Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Project Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Four Problematic Methods in Reliability Analysis

Some basic methods used in reliability analysis are problematic because they produce incorrect and overoptimistic predictions. Initially gratifying forecasts are often invalidated by testing and operational experience. The problematic methods in reliability analysis include estimating the system failure rate as the sum of component failure rates, assuming that reliability growth continues indefinitely during testing, overestimating the benefits of redundancy, and using the fault tolerance count instead of a detailed reliability analysis. Reliability analysis can produce more optimism than accuracy. This bug may now be a feature. The optimistic bias inevitable in project planning should be corrected by realistic reliability analysis that reflects relevant experience. That the repeated poor performance of reliability analysis is found to be surprising suggests willful blindness. Rigorous methods and impartial critical review are necessary to improve reliability analysis.

Reliability analysis↗

Four Problematic Methods in Reliability Analysis

Some basic methods used in reliability analysis are problematic because they produce incorrect and overoptimistic predictions. Initially gratifying forecasts are often invalidated by testing and operational experience. The problematic methods in reliability analysis include estimating the system failure rate as the sum of component failure rates, assuming that reliability growth continues indefinitely during testing, overestimating the benefits of redundancy, and using the fault tolerance count instead of a detailed reliability analysis. Reliability analysis can produce more optimism than accuracy. This bug may now be a feature. The optimistic bias inevitable in project planning should be corrected by realistic reliability analysis that reflects relevant experience. That the repeated poor performance of reliability analysis is found to be surprising suggests willful blindness. Rigorous methods and impartial critical review are necessary to improve reliability analysis.

Reliability analysis↗

Management of Biological Materials in Wastewater from Research & Development Facilities

PNNL has developed and instituted a systematic approach to managing work with biological material that begins in the project planning phase and carries through implementation to waste disposal. This paper describes two major processes used at PNNL to analyze and mitigate the hazards associated with working with biological materials and evaluate them for disposal to the sewer, ground, or surface water in a manner that protects human health and the environment. The first of these processes is the Biological Work Permit which is used to identify requirements for handling, storing, and working with biological materials and the second is the Sewer Approval process which is used to evaluate discharges of wastewaters containing biological materials to assure they meet industrial wastewater permits and other environmental regulations and requirements.

63 RADIATION, THERMAL, AND OTHER ENVIRON. POLLUTAN↗

Present Status of the ILC Project and Development

The Technical Design of the International Linear Collider (ILC) Project will be finished in late 2012. The Technical Design Report (TDR) will include a description of the updated design, with a cost estimate and a project plan, and the results of research and development (R & D) done in support of the ILC. Results from directed ILC R & D are used to reduce the cost and risk associated with the ILC design. We present a summary of key challenges and show how the global R & D effort has addressed them. The most important activity has been in pursuit of very high gradient superconducting RF linac technology. There has been excellent progress toward the goal of practical industrial production of niobium sheet-metal cavities with gradient performance in excess of 35 MV/m. In addition, three purpose-built beam test facilities have been constructed and used to study and demonstrate high current linac performance, electron-cloud beam dynamics and precision beam control. The report also includes a summary of component design studies and conventional facilities cost optimization design studies.

43 PARTICLE ACCELERATORS↗

Preliminary structural design conceptualization for composite rotor for verdant power water current turbine

Sandia National Laboratories (SNL) and Verdant Power Inc. (VPI) have partnered under a Cooperative Research and Development Agreement (CRADA) to develop a new kinetic hydropower rotor. The rotor features an improved hydrodynamic and structural design which features state-of-the-art technology developed for the wind industry. The new rotor will have higher energy capture, increased system reliability, and reduction of overall cost of energy. This project was divided into six tasks: (1) Composite Rotor Project Planning and Design Specification; (2) Baseline Fatigue Testing and Failure analysis; (3) Develop Blade/Rotor Performance Model; (4) Hydrofoil Survey and Selection; (5) FEM Structural Design; and (6) Develop Candidate Rotor Designs and Prepare Final Report.

