Underground Test Area Activity Waste Management Plan; and Attachment 1 Fluid Management Plan for the Underground Test Area Activity

The U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office initiated the Underground Test Area Activity to characterize the risk posed to human health and the environment as a result of underground nuclear testing activities at the Nevada National Security Site. The UGTA Activity is now administered by the DOE Environmental Management Nevada Program. This document is a revision to NNSA/NSO (2009). The new document and revision number reflect EM Nevada Program as the current UGTA Activity administrator.

54 ENVIRONMENTAL SCIENCES↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of InSpector{sup TM} 1 1000 Instrument with LaBr{sub 3} for Nuclear Criticality Safety (NCS) Applications at the Westinghouse Hematite Decommissioning Project (HDP) - 13132

The Westinghouse Hematite Decommissioning Project (HDP) is a former nuclear fuel cycle facility that is currently undergoing decommissioning. One aspect of the decommissioning scope is remediation of buried nuclear waste in unlined burial pits. The current Nuclear Criticality Safety program relies on application of criticality controls based on radiological setpoints from a 2 x 2 Sodium Iodide (NaI) detector. Because of the nature of the material buried (Low Enriched Uranium (LEU), depleted uranium, thorium, and radium) and the stringent threshold for application of criticality controls based on waste management (0.1 g {sup 235}U/L), a better method for {sup 235}U identification and quantification has been developed. This paper outlines the early stages of a quick, in-field nuclear material assay and {sup 235}U mass estimation process currently being deployed at HDP. Nuclear material initially classified such that NCS controls are necessary can be demonstrated not to require such controls and dispositioned as desired by project operations. Using Monte Carlo techniques and a high resolution Lanthanum Bromide (LaBr) detector with portable Multi-Channel Analyzer (MCA), a bounding {sup 235}U mass is assigned to basic geometries of nuclear material as it is excavated. The deployment of these methods and techniques has saved large amounts of time and money in the nuclear material remediation process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Producing Desired Properties From a Broader Spectrum of Compositions - 18167

The U.S. Department of Energy, Office of River Protection has an extensive research program to develop low-activity waste and high-level waste glass compositions for the balance of mission of the Waste Treatment and Immobilization Plant (WTP). The fundamental data stemming from this program will support development of advanced glass formulations, key process control models, and processing strategies to ensure safe and successful operations for both the Low-Activity Waste and High-Level Waste facilities with an appreciation toward reducing overall mission life. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1B, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Safety Design Strategy for the Remote Handled Low-Level Waste Disposal Project

In accordance with the requirements of U.S. Department of Energy (DOE) Order 413.3A, “Program and Project Management for the Acquisition of Capital Assets,” safety must be integrated into the design process for new or major modifications to DOE Hazard Category 1, 2, and 3 nuclear facilities. The intended purpose of this requirement involves the handling of hazardous materials, both radiological and chemical, in a way that provides adequate protection to the public, workers, and the environment. Requirements provided in DOE Order 413.3A and DOE Order 420.1C, “Facility Safety,” and the expectations of DOE-STD-1189-2008, “Integration of Safety into the Design Process,” provide for identification of hazards early in the project and use of an integrated team approach to design safety into the facility. This safety design strategy provides the basic safety-in-design principles and concepts that will be used for the Remote-Handled Low-Level Waste Disposal Project.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nevada National Security Site Radiological Control Manual (Rev. 2)

This manual contains the radiological control requirements to be used for all radiological activities conducted by programs under the purview of the U.S. Department of Energy (DOE) and the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office (NNSA/NSO). Compliance with these requirements will ensure compliance with Title 10 Code of Federal Regulations (CFR) Part 835, “Occupational Radiation Protection.” Programs covered by this manual are located at the Nevada National Security Site (NNSS); Nellis Air Force Base and North Las Vegas, Nevada; Santa Barbara and Livermore, California; and Andrews Air Force Base, Maryland. In addition, fieldwork by NNSA/NSO at other locations is covered by this manual.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DESTRUCTIVE EXAMINATION OF SHIPPING PACKAGE 9975-02028

