are under control and continuously improved (green).

Shepherd, Christena C.↗

Technical and Licensing Considerations for Micro-Reactors

The U.S. Nuclear Regulatory Commission (NRC) has interacted with vendors pursuing the commercialization of micro-reactors (i.e., reactors capable of producing about 1 MW(th) to 20 MW(th) of energy from nuclear fission). It is envisioned that micro-reactors could be assembled and fueled in a factory and shipped to a site. Many of the sites are expected to be remote locations requiring off-grid power or in some cases military bases. The objective of this effort is to explore the technical issues and the approach required to reach a finding of "reasonable assurance of public health and safety" for this new and different class of reactors. The analysis performed here leverages available micro-reactor design and testing data available from national laboratory experience as well as commercial design information to explore technical issues. Some factors considered include source term, accidents that would need to be analyzed, and the extent of the probabilistic risk assessment (PRA). The technical evaluation was performed within the framework of the Licensing Modernization Project (LMP) to identify licensing basis events, classification of structures, systems and components, and defense-in-depth needed to provide regulatory certainty. With this framework and technical evaluation in mind, the scope and content of a micro-reactor licensing application is discussed.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Drought and Extreme Heat Impacts to Data Centers in Northern California

Commonly, data centers are designed and operated on the assumption of stationarity of the climate. Historical weather data informs the basis of their design and operations. However, as a result of climate change, this assumption is not valid and poses a great risk for data centers. In the coming decades, Northern California’s drought and extreme heat risk is projected to increase significantly. This report provides a drought and extreme heat impacts assessment of data centers in this region. Expert solicitation of data center experts enabled a tailored approach to this report. We identify the climate variables and analytics relevant for assessing data center-specific impacts from extreme heat and drought and demonstrate how to access and understand future climate projections from climate models. We emphasize the importance of including future climate projections into data center design and planning. This report is an important first step towards building an effective extreme heat and drought adaptation strategy for data centers in Northern California. While our geographical focus in this report is Northern California, many findings in this report are broadly applicable.

58 GEOSCIENCES↗

Towards a Methodology and Tooling for Model-Based Probabilistic Risk Assessment (PRA)

A Probabilistic Risk Assessment (PRA) aims to identify and assess potential risks to system technical performance requirements for the purpose of furnishing risk insights into project decisions. PRAs have traditionally been conducted manually using software with an isolated data model. As system complexity rises it becomes difficult to ensure consistency between a PRA, the evolving system design, and other engineering analyses; the techniques for conducting PRAs must evolve to meet this challenge. This work presents progress towards a methodology and tooling for conducting a PRA by leveraging data in the system model, embedded for other purposes and analyses, to conduct a PRA. An approach for identifying the appropriate probabilistic equation for each risk scenario from a standard library is presented, which is a significant step towards the quantification of the likelihood of a risk scenario occurrence. The final calculation of the likelihood of occurrence is left as an item of future work. We also present the development of preliminary tooling to carry out the methodology on a well-formed system model. The information needed to conduct the PRA is embedded in a consistent manner in a system model, so the model-based PRA can be regularly executed as the system model changes. The ability to modify the PRA in concert with lifecycle evolution affords a project the opportunity to track the extent to which system modification impacts compliance with requirements. These aspects of this model-based PRA methodology make it capable of managing risk in increasingly complex technical systems.

Schreiner, Samuel S.↗

Quantitative Risk Analysis of High Safety Significant Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants using IRADIC Technology

