American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. Army – Project 276 Renewable Resource Development on Department of Defense Bases in Alaska: Challenges and Opportunities

The potential to increase utilization of renewable energy sources among military facilities in Alaska through coordinated development and operation is the premise of this task. The US Army Pacific Command requested assistance from PNNL to help develop a more complete understanding of the context for wheeling power within Alaska, including legal and regulatory barriers that may prohibit the DOD facilities from wheeling power among various locations to optimize the development and use of renewable resources.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance for Geothermal Resource Evaluation Projects

The purpose of this document is to report on the evaluation of geothermal resource potential on and around three different United States (U. S.) Air Force Bases (AFBs): Nellis AFB and Air Force Range (AFR) in the State of Nevada (see maps 1 and 5), Holloman AFB in the State of New Mexico (see map 2), and Mountain Home AFB in the State of Idaho (see map 3). All three sites are located in semi-arid parts of the western U. S. The U. S. Air Force, through its Air Combat Command (ACC) located at Langley AFB in the State of Virginia, asked the Federal Energy Management Program (FEMP) for technical assistance to conduct technical and feasibility evaluations for the potential to identify viable geothermal resources on or around three different AFBs. Idaho National Laboratory (INL) is supporting FEMP in providing technical assistance to a number of different Federal Agencies. For this report, the three different AFBs are considered one project because they all deal with potential geothermal resource evaluations. The three AFBs will be evaluated primarily for their opportunity to develop a geothermal resource of high enough quality grade (i.e., temperature, productivity, depth, etc.) to consider the possibility for generation of electricity through a power plant. Secondarily, if the resource for the three AFBs is found to be not sufficient enough for electricity generation, then they will be described in enough detail to allow the base energy managers to evaluate if the resource is suitable for direct heating or cooling. Site visits and meetings by INL personnel with the staff at each AFB were held in late FY-2009 and FY-2010. This report provides a technical evaluation of the opportunities and challenges for developing geothermal resources on and around the AFBs. An extensive amount of literature and geographic information was evaluated as a part of this assessment. Resource potential maps were developed for each of the AFBs.

15 GEOTHERMAL ENERGY↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance - United States Pacific Command (PACOM) Guam, Task 3.3: Building Retuning Training

Document describes an onsite workshop and building retuning training conducted in Guam in August 2010. Document reports on issues identified during an audit of several buildings and recommendations to save energy throughout the site. During the workshop, it became apparent that as site personnel maintain the facilities at Guam, the following retuning efforts and strategies should be prioritized: (1) Controlling the mechanical systems operational hours and zone temperature set points appeared to present the best opportunities for savings; (2) Zone temperature set points in some buildings are excessively low, especially at night, when the zone temperatures are so cold that they approached the dewpoint; and (3) Manually-set outside air dampers are providing excessive outside air, especially for spaces that are unoccupied. Two of the larger schools, one on the Naval Base and one on Anderson AFB, are in need of a significant recommissioning effort. These facilities are relatively new, with direct digital controls (DDC) but are significantly out of balance. The pressure in one school is extremely negative, which is pulling humid air through the facility each time a door is opened. The draft can be felt several feet down the halls. The pressure in the other school is extremely positive relative to the outside, and you can stand 20-feet outside and still feel cool drafts of air exiting the building. It is recommended that humidity sensors be installed in all new projects and retrofitted into exist facilities. In this humid climate, control of humidity is very important. There are significant periods of time when the mechanical systems in many buildings can be unloaded and dehumidification is not required. The use of CO{sub 2} sensors should also be considered in representative areas. CO{sub 2} sensors determine whether spaces are occupied so that fresh air is only brought into the space when needed. By reducing the amount of outside air brought into the space, the humidity load is also substantially reduced. CO{sub 2} and humidity sensors, combined with outside air sensors, can be used to predict whether conditions are amenable to mold growth and to automatically adjust systems to help prevent mold without using extra energy. The goal of this training is to give the building operators the knowledge needed to make positive changes in the operation of building systems. As class participants apply this knowledge, building systems will run more efficiently, occupant comfort should improve, while saving energy and reducing greenhouse gas emissions.

