Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Projection”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Crump Geyser Exploration and Drilling Project. High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling

The Crump Geyser Exploration and Drilling Project – High Precision Geophysics and Detailed Structural Exploration and Slim Well Drilling ran from January 29, 2010 to September 30, 2013. During Phase 1 of the project, collection of all geophysical surveys was completed as outlined in the Statement of Project Objectives. In addition, a 5000-foot full sized exploration well was drilled by Ormat, and preexisting drilling data was discovered for multiple temperature gradient wells within the project area. Three dimensional modeling and interpretation of results from the geophysical surveys and drilling data gave confidence to move to the project into Phase 2 drilling. Geological and geophysical survey interpretations combined with existing downhole temperature data provided an ideal target for the first slim-hole drilled as the first task in Phase 2. Slim-hole 35-34 was drilled in September 2011 and tested temperature, lithology, and permeability along the primary range-bounding fault zone near its intersection with buried northwest-trending faults that have been identified using geophysical methods. Following analysis of the results of the first slim-hole 35-34, the second slim hole was not drilled and subsequent project tasks, including flowing differential self-potential (FDSP) surveys that were designed to detail the affect of production and injection on water flow in the shallow aquifer, were not completed. NGP sold the Crump project to Ormat in August 2014, afterwards, there was insufficient time and interest from Ormat available to complete the project objectives. NGP was unable to continue managing the award for a project they did not own due to liability issues and Novation of the award was not a viable option due to federal award timelines. NGP submitted a request to mutually terminate the award on February 18, 2015. The results of all of the technical surveys and drilling are included in this report. Fault interpretations from surface geology, aeromag, seismic, and gravity data sets are in good agreement, illustrating two or more major range-bounding faults and buried northwest trending faults. The intersections of these fault systems provide the primary targets for drilling.

15 GEOTHERMAL ENERGY↗

Yeager Airport Hydrogen Vehicle Test Project

The scope of this project was changed during the course of the project. Phase I of the project was designed to have the National Alternative Fuels Training Consortium (NAFTC), together with its partners, manage the Hydrogen Vehicle Test Project at the Yeager Airport in conjunction with the Central West Virginia Regional Airport Authority (CWVRAA) in coordination with the United States Department of Energy National Energy Technology Laboratory (U.S. DOE NETL). This program would allow testing and evaluation of the use of hydrogen vehicles in the state of West Virginia utilizing the hydrogen fueling station at Yeager Airport. The NAFTC and CWVRAA to raise awareness and foster a greater understanding of hydrogen fuel and hydrogen-powered vehicles through a targeted utilization and outreach and education effort. After initial implementation of the project, the project added, determine the source(s) of supply for hydrogen powered vehicles that could be used for the testing. After completion of this, testing was begun at Yeager Airport. During the course of the project, the station at Yeager Airport was closed and moved to Morgantown and the West Virginia University Research Corporation. The vehicles were then moved to Morgantown and a vehicle owned by the CWVRAA was purchased to complete the project at the new location. Because of a number of issues detailed in the report for DE-FE0002994 and in this report, this project did not get to evaluate the effectiveness of the vehicles as planned.

08 HYDROGEN↗

First-of-A-Kind Control Room Modernization Project Plan

This project plan describes a comprehensive approach to the design of an end-state concept for a modernized control room for Palo Verde. It describes the collaboration arrangement between the DOE LWRS Program Control Room Modernization Project and the APS Palo Verde Nuclear Generating Station. It further describes the role of other collaborators, including the Institute for Energy Technology (IFE) and the Electric Power Research Institute (EPRI). It combines advanced tools, methodologies, and facilities to enable a science-based approach to the validation of applicable engineering and human factors principles for nuclear plant control rooms. It addresses the required project results and documentation to demonstrate compliance with regulatory requirements. It describes the project tasks that will be conducted in the project, and the deliverable reports that will be developed through these tasks. This project plan will be updated as new tasks are added and as project milestones are completed. It will serve as an ongoing description on the project both for project participants and for industry stakeholders.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Safeguards by Design Projects (FY2020 Final Report)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degrees in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative, Human Capital Development: University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. FY20, three teams at the University of Rhode Island and one team at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was a positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities cancelled in class room classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via the internet. Additionally, while the teams planned to build prototypes this did not happen since there was a social distancing ban on students meeting in person.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