This report documents the activities performed by Idaho National Laboratory (INL) during fiscal year (FY) 2021 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) Risk Assessment project. In FY-2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a strong technical basis to support effective, licensable, and secure DI&C technologies for digital upgrades/designs. An integrated risk assessment technology for the DI&C systems (IRADIC technology) was proposed for this strategy, which aims to (1) provide a best-estimate risk-informed capability to quantitatively and accurately estimate the safety margin obtained from plant modernization, especially for the High Safety Significant Safety-related (HSSSR) DI&C systems, (2) develop an advanced risk assessment technology to support transition from analog to DI&C technologies for nuclear industry, (3) assure the long-term safety and reliability of vital HSSSR DI&C systems, (4) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals and deal with the expensive licensing justifications from regulatory insights, the IRADIC technology is instructive for nuclear vendors and utilities to effectively lower the costs associated with digital compliance and speed industry advances by: (1) defining an integrated risk-informed analysis process for DI&C upgrade, including hazard analysis, reliability analysis, and consequence analysis, (2) applying systematic and risk-informed tools to address common cause failures (CCFs) and quantify responding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the individual level, system level, and plant level, (4) providing insights and suggestions on designs to manage the risks; thus, to support the development, licensing, and deployment of advanced DI&C technologies on nuclear power plant (NPPs). In this report, an approach for performing software CCF analysis, given limited data, is developed and demonstrated using a case study of a highly redundant digital reactor trip system. Consequence analysis is also performed based on different accident scenarios. Results indicate that plant modernization including the improvement of HSSSR DI&C systems will make great benefits to plant safety by providing more safety margins to accident management. In addition, a novel approach is proposed in this report for the quantification of software hazards when sufficient operational and testing data available. The method incorporates software development quality as well as strong analysis techniques to identify and link software defects to potential failure modes. The approach includes both semantic and test-based analysis to detect failures that can exist in different stages of the software development life cycle. This method is applied to an advanced human system interface relevant to reactor trip safety developed from the APR 1400 design.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Medical Model Overview

The Integrated Medical Model (IMM) Project represents one aspect of NASA's Human Research Program (HRP) to quantitatively assess medical risks to astronauts for existing operational missions as well as missions associated with future exploration and commercial space flight ventures. The IMM takes a probabilistic approach to assessing the likelihood and specific outcomes of one hundred medical conditions within the envelope of accepted space flight standards of care over a selectable range of mission capabilities. A specially developed Integrated Medical Evidence Database (iMED) maintains evidence-based, organizational knowledge across a variety of data sources. Since becoming operational in 2011, version 3.0 of the IMM, the supporting iMED, and the expertise of the IMM project team have contributed to a wide range of decision and informational processes for the space medical and human research community. This presentation provides an overview of the IMM conceptual architecture and range of application through examples of actual space flight community questions posed to the IMM project.

Spae Adaptation Syndrome↗

Integrating Land Cover Modeling and Adaptive Management to Conserve Endangered Species and Reduce Catastrophic Fire Risk

Land cover modeling is used to inform land management, but most often via a two-step process where science informs how management alternatives can influence resources and then decision makers can use this to make decisions. A more efficient process is to directly integrate science and decision making, where science allows us to learn to better accomplish management objectives and is developed to address specific decisions. Co-development of management and science is especially productive when decisions are complicated by multiple objectives and impeded by uncertainty. Multiple objectives can be met by specification of tradeoffs, and relevant uncertainty can be addressed through targeted science (i.e., models and monitoring). We describe how to integrate habitat and fuels monitoring with decision making focused on dual objectives of managing for endangered species and minimizing catastrophic fire risk. Under certain conditions, both objectives might be achieved by a similar management policy, but habitat trajectories suggest tradeoffs. Knowledge about system responses to actions can be informed by applying competing management actions to different land units in the same system state and by ideas about fire behavior. Monitoring and management integration is important to optimize state-specific management decisions and increase knowledge about system responses. We believe this approach has broad utility for and cover modeling programs intended to inform decision making.

adaptive management↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportunities for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Office of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamination, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR community will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Planetary Protection↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportunities for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Office of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamination, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR community will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Elaine Seasly↗

Taking risks and taking advice: The role of experience in airline pilot diversions

The research asks how pilots make diversion decisions, what factors determine whether they are make well or poorly, and how they may be improved. The results support the view that experienced decision makers may solve problems in a way that is qualitatively different from the approaches of less experienced decision makers. The results also support a concept of expertise that goes beyond a stock of specialized recognitional templates, to include domain-specific methods for processing information. Such metacognitive skills evolve through long experience. They may enhance both the accuracy and the efficiency of decision processes.