54 ENVIRONMENTAL SCIENCES↗

Solicitation and Selection of Partner Projects, Technical Team Leads, and Measurement and Validation Contractors for the American Recovery and Reinvestment Act (ARRA) Funded Commercial Building Partnerships (CBP-2)

In March 2010, Pacific Northwest National Laboratory (PNNL) joined two other labs receiving ARRA funding, Lawrence Berkeley National Laboratory (LBNL) and the National Renewable National Laboratory (NREL), to began weekly conference calls with the goal of coordinating a joint lab solicitation to support the ARRA-funded CBP project. Two solicitations were identified for: 1) new CBP Partners; 2) technical contractors to provide technical assistance and measurement and verification (M&V) contractors. The M&V contractors support the work by providing model reviews and conducting monitoring studies to verify building performance. This report documents the process used by the labs for the solicitations, and describes the process and outcomes for PNNL, selection of candidate Partners, technical teams, and M&V contractors.

Nesse, Ronald J.↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance: Installation Management Command - Southeast (IMCOM-SE), Fast Pyrolysis Technology Demonstration, Fort Bragg, North Carolina #72

FEMP technical assistance for the ESTCP Fast Pyrolysis project. Results from a 2009 Pacific Northwest National Laboratory (PNNL) assessment of renewable energy generation potential in the Southeast revealed that biomass presents the greatest opportunity. The Renewable Oil International LLC was pursuing a demonstration of a fast pyrolysis process to convert wood waste, paper waste, and tree chips into BioOil. The Installation Management Command, Southeast and Environmental Security Technology Certification Program (ESTCP) initiated a project to construct the equipment and test the process at the landfill on Fort Bragg, North Carolina. The process will test the relative efficiency of several feedstocks including wood pallet waste, paper and cardboard waste, and whole tree chips. The resulting BioOil will be tested and analyzed to determine energy content, cost to produce and environmental impact. PNNL was requested to provide technical assistance, which included: 1. Preparing the Technology Demonstration Plan and initial information for the Cost and Performance report, 2. Providing technical review of the process and end products, 3. Defining techniques for measuring feedstock characteristics, BioOil energy balance, and resulting emissions from each feedstock, and 4. Identifying testing laboratories for various BioOil tests needed to determine potential future uses of the end products.

09 BIOMASS FUELS↗

Office of Electricity Delivery and Energy Reliability (OE) National Energy Technology Laboratory (NETL) American Recovery and Reinvestment Act 2009 United States Department of Energy

The purpose of this project was for Seeo to deliver the first ever large-scale or grid-scale prototype of a new class of advanced lithium-ion rechargeable batteries. The technology combines unprecedented energy density, lifetime, safety, and cost. The goal was to demonstrate Seeo’s entirely new class of lithium-based batteries based on Seeo’s proprietary nanostructured polymer electrolyte. This technology can enable the widespread deployment in Smart Grid applications and was demonstrated through the development and testing of a 10 kilowatt-hour (kWh) prototype battery system. This development effort, supported by the United States Department of Energy (DOE) enabled Seeo to pursue and validate the transformational performance advantages of its technology for use in grid-tied energy storage applications. The focus of this project and Seeo’s goal as demonstrated through the efforts made under this project is to address the utility market needs for energy storage systems applications, especially for residential and commercial customers tied to solar photovoltaic installations. In addition to grid energy storage opportunities Seeo’s technology has been tested with automotive drive cycles and is seen as equally applicable for battery packs for electric vehicles. The goals of the project were outlined and achieved through a series of specific tasks, which encompassed materials development, scaling up of cells, demonstrating the performance of the cells, designing, building and demonstrating a pack prototype, and providing an economic and environmental assessment. Nearly all of the tasks were achieved over the duration of the program, with only the full demonstration of the battery system and a complete economic and environmental analysis not able to be fully completed. A timeline over the duration of the program is shown in figure 1.

