STS-44 Space Shuttle mission report

The STS-44 Space Shuttle Program Mission Report is a summary of the vehicle subsystem operations during the forty-fourth flight of the Space Shuttle Program and the tenth flight of the Orbiter vehicle Atlantis (OV-104). In addition to the Atlantis vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-53 (LWT-46); three Space Shuttle main engines (SSME's) (serial numbers 2015, 2030, and 2029 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-047. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L019A for the left SRB and 360W019B for the right SRB. The primary objective of the STS-44 mission was to successfully deploy the Department of Defense (DOD) Defense Support Program (DSP) satellite/inertial upper stage (IUS) into a 195 nmi. earth orbit at an inclination of 28.45 deg. Secondary objectives of this flight were to perform all operations necessary to support the requirements of the following: Terra Scout, Military Man in Space (M88-1), Air Force Maui Optical System Calibration Test (AMOS), Cosmic Radiation Effects and Activation Monitor (CREAM), Shuttle Activation Monitor (SAM), Radiation Monitoring Equipment-3 (RME-3), Visual Function Tester-1 (VFT-1), and the Interim Operational Contamination Monitor (IOCM) secondary payloads/experiments.

Fricke, Robert W.↗

STS-42 Space Shuttle mission report

The STS-42 Space Shuttle Program Mission Report contains a summary of the vehicle subsystem operations during the forty-fifth flight of the Space Shuttle Program and the fourteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-52 (LWT-45); three Space Shuttle main engines (SSME's), which were serial numbers 2026, 2022, and 2027 in positions 1, 2, and 3, respectively; and two Solid Rocket Boosters (SRB's) designated as BI-048. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L020A for the left SRM and 360Q020B for the right SRM. The primary objective of the STS-42 mission was to complete the objectives of the first International Microgravity Laboratory (IML-1). Secondary objectives were to perform all operations necessary to support the requirements of the following: Gelation of Sols: Applied Microgravity Research (GOSAMR); Student Experiment 81-09 (Convection in Zero Gravity); Student Experiment 83-02 (Capillary Rise of Liquid Through Granular Porous Media); the Investigation into Polymer Membrane Processing (IPMP); the Radiation Monitoring Equipment-3 (RME-3); and Get-Away Special (GAS) payloads carried on the GAS Beam Assembly.

Fricke, Robert W.↗

STS-48 Space Shuttle mission report

The STS-48 Space Shuttle Program Mission Report is a summary of the vehicle subsystem operations during the forty-third flight of the Space Shuttle Program and the thirteenth flight of the Orbiter vehicle Discovery (OV-103). In addition to the Discovery vehicle, the flight vehicle consisted of the following: an External Tank (ET) designated as ET-42 (LUT-35); three Space Shuttle main engines (SSME's) (serial numbers 2019, 2031, and 2107 in positions 1, 2, and 3, respectively); and two Solid Rocket Boosters (SRB's) designated as BI-046. The lightweight redesigned Solid Rocket Motors (RSRM's) installed in each one of the SRB's were designated as 360L018A for the left SRB and 360L018B for the right SRB. The primary objective of the flight was to successfully deploy the Upper Atmospheric Research Satellite (UARS) payload.

Fricke, Robert W.↗

Transistorized PWM inverter-induction motor drive system

This paper describes the development of a transistorized PWM inverter-induction motor traction drive system. A vehicle performance analysis was performed to establish the vehicle tractive effort-speed requirements. These requirements were then converted into a set of inverter and motor specifications. The inverter was a transistorized three-phase bridge using General Electric power Darlington transistors. The description of the design and development of this inverter is the principal object of this paper. The high-speed induction motor is a design which is optimized for use with an inverter power source. The primary feedback control is a torque angle control with voltage and torque outer loop controls. A current-controlled PWM technique is used to control the motor voltage. The drive has a constant torque output with PWM operation to base motor speed and a constant horsepower output with square wave operation to maximum speed. The drive system was dynamometer tested and the results are presented.

Peak, S. C.↗

Design assurance test of the Thiokol Te-M-521-5 apogee kick motor tested in the spin mode at simulated altitude conditions

One Thiokol Chemical Corporation TE-M-521-5 solid-propellant apogee rocket motor was successfully fired at an average simulated altitude of about 108,000 ft while spinning at 46 rpm. The general program objectives were to verify compliance of motor performance with the manufacturer's specifications. Specific primary objectives were to determine vacuum ballistic performance of the motor after prefire vibration conditioning and temperature conditioning at 40F, altitude ignition characteristics, motor structural integrity, and motor temperature-time history during and after motor operation. Additional objectives were to measure the lateral (nonaxial) thrust component during motor operation and to measure radiation heat flux in the vicinity of the nozzle exit plane.