Cohen, Marvin S.↗

The Design and Evaluation of Zero Trust Architecture for Electric Vehicle Charging Infrastructure: EVs @ Scale Series on EV Charging Station Cybersecurity

Implementing a zero trust architecture can significantly bolster the security of electric vehicle (EV) charging infrastructure. EV charging infrastructure includes numerous networked interfaces, each of which can present potential vulnerabilities. When these vulnerabilities are exploited, they can compromise the entire system, leading to severe operational and security risks. Zero trust is a security model that operates on the principle of "never trust, always verify," which helps manage the attack surface and limit the scope of any potential compromises. Fundamentally, this model ensures that no entity, whether inside or outside the network, is trusted by default. The design principles of zero trust include continuous verification, strict deny-by-default access controls, and micro-segmentation. Continuous verification ensures that every request is thoroughly checked, regardless of its origin. Strict access controls enforce the principle of least privilege, allowing users and devices only the minimum necessary access to perform their functions. Micro-segmentation involves dividing the network into smaller, isolated segments to prevent lateral movement in case of a breach. In the context of EV charging infrastructure, zero trust can be implemented through various strategies. For example, multi-factor authentication (MFA) can be required for engineers to access the management interfaces and control systems of charging stations. Real-time monitoring and analysis of network traffic can help detect and respond to anomalies. Systems that do not need to communicate with each other can be micro-segmented to enhance security. All communications should adhere to predefined policies to be permitted. Additionally, encrypting communications can protect sensitive information exchanged between chargers and management systems. This paper presents a zero trust architecture specifically designed for EV charging infrastructure. Implementing zero trust not only mitigates risks but also builds a resilient infrastructure capable of withstanding and quickly recovering from cyber threats. The architecture addresses six defined security objectives. A comprehensive test plan is developed to assess the architecture against these objectives, and the results of the evaluation are reported. This approach is essential for maintaining the reliability and integrity of EV charging services in an increasingly interconnected and vulnerable digital landscape. This is the first in a planned series of papers exploring the implementation of zero trust in EV charging infrastructure. Each paper will delve into different aspects and applications of zero trust, highlighting how various work processes and requirements can lead to distinct architectural designs. These architectures will be tailored to address specific security challenges and operational needs within the EV charging ecosystem, ensuring a robust and adaptable security framework.

33 ADVANCED PROPULSION SYSTEMS↗

Risk Analysis Associated with Loss of Toxic Gases During Orion Landing and Recovery Operations

Mission, landing and recovery operations for the Orion crew module involve reentry into the Earth's atmosphere and the deployment of three Nomex parachutes to slow the descent before landing along the west coast of the United States. Orion may have residual fuel (hydrazine, N2H4) or coolant (ammonia, NH3) on board which are both highly toxic to crew in the event of exposure. These risks were evaluated using a first principles analysis approach through fluid dynamics modeling. Plume calculations were first performed with the ANSYS Fluent computational fluid dynamics code. Data were then extracted at locations relevant to crew safety such as the snorkel fan inlet and the egress hatch. Mixing calculations were performed to quantify exposure concentrations within the crew bay before and during egress and departure. Finally, results included herein were used to inform the Orion post-landing Concept of Operations (ConOps) so that strategies could be formulated to maintain crew safety in the event of the loss of fuel or coolant.

Orion↗

Covariance Realism Is Not Enough

A great deal of effort has been put into improving the practice of space situational awareness such that covariance data associated with predicted close approaches is more “realistic.” However, “realistic” usually has meant “larger” and this presents a problem. In many cases, there exist multiple sources for predictive ephemerides, which may be fused to produce predictive states with smaller associated covariances. Ancillary to the fusion computation is the capability to assess consistency of the estimates. If actionable covariance information becomes available, interval estimates for the miss distance provide a more informative alternative to collision probability for risk assessment.

