Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Missions”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Rapid Turnaround of Costing/Designing of Space Missions Operations

The Ground Segment Team (GST), at NASA's Jet Propulsion Laboratory in Pasadena, California, provides high-level mission operations concepts and cost estimates for projects that are in the formulation phase. GST has developed a tool to track costs, assumptions, and mission requirements, and to rapidly turnaround estimates for mission operations, ground data systems, and tracking for deep space and near Earth missions. Estimates that would often take several weeks to generate are now generated in minutes through the use of an integrated suite of cost models. The models were developed through interviews with domain experts in areas of Mission Operations, including but not limited to: systems engineering, payload operations, tracking resources, mission planning, navigation, telemetry and command, and ground network infrastructure. Data collected during interviews were converted into parametric cost models and integrated into one tool suite. The tool has been used on a wide range of missions from small Earth orbiters, to flagship missions like Cassini. The tool is an aid to project managers and mission planners as they consider different scenarios during the proposal and early development stages of their missions. The tool is also used for gathering cost related requirements and assumptions and for conducting integrated analysis of multiple missions.

Cost estimation↗

Performance Testing of Yardney Li-Ion Cells and Batteries in Support of JPL's 2009 Mars Science Laboratory Mission

In 2009, JPL is planning to launch an unmanned rover mission to the planet Mars. This mission, referred to as the Mars Science Laboratory (MSL), will involve the use of a rover that is much larger than the previously developed Spirit and Opportunity Rovers for the 2003 Mars Exploration Rover (MER) mission, that are currently still in operation on the surface of the planet after more than three years. Part of the reason that the MER rovers have operated so successfully, far exceeding the required mission duration of 90 