Cimino, A. A.↗

Block 2 SRM conceptual design studies. Volume 1, Book 1: Conceptual design package

The conceptual design studies of a Block 2 Solid Rocket Motor (SRM) require the elimination of asbestos-filled insulation and was open to alternate designs, such as case changes, different propellants, modified burn rate - to improve reliability and performance. Limitations were placed on SRM changes such that the outside geometry should not impact the physical interfaces with other Space Shuttle elements and should have minimum changes to the aerodynamic and dynamic characteristics of the Space Shuttle vehicle. Previous Space Shuttle SRM experience was assessed and new design concepts combined to define a valid approach to assured flight success and economic operation of the STS. Trade studies, preliminary designs, analyses, plans, and cost estimates are documented.

Smith, Brad↗

Design Optimization Studies of Partially Superconducting Machines based on NASA’s High Efficiency Megawatt Motor

Single aisle class electric aircraft require high power density and efficiency megawatt electric machines to be competitive with their tradition turbofan counterparts. Superconducting machines are seen as a key enabling technology for achieving the electric motor power density and efficiency needed by single aisle class electric aircraft. NASA’s High Efficiency Megawatt Motor (HEMM) is a partially superconducting machine being developed at NASA Glenn Research Center as a technology demonstration of a practical near-term superconducting machine. HEMM is being developed to meet the requirements of the generators on NASA’s STARC-ABL reference aircraft. HEMM is expected to achieve greater than 16 kW/kg electromagnetic specific power and greater than 98% efficiency at a nominal operating condition of 1.4 MW and 6800 RPM. In this paper, a design optimization algorithm for partially superconducting machines based on HEMM’s technologies is used to explore the possible performance of HEMM technology at other machine power levels and operating conditions. The design optimization algorithm is detailed in full and results for achievable geared and direct drive machine performance are presented.

Thomas F Tallerico↗

Flight set 360L001 (STS-26) igniter, post flight

Space Transportation System (STS-26) was launched from KSC pad 39B. Two of the Redesigned Solid Rocket Motors (RSRM) were part of the launch system and are designated RSRM-1A and RSRM-1B. Each of these motors were initiated by an 1U75164 igniter. The post flight condition of the igniters and associated components is documented. The overall performance of the igniter components was excellent. No damage or heat affected areas were noted. The sealing elements of the igniter functioned as expected with no evidence of erosion or blowby. The thermal protection system protected all areas adequately. No excessive erosion was noted. Corrosion was found in the special bolt holes in the igniter chamber. The corrosion will not affect refurbishment of the chamber. Beginning with flight 5 grease has been added to the chamber holes to prevent this erosion.

Hale, Elgie J.↗

NASA Scout ST-1 Flight-Test Results and Analyses, Launch Operations, and Test Vehicle Description

The first of a series of flight tests for the development of the four-stage, solid-propellant Scout vehicle was conducted at the NASA Wallops Station under the direction of the Langley Research Center. Vehicle designation for the test was NASA Scout ST-1. Performance characteristics of the vehicle and components were recorded during a high-altitude probe mission. Flight-simulation studies are presented and show that the accuracy of the guidance system during the flight was within control-system design specifications. The control system functioned normally during the flight with the exception of an overpowering of the reaction-control roll jets near burnout of the third-stage rocket motor. The resulting roll displacement of the vehicle is shown to have caused the monitor tracking radar which had been erroneously tracking a radar beacon in the vehicle on a side lobe to reorient to the major lobe of the receiving antenna. This tracking switch falsely indicated a violent turning maneuver on the monitor plot board and resulted in a hold-fire decision for the fourth-stage rocket motor. Although data for the final thrusting and coast phase of the flight were not obtained, the majority of the test objectives were achieved. In-flight thrust misalignment angles for the second- and third-stage rocket motors derived from control-system error data and for the first-stage motor determined from flight-simulation studies are presented. All rocket-motor thrust misalignment angles were well within the tolerances used for control-system design. Rocket-motor flight performance is presented, and velocity increments attained from the first three stages substantiated the predicted nominal performance. Operation of the rocket motors was satisfactory with the exception of high-level vibrations which were encountered during third-stage motor burning. Rolling moments which overpowered the reaction-control jets are also attributed to the burning characteristics of the third-stage motor. A discussion of the premature loss of the third-stage heat shield is given and shows that the heat-shield latching mechanism failed from pressure loads as the vehicle entered the transonic speed range. Although venting was provided to relieve the high negative pressures known to exist on the heat shield at these speeds, a field modification of the wiring tunnel had the same effect as opening the inside of the heat shield to ambient pressures. Consequently, the latching mechanism failed from pressure loads which were of about the same magnitude as the latching-mechanism yield loads. Skin temperatures were recorded at several locations on the vehicle and were generally in good agreement with theoretical values. Aerodynamic heating presented no problem during the flight since the maximum temperatures recorded during the flight were only about half the design values because of the high-launch-angle trajectory. Environmental vibrations recorded in the vicinity of the guidance package showed that no significant continuous amplitude levels above the general instrumentation noise level were present during first- and second-stage burning. Large vibration amplitudes were recorded during third-stage burning which coincided with the large roll disturbance experienced by the vehicle near burnout of the third-stage motor.

