Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PILOT”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

THE MILLIMETER ASTRONOMY LEGACY TEAM 90 GHz (MALT90) PILOT SURVEY

We describe a pilot survey conducted with the Mopra 22 m radio telescope in preparation for the Millimeter Astronomy Legacy Team Survey at 90 GHz (MALT90). We identified 182 candidate dense molecular clumps using six different selection criteria and mapped each source simultaneously in 16 different lines near 90 GHz. We present a summary of the data and describe how the results of the pilot survey shaped the design of the larger MALT90 survey. We motivate our selection of target sources for the main survey based on the pilot detection rates and demonstrate the value of mapping in multiple lines simultaneously at high spectral resolution.

79 ASTRONOMY AND ASTROPHYSICS↗

First Ever Polymer Flood Field Pilot to Enhance the Recovery of Heavy Oils on Alaska’s North Slope – Polymer Injection Performance

Alaska North Slope (ANS) holds an estimated 20-30+ billion barrel heavy oil resources, yet the development pace has been very slow due to high development costs and low oil recovery using conventional waterflood and EOR methods. The objective of this pilot is to perform a field experiment to validate the use of an advanced polymer flooding technology to unlock the vast heavy oil resources on ANS. The advanced polymer flooding technology combines polymer flooding, low salinity water flooding, horizontal wells, and if necessary, injection conformance control treatments into one integrated process to significantly improve oil recovery from heavy oil reservoirs. Two pairs of horizontal injection and production wells have been deployed in an isolated fault block of the Schrader Bluff heavy oil reservoir at the Milne Point Field to conduct a polymer flood pilot. The pilot will acquire scientific knowledge and field performance data to optimize polymer flood design in the Schrader Bluff heavy oil reservoirs on ANS. Polymer injection started on August 28, 2018 using a custom made polymer blending and pumping unit. This paper focuses on the facility setup and polymer injection performance into the horizontal injectors drilled and completed in the Schrader Bluff heavy oil reservoir. Partially hydrolyzed polyacrylamide (HPAM) polymer was selected and the initial target viscosity was set at 45 centipoise. Polymer injection rate was set at 2200 bbl/day for one injector (J-23A) and 1200 bbl/day for the other (J-24A) based on production voidage. Injection pressure was controlled at below fracture pressure to prevent fracturing the reservoir and causing fast breakthroughs. Step rate and pressure falloff tests indicate that short term polymer injectivity is similar to water injectivity, which means that injectivity is mostly controlled by fluid mobility deep in the reservoir rather than that in the vicinity of the injection wellbore. Long term injection data indicate that polymer injectivity has been decreasing in both injectors as the reservoir is filled by polymer. No polymer has been observed in the production stream 7 months after the start of polymer injection compared with a 3-month breakthrough time with waterflood. This indicates that polymer significantly delays breakthrough time which will lead to increased sweep efficiency.

Ning, Samson↗

Design of an ATR Loop 2A Test Train: Phase 2 of the EPRI/INL Pilot Project for Irradiation of Alloys X-750 and XM-19

The Advanced Test Reactor National Scientific User Facility (ATR NSUF) and Electric Power Research Institute (EPRI) formed an agreement to test representative alloys used as reactor structural materials as a pilot program toward establishing guidelines for future ATR NSUF research programs. The pilot project is a three phase project consisting of baseline material characterization (Phase I), experiment design and irradiation thermal and neutronics analyses (Phase II), and post irradiation examination (Phase III). The intent of this Phase II portion of the pilot project is to estimate thermal and neutronic characteristics of the planned experiments and to provide design details of the experiment assemblies themselves. The materials chosen for this research are the nickel based super alloy X-750, and nitrogen strengthened austenitic stainless steel XM-19.