An Adaptable and Comprehensive Project Assessment Tool

Most companies, agencies, and other real property owners require capital asset projects to pass some type of scrutiny before budgets and authority to expend funds for the design, construction and eventual operations are approved. This process typically involves management approval of key/critical decision(s) or a project’s passage through gates (or critical decisions). Cost, functionality, safety, and risk are just some of the factors typically considered during project assessment processes. This paper describes a tool that was developed and is used by the Department of Energy to facilitate this project assessment process. There are three versions of this tool for construction, decontamination and decommissioning (D&D), and environmental restoration/cleanup project types. The tool’s elements and associated criteria are tailored for each project type; although some elements, such as cost estimating and scheduling, are used in common. The tool is easy to use, requiring little or no training. It provides a common assessment tool for project self-appraisals and independent project reviews. It promotes efficiency and reduces disagreements and unnecessary effort. A comprehensive array of elements covers the gamut of cost, schedule, scope/technical, and safety/security ensuring that no important project attributes are overlooked. The tool is adaptable for use by any organization.

97 MATHEMATICS AND COMPUTING↗

Safeguards by Design Projects (Final Report-FY-22)

This University Engagement project challenged engineering students at universities, that do not have Bachelor degree programs in nuclear engineering but do have research reactors and some nuclear engineering coursework, to incorporate Safeguards by Design concepts into their Senior Capstone Design Project. This University Engagement project was part of the U. S. Department of Energy’s (DOE) National Nuclear Security Administration (NNSA), Office of Defense Nuclear Nonproliferation, Office of International Nuclear Safeguards, Next Generation Safeguards Initiative (NGSI), Human Capital Development (HCD): University Engagement Program. This program exposed university students with Mechanical Engineering majors and Nuclear Engineering minors to the concepts of international nuclear safeguards. In FY22, three teams at the University of Rhode Island and two teams at the University of Texas - Austin participated in researching, designing, building, and testing projects to support international nuclear safeguards measurements or verification. The projects involved engaging in activities at the university’s research reactors. All the projects engaged students with prototyping a design and/or tool for application at the Universities’ reactor. At the end of the course, most of the students expressed the experience was positive and they learned more about international nuclear safeguards and applying requirements than they had previously encountered. This school year the projects were further complicated by the COVID-19 pandemic. Both universities had limited in classes on campus, still relying on Zoom classes, and limited direct student/professor interactions. Furthermore, Los Alamos National Laboratory (LANL) greatly restricted travel, therefore making it impossible to visit the students at the end of the semester for the review of their design projects. The final design and review meeting for the projects happened via meetings over the internet. Additionally, the teams did build and test some prototypes but could only do so in a limited capacity.

42 ENGINEERING↗

LH CO 2 MENT Colorado Project (Final Report)

The objective of Electricore’s pre-FEED project “LH CO 2 MENT COLORADO PROJECT” is to accelerate the implementation of a 1.5 million tonnes per year (TPY), and first-of-a-kind (FOAK) at world scale, Svante VeloxoTherm™ carbon capture plant. This project represents a quantum leap to a large-scale facility that will launch Svante’s carbon capture technology into the next era of accomplishments and market acceptance. By completing the Front-End Loading (FEL) Feasibility Study Report (FEL-2) for a fit-for-purpose design at the HOLCIM cement plant, located near Florence Colorado, USA, this technology can be proven as the future of large-scale deployment for carbon capture and storage. This carbon capture plant was designed with the goal of reaching a target of near Net Zero Emissions by capturing 90% of the carbon dioxide (CO 2 ) emissions from the HOLCIM cement plant and from the boiler which produces steam required to regenerate the adsorbent. Additionally, this project will be leveraging a renewable Power Purchase Agreement (PPA) using solar energy to acquire power at the target price of 0.04 $/kWh or less. In its current configuration CO 2 emissions from the HOLCIM cement plant is around 700 – 800 kg/ton of clinker produced. The proposed new carbon capture plant will allow a reduction of CO 2 emissions to about 100 kg/ton of clinker produced. The scope of work consists of the process design and capital & operating cost estimation (Class IV) for a total plant capacity of 4,750 TPD of pipeline grade CO 2 . The Svante VeloxoTherm™ technology is comprised of a Rotary Adsorption Machine (RAM) for intensified Thermal Swing Adsorption (TSA) using Structured Adsorbent Beds (SABs) and related Balance of Plant (BOP), including CO 2 compression. A business case (financial analysis) evaluation has been undertaken for the Owner’s management review. Recommendations on how best to proceed to the next stage of the project have been conveyed and are documented within this report. This analysis has relied on a detailed and comprehensive Project Financial Model, evaluating the Total Project IRR (after tax, unlevered, and including all forecast 45Q PTCs and 100% tax efficiency) – the project financial analysis (as opposed to standard TEA analysis) only considered a 12 year plant economic lifetime as a result of 45Q being the sole driver considered at this stage. The Total Project IRR was evaluated across a large number of potential scenarios. The evaluation demonstrated that if the 45Q PTD is increased to $85/MT for sequestration, there are a large number of feasible scenarios which demonstrate economic returns.