25 ENERGY STORAGE↗

American Recovery and Reinvestment Act of 2009. Experiences from the Consumer Behavior Studies on Engaging Customers

One of the most important aspects for the successful implementation of customer-facing programs is to better understand how to engage and communicate with consumers. Customer-facing programs include time-based rates, information and feedback, load management, and energy efficiency. This report presents lessons learned by utilities through consumer behavior studies (CBS) conducted as part of the Department of Energy’s (DOE) Smart Grid Investment Grant (SGIG) program. The SGIG CBS effort presents a unique opportunity to advance the understanding of consumer behaviors in terms of customer acceptance and retention, and electricity consumption and peak demand impacts. The effort includes eleven comprehensive studies with the aim of evaluating the response of residential and small commercial customers to time-based rate programs implemented in conjunction with advanced metering infrastructure and customer systems such as in-home displays, programmable communicating thermostats, and web portals. DOE set guidelines and protocols that sought to help the utilities design studies that would rigorously test and more precisely estimate the impact of time-based rates on customers’ energy usage patterns, as well as identify the key drivers that motivate behavioral changes.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act of 2009. Interim Report on Customer Acceptance, Retention, and Response to Time-Based Rates from the Consumer Behavior Studies

Time-based rate programs1, enabled by utility investments in advanced metering infrastructure (AMI), are increasingly being considered by utilities as tools to reduce peak demand and enable customers to better manage consumption and costs. There are several customer systems that are relatively new to the marketplace and have the potential for improving the effectiveness of these programs, including in-home displays (IHDs), programmable communicating thermostats (PCTs), and web portals. Policy and decision makers are interested in more information about customer acceptance, retention, and response before moving forward with expanded deployments of AMI-enabled new rates and technologies. Under the Smart Grid Investment Grant Program (SGIG), the U.S. Department of Energy (DOE) partnered with several utilities to conduct consumer behavior studies (CBS). The goals involved applying randomized and controlled experimental designs for estimating customer responses more precisely and credibly to advance understanding of time-based rates and customer systems, and provide new information for improving program designs, implementation strategies, and evaluations. The intent was to produce more robust and credible analysis of impacts, costs, benefits, and lessons learned and assist utility and regulatory decision makers in evaluating investment opportunities involving time-based rates. To help achieve these goals, DOE developed technical guidelines to help the CBS utilities estimate customer acceptance, retention, and response more precisely.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act of 2009: Final Report on Customer Acceptance, Retention, and Response to Time-Based Rates from Consumer Behavior Studies

Time-based rate programs, enabled by utility investments in advanced metering infrastructure (AMI), are increasingly being considered by utilities as tools to reduce peak demand and enable customers to better manage consumption and costs. Under the Smart Grid Investment Grant Program (SGIG), the U.S. Department of Energy (DOE) partnered with several electric utilities to conduct consumer behavior studies (CBS). The goals involved applying randomized and controlled experimental designs for estimating customer responses more precisely and credibly to advance understanding of time-based rates and customer systems, and provide new information for improving program designs, implementation strategies, and evaluations. The intent was to produce more robust and credible analysis of impacts, costs, benefits, and lessons learned and assist utility and regulatory decision makers in evaluating investment opportunities involving time-based rates.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