Source record↗

Progress Report on the ISCR Pilot Test Conducted at the Former CCC/USDA Grain Storage Facility in Montgomery City, Missouri, as of April 2013

The Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) is conducting an environmental investigation at the former CCC/USDA grain storage facility on the county fairgrounds in Montgomery City, Missouri, to evaluate contamination associated with the former use of grain fumigants containing carbon tetrachloride at the site. The CCC/USDA studies have identified carbon tetrachloride in the soils (primarily unconsolidated glacial tills) at concentrations that exceed the U.S. Environmental Protection Agency (EPA) regional screening level (RSL) values for this compound in residential soils (610 μg/kg) but are below the corresponding RSL for industrial soils (3,000 μg/kg). Concentrations of carbon tetrachloride greater than the EPA maximum contaminant level (MCL; 5.0 μg/L) for this contaminant in drinking water were also identified in the shallow groundwater (Argonne 2012). On the basis of these findings, remedial actions are considered necessary to mitigate the present and potential future impacts of the contamination. In cooperation with the Missouri Department of Natural Resources (MDNR), the CCC/USDA has initiated a field-scale pilot test to evaluate an in situ technology for treatment of the carbon tetrachloride contamination. In this approach, a chemical amendment consisting primarily of slow-release organic matter and zero-valent iron is employed to induce oxygen-depleted, chemically reducing conditions in the subsurface. These conditions foster the in situ chemical reduction (ISCR) of carbon tetrachloride and its degradation products (chloroform, methylene chloride, and chloromethane) via both inorganic and biologically mediated processes. The chemical amendment being used, EHC™, was developed by the Adventus Group, Freeport, Illinois, and is now manufactured and distributed by FMC Environmental Solutions, Philadelphia, Pennsylvania. With the approval of the MDNR (2012), the ISCR technology is being tested in two target areas interpreted to represent contaminant source areas. The pilot test is being implemented on behalf of the CCC/USDA by Argonne National Laboratory. Approximately 80,000 lb of the EHC material was injected by using direct-push techniques at 99 locations in the target areas, from November 9 to December 15, 2012 (Argonne 2012). To determine the geochemical effects of the pilot injections and their impact on the levels of contamination in the test areas, an extended monitoring program (Argonne 2012) is being implemented. The program includes an initial “baseline” sampling event to document pre-treatment conditions and periodic post-injection monitoring events, approximately 1, 2, 4, 6, 9, and 12 months after the completion of the injection program (Argonne 2012). This report provides a brief summary of the specific activities conducted, with a compilation of the monitoring data obtained, during the baseline sampling event (October 2012) and the first, second, and third post-injection monitoring events (in January, February, and April 2013).

54 ENVIRONMENTAL SCIENCES↗

Select Generic Dry-Storage Pilot Plant Design for Safeguards and Security by Design (SSBD) per Used Fuel Campaign

As preparation to the year-end deliverable (Provide SSBD Best Practices for Generic Dry-Storage Pilot Scale Plant) for the Work Package (FT-15LA040501–Safeguards and Security by Design for Extended Dry Storage), the initial step was to select a generic dry-storage pilot plant design for SSBD. To be consistent with other DOE-NE Fuel Cycle Research and Development (FCR&D) activities, the Used Fuel Campaign was engaged for the selection of a design for this deliverable. For the work Package FT-15LA040501–“Safeguards and Security by Design for Extended Dry Storage”, SSBD will be initiated for the Generic Dry-Storage Pilot Scale Plant described by the layout of Reference 2. SSBD will consider aspects of the design that are impacted by domestic material control and accounting (MC&A), domestic security, and international safeguards.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

National Alliance for Advance Biofuels and Bio-Products Final Technical Report Addendum Hydrothermal Processing Pilot System

The main objective of the NAABB was to combine science, technology, and engineering expertise from across the nation to break down critical technical barriers to commercialization of algae-based biofuels. As a part of the consortium, Genifuel’s NAABB goals was to fabricate and demonstrate a pilot-scale system to convert algae into fuels. The purpose of this pilot system was to show that processes developed in the laboratory at bench-scale during the program could be successfully scaled up to a pre-commercial level, and thereby provide visibility into the ultimate viability and cost of algae biofuels. The pilot system has now been completed and tested, and this report documents what has been achieved.