01 COAL, LIGNITE, AND PEAT↗

IACMI Project 4.10: Blade Finishing Automation (Final Report)

IACMI Project 4.10, the Innovative Wind Turbine Blade Finishing with Advanced Automated Technology project, performed research addressing the challenges and opportunities associated with automating wind turbine blade finishing operations, including blade trimming and grinding. These activities, developed and conducted in close cooperation with wind industry partners, included: • The development of new automation technology and systems; • The integration of automation technology and components; • The improvements of sensor technology and their deployment in automation systems • The elimination of extensive manual programing for the automation of wind blade finishing; • The rethinking of the approach to specific work tasks for automation systems; • The demonstration at scale of innovative wind turbine blade finishing automations systems. The IACMI Wind TA team worked with GE Renewable Energy and LM Wind Power to establish the metrics of the automated blade finishing system developed in the project. In addition, the project team helped to integrate the advanced automated systems into wind turbine blade production facilities. This project was divided into two phases. Phase I provided project management, preliminary techno-economic model development, early US wind turbine industry outreach, and early research into robotic solutions for automated wind blade finishing. This second phase continued with project management, as well as final techno-economic model development, advanced research into robotic solutions for automated wind blade finishing, as well as specifications and procurement of a robotic system for automated wind blade finishing. The 4.10 project leveraged the capabilities and facilities established through the Institute for Advanced Composites Manufacturing Innovation (IACMI), the Colorado Office of Economic Development and International Trade (OEDIT) and the National Renewable Energy Laboratory (NREL). The IACMI Wind Technology Area (TA) designed and prepared for deployment a robotic automated wind turbine blade finishing system at the NREL/IACMI Composites Manufacturing Education and Technology (CoMET) facility. The results of this project led to follow-on funding to build upon and expand research in automated wind turbine blade finishing.

17 WIND ENERGY↗

Walla Walla River Fish Passage Operations Project : Annual Progress Report October 2007 - September 2008.

In the late 1990s, the Confederated Tribes of the Umatilla Indian Reservation, Oregon Department of Fish and Wildlife, and Washington Department of Fish and Wildlife, along with many other agencies, began implementing fisheries restoration activities in the Walla Walla Basin. An integral part of these efforts is to alleviate the inadequate fish migration conditions in the basin. Migration concerns are being addressed by removing diversion structures, constructing fish passage facilities, implementing minimum instream flow requirements, and providing trap and haul efforts when needed. The objective of the Walla Walla River Fish Passage Operations Project is to increase the survival of migrating adult and juvenile salmonids in the Walla Walla River basin. The project is responsible for coordinating operation and maintenance of ladders, screen sites, bypasses, trap facilities, and transportation equipment. In addition, the project provides technical input on passage and trapping facility design, operation, and criteria. Operation of the various passage facilities and passage criteria guidelines are outlined in an annual operations plan that the project develops. Beginning in March of 2007, two work elements from the Walla Walla Fish Passage Operations Project were transferred to other projects. The work element Enumeration of Adult Migration at Nursery Bridge Dam is now conducted under the Walla Walla Basin Natural Production Monitoring and Evaluation Project and the work element Provide Transportation Assistance is conducted under the Umatilla Satellite Facilities Operation and Maintenance Project. Details of these activities can be found in those project's respective annual reports.

13 HYDRO ENERGY↗

Grande Ronde Basin Fish Habitat Enhancement Project : 2007 Annual Report.