13 HYDRO ENERGY↗

Update on Co-Design @ Los Alamos

We present an update on current co-design work at LANL. We describe three non-ASC co-design projects: CoCoMANS (LDRD), ExMatEx (ASCR) and the Co-Design Summer School (IS and T). For each project we give a brief overview of the project plans and status.

97 MATHEMATICS AND COMPUTING↗

Streamlining the Bankability Process using International Standards

NREL has supported the international efforts to create a streamlined process for documenting bankability and/or completion of each step of a PV project plan. IECRE was created for this purpose in 2014. This poster describes the goals, current status of this effort, and how individuals and companies can become involved.

14 SOLAR ENERGY↗

Hydrogen Safety Sensor Performance and Use Gap Analysis: Preprint

Hydrogen sensors are recognized as an important technology for facilitating the safe implementation of hydrogen as an alternative fuel, and there are numerous reports of a sensor alarm successfully preventing a potentially serious event. However, gaps in sensor metrological specifications, as well as in their performance for some applications, exist.The U.S. Department of Energy (DOE) Fuel Cell Technology Office published a short list of critical gaps in the 2007 and 2012 multiyear project plans; more detailed gap analyses were independently performed by the JRC and NREL. There have been, however, some significant advances in sensor technologies since these assessments, including the commercial availability of hydrogen sensors with fast response times (t90 less than 1 s, which had been an elusive DOE target since 2007), improved robustness to chemical poisons, improved selectivity, and improved lifetime and stability. These improvements, however, have not been universal and typically pertain to select platforms or models. Moreover, as hydrogen markets grow and new applications are being explored, more demands will be imposed on sensor performance. The hydrogen sensor laboratories at NREL and JRC are currently updating the hydrogen safety sensor gap analysis through direct interaction with international stakeholders in the hydrogen community, especially end-users. NREL and the JRC are currently organizing a series of workshops (in Europe and the U.S.) with sensor developers, end-users, and other stakeholders in 2017 to identify technology gaps and to develop a path forward to address them. One workshop is scheduled for May 10 in Brussels, Belgium at the Headquarters of the Fuel Cell and Hydrogen Joint Undertaking. A second workshop is planned at the National Renewable Energy Laboratory in Golden, CO, USA. This presentation will review improvements in sensor technologies in the past 5 to 10 years, identify gaps in sensor performance and use requirements, and identify potential research strategies to address the gaps. The presentation will also summarize the outcomes of the Hydrogen Sensors Workshops.

30 DIRECT ENERGY CONVERSION↗

Assessment of the Economic Potential of Distributed Wind in Colorado, Minnesota, and New York

Stakeholders in the small and distributed wind space require access to better tools and data for more informed decisions on high-impact topics, including project planning, policymaking, and funding allocation. A major challenge in obtaining improved information is in the identification of favorable sites - namely, the intersection of sufficient wind resource with economic parameters such as retail rates, incentives, and other policies. This presentation made at the AWEA WINDPOWER Conference and Exhibition in Chicago in 2018 explores the researchers' objective: To understand the spatial variance of key distributed wind parameters and identify where they intersect to form pockets of favorable areas in Colorado, Minnesota, and New York.

17 WIND ENERGY↗

Snowmass 2021 CMB-S4 White Paper

This Snowmass 2021 White Paper describes the Cosmic Microwave Background Stage 4 project CMB-S4, which is designed to cross critical thresholds in our understanding of the origin and evolution of the Universe, from the highest energies at the dawn of time through the growth of structure to the present day. We provide an overview of the science case, the technical design, and project plan.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Numerical study on interaction of local air cooler with stratified hydrogen cloud in a large vessel

Within the framework of the ERCOSAM project, planning calculations are performed to examine sensitivity parameters that can affect the break-up (erosion) of a helium layer by mitigation devices (i.e., cooler, spray, or Passive Autocatalytic Recombiner - PAR). This paper reports the GOTHIC analysis results for the cooler tests to be performed in the PANDA facility. The cooler elevation and geometry, helium layer thickness, steam distribution in the vessel, and the vessel geometry (inter-connected multi-compartments versus a single volume) on the erosion process as well as the cooling capacity are studied. This analysis is valuable because only a limited number of conditions will be examined in the planned experiments. The study provides a useful understanding of the interaction of a cooler with a stratified atmosphere. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Proposed Path Forward for Standardization - 17131