09 BIOMASS FUELS↗

ION Advanced Solvent CO 2 Capture Pilot Project

This final report to DOE/NETL presents all the work and tests performed during ION Engineering’s (ION) carbon dioxide (CO 2 ) capture pilot test campaign: “ION Advanced Solvent CO 2 Capture Project”. This project is comprised of three budget periods (BP): BP1 – Design of a 0.6 MWe system, BP2 – 0.5 MWe National Carbon Capture Center (NCCC) Testing Campaign, and BP3 – 12 MWe Technology Center at Mongstad (TCM) Testing Campaign. The program began in October 2013 and continued until December 2017. The campaign at NCCC, which took place from June to August of 2015, resulted in 1,116 operational hours where ~350 tonnes of CO 2 were captured from the 0.5 MWe coal-fired flue gas slipstream. The follow-up campaign at TCM took place from Oct 2016 to April 2017, where 2,775 hours of operation resulted in the capture of 14,820 tonnes of CO 2 , which is a cumulative of capturing CO 2 from the natural gas-fired Combined Heat and Power (CHP) plant, and a residue fluid catalytic cracker gas (RFCC) from Statoil at Mongstad. ION has conducted a thoughtful, comprehensive, and successful program in close collaboration with all its partners. CO 2 was successfully removed and captured for extended periods of time using three gas sources (NCCC Coal-fired Power plant, TCM CHP flue gas with and without CO 2 recycle, and TCM RFCC flue gas with air dilution) at various slipstream flows ranging from 0.5 MWe to 12 MWe. The data gathered on its solvent continues to strengthen the development of ION’s advanced solvent and positive track record in executing on-site test campaigns in highly industrialized settings. These existing pilot plants do not include the necessary process modifications that ION requires to obtain the lowest possible regeneration energy; processes such as a cold-rich bypass and intercooling, would allow for lowering the demonstrated specific reboiler duty. The resulting data was also used to validate the process model, and, in the absence of testing on a custom test rig specifically designed for ION’s advanced solvent, the results of the process model have shown specific reboiler duties under 2.5 MJ/kg CO 2 (1075 BTU/lb CO 2 ). When these regeneration energies are factored into the Techno-Economic Analysis (TEA), where ION’s technology is compared to the DOE/NETL BBS Case 12, which integrates a highly optimized and commercially available CO 2 capture technology, ION’s technology shows: 38% incremental reduction in capital cost of CO 2 capture; 28% incremental reduction in annual operating and maintenance costs of CO 2 capture; and $35-44 per tonne of CO 2 capture, which is a 20% to 40% reduction in cost of CO 2 capture. Throughout pilot testing, ION has confirmed its understanding of process improvements and analytics that will enable successful operation of its advanced solvent at significantly lower L/G circulation rates, packing heights and regeneration energies than MEA. ION has identified routes to further develop its technology and is looking forward to testing a fully optimized solvent and capture system in the near future.

01 COAL, LIGNITE, AND PEAT↗

Pilot Scale Operation and Testing of Syngas Chemical Looping For Hydrogen Production