Destructive and non-destructive examinations have been performed on specified components of shipping package 9975-02028. For those attributes that were also measured during the field surveillance, no significant changes were observed. Four conditions were identified that do not meet inspection criteria. These conditions are subject to additional investigation and disposition by the Surveillance Program Authority. The conditions include: (1) The lead shield was covered with a white corrosion layer; (2) The lead shield height exceeds drawing requirements; (3) Mold was observed on the lower fiberboard subassembly; and (4) Fiberboard thermal conductivity in the axial direction exceeded the specified range. The Surveillance Program Authority was notified of these conditions and will document the disposition by surveillance report. All other observations and test results met identified criteria, or were collected for information and trending purposes. The Savannah River Site (SRS) stores packages containing plutonium (Pu) materials in the K-Area Complex (KAC). The Pu materials are packaged per the DOE 3013 Standard and stored within Model 9975 shipping packages in KAC. The KAC facility DSA (Document Safety Analysis) credits the Model 9975 package to perform several safety functions, including criticality prevention, impact resistance, containment, and fire resistance to ensure the plutonium materials remain in a safe configuration during normal and accident conditions. The Model 9975 package is expected to perform its safety function for at least 12 years from initial packaging. The DSA recognizes the degradation potential for the materials of package construction over time in the KAC storage environment and requires an assessment of materials performance to validate the assumptions of the analysis and ultimately predict service life. As part of the comprehensive Model 9975 package surveillance program, destructive examination of package 9975-02028 was performed following field surveillance in accordance with Reference. Field surveillance of the Model 9975 package in KAC included nondestructive examination of the drum, fiberboard, lead shield and containment vessels. Results of the field surveillance are provided in Attachment 1.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced dismantling techniques applied in an industrial project for the dismantling of highly activated equipment - 15446

Commissioned in 1958 on the CEA nuclear site of Marcoule (France) and shut down in 1997, the former UP1 plant was dedicated to reprocess the spent fuel from G1, G2 and G3 GCR reactors. Since 1998, a wide program for cleaning-up and dismantling the plant has been developed in order to dismantle the process equipment, eliminate any radiological risk in all buildings concerned and remove all the resulting waste. Major technical challenges are related to the wide range of complex components and equipment in the facilities such as chemical dissolvers, extractor batteries, evaporators, tanks; and to a high risk of exposure, due to the presence of fission products. To address these challenges, CEA led R and D programs to develop advanced tools for complex dismantling projects: immersive virtual reality, laser cutting techniques, special remote-controlled arms combining dexterity and high resistance to irradiation The purpose of this paper is to provide an overview of a practical implementation and to show first results of these advanced techniques on a real case: the dismantling of dissolver's equipment from the dissolution workshop of UP1 plant. ONET Technologies has been chosen by CEA to design, build and operate the overall dismantling and waste treatment system for this project. ONET Technologies designed two main subsystems to meet all the requirements for this project: first, the 'Remotely-Operated Handling and Cutting Unit' and second the 'Waste Extraction and Conditioning Unit' and the combining innovative technologies. During the design phase, the 'Immersive Virtual Reality' has been used to qualify the kinematics in the final environment and the preliminary dismantling scenario. Following a first R and D program of CEA regarding the laser cutting technique applied to nuclear decommissioning, ONET Technologies and CEA realized elementary inactive tests based on a 6 kW Nd-Yag laser source to qualify the cutting performance according to material and thickness. Main objective was to meet the safety criteria and to check the physical characteristics of waste resulting from the laser cutting operation. The Remotely-Operated Handling and Cutting Unit was equipped with a MAESTRO manipulator, resulting from ten years of research and development cooperation between CEA and Cybernetix. This manipulator, a 6 axis hydraulic manipulator-arm specifically designed to work in harsh environment, entered in its industrial phase. ONET Technologies was responsible for the overall system integration, confinement and performance. A comprehensive qualification program in real conditions has been driven during 2014. The dismantling scenario was tested with a mockup at a full scale of dissolver equipment and confirmed at this stage the expected level of performance and safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cost Estimation Inputs for Spent Nuclear Fuel Geologic Disposal Concepts