Incorporation of a standardized canister system into the commercial waste management system represents an opportunity to develop an integrated approach to storage, transportation, and disposal issues. However, regardless of timing and method, deployment of such a system would have the potential to cause significant system-wide impacts. The current inventory of commercial spent nuclear fuel dry storage systems is diverse and increasing. In addition, the currently loaded systems are large-capacity systems (up to 37 pressurized water reactor assemblies or 89 boiling water reactor assemblies) that are now able to accommodate large (greater than 45 kilowatts) amounts of heat during storage, with the potential to accommodate fairly high heat loads (∼32 kilowatts) for transportation as well. A standardized canister system designed with disposition in mind would likely be significantly smaller than the current systems and have dramatically lower heat limit maximums. Over the past few years, the Department of Energy (DOE) Office of Nuclear Energy Fuel Cycle Technologies Nuclear Fuels Storage and Transportation Planning Project (NFST) has performed a number of system analyses using logistic simulations to evaluate the impacts of incorporating these smaller canisters into the commercial waste management system. These simulations predict the amount of resources (e.g., staff, canisters/casks, rail-cars, facilities), the size of facilities, and the timing of operations, as well as provide rough order-of-magnitude cost estimates. In addition to system analyses, DOE funded efforts by EnergySolutions to develop a generic design of a small-capacity standardized canister system and investigate innovative operational approaches to minimize the at-reactor operational impacts of loading such smaller canisters. A result of EnergySolutions' work was the development of a 'canister-in-carrier' concept that would allow for loading, storing, transporting, and potentially disposing of groups of small canisters at the same time. With the inclusion of this new concept, the most recent system analyses show that incorporating standardized canister systems into the commercial waste management system has the potential for some system-wide cost reductions in addition to the flexibility that smaller canisters would provide to the system. Based on these analyses, the authors of this paper recommend that DOE fund (1) a demonstration of the ability to weld up to four small canisters at the same time to confirm the feasibility and practicality of the canister-in-carrier concept and (2) the development of a more detailed conceptual design for future applications for Certificates of Compliance, if standardized canisters were incorporated into the commercial waste management system. This paper documents both the results of the latest assessment of standardized canister concepts including the canister-in-carrier concept and the authors' recommendations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decommissioning costs - some international perspectives and initiatives. Presentation for Panel discussion. Session No. 024: 'Getting a Handle on Decommissioning Costs - a Global Perspective'

Financing for decommissioning: Are the cost estimates valid? Are the financing arrangements suitable? Are the fund management systems appropriate? Cost estimates are estimated, analysed and updated on a regular basis, but cost comparisons are not straight-forward. There is an incomplete understanding of variability between estimates. Multiple internal and external factors impact estimates: Institutional, legal and policy, purpose, Strategies and plans, overall context, Facility characteristics and history Contingencies and risk, Limited actual cost data. The financing arrangements: there exists a range of systems in place for the implementation of Funding Policy and Strategy, but there are Considerable variations in: Calculating funding requirements, contributions/provisions, Allocating risks and requirements for securities Managing funds and accounting, adjusting the system, Managing disbursements, Reporting and supervision. All cost estimates for future decommissioning activities include considerable uncertainties. These uncertainties will gradually diminish with growing experience from current and planned projects. Different costing methods have different data requirements. Their reliability depends on the extent to which various data are available and applicable to the specific case being considered. Independent of the assessment method, some uncertainty is inevitable in all estimates of future costs. Analysis of the costing method may be useful in order to locate the key uncertainties in each specific estimate. NEA's Decommissioning Cost Estimation Group (DCEG) was Created in 2008 to foster the exchange of information and experience. It Aims to enhance the credibility, reliability, and auditability of the cost estimation process. It Helps define international good practices in decommissioning cost estimation. However, some major challenges remain. Weaknesses in: Understanding relations between estimates and actual costs, Lack of relevant cost data, sharing data. How might be addressed: Improved sharing of cost data, Systematic analyses of estimates and actual costs, Developing benchmarking approaches.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Results of Modeling and Simulation Support to Specia Nuclear Material Handling Facility Operations - 16053