The Syngas Chemical looping (SCL) process provides efficient and economic means to utilize the abundant fossil reserve of coal. The main problem associated with coal utilization is the CO 2 emissions resulting from its combustion. Even though CO 2 regulation or carbon tax is currently not in place, its enforcement is expected in the near future. Such a greenhouse gas emission control, if adopted in current power plant systems, will drive the efficiency down and increase the cost of electricity, due to the energy and capital-intensive nature of current CO 2 separation techniques. This highlights the need to develop technologies that present a solution to the rising cost of electricity in the future. The integrated gasification combined cycle (IGCC) presents an improvement to the above predicament, but it is capital intensive due to the extensive unit operations involved. The efficiency for a CO 2 capture incorporated IGCC system is around ~32%, resulting in approximately 45% increase in cost of electricity. This is definitely a better path to traverse than the conventional pulverized coal (PC) power plants as it has improved economics and efficiencies accompanied by product flexibility. The SCL process advances the benefits even further when integrated with the IGCC process. The SCL process removes the expensive WGS system and CO 2 separation columns, thereby saving on capital and operational expenses. This integration results in a 12 – 21% increase in efficiency accompanied by a reduction in cost of electricity by 15 – 28%, over conventional IGCC systems. Therefore, SCL process provides the best route to harness the energy from coal. The overall project objective was to construct and operate a syngas chemical looping pilot scale test unit at the NCCC. The project scope of work was divided into 3 phases. In Phase I, cold flow model studies using a 1:1 scale acrylic test unit constructed at Particulate Solids Research, Inc. (PSRI) was successfully completed confirming robust solid flow control is achievable in the non-mechanical system design. In Phase II, the high pressure, high temperature, chemical looping reactor was successfully designed with all necessary equipment and safety instrumentation/controls specified to allow for fabrication, site construction, and assembly to commence in Phase III. In Phase III, the SCL pilot plant was successfully assembled and all necessary functional checks and pre-startup safety reviews completed. During unit commission over the course of 200 hours of testing, operational issues were observed with premix burner used for system startup. With the grants awarded by the National Energy Laboratory (NETL) and the Ohio Development Services Agency (ODSA) under awards DE-FE0023915 and D-14-18, the SCL pilot unit underwent three auxiliary equipment modifications to resolve all of the startup operational issues encountered. The unit was successfully demonstrated with 300+hr continuous operation. Key results obtained include high syngas conversion of 97.95% with 16.03% oxygen carrier conversion in the moving bed reducer and >99% purity H 2 produced from the moving bed oxidizer.

01 COAL, LIGNITE, AND PEAT↗

SolarAPP+ Pilot Analysis: Performance and Impact of Instant, Online Solar Permitting

The National Renewable Energy Laboratory (NREL) led a collaborative effort to develop the Solar Automated Permit Processing Plus (SolarAPP+), a no-cost solar permitting software solution to address residential solar photovoltaic (PV) permitting resource constraints and streamline solar adoption processes among authorities having jurisdiction (AHJs). The SolarAPP+ is an online portal that automates permit plan review, enabling an instant permit approval process for code-compliant residential PV systems. Based on national model building, electrical, and fire codes, the SolarAPP+ automatically performs a compliance check of permit inputs against code requirements and produces an inspection checklist that can be used to verify installation practices, workmanship, and adherence to the approved design. NREL conducted a two-phase pilot with five participating AHJs and 16 solar contractors, spanning from November 2020 through December 2021, evaluating the ability of SolarAPP+ to deliver instant permits and its impact on four critical areas within each AHJ: permit review timelines; solar adoption timelines; AHJ time saved; and inspection results. The pilot confirmed that SolarAPP+ reduced permit review times to less than one day, reduced solar adoption timelines by an average of 12 days, saved an estimated 2,067 staff hours, and had comparable inspection results to those found in traditional permitting. The pilot further identified key lessons for improving SolarAPP+, including ways to streamline SolarAPP+ adoption, development of training resources, and expansion of supported products.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Small field campaign: aerosol – ice formation closure pilot study. Final Report