A set of 16 geologic disposal concepts is described in sufficient detail for rough-order-of-magnitude repository cost estimates, for disposal of spent nuclear reactor fuel in generic crystalline, argillaceous, and salt host geologic media. The description includes total length, diameter, and volume for all underground shafts, ramps, drifts and large-diameter borings. Basic types of ground support are specified. Total repository capacity is assumed to be approximately 140,000 MT of spent fuel, but concepts are described in terms of modular panels each containing 10,000 MT. Waste packaging is described, and the materials and outer dimensions for disposal overpacks are given. The manner of emplacement is specified, with any additional fixturing, lining, buffer materials, and backfill needed. Thermal limits for waste package emplacement or repository closure are given, as appropriate for enclosed and open emplacement modes, respectively. The 16 disposal concepts are based on disposal concept studies performed for the Used Fuel Disposition R&D program between 2011 and 2014, and the accompanying engineering analyses.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Progress and Technology Assessment of Melt-Cast Ceramic Waste Forms

The Savannah River National Laboratory (SRNL) conducted research from FY2011 – FY2020 to develop ceramic waste forms to treat High-Level Waste (HLW) resulting from reprocessing of commercial Used Nuclear Fuel (UNF) as part of the Department of Energy (DOE) office of Nuclear Energy (NE) Fuel Cycle Technologies (FCT) research program. The objective of the research was to develop a reference ceramic waste form and process technology needed to immobilize the combined HLW raffinate stream, including undissolved solids and soluble technetium, and potentially the TRU waste stream resulting from reprocessing processes. This report compiles the relevant literature produced under, and pertinent to, the program objectives and provides a perspective on the technology development as well as prospects for future.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2018

The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2018. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2018 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) Calendar Year (2016)

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2016. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2016. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2016 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report Calendar Year 2013

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2013. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2013. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2013 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2014

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2014. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2014. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2014 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

West Valley Demonstration Project Annual Site Environmental Report (ASER) for Calendar Year 2015

West Valley Demonstration Project (WVDP) Annual Site Environmental Report (ASER) for Calendar Year 2015. The report, prepared for the U.S. Department of Energy West Valley Demonstration Project office (DOE-WVDP), summarizes the environmental protection program at the WVDP for calendar year (CY) 2015. Monitoring and surveillance of the facilities used by the DOE are conducted to verify protection of public health and safety and the environment. The report is a key component of DOE’s effort to keep the public informed of environmental conditions at the WVDP. The quality assurance protocols applied to the environmental monitoring program ensure the validity and accuracy of the monitoring data. In addition to demonstrating compliance with environmental laws, regulations, and directives, evaluation of data collected in 2015 continued to indicate that WVDP activities pose no threat to public health or safety, or to the environment.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Isolation Pilot Plant Annual Site Environmental Report for 2007

The purpose of the Waste Isolation Pilot Plant Annual Site Environmental Report for 2007 (ASER) is to provide information required by U.S. Department of Energy (DOE) Order 231.1A, Environment, Safety, and Health Reporting. Specifically, the ASER presents summary environmental data that (1) characterize site environmental management performance; (2) summarize environmental occurrences and responses reported during the calendar year; (3) confirm compliance with environmental standards and requirements; (4) highlight significant facility programs and efforts; and (5) describe how compliance and environmental improvement is accomplished through the WIPP Environmental Management System (EMS). The DOE Carlsbad Field Office (CBFO) and the management and operating contractor (MOC), Washington TRU Solutions LLC (WTS), maintain and preserve the environmental resources at the Waste Isolation Pilot Plant (WIPP). DOE Order 231.1A; DOE Order 450.1, Environmental Protection Program; and DOE Order 5400.5, Radiation Protection of the Public and the Environment, require that the affected environment at and near DOE facilities be monitored to ensure the safety and health of the public and preservation of the environment. This report was prepared in accordance with DOE Order 231.1A, which requires that DOE facilities submit an ASER to the DOE Headquarters Chief Health, Safety, and Security Officer. The WIPP Hazardous Waste Facility Permit (HWFP) (NM4890139088-TSDF [treatment, storage, and disposal facility]) further requires that the ASER be provided to the New Mexico Environment Department (NMED).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