Newport News Shipbuilding (NNS) is the sole designer and provider of nuclear powered aircraft carriers and one of only two companies in the United States to build nuclear powered submarines. As part of the upkeep of aircraft carriers, the ships return to NNS once in their lifetime for a complex overhaul and to be refueled. In support of overhaul operations NNS maintains a state of the art Special Nuclear Material (SNM) handling facility. Due to the complex nature of the operations that occur within this facility, during the design and initial operation of the building NNS developed a facility simulation model to provide decision support during the project planning and operational phases. This tool allows users to experiment with process times, process order, equipment utilization, personnel utilization and spatial utilization. By capturing the planned operations, time distributions for operations, equipment sizes and uses and personnel requirements, the tool accurately reflects the planned use of the facility. This realism allows the user to experiment with any aspect of the facility, in a controlled and cost effective space, and determine how changes or potential delays may impact overall facility operations. Thus the model allows for rapid exploration of multiple scenarios to determine likely outcomes, allowing a user to identify risks well ahead of their realization and explore mitigation strategies in a controlled space, to determine the ideal path forward. The tool was successful during the initial operation of the facility in helping to identify and mitigate risks related to the complex operations occurring during SNM handling. The tool is now in use to support planning for the next series of operations that will occur within the facility. The initial operations the model supported occurred during the deactivation of the USS Enterprise, and future operation will focus on the overhaul of Nimitz class aircraft carriers. The NNS planning team is currently using the tool to assess potential risks and challenges that are identified as potentially impacting the schedule and timelines for these overhaul processes. In addition, the NNS development team is working to add new operational steps to the model, capturing work that is occurring near the facility, but which directly impacts the facilities operational abilities. In conjuncture with the engineering planning division, the NNS development team has run over 20 complex scenarios through the tool. The team has provided output from these scenarios to both NNS personnel and government representatives. To date the model has successfully supported the identification of several feasible paths to incorporate new processes, dictated by the work to support a overhaul vs a deactivation. The model also provides a spatial arrangement component that allows users to experiment with different equipment placement within the facility. Due to the fidelity of the model, arranging equipment with the spatial component allows a user to set up the facility in an experimental layout and run the processes inside the facility to determine if the layout will be feasible, or if it would impact operational capabilities. Additionally, the spatial component allows for visual collaboration between stakeholders to ensure all operational personnel are aware of the current and planned layout, and that they do not locate equipment or work stations in locations that would interfere with facility operations. The spatial component, in combination with the simulation component, has resulted in several documented improvements in process. These include: the identification of additional equipment which could be stored outside the facility, without impacting operations, to increase space; confirmation of the ideal placement of a large water tank; and identification of several risks related to planned equipment storage area, allowing the team to develop new plans and avoid realizing the risk. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Evaluation of Alternative Waste Management System Architectures - 16338

The Nuclear Fuels Storage and Transportation Planning Project (NFST), under the U.S. Department of Energy, Office of Nuclear Energy, Office of Fuel Cycle Technologies, is conducting analyses to inform future decisions regarding an integrated waste management system with a current focus on commercial spent nuclear fuel (SNF). This work builds on results from previous systems architecture studies within NFST. System-level analyses of the overall interface between at-reactor, consolidated storage, and ultimate disposition, along with the development of supporting logistic simulation tools, were initiated in 2012. This paper highlights recent results of the NFST systems architecture analysis efforts initiated in 2012. Waste management design choices are evaluated with respect to the impact on the entire system. This includes an analysis of alternative strategies for allocating receipt of SNF from reactor sites, storage options for SNF at an interim storage facility (ISF), and thermal limits restricting the transportation of canisters from an ISF to a mined geological repository (MGR). (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

NORM in Building Materials: A Case Study in Releasing and Disposing of Building Debris within the DOE System - 18123