Prediction of atmospheric ice formation from aerosol particles by heterogeneous nucleation represents one of the grand challenges in atmospheric science. Our insufficient predictive understanding of primary ice formation is the reason that climate models typically do not include heterogeneous ice nucleation with subsequent effects on climate uncertainty. Mixed-phase clouds, where supercooled water droplets and ice crystals coexist play globally an important role regulating climate. This is especially the case for the Arctic region that experiences the greatest warming due to climate change compared to other regions in the world. Immersion freezing initiated by ice-nucleating particles (INPs) in supercooled water droplets is recognized as the dominant primary ice formation pathway in mixed-phase cloud regimes. For this reason, it is crucial to evaluate our capability to predict immersion freezing for a given ambient aerosol population. The goal of this project is conducting a field-based pilot study at the U.S. DOE Atmospheric Radiation Measurement (ARM) user facility at Southern Great Plains (SGP) to evaluate our capability to predict the number concentration of aerosol particles that serve as INPs in the immersion freezing mode. Successful prediction of INP number concentrations is also termed “closure”. This field-observational approach represents a first-of-its kind attempt of an aerosol–ice formation closure study (AEROICESTUDY). Very few closure studies related to INPs have been conducted, and to our knowledge, none using robust size-resolved ambient aerosol composition measurements as a starting point. Achievement of aerosol–ice formation closure relies on our ability to characterize the ambient aerosol population with respect to particles size and composition and to determine INP number concentrations for specified freezing temperatures. This requires numerous online and offline instrumentation resulting in this pilot field campaign being a multi-institutional and community-collaborative effort. We chose the ARM SGP megasite for this first aerosol-ice formation closure pilot study due to its significant measurement capabilities available to obtain detailed physical characterization of the local aerosol population including size distribution, mass loading, and chemical composition of non-refractory aerosol particles. The overall objective of this project is to identify ice nucleation parameterizations that produce the most robust predictions of INP numbers and thus are best suited to be included in cloud and climate models. This objective includes the following goals for this field and laboratory-based project: i) What are the crucial aerosol physicochemical property measurements needed to accurately guide ice nucleation representations in models and long-term INP measurements? ii) What level of parameter details needs to be known to achieve aerosol–ice formation closure? iii) What are the leading causes for climate model bias in INP predictions? We found that the advances in our understanding of immersion freezing garnered over the last 20 years allowed us to yield partial and full closures of atmospheric immersion freezing from ambient aerosol particles. When the aerosol population is physicochemically complex and parameterizations for representative INP types are not yet available, we still struggle to accurately predict INP number concentrations. This project clearly demonstrates that with more laboratory and field measurements that are accompanied by particle composition analysis, the necessary datasets to achieve aerosol–ice formation closure for various locations will emerge, thus providing a robust foundation for guiding the representation of INPs in cloud and climate models.

54 ENVIRONMENTAL SCIENCES↗

Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned

Historically, regulatory barriers have precluded nuclear plant safety-related (SR) Instrumentation and Control (I&C) system modernizations. These barriers have been largely addressed by industry and United States Nuclear Regulatory Commission (NRC) efforts, including development of the License Amendment Request (LAR) Alternate Review (AR) process for digital I&C upgrades. The U.S. Department of Energy (DOE) and the Idaho National Laboratory (INL) are supporting a SR I&C pilot upgrade at the Limerick Generating Station (LGS) to demonstrate this process and capturing associated lessons learned for the benefit of industry. In 2021, a paper summarizing lessons learned as captured in INL/EXT-20-59809, Safety Related Instrumentation & Control Pilot Upgrade Initial Scoping Phase Implementation Report and Lessons Learned was presented at the 12th NPIC & HMIT conference. It is recommended that readers of this paper review reference 1 or the associated Nuclear Journal paper for context. This paper summarizes activities performed and lessons learned for the conceptual design phase and portions of the detailed design phase as captured in INL/RPT-23-XXXX, “Safety-Related Instrumentation and Control Pilot Upgrade: Conceptual - Detailed Design Phase Report and Lessons Learned.” The portions of the effort covered by reference 2 include conceptual design phase activities from December 2020, through completion in November 2021, and detailed design activities through September 2022. These efforts and associated detailed documentation in reference 3 are intended to support similar industry upgrades as a foundation stone for a Digital Transformation that will improve plant safety, reliability, and operational performance while lowering plant total cost of ownership.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Report for Water Electrodialysis Reversal Pilot