On July 1, 1984 the Bonneville Power Administration and the Oregon Department of Fish and Wildlife entered into an intergovernmental contract to initiate fish habitat enhancement work in the Joseph Creek subbasin of the Grande Ronde River Basin in northeast Oregon. In 1985 the Upper and Middle Grande Ronde River, and Catherine Creek subbasins were included in the contract, and in 1996 the Wallowa River subbasin was added. The primary goal of 'The Grande Ronde Basin Fish Habitat Enhancement Project' is to create, protect, and restore riparian and instream habitat for anadromous salmonids, thereby maximizing opportunities for natural fish production within the basin. This project provided for implementation of Program Measure 703 (C)(1), Action Item 4.2 of the Northwest Power Planning Council's Columbia River Basin Fish and Wildlife Program (NPPC, 1987), and continues to be implemented as offsite mitigation for mainstem fishery losses caused by the Columbia River hydro-electric system. All work conducted by the Oregon Department of Fish and Wildlife and partners is on private lands and therefore requires that considerable time be spent developing rapport with landowners to gain acceptance of, and continued cooperation with this program throughout 10-15 year lease periods. Both passive and active restoration treatment techniques are used. Passive regeneration of habitat, using riparian exclosure fencing and alternate water sources are the primary method to restore degraded streams when restoration can be achieved primarily through changes in management. Active restoration techniques using plantings, bioengineering, site-specific instream structures, or whole stream channel alterations are utilized when streams are more severely degraded and not likely to recover in a reasonable timeframe. Individual projects contribute to and complement ecosystem and basin-wide watershed restoration efforts that are underway by state, federal, and tribal agencies, and coordinated by the Grande Ronde Model Watershed Program (Project. No.199202601). Work undertaken during 2007 included: (1) Starting 1 new fencing project in the NFJD subbasin that will protect an additional 1.82 miles of stream and 216.2 acres of habitat; (2) Constructing 0.47 miles of new channel on the Wallowa River to enhance habitat, restore natural channel dimensions, pattern and profile and reconnect approximately 18 acres of floodplain and wetland habitat; (3) Planting 22,100 plants along 3 streams totaling 3.6 stream miles; (4) Establishing 34 new photopoints on 5 projects and retaking 295 existing photopoint pictures; (5) Monitoring stream temperatures at 10 locations on 5 streams and conducting other monitoring activities; (6) Completing riparian fence, water gap and other maintenance on 116.8 miles of project fences; (7) Initiated writing of a comprehensive project summary report that will present a summary of conclusions of the benefits to focal species and management recommendations for the future. Since initiation of this program 56 individual projects have been implemented, monitored and maintained along 84.8 miles of anadromous fish bearing streams that protect and enhance 3,501 acres of riparian and instream habitat.

13 HYDRO ENERGY↗

FinalReport for completed IPP-0110 and 0110A Projects:"High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications"

The DOE-supported IPP (Initiatives for Proliferation Prevention) Project, IPP-0110, and its accompanying 'add-on project' IPP-0110A, entitled 'High Energy Ion Technology of Interfacial Thin Film Coatings for Electronic, Optical and Industrial Applications' was a collaborative project involving the Lawrence Berkeley National Laboratory (LBNL) as the U.S. DOE lab; the US surface modification company, Phygen, Inc., as the US private company involved; and the High Current Electronics Institute (HCEI) of the Russian Academy of Sciences, Tomsk, Siberia, Russia, as the NIS Institute involved. Regular scientific research progress meetings were held to which personnel came from all participating partners. The meetings were held mostly at the Phygen facilities in Minneapolis, Minnesota (with Phygen as host) with meetings also held at Tomsk, Russia (HCEI as host), and at Berkeley, California (LBNL as host) In this way, good exposure of all researchers to the various different laboratories involved was attained. This report contains the Final Reports (final deliverables) from the Russian Institute, HCEI. The first part is that for IPP-0110A (the 'main part' of the overall project) and the second part is that for the add-on project IPP-0110A. These reports are detailed, and contain all aspects of all the research carried out. The project was successful in that all deliverables as specified in the proposals were successfully developed, tested, and delivered to Phygen. All of the plasma hardware was designed, made and tested at HCEI, and the performance was excellent. Some of the machine and performance parameters were certainly of 'world class'. The goals and requirements of the IPP Project were well satisfied. I would like to express my gratitude to the DOE IPP program for support of this project throughout its entire duration, and for the unparalleled opportunity thereby provided for all of the diverse participants in the project to join in this collaborative research. The benefits are superb, as measured in quite a number of different ways.

