Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROBABILISTIC ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Reducing model error using optimized galaxy selection: weak lensing cluster mass estimation

Galaxy clusters are one of the most powerful probes to study extensions of General Relativity and the Standard Cosmological Model. Upcoming surveys like the Vera Rubin Observatory’s Legacy Survey of Space and Time are expected to revolutionise the field, by enabling the analysis of cluster samples of unprecedented size and quality. To reach this era of high-precision cluster cosmology, the mitigation of sources of systematic error is crucial. A particularly important challenge is bias in cluster mass measurements induced by the mismodelling of photometric redshift estimates of source galaxies. This work proposes a method to optimise the source sample selection in cluster weak lensing analyses drawn from wide-field survey lensing catalogs to reduce the bias on reconstructed cluster masses. We use a combinatorial optimisation scheme and methods from variational inference to select galaxies in latent space to produce a probabilistic galaxy source sample catalog for highly accurate cluster mass estimation. We show that our method reduces the critical surface mass density Σ crit relative modelling bias on the 60-70% level, while maintaining up to 90% of galaxies. We highlight that our methodology has applications beyond cluster mass estimation as an approach to jointly combine galaxy selection and model inference under sources of systematics.

79 ASTRONOMY AND ASTROPHYSICS↗

Assessment of Crew Time for Maintenance and Repair Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, understanding how crew repair and maintenance timelines are impacted by mission operations and technology changes is vital for future mission planning. Past work has been done using historical International Space Station (ISS) data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available datasets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat (SH), and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA ISS maintenance and crew time data are logged into two central databases: the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS). Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair time for each failure and repair event. The entire maintenance activity dataset is then categorized based on the class of failed component to ensure a significant sample size for each class and accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time to Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. The authors applied these modeling methods to a case study of a crewed mission to the planned SH and produced expected corrective maintenance crew time distributions. The results produced an expected corrective maintenance crew time at over 24 hours per mission, and a maintenance crew time distribution that reflects the importance of planning for sufficient maintenance requirements each mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Evaluation of the risk of perchlorate exposure in a population of late-gestation pregnant women in the United States: Application of probabilistic biologically-based dose response modeling

The risk of ubiquitous perchlorate exposure and the dose-response on thyroid hormone levels in pregnant women in the United States (U.S.) have yet to be characterized. In the current work, we integrated a previously developed perchlorate submodel into a recently developed population-based pregnancy model to predict reductions in maternal serum free thyroxine (fT4) levels for late-gestation pregnant women in the U.S. Our findings indicated no significant difference in geometric mean estimates of fT4 when perchlorate exposure from food only was compared to no perchlorate exposure. The reduction in maternal fT4 levels reached statistical significance when an added contribution from drinking water (i.e., 15 μg/L, 20 μg/L, or 24.5 μg/L) was assumed in addition to the 90th percentile of food intake for pregnant women (0.198 μg/kg/day). We determined that a daily intake of 0.45 to 0.50 μg/kg/day of perchlorate was necessary to produce results that were significantly different than those obtained from no perchlorate exposure. Adjusting for this food intake dose, the relative source contribution of perchlorate from drinking water (or other non-dietary sources) was estimated to range from 0.25–0.3 μg/kg/day. Assuming a drinking water intake rate of 0.033 L/kg/day, the drinking water concentration allowance for perchlorate equates to 7.6–9.2 μg/L. In summary, we have demonstrated the utility of a probabilistic biologically-based dose-response model for perchlorate risk assessment in a sensitive life-stage at a population level; however, there is a need for continued monitoring in regions of the U.S. where perchlorate exposure may be higher. - Highlights: • Probabilistic risk assessment for perchlorate in U.S. pregnant women was conducted. • No significant change in maternal fT4 predicted due to perchlorate from food alone. • Drinking water concentration allowance for perchlorate estimated as 7.6–9.2 μg/L.

60 APPLIED LIFE SCIENCES↗

Assessment of Crew Time for Maintenance and Repairs Activities for Lunar Surface Missions

NASA is currently evaluating different methods to predict how much time crewmembers will spend conducting repair and maintenance activities on future space missions. As mission scope and spacecraft architectures change, it will be necessary to understand how crew repair and maintenance timelines are impacted by mission operations and technology changes. Past work has been done using historical ISS data to accurately predict crew habitation and operation timelines, resulting in the development of NASA’s Exploration Crew Time Model (ECTM). However, understanding crew maintenance and repair requirements has posed a unique challenge due to the complexity of available datasets, the probabilistic nature of sub-system failures, and the impacts of reliability growth on failure rates. This paper presents a methodology to collect and condition empirical repair and maintenance time data from available data sets, to extrapolate from that data to estimate projected maintenance and repair times for a lunar Surface Habitat, and to assess how uncertainty in repair time could impact utilization time on the lunar surface. NASA International Space Station (ISS) maintenance and crew time data are logged into two central databases, the Maintenance Data Collection (MDC) and the Operations Planning Timeline Integration System (OPTimIS) respectively. Separately, each of these two datasets capture only portions of the complete set of data required to generate an accurate assessment of crew time spent on maintenance activities at a sub-system level. MDC provides a detailed catalog of failure events and an overview of the failure’s required maintenance and OPTimIS provides a description of crew activities and crew time durations dedicated to maintenance. To create a more useful crew time estimate for maintenance timelines, the authors developed a methodology to capture relevant data from each set and combine and utilize that data by linking crew time requirements to specific components. The authors compare the failure logs in the MDC to crew activity logs pulled from OPTimIS and then process the data to estimate required repair times for each failure event. Data is also classified by the outcome of each repair event, whether the failed component was replaced or whether it was repaired in place. The entire maintenance activity dataset is then categorized based on the class of failed component to allow for a statistically significant sample size for each class and to provide accurate crew time estimates for any components lacking relevant data. This resultant component repair time data can be used in the future to generate Mean Time To Repair (MTTR) estimates and confidence intervals for each class of component based on a probabilistic distribution of documented maintenance events. These improved MTTR values can then be applied to candidate element sub-system architectures, along with component Mean Time Between Failure (MTBF) data to generate distributions for potential required system crew repair time estimates for a given mission. Repair time distributions can then be used to develop more accurate crew schedules and to assess potential available utilization time.

Crew Time↗

Application of machine learning for the estimation of electron energy distribution from optical emission spectra

Abstract This paper discusses the use of probabilistic deep neural networks for the prediction of the electron energy probability function in low-temperature non-thermal plasmas. The neural networks are trained using optical emission spectroscopy and Langmuir probe measurements, with the goal of providing a reliable estimate of the electron energy probability function solely from optical emission data. The performance of both non-Bayesian and Bayesian networks is evaluated. It is found that Bayesian models are preferable as they assign a higher level of uncertainty to their prediction especially when the dataset used to train them is small. This work describes one of the many potential applications of machine learning in plasma science and technology.

Physics↗

Dynamic Adjustment of Simulation Parameters for Efficient Vehicle Prognostics

Model-based diagnostics and prognostics rely on state estimation and uncertainty management algorithms to produce useful information for system operators and maintainers. This information enables more informed operational decisions, condition-based maintenance, and overall mission safety assurance. Typically, uncertainty is associated with vehicle state-of-health estimation and prediction results because of modeling errors, internal or external sources of noise, and sensor inaccuracy. Probabilistic uncertainty management methods including Sequential Monte Carlo simulation are commonly used to reason about state-of-health estimates and predictions in the presence of these sources of uncertainty. However, such algorithms can be computationally expensive as they require a very large number of samples to obtain a sufficiently accurate quantification of the end of life probability distribution. As a result, highly mobile autonomous systems that leverage the prognostic results for mission-level replanning are often constrained in their processing capability because of these computationally expensive simulation approaches. Therefore, in this paper, we investigate algorithmic methods for dynamically adjusting simulation time step as well as number of samples to achieve highly efficient prognostic results while maintaining results accuracy. Results obtained from simulated flight experiments of an electric unmanned aerial vehicle are presented to verify the efficacy of such algorithms.

Prognostics↗

Data-Driven Load Modeling and Forecasting of Residential Appliances

The expansion of residential demand side management programs and increased deployment of controllable loads require accurate appliance-level load modeling and forecasting. This paper proposes a conditional hidden semi-Markov model to describe the probabilistic nature of residential appliance demand. Model parameters are estimated directly from power consumption data using scalable statistical learning methods. We also propose an algorithm for short-term load forecasting as a key application for appliance-level load models. Case studies performed using granular sub-metered power measurements from various types of appliances demonstrate the effectiveness of the proposed load model for short-term prediction.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Quantum Search Approaches to Sampling-Based Motion Planning

In this paper, we present a novel formulation of traditional sampling-based motion planners as database-oracle structures that can be solved via quantum search algorithms. We consider two complementary scenarios: for simpler sparse environments, we formulate the Quantum Full Path Search Algorithm (q-FPS), which creates a superposition of full random path solutions, manipulates probability amplitudes with Quantum Amplitude Amplification (QAA), and quantum measures a single obstacle free full path solution. For dense unstructured environments, we formulate the Quantum Rapidly Exploring Random Tree algorithm, q-RRT, that creates quantum superpositions of possible parent-child connections, manipulates probability amplitudes with QAA, and quantum measures a single reachable state, which is added to a tree. As performance depends on the number of oracle calls and the probability of measuring good quantum states, we quantify how these errors factor into the probabilistic completeness properties of the algorithm. We then numerically estimate the expected number of database solutions to provide an approximation of the optimal number of oracle calls in the algorithm. We compare the q-RRT algorithm with a classical implementation and verify quadratic run-time speedup in the largest connected component of a 2D dense random lattice. We conclude by evaluating a proposed approach to limit the expected number of database solutions and thus limit the optimal number of oracle calls to a given number.

97 MATHEMATICS AND COMPUTING↗

Advanced probabilistic methods for quantifying the effects of various uncertainties in structural response

The effects of actual variations, also called uncertainties, in geometry and material properties on the structural response of a space shuttle main engine turbopump blade are evaluated. A normal distribution was assumed to represent the uncertainties statistically. Uncertainties were assumed to be totally random, partially correlated, and fully correlated. The magnitude of these uncertainties were represented in terms of mean and variance. Blade responses, recorded in terms of displacements, natural frequencies, and maximum stress, was evaluated and plotted in the form of probabilistic distributions under combined uncertainties. These distributions provide an estimate of the range of magnitudes of the response and probability of occurrence of a given response. Most importantly, these distributions provide the information needed to estimate quantitatively the risk in a structural design.

Nagpal, Vinod K.↗

Probabilistic fracture finite elements

The Probabilistic Fracture Mechanics (PFM) is a promising method for estimating the fatigue life and inspection cycles for mechanical and structural components. The Probability Finite Element Method (PFEM), which is based on second moment analysis, has proved to be a promising, practical approach to handle problems with uncertainties. As the PFEM provides a powerful computational tool to determine first and second moment of random parameters, the second moment reliability method can be easily combined with PFEM to obtain measures of the reliability of the structural system. The method is also being applied to fatigue crack growth. Uncertainties in the material properties of advanced materials such as polycrystalline alloys, ceramics, and composites are commonly observed from experimental tests. This is mainly attributed to intrinsic microcracks, which are randomly distributed as a result of the applied load and the residual stress.

Liu, W. K.↗

Probabilistic Assessment of Radiation Risk for Astronauts in Space Missions

Accurate predictions of the health risks to astronauts from space radiation exposure are necessary for enabling future lunar and Mars missions. Space radiation consists of solar particle events (SPEs), comprised largely of medium energy protons, (less than 100 MeV); and galactic cosmic rays (GCR), which include protons and heavy ions of higher energies. While the expected frequency of SPEs is strongly influenced by the solar activity cycle, SPE occurrences themselves are random in nature. A solar modulation model has been developed for the temporal characterization of the GCR environment, which is represented by the deceleration potential, phi. The risk of radiation exposure from SPEs during extra-vehicular activities (EVAs) or in lightly shielded vehicles is a major concern for radiation protection, including determining the shielding and operational requirements for astronauts and hardware. To support the probabilistic risk assessment for EVAs, which would be up to 15% of crew time on lunar missions, we estimated the probability of SPE occurrence as a function of time within a solar cycle using a nonhomogeneous Poisson model to fit the historical database of measurements of protons with energy > 30 MeV, (phi)30. The resultant organ doses and dose equivalents, as well as effective whole body doses for acute and cancer risk estimations are analyzed for a conceptual habitat module and a lunar rover during defined space mission periods. This probabilistic approach to radiation risk assessment from SPE and GCR is in support of mission design and operational planning to manage radiation risks for space exploration.

Kim, Myung-Hee↗

A Model-Based Probabilistic Inversion Framework for Wire Fault Detection Using TDR

Time-domain reflectometry (TDR) is one of the standard methods for diagnosing faults in electrical wiring and interconnect systems, with a long-standing history focused mainly on hardware development of both high-fidelity systems for laboratory use and portable hand-held devices for field deployment. While these devices can easily assess distance to hard faults such as sustained opens or shorts, their ability to assess subtle but important degradation such as chafing remains an open question. This paper presents a unified framework for TDR-based chafing fault detection in lossy coaxial cables by combining an S-parameter based forward modeling approach with a probabilistic (Bayesian) inference algorithm. Results are presented for the estimation of nominal and faulty cable parameters from laboratory data.

Schuet, Stefan R.↗

Effect of Clouds on Optical Imaging of the Space Shuttle During the Ascent Phase: A Statistical Analysis Based on a 3D Model

Clouds are highly effective in obscuring optical images of the Space Shuttle taken during its ascent by ground-based and airborne tracking cameras. Because the imagery is used for quick-look and post-flight engineering analysis, the Columbia Accident Investigation Board (CAIB) recommended the return-to-flight effort include an upgrade of the imaging system to enable it to obtain at least three useful views of the Shuttle from lift-off to at least solid rocket booster (SRB) separation (NASA 2003). The lifetimes of individual cloud elements capable of obscuring optical views of the Shuttle are typically 20 minutes or less. Therefore, accurately observing and forecasting cloud obscuration over an extended network of cameras poses an unprecedented challenge for the current state of observational and modeling techniques. In addition, even the best numerical simulations based on real observations will never reach "truth." In order to quantify the risk that clouds would obscure optical imagery of the Shuttle, a 3D model to calculate probabilistic risk was developed. The model was used to estimate the ability of a network of optical imaging cameras to obtain at least N simultaneous views of the Shuttle from lift-off to SRB separation in the presence of an idealized, randomized cloud field.

FROM↗

Sampling Functions from Gaussian Processes and Structured Covariance Gaussian Networks

When learning aerodynamic models from data, it is critical to incorporate estimates of model uncertainty. This motivates the design of probabilistic aerodynamic databases which can be sampled to generate physically and statistically plausible aerodynamic models. In this talk we discuss how to sample deterministic functions from two different kinds of probabilistic models and demonstrate their use. First, Gaussian Process Regressors (GPRs) are a widely used probabilistic kernel-based model which can be thought of as Gaussian distributions over functions. GPRs are generally trained by maximizing the marginal likelihood of seeing the training data over the kernel parameter space. Sample functions are easily generated by drawing points from the Gaussian distribution at desired input points. However, when the points are not known ahead of time, the classical sampling approach is not possible since successive function samples will generate different function realizations. We present an approach for sampling consistent function evaluations from a GPR over multiple samples. Second, we describe a neural network architecture which learns a conditional Gaussian distribution by maximizing the marginal likelihood at each point in the input space. We then discuss and compare several options for generating sample functions which match this distribution. Finally, we demonstrate the use of these probabilistic aerodynamic models in an atmospheric reentry simulation.

Gaussian process regression↗

Improving online risk assessment with equipment prognostics and health monitoring

The current approach to evaluating the risk of nuclear power plant (NPP) operation relies on static probabilities of component failure, which are based on industry experience with the existing fleet of nominally similar light water reactors (LWRs). As the nuclear industry looks to advanced reactor designs that feature non-light water coolants (e.g., liquid metal, high temperature gas, molten salt), this operating history is not available. Many advanced reactor designs use advanced components, such as electromagnetic pumps, that have not been used in the US commercial nuclear fleet. Given the lack of rich operating experience, we cannot accurately estimate the evolving probability of failure for basic components to populate the fault trees and event trees that typically comprise probabilistic risk assessment (PRA) models. Online equipment prognostics and health management (PHM) technologies can bridge this gap to estimate the failure probabilities for components under operation. The enhanced risk monitor (ERM) incorporates equipment condition assessment into the existing PRA and risk monitor framework to provide accurate and timely estimates of operational risk.

active and passive components↗

A Bayesian Approach to Real-Time Dynamic Parameter Estimation Using Phasor Measurement Unit Measurement

Here, we develop a polynomial-chaos-expansion (PCE)-based approach for decentralized dynamic parameter estimation through Bayesian inference. Using this approach, the non-Gaussian distribution of the inverted parameters is obtained. More specifically, we first represent the decentralized generator model with the PCE-based surrogate. This surrogate allows us to efficiently evaluate the time-consuming dynamic solver at parameter values through Metropolis-Hastings (M-H)-based Markov chain Monte Carlo (MCMC). Then, we propose a two-stage hybrid Markov chain Monte Carlo (MCMC) to recover a posteriori distribution of the decentralized generator model parameters. In the first stage, we use the gradient-enhanced Langevin MCMC algorithm to characterize an intermediate posterior parameter distribution. This algorithm is computationally scalable to the high-dimensional parameter space. Based on the intermediate posterior distribution, during the second stage, we use the adaptive MCMC algorithm to fine-tune the strong correlations between the parameters. Finally, the fully recovered a posterior distribution is obtained in the end. The simulation results show that the proposed PCE-based hybrid MCMC algorithm can accurately and efficiently estimate the high-dimensional generator dynamic model parameters with full probabilistic distribution provided.

42 ENGINEERING↗

International Developments on Uncertainties in NPP Decommissioning costs and planned work on Benchmarking at the OECD-NEA - 17074

The ability to decommission NPPs shut down after normal operation has been proven technically. Issues of current concern include the ability to accurately calculate and demonstrate the validity of decommissioning cost estimates, and to control costs during decommissioning. This paper describes recent international developments concerning addressing uncertainties in NPP decommissioning cost estimation, and work currently being planned relating to decommissioning cost benchmarking at the OECD Nuclear Energy Agency. The process of decommissioning cost estimation is evolving, with a general trend towards showing greater levels of detail in the estimate. The International Structure for Decommissioning Costing was published in 2012 and presents a common reporting format for decommissioning costing undertaken on a deterministic basis. However, this does not address probabilistic methods or associated presentation formats for the inclusion of uncertainties in decommissioning estimates. A consistent and comparable treatment of uncertainties in decommissioning cost estimation would further facilitate comparison between different cost estimates and enhance understanding of and confidence in the estimates themselves. There is growing interest in benchmarking decommissioning costs, reflecting a need to better understand the relationships between estimates and actual costs, to give greater confidence that funding will be sufficient, and as a useful tool in project management and enhancing project delivery. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Probabilistic Analysis of Impact of Wake Vortices on Closely-Spaced Parallel Approaches

One of the primary constraints on the capacity of the nation's air transportation system is the landing capacity of its largest airports. Many airports with closely spaced parallel runways suffer a severe runway acceptance rate when the weather conditions do not allow full utilization of these parallel runways. The present requirement for simultaneous independent landings in Instrument Meteorological Conditions, IMC, is at least 4300 feet of lateral runway spacing (as close as 3000 feet for runways with a Precision Runway Monitor). Operations in Visual Meteorological Conditions, VMC, to Closely Spaced Parallel Approaches only require a lateral runway spacing greater than 750 feet. A study by Hardy and Lewis integrated and extended earlier studies and concepts in lateral traffic separation, longitudinal station keeping, wake prediction, wake display, and the concepts of R N P into a preliminary system concept for Closely Spaced Parallel Approaches in IMC. This system allows IMC airport acceptance rates to approach those for VMC. The system concept that was developed, presented traffic and wake information on the NAVigation Display, NAV, and developed operational procedures for a mix of conventional and Runway Independent Aircraft with different approach speeds to Closely Spaced Parallel Runways. This paper first describes some improvements made on the technology needed to better predict and formulate a probabilistic representation for the time-dependent motion and spreading of the hazardous region associated with the lift-generated vortex wakes of preceding aircraft. In this way, the time at which the vortex wakes of leading aircraft intrude into the airspace of adjacent flight-corridor/runway combinations can be more reliably predicted. Such a prediction is needed because it determines restraints to be placed on in-trail separation distances; or, the allowable time intervals between aircraft executing nearly simultaneous landings or takeoffs on very closely-spaced runways. Improved estimates of wake spreading are achieved by inclusion of representations in the equations for wake spreading due to ambient turbulence and due to the long-wave instability of a vortex pair. Wake motion and spreading due to the time-averaged wind and its variations with time, are retained. The more detailed representation of wake spreading presented here permits the development of probabilistically-based uncertainty estimates for wake spreading. Measurements needed within actual aircraft wake vortices to validate and support this analysis are also described. The second part of the paper uses the improvements in the accuracy of the location of wake vortices to extend the preliminary system concept for Closely Spaced Parallel Approaches described earlier with more robust operational procedures. Additionally, improvements in longitudinal station keeping, wake display, and risk assessment methodologies are incorporated and described.

Hardy, Gordon H.↗