This final report presents all the work and tests performed during ION Clean Energy’s Water Electrodialysis Reversal Pilot referred to as the “WERP” Project (DE-FE-0032066). ION Clean Energy Engineering (ION) and Nebraska Public Power District (NPPD) executed the Electrodialysis Reversal (EDR) Pilot Study and developed a commercial cost estimate needed to evaluate the retrofit of an EDR system to NPPD’s Gerald Gentleman Station (GGS). The proven project team was comprised of NPPD, Sargent & Lundy (S&L) and ElectroSep, who is a leading developer, fabricator and operator of electrodialysis units. ION, working in conjunction with NPPD and ElectoSep, developed a test program for evaluating the performance of the EDR technology proposed to be employed and evaluated for this pilot. The Department of Energy’s National Energy and Technology Laboratory (DOE/NETL) awarded ION Clean Energy, Inc. a single budget period (BP) of $816,759 with $207,942 of in-kind contribution from NPPD to investigate ElectroSep’s Electrodialysis technology to clean grey water from NPPD’s GGS.

01 COAL, LIGNITE, AND PEAT↗

Sand Thermal Energy Storage Pilot Design (Final Report)

This report summarizes work done on developing a 10-MWhe pilot of the sand-based thermal energy storage (SandTES) technology at Alabama Power’s Plant Gaston Unit 5, an operating, supercritical coal power unit. The system will be integrated to the unit, obtaining steam to heat the sand through an air-blown fluidized-bed heat exchanger, then storing the water to be reused during discharging to produce steam that will then be vented. An electrical particle heater will also be included to provide part of the heat to the sand to provide data and learnings for commercial systems that will be fully electrically heated. Hot sand is contained in one bunker, while cold sand is housed in the other bunker, and standard solids handling equipment moves the sand around. This pilot would advance the SandTES technology to Technology Readiness Level 6 and position it for commercial readiness by 2030. This work was done in two phases: Phase I performed a conceptual study that provided Association for the Advancement of Cost Engineering (AACE) Class 5 costs and estimated performance, and then Phase II, which also involved a design update, performed a more detailed pre-front-end engineering and design study that elicited AACE Class 4 costs. Work was also done to provide estimated costs for commercial applications of the technology, assess its gaps, create its technology maturation and commercialization plans, and finally perform an Environmental Information Volume for the pilot site as a first step in the National Environmental Policy Act process.

20 FOSSIL-FUELED POWER PLANTS↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C1 Feed (LAWC22) Glass in Support of the LAW Pilot Melter (Final Report)

The Vitreous State Laboratory at The Catholic University of America (VSL) is developing and testing glass formulations for RPP-WTP waste envelopes to provide data to meet the RPP-WTP contract requirements and to support system design activities. That work is based upon small-scale batch melts (“crucible melts”) using waste envelope simulants. Selected formulations have also been tested in small-scale continuously-fed joule-heated melters (DM10 and DM100 systems) and, ultimately, in the LAW Pilot Melter. Such melter tests provide information on key process factors such as feed processing behavior, dynamic effects during processing, sulfate incorporation, processing rates, off-gas amounts and compositions, foaming control, etc., that cannot be reliably obtained from crucible melts. This sequential scale-up approach in the vitrification testing program ensures that maximum benefit is obtained from the more costly pilot-scale tests and that the most effective use is made of that resource. The principal objective of the work described in this report was to collect the necessary small-scale melter test data with a LAW Sub-Envelope C1 waste simulant in order to support the next series of tests with the same melter feed on the LAW Pilot Melter. This work was conducted under a corresponding Test Specification and Test Plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compositional Variation Tests on DuraMelter 100 with LAW Sub-Envelope C2 Feed in Support of the LAW Pilot Melter (Final Report)