In 2013, the Office of Management and Budget issued Memorandum 2013-02, clarifying its 'Freeze the Footprint' policy. Memorandum 2013-02 requires that all federal agencies maintain or reduce their total square footage, within each subsequent year, from a FY2012 baseline. Memorandum 2013-02 also requires that total square footage remain constant with respect to the type/intended use of a building. At Los Alamos National Laboratory (LANL), this means that new construction cannot occur without demolition of equivalent (both in type and square footage) building(s). Since 2013, decommissioning and demolition of aging, unused facilities at LANL has increased. In 2016, the TA16-280 building complex was scheduled for demolition. TA16-280 is a former high explosives (HE) processing facility that consists of six buildings connected to each other via weatherproof walkways. It was constructed in the 1950's and has been subsequently used for HE shipping, receiving, and storage. Interviews with radiation protection staff suggest that some of the buildings within the complex may have been used to store depleted uranium metal parts in a non-dispersible form. It is LANL policy to conduct decommissioning surveys for radioactive materials when building history cannot confirm that a structure is radiologically non-impacted. LANL follows the Multi-Agency Radiation Survey and Assessment of Materials and Equipment (MARSAME) process to develop its surveys and clear structures from radiological control. After clearance, a structure may be dispositioned as non-regulated waste, at a significant cost savings compared to regulated disposition pathways such as low-level waste. MARSAME measurements conducted in the 16-280 complex were elevated compared to reference measurements of surrogate materials, and a majority of the survey units failed to pass indistinguishable from background (IFB), which is LANL's unregulated clearance criteria. Further measurements conducted both in situ and in the laboratory indicated the presence of naturally-occurring thorium in several building materials including: poured concrete, the glaze atop ceramic blast tiles, and the porcelain enamel on the exterior of blast-proof ceiling lamps. Other than naturally-occurring thorium, there were no elevated radionuclide concentrations detected in building materials. It should be noted that there was no history of thorium use in the 16-280 complex, and the material in question was in all cases fixed to and within the building materials in question. Except in certain specific cases, such material is exempt from regulation under the Atomic Energy Act of 1954 [3], as amended, and is therefore exempt from regulation under the Nuclear Regulatory Commission, the Department of Energy, and agreement state regulatory frameworks. Despite this regulatory exemption, disposition of material from the 16-280 complex proved to be challenging, principally because local industrial landfills stipulate 'No radioactive material' in their Waste Acceptance Criteria. This disconnect between what is regulated and what is disposable creates a situation where some DOE sites find it easier to disposition property as Low Level Waste in lieu of pursuing a non-regulated disposition pathway. This presentation will explore the specifics of the 16-280 decommissioning project as well as the implications of the release/disposition disconnect for naturally occurring radioactive material and project planning at LANL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Autonomous Radiation Survey Inside Contaminated Buildings at Fukushima Daiichi with the Riser UAV - 18299

Nuclear decommissioning is constrained and defined by radiation and radioactive contamination. Where radiation is high and its distribution is unknown simply gathering the data needed for project planning can become a challenge. Fukushima Daiichi epitomises this challenge. The complex sequence of events at the plant following the March 2011 earthquake and tsunami has resulted in extensive physical damage and an essentially unpredictable distribution of contamination. TEPCO have applied a range of manual and robotics techniques to map the status of the plant, but many significant areas have remained no-go zones due to a combination of high radiation, physical hazards and obstacles. Further, even in areas where manual survey is feasible, there is strong desire to minimise human exposure to radiation by deploying robots where possible. Riser is a fully autonomous UAV equipped with an infrastructure-free 3D navigation and mapping system, inspection cameras and a CZT spectrometric measurement capability. The system has been custom designed specifically to meet the needs of the nuclear inspection. Riser is capable of accessing areas with dose rates of hundreds of milli-sievert per hour and producing 3D models and radiation surveys with accurately located data points. The data from Riser can subsequently be fused using Createc's N-Visage engine to produce three-dimensional contamination maps which can be used for predictive modelling of future D and D activity. Riser has been deployed at Fukushima Daiichi since March 2017. We present examples of data and analysis outputs, as well as general learning about deploying autonomous robots at a nuclear site. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