ARRA Energy Storage Demonstration Projects: Lessons Learned and Recommendations

The American Recovery and Reinvestment Act (ARRA) of 2009 (Recovery Act) provided funding for 16 energy storage demonstration projects. The projects ranged in scope from feasibility studies and technology demonstrations to full-scale, operational energy storage plants. This investment had a significant positive impact on the grid-connected energy storage industry. The goal of this report is to summarize the lessons learned from the ARRA projects, and to make recommendations for future Department of Energy (DOE) investments. Information for this report primarily came from three sources: a questionnaire and interview with each project team; DOE energy storage program peer review presentations; and DOE reports required as part of the ARRA project. Some lessons learned were common to many projects. Development of standards, codes and protocols specific to energy storage systems will mitigate uncertainty over code compliance, streamline permitting, and should be a priority (especially related to safety). Removal of regulatory barriers that preclude optimal operation of an energy storage system with multiple applications would immediately enable further deployment (e.g., FERC standards preclude the marketing department from reliability activities). Maturity of the approach to monetization varies substantially between applications with frequency regulation as an ancillary service leading other applications. Finally, developers focused on ramp mitigation and time shifting envision a reference plant. This reference plant would scale up from the current demonstration systems and would lead to the deployment of 50 MW-scale peaker plants.

25 ENERGY STORAGE↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building Oakland, CA

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be build at Oakland, California by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration Project 209 - Control Tower and Support Building, Las Vegas, NV

This report represents findings of a design review team that evaluated construction documents (at the 70% level) and operating specifications for a new control tower and support building that will be built in Las Vegas, Nevada by the Federal Aviation Administration (FAA). The focus of the review was to identify measures that could be incorporated into the final design and operating specification that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance U.S. General Services Administration – Project 195 John Seiberling Federal Office Building and U.S. Courthouse, Akron, Ohio

This report documents the findings from an onsite audit of the John Seiberling Federal building located in Akron, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would reduce in either electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance US General Serices Administration - Project 193, John W. Bricker Federal Building, Columbus, OH

This report documents the findings from an onsite audit of the John W. Bricker Federal building located in Columbus, Ohio. The Federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy efficiency opportunities that, once implemented, would either reduce electrical and gas consumption or increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) - FEMP Technical Assistance - Federal Aviation Administration - Project 209 - Control Tower and Support Building, Boise, Idaho

This report documents an energy audit performed by Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted on the Federal Aviation Administration (FAA) control tower and base building in Boise, Idaho. This report presents findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) followed by a site visit of the facility under construction. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for FAA that would not have otherwise occurred.

99 GENERAL AND MISCELLANEOUS↗

American Recovery and Reinvestment Act ( ARRA) FEMP Technical Assistance, U.S. General Services Administration - Project 194 U.S. Custom Cargo Inspection Facility, Detroit, MI

This report documents the findings of an on-site audit of the U.S. Customs Cargo Inspection Facility (CIF) in Detroit, Michigan. The federal landlord for this building is the General Services Administration (GSA). The focus of the audit was to identify various no-cost or low-cost energy-efficiency opportunities that, once implemented, would reduce electrical and gas consumption and increase the operational efficiency of the building. This audit also provided an opportunity to identify potential capital cost projects that should be considered in the future to acquire additional energy (electric and gas) and water savings to further increase the operational efficiency of the building.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

American Recovery and Reinvestment Act (ARRA) FEMP Technical Assistance Federal Aviation Administration – Project 209 Control Tower and Support Building, Reno, Nevada

Pacific Northwest National Laboratory (PNNL) and Redhorse Corporation (Redhorse) conducted an energy audit on the Federal Aviation Administration (FAA) control tower and base building in Reno, Nevada. This report presents the findings of the energy audit team that evaluated construction documents and operating specifications (at the 100% level) and completed a site visit. The focus of the review was to identify measures that could be incorporated into the final design and operating specifications that would result in additional energy savings for the FAA that would not have otherwise occurred.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

National Security/Emergency Preparedness and Disaster Recovery Communications Via ACTS

During the period from early 1993 through 1994, the U.S. National Communication System, a government agency, sponsored the development and execution of several fixed and mobile experiments using the Advanced Communications Technology Satellite (ACTS)...The results of these experiments are described in this paper.

U.S. National Communication System Advanced Commun↗