Scout Launch Vehicle↗

The Robonaut 2 Hand - Designed to do Work with Tools

The second generation Robonaut hand has many advantages over its predecessor. This mechatronic device is more dexterous and has improved force control and sensing giving it the capability to grasp and actuate a wider range of tools. It can achieve higher peak forces at higher speeds than the original. Developed as part of a partnership between General Motors and NASA, the hand is designed to more closely approximate a human hand. Having a more anthropomorphic design allows the hand to attain a larger set of useful grasps for working with human interfaces. Key to the hand s improved performance is the use of lower friction drive elements and a redistribution of components from the hand to the forearm, permitting more sensing in the fingers and palm where it is most important. The following describes the design, mechanical/electrical integration, and control features of the hand. Lessons learned during the development and initial operations along with planned refinements to make it more effective are presented.

Bridgwater, L. B.↗

Trends in best-in-class energy-efficient technologies for room air conditioners

Improving the efficiency of room air conditioners (RACs) could provide significant energy and associated emissions savings, particularly in emerging economies with hot climates where the cooling demand is expected to increase dramatically. To help accelerate efficiency improvements, this study identifies “best-in-class” high-efficiency RAC components and products. The findings show that manufacturers tend to minimize manufacturing costs by using RAC designs that are readily available or standardized to their production, and they share components across various models. High-efficiency RAC models use advanced compressor technologies optimized at a low frequency, large heat exchangers with thermodynamically effective materials and designs, highly efficient direct current fan motors, advanced metering devices, and smart sensors for temperature and humidity control. Recently RAC manufacturers have been improving seasonal efficiency – better reflecting part-load operation – especially via variable-speed (inverter) drives for compressor motors. Recent highest-efficiency RAC models use low global warming potential (GWP) refrigerants, having transitioned from conventional high-GWP refrigerants, in regions where RACs that use these low-GWP refrigerants are commercially available. Recently demonstrated innovative technologies show trends toward smart hybrid designs, evaporative cooling, and solid-state materials beyond the conventional vapor-compression technology. This information could help policymakers improve their RAC market-transformation programs to align with the most-efficient global technology.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Solar domestic hot water system installed at Texas City, Texas

This is the final technical report of the solar energy system located at LaQuinta Motor Inn, Texas City, Texas. The system was designed to supply 63 percent of the total hot water load for a new 98 unit motor inn. The solar energy system consists of a 2100 square feet Raypack liquid flat plate collector subsystem and a 2500 gallon storage subsystem circulating hot water producing 3.67 x 10 to the 8th power Btu/year. Abstracts from the site files, specification references, drawings, installation, operation, and maintenance instructions are included.

Source record↗

Orbital maneuvering vehicle thermal design and analysis techniques

This paper describes the OMV thermal design that is required to maintain components within temperature limits for all mission phases. A key element in the OMV thermal design is the application of a motorized thermal shade assembly that is a replacement for the more conventional variable conductance heat pipes or louvers. The thermal shade assembly covers equipment module radiator areas, and based upon the radiator temperature input to onboard computer, opens and closes the shade, varying the effective radiator area. Thermal design verification thermal analyses results are presented. Selected thermal analyses methods, including several unique subroutines, are discussed. A representation of enclosure Script F equations, in matrix form, is also included. Personal computer application to the development of the OMV thermal design is summarized.