Carpenter, J. Russell↗

Exploration of a Potential Desirability of Outcome Ranking Endpoint for Complicated Intra-Abdominal Infections Using 9 Registrational Trials for Antibacterial Drugs

Abstract Background Desirability of outcome ranking (DOOR) is a novel approach to clinical trial design that incorporates safety and efficacy assessments into an ordinal ranking system to evaluate overall outcomes of clinical trial participants. Here, we derived and applied a disease-specific DOOR endpoint to registrational trials for complicated intra-abdominal infection (cIAI). Methods Initially, we applied an a priori DOOR prototype to electronic patient-level data from 9 phase 3 noninferiority trials for cIAI submitted to the US Food and Drug Administration between 2005 and 2019. We derived a cIAI-specific DOOR endpoint based on clinically meaningful events that trial participants experienced. Next, we applied the cIAI-specific DOOR endpoint to the same datasets and, for each trial, estimated the probability that a participant assigned to the study treatment would have a more desirable DOOR or component outcome than if assigned to the comparator. Results Three key findings informed the cIAI-specific DOOR endpoint: (1) a significant proportion of participants underwent additional surgical procedures related to their baseline infection; (2) infectious complications of cIAI were diverse; and (3) participants with worse outcomes experienced more infectious complications, more serious adverse events, and underwent more procedures. DOOR distributions between treatment arms were similar in all trials. DOOR probability estimates ranged from 47.4% to 50.3% and were not significantly different. Component analyses depicted risk-benefit assessments of study treatment versus comparator. Conclusions We designed and evaluated a potential DOOR endpoint for cIAI trials to further characterize overall clinical experiences of participants. Similar data-driven approaches can be utilized to create other infectious disease–specific DOOR endpoints.

Immunology↗

High-resolution mountain topography can inform global snow vulnerability estimates

Snow is changing globally. Computationally intensive snow reanalysis products and downscaled climate model projections allow for the estimation of historical and projected changes in snow over ∼4–10 km resolutions, but these resolutions are coarse relative to the scales needed for water supply and flood planning. Fine-scale digital elevation models (DEMs) are widely available but are underutilized to make first-order assessments of snow vulnerability. Here, we leverage DEMs at a 7.5 arc s (∼250 m) resolution, combining these with historical freezing level height estimates from ERA-5 to derive estimates of changes in the snow-receiving area (SRA) and its variability across global mountain ranges. Results show estimated SRA declines in 29% (1.9 million km2) of the global mountain area from 1982–2020; 66% of the mountainous areas had no change over the historical period. At +1.5 °C of warming relative to the pre-industrial control, global mountain SRA would decline by 9.5% (1.0 million km2) relative to recent conditions. This loss would be approximately doubled with +2 °C of warming. In a +4 °C warming scenario, an additional 34% (3.6 million km2) of SRA would be lost beyond the +2 °C case. Across individual mountain ranges, SRA losses can occur nonlinearly with warming, with some locations that have historically had relatively minor SRA losses at risk of substantially larger losses in warmer climates. Analysis using coarser-resolution DEMs can underestimate or overestimate SRA and its rate of loss, with the largest impacts in relatively warm, low-elevation mountain ranges. Results of this work provide estimates of projected loss in SRA at policy-relevant warming levels; inform the resolutions needed for process-based snow modeling; identify snow vulnerability hotspots; and provide a new integrated approach to snow vulnerability assessment that is achievable at global scales and highlights potential nonlinearities from recent trends to a variety of future warming scenarios.

climate, mountains↗

NASA’s Revised Planetary Protection Policy and Implementation

NASA has updated its planetary protection policy and implementation approach in response to advances in scientific understanding of solar system targets, upcoming mission opportuni-ties for exploration and sample return, and the private sector’s emerging capability to plan missions to Earth’s Moon and Mars. In September 2021, the NASA Procedural Requirements NPR 8715.24, entitled “Planetary Protection Provisions for Robotic Extraterrestrial Missions” was released which repositions planetary protection in existing NASA mission and program management structures, introduces risk-informed decision making, expands on key roles and responsibilities for both programmatic and the Oÿce of Safety and Mission Assurance, updates the categorization process and streamlines the planetary protection documentation approval and schedule. NASA is working on a more detailed technical standard to accompany NPR 8715.24 which will include the detailed technical requirements to address organic contamina-tion, inadvertent impact avoidance, biological control and management, end of mission disposal and restricted Earth-Return sample safety and assurance. This report to the COSPAR com-munity will describe the current NASA planetary protection policy and its alignment with the revised COSPAR planetary protection policy. NASA’s plans for updating the supporting “Handbook for Implementing Planetary Protection Technical Requirements” and future policies for addressing planetary protection of crewed missions will also be presented.

Elaine Seasly↗