43 PARTICLE ACCELERATORS↗

CONCEPT OF OPERATIONS PLANS for Phase I the INTERNATIONAL PILOT FOR Global Radiological source SORTING, Tracking, AND MONITORING (GradSStraM) Using eMERGING RFID AND WEB 2.0 TECHNOLOGIES TO PROVIDE TOTAL ASSET AND INFORMATION VISUALIZATIONA United states- European Union Lighthouse Priority Project for fostering trade and reducing regulatory burden

Thousands of shipments of radioisotopes developed in the United States (US) are transported domestically and internationally for medical and industrial applications, including to partner laboratories in European Union (EU) countries. Over the past five years, the Environmental Protection Agency (EPA), the Department of Energy (DOE), and Oak Ridge National Laboratory (ORNL) have worked with state regulatory compliance personnel, key private sector shippers and carriers, the Department of Homeland Security (DHS), the Department of Transportation (DOT), the Department of Defense (DoD) and the Nuclear Regulatory Commission (NRC) on Radio Frequency Identification (RFID) tracking and monitoring of medical and industrial radioisotopes in commerce. The EPA Radiological Source Tracking and Monitoring (RadSTraM) project tested, evaluated, and integrated RFID technologies in laboratory settings, and at multiple private-sector shipping and distribution facilities (Perkin Elmer and DHL) using common radioisotopes used in everyday commerce. The RFID tracking was also tested in association with other deployed technologies including radiation detection, chemical/explosives detection, advanced imaging, lasers, and infrared scanning. At the 2007 EU-US Summit, the leaders of the US Department of Commerce (DOC) and EU European Commission (EC) committed to pursue jointly directed Lighthouse Priority Projects. These projects are intended to 'foster cooperation' and 'reduce regulatory burdens' with respect to transatlantic commerce. The Transatlantic Economic Council (TEC) Lighthouse Project on Radio Frequency Identification (RFID) has been directed to 'develop a joint framework for cooperation on identification and development of best practices for Radio Frequency Identification (RFID) technologies.' The RFID Lighthouse Priority Project commits both sides to endeavor to align U.S. and EU regulatory and policy approaches on RFID technologies, including pilot projects in the public sector. The RadSTraM project was specifically cited as a candidate for a RFID Lighthouse Project by the EU/DOC collaboration in meeting their mutual goal of developing a 'joint framework for cooperation on identification and development of best practices for RFID technologies.' Concurrently, the Universal Postal Union (UPU) identified this project as a candidate for radioisotope packages shipped by the postal service between the United State Postal Service (USPS). and European Post Agencies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Are long-term climate projections useful for on-farm adaptation decisions?

The current literature on climate services for farmers predominantly focuses on seasonal forecasts, with an assumption that longer-term climate projections may not be suitable for informing farming decisions. In this paper, we explore whether certain types of long-term climate projections may be useful for some specific types of farming decisions. Through interviews with almond tree crop farmers and farm advisors in California, we examine how farmers perceive the utility and accuracy levels of long-term climate projections and identify the types of projections that they may find useful. The interviews revealed that farmers often perceive long-term climate projections as an extension of weather forecasts, which can lead to their initial skepticism of the utility of such information. However, we also found that when farmers were presented with long-term trends or shifts in crop-specific agroclimatic metrics (such as chill hours or summer heat), they immediately perceived these as valuable for their decision-making. Hence, the manner in which long-term projections are framed, presented, and discussed with farmers can heavily influence their perception of the potential utility of such projections. The iterative conversations as part of the exploratory interview questions, served as a tool for “ joint construction of meaning” of complex and ambiguous terms such as “long-term climate projections,” “long-term decisions” and “uncertainty.” This in-turn supported a joint identification (and understanding) of the types of information that can potentially be useful for on-farm adaptive decisions, where the farmer and the interviewer both improvise and iterate to find the best types of projections that fit specific decision-contexts. Overall, this research identifies both the types of long-term climate information that farmers may consider useful, and the engagement processes that are able to effectively elicit farmers' long-term information needs.

Jagannathan, Kripa↗

Transport Cost for Carbon Removal Projects With Biomass and CO2 Storage

Strategies to remove carbon from the atmosphere are needed to meet global climate goals. Promising strategies include the conversion of waste biomass to hydrogen, methane, liquid fuels, or electricity coupled with CO 2 capture and storage (CCS). A key challenge for these projects is the need to connect geographically dispersed biomass supplies with geologic storage sites by either transporting biomass or CO 2 . We assess the cost of transport for biomass conversion projects with CCS using publicly available cost data for trucking, rail, and CO 2 pipelines in the United States. We find that for large projects (order of 1 Mt/yr CO 2 or greater), CO 2 by pipeline is the lowest cost option. However, for projects that send most of the biomass carbon to storage, such as gasification to hydrogen or electricity production, biomass by rail is a competitive option. For smaller projects and lower fractions of carbon sent to storage, such as for pyrolysis to liquid fuels, CO 2 by rail is the lowest cost option. Assessing three plausible example projects in the United States, we estimate that total transport costs range from $24/t-CO 2 stored for a gasification to hydrogen project traversing 670 km to $\$ 36$/t for a gasification to renewable natural gas project traversing 530 km. In general, if developers have flexibility in choosing transport mode and project type, biomass sources and storage sites can be connected across hundreds of kilometers for transport costs in the range of $20-40/t-CO 2 stored. Truck and rail are often viable modes when pipelines cannot be constructed. Distances of 1,000 km or more can be connected in the same cost range when shared CO 2 pipelines are employed.

09 BIOMASS FUELS↗

Genomic Encyclopedia of Type Strains, Phase I: The one thousand microbial genomes (KMG-I) project

The Genomic Encyclopedia of Bacteria and Archaea (GEBA) project was launched by the JGI in 2007 as a pilot project with the objective of sequencing 250 bacterial and archaeal genomes. The two major goals of that project were (a) to test the hypothesis that there are many benefits to the use the phylogenetic diversity of organisms in the tree of life as a primary criterion for generating their genome sequence and (b) to develop the necessary framework, technology and organization for large-scale sequencing of microbial isolate genomes. While the GEBA pilot project has not yet been entirely completed, both of the original goals have already been successfully accomplished, leading the way for the next phase of the project. Here we propose taking the GEBA project to the next level, by generating high quality draft genomes for 1,000 bacterial and archaeal strains. This represents a combined 16-fold increase in both scale and speed as compared to the GEBA pilot project (250 isolate genomes in 4+ years). We will follow a similar approach for organism selection and sequencing prioritization as was done for the GEBA pilot project (i.e. phylogenetic novelty, availability and growth of cultures of type strains and DNA extraction capability), focusing on type strains as this ensures reproducibility of our results and provides the strongest linkage between genome sequences and other knowledge about each strain. In turn, this project will constitute a pilot phase of a larger effort that will target the genome sequences of all available type strains of the Bacteria and Archaea.

59 BASIC BIOLOGICAL SCIENCES↗

Development of a funding, cost, and spending model for satellite projects

The need for a predictive budget/funging model is obvious. The current models used by the Resource Analysis Office (RAO) are used to predict the total costs of satellite projects. An effort to extend the modeling capabilities from total budget analysis to total budget and budget outlays over time analysis was conducted. A statistical based and data driven methodology was used to derive and develop the model. Th budget data for the last 18 GSFC-sponsored satellite projects were analyzed and used to build a funding model which would describe the historical spending patterns. This raw data consisted of dollars spent in that specific year and their 1989 dollar equivalent. This data was converted to the standard format used by the RAO group and placed in a database. A simple statistical analysis was performed to calculate the gross statistics associated with project length and project cost ant the conditional statistics on project length and project cost. The modeling approach used is derived form the theory of embedded statistics which states that properly analyzed data will produce the underlying generating function. The process of funding large scale projects over extended periods of time is described by Life Cycle Cost Models (LCCM). The data was analyzed to find a model in the generic form of a LCCM. The model developed is based on a Weibull function whose parameters are found by both nonlinear optimization and nonlinear regression. In order to use this model it is necessary to transform the problem from a dollar/time space to a percentage of total budget/time space. This transformation is equivalent to moving to a probability space. By using the basic rules of probability, the validity of both the optimization and the regression steps are insured. This statistically significant model is then integrated and inverted. The resulting output represents a project schedule which relates the amount of money spent to the percentage of project completion.

Johnson, Jesse P.↗

Accomplishments of the Advanced Reusable Technologies (ART) RBCC Project at NASA/Marshall Space Flight Center

The focus of the NASA / Marshall Space Flight Center (MSFC) Advanced Reusable Technologies (ART) project is to advance and develop Rocket-Based Combined-Cycle (RBCC) technologies. The ART project began in 1996 as part of the Advanced Space Transportation Program (ASTP). The project is composed of several activities including RBCC engine ground testing, tool development, vehicle / mission studies, and component testing / development. The major contractors involved in the ART project are Aerojet and Rocketdyne. A large database of RBCC ground test data was generated for the air-augmented rocket (AAR), ramjet, scramjet, and ascent rocket modes of operation for both the Aerojet and Rocketdyne concepts. Transition between consecutive modes was also demonstrated as well as trajectory simulation. The Rocketdyne freejet tests were conducted at GASL in the Flight Acceleration Simulation Test (FAST) facility. During a single test, the FAST facility is capable of simulating both the enthalpy and aerodynamic conditions over a range of Mach numbers in a flight trajectory. Aerojet performed freejet testing in the Pebble Bed facility at GASL as well as direct-connect testing at GASL. Aerojet also performed sea-level static (SLS) testing at the Aerojet A-Zone facility in Sacramento, CA. Several flight-type flowpath components were developed under the ART project. Aerojet designed and fabricated ceramic scramjet injectors. The structural design of the injectors will be tested in a simulated scramjet environment where thermal effects and performance will be assessed. Rocketdyne will be replacing the cooled combustor in the A5 rig with a flight-weight combustor that is near completion. Aerojet's formed duct panel is currently being fabricated and will be tested in the SLS rig in Aerojet's A-Zone facility. Aerojet has already successfully tested a cooled cowl panel in the same facility. In addition to MSFC, other NASA centers have contributed to the ART project as well. Inlet testing and parametrics were performed at NASA / Glenn Research Center (GRC) and NASA / Langley Research Center (LaRC) for both the Aerojet and Rocketdyne concepts. LaRC conducted an Air-Breathing Launch Vehicle (ABLV) study for several vehicle concepts with RBCC propulsion systems. LaRC is also performing a CFD analysis of the ramjet mode for both flowpaths based on GASL test conditions. A study was performed in 1999 to investigate the feasibility of performing an RBCC flight test on the NASA / Dryden Flight Research Center (DFRC) SR-71 aircraft. Academia involvement in the ART project includes parametric RBCC flowpath testing by Pennsylvania State University (PSU). In addition to thrust and wall static pressure measurements, PSU is also using laser diagnostics to analyze the flowfield in the test rig. MSFC is performing CFD analysis of the PSU rig at select test conditions for model baseline and validation. Also, Georgia Institute of Technology (GT) conducted a vision vehicle study using the Aerojet RBCC concept. Overall, the ART project has been very successful in advancing RBCC technology. Along the way, several major milestones were achieved and "firsts" accomplished. For example, under the ART project, the first dynamic trajectory simulation testing was performed and the Rocketdyne engine A5 logged over one hour of accumulated test time. The next logical step is to develop and demonstrate a flight-weight RBCC engine system.

Nelson, Karl W.↗

Portsmouth Atmospheric Science School (PASS) Project

The Portsmouth Atmospheric Science School Project (PASS) Project was granted a one-year no cost extension for 2001-2002. In year three of the project, objectives and strategies were modified based on the previous year-end evaluation. The recommendations were incorporated and the program was replicated within most of the remaining elementary schools in Portsmouth, Virginia and continued in the four middle schools. The Portsmouth Atmospheric Science School Project is a partnership, which includes Norfolk State University, Cooperating Hampton Roads Organizations for Minorities in Engineering (CHROME), NASA Langley Research Center, and the City of Portsmouth, Virginia Public Schools. The project seeks to strengthen the knowledge of Portsmouth Public Schools students in the field of atmospheric sciences and enhance teacher awareness of hands on activities in the atmospheric sciences. The project specifically seeks to: 1) increase the interest and participation of elementary and middle school students in science and mathematics; 2) strengthen existing science programs; and 3) facilitate greater achievement in core subjects, which are necessary for math, science, and technical careers. Emphasis was placed on providing training activities, materials and resources for elementary students (grades 3 - 5) and middle school students (grades 6 - 8), and teachers through a CHROME club structure. The first year of the project focused on introducing elementary students to concepts and activities in atmospheric science. Year two of the project built on the first year's activities and utilizes advanced topics and activities appropriate for middle school students. During the third year of the project, in addition to the approaches used in years one and two, emphasis was placed on activities that enhanced the Virginia Standards of Learning (SOL).

Coleman, Clarence D.↗