Chapter, J.↗

The Determination of Forces and Moments on a Gimballed SRM Nozzle Using a Cold Flow Model

The Solid Rocket Motor Air Flow Facility (SAF) at NASA Marshall Space Flight Center was used to characterize the flow in the critical aft end and nozzle of a solid propellant rocket motor (SRM) as part of the design phase of development. The SAF is a high pressure, blowdown facility which supplies a controlled flow of air to a subscale model of the internal port and nozzle of a SRM to enable measurement and evaluation of the flow field and surface pressure distributions. The ASRM Aft Section/Nozzle Model is an 8 percent scale model of the 19 second burn time aft port geometry and nozzle of the Advanced Solid Rocket Motor, the now canceled new generation space Shuttle Booster. It has the capability to simulate fixed nozzle gimbal angles of 0, 4, and 8 degrees. The model was tested at full scale motor Reynolds Numbers with extensive surface pressure instrumentation to enable detailed mapping of the surface pressure distributions over the nozzle interior surface, the exterior surface of the nozzle nose and the surface of the simulated propellant grain in the aft motor port. A mathematical analysis and associated numerical procedure were developed to integrate the measured surface pressure distributions to determine the lateral and axial forces on the moveable section of the nozzle, the effective model thrust and the effective aerodynamic thrust vector (as opposed to the geometric nozzle gimbal angle). The nozzle lateral and axial aerodynamic loads and moments about the pivot point are required for design purposes and require complex, three dimensional flow analyses. The alignment of the thrust vector with the nozzle geometric centerline is also a design requirement requiring three dimensional analyses which were supported by this experimental program. The model was tested with all three gimbal angles at three pressure levels to determine Reynolds number effects and reproducibility. This program was successful in demonstrating that a measured surface pressure distribution could be integrated to determine the lateral and axial loads, moments and thrust vector alignment for the scaled model of a large space booster nozzle. Numerical results were provided which are scaleable to the full scale rocket motor and can be used as benchmark data for 3-D CFD analyses.

Whitesides, R. Harold↗

NASA-USRP Summer 2013 Internship Final Report

Three major projects were undertaken during the Summer 2013 USRP Internship: (A) assisting the cTAPS group with component and pressure vessel system analyses and documentation, (B) designing a hoisting fixture for a solid rocket motor, (C) finding an alternative to removing the DOT rated gaseous nitrogen tank from the roof for hydrostatic testing. Hypergolic Material Assessments (HMAs) and pressure calculations were performed on components of pressure systems. Additionally, component information was logged in the Standard Parts Database to provide a location where system designers can find information regarding components, including their specifications and compatibility with fluids. A hoisting fixture was designed to hoist a solid rocket motor and meets the specifications related to stress and size. However, there are issues with the fixtures bolt head allotment, the bolt spacing, and the complexity of the part. Finally, calculations were performed on an expiring DOT rated gaseous nitrogen tank in an attempt to re-rate it per ASME standards. This was unsuccessful so other options are being explored for the tank. While much progress was made on all three projects, there is still work to be performed on each project to achieve the desired results.

Gurganus, S. Christine↗

Electrostatic generator/motor electrodes located on the inner surface of an electromechanical battery rotor

A geometric design of E-S generator motor electrodes mounted on the inner surface of a fiber-composite rotor is provided. The electrode configuration is able to sustain very high g levels. The rotor may be funned of carbon-fiber wound on top of an inner E car S-glass fiber composite core. The electrode design provides the needed area to satisfy the power requirements of the storage system and utilizes a stacked wedge-like electrode array that both solves the high-g problem and results in a doubling or tripling of the electrode area, relative to that of electrodes that conform to the inner cylindrical surface of the rotor.

25 ENERGY STORAGE↗

Helium Balloon Valve Improvement

The NASA Balloon Program Office (BPO), located at Wallops Flight Facility asked the Mechanical Systems Branch (Code 548) to improve the design of their balloon valve. BPO uses two main types of balloons, Zero Pressure Balloon (ZPB) and Super Pressure Balloon (SPB), which both use the valve. It is used for termination of the ZPB, and inflation and termination of the SPB. During launch campaigns the valve showed signs of helium leakage which lead the BPO to ask for an improvement. As part of a Professional Readiness Engineering Program (PREP), research and review of the current valve was conducted and a new design was prepared. The current custom designed valve consists of a "pie" plate that is actuated up and down via a gear rack that is driven by a globe motor. When closed the knife edge of the pie plate bites into a silicone gasket to seal the structure. Unfortunately, the gasket material permanently deforms after being compressed and the plate itself bends under the force induced by the motor, introducing two possible helium leak paths. The new custom designed valve utilizes o-rings instead of one gasket to reduce the possibility of leakage from permanent deformation. One o-ring seals the valve structure to its mating surface and a spring energized o-ring is used in a piston design to seal the valve once it's closed. The design also utilizes different materials to increase stiffness and strength so that it is less likely to bend under the force from the motor. Currently the new valve has finished the design and analysis phases and is proceeding towards manufacturing and testing.

Seo, Lindsey↗