One of the principal objectives of the DM100 melter tests was to demonstrate that the LAW Sub-Envelope C2 feeds with ± 15% variations in the amounts of waste simulant are suitable for large-scale tests on the LAW Pilot melter. The other principle objective for the DM100 tests was to determine the relative effects of sugar versus waste organics on glass redox state, NOx emissions, sulfur emissions, sulfur retention in the glass, secondary sulfate layer formation, and glass-melt foaming. Additional objectives included measurement of the feed rheological properties and collection of melter emissions data. Screening tests are conducted at the DM100 scale in order to identify and correct potential problems before testing at the larger scale LAW Pilot melter. Testing goals were met in that the results of the DM100 melter test resulted in selection of LAW Sub-Envelope C2 feed suitable for Pilot Melter testing.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Wholesale Electricity Analysis via Simulation & Learning Experiments (WEASLE): Platform Development and Pilot Competition

This document reports the development of the Wholesale Electricity Analysis via Simulation and Learning Experiments (WEASLE) platform and the pilot competition that was conducted to test the platform. Due to the increasing reliance on variable renewable energy resources for bulk power, the pilot competition, called the Energy Storage Participation Algorithm Competition (ESPA-Comp), was used to test the effect of various market designs on storage utilization and market efficiency. Basic details of the platform are provided, including an overview of the market clearing engine, the battery dispatch and degradation models, electric grid topology and resource mix, and software architecture. Two market designs were tested: a two-settlement market analogous to typical ISO design today, and a multi-settlement market that allows additional forward-trading periods during the real-time market. Results from the pilot competition show that the storage bidding problem is nontrivial and is well suited for future challenges. We find that: 1) all four teams utilized different approaches to the bidding problem, 2) different methodological approaches led to substantially different offer behaviors, 3) resource profits are clustered by team and methodological approach, 4) simulated offers reduced market surplus by about 0.5%, 5) substantially different prices between two-settlement and multi-settlement markets albeit minimal difference in overall market surplus.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Lighting for Health and Wellness Recommendations in Offices: A Circadian Lighting Pilot Project in Chicago, IL

In 2019 Cook County initiated a request for proposals for a pilot project aimed at designing and specifying an advanced tunable lighting system for government offices in Chicago, Illinois. The primary goal of the project was to replace the existing tubular LED (TLED) lighting system with a lighting system that supported the circadian rhythms and wellbeing their office employees. A secondary goal was to evaluate the potential impacts of the new lighting system, informing Cook County’s internal workplace design standards. Schuler Shook, a Chicago-based lighting design firm, was awarded the Circadian Lighting Pilot Project in October 2019 and invited Pacific Northwest National Laboratory (PNNL) to contribute as a research partner. Based on the initial project goals, Schuler Shook and PNNL established design objectives that would enable a human factors study in the office spaces, investigating the benefits and drawbacks of using a tunable LED lighting system to meet existing recommendations for lighting and health. The following report details the lighting design process through design development, with summaries of the relevant circadian lighting metrics, simulation tools, energy considerations, and research plan for the Circadian Lighting Pilot Project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Greenbelt Homes Pilot Program: Summary of Building Envelope Retrofits, Planned HVAC Equipment Upgrades, and Energy Savings

In fall 2010, Greenbelt Homes, Inc. (GHI) a 1,566-home cooperative of circa 1930-1940 homes in Greenbelt, Maryland, undertook a multiyear pilot energy efficiency retrofit project. GHI established this pilot project as a basis for decision making for the rollout of a decade-long community-wide upgrade program that will incorporate energy-efficiency improvements to the building envelopes and mechanical equipment. The community upgrade is fully funded by the cooperative through its membership with no outside subsidies. This project thus presents a unique opportunity to evaluate and prioritize the wide range of benefits of high-performance retrofits based on member experience with and acceptance of the retrofit measures implemented during the pilot project. Addressing the complex interactions between benefits, tradeoffs, construction methods, project management implications, realistic upfront costs, financing, and other considerations provides a case study for energy retrofit projects to include high-performance technologies based on the long-term value to the homeowner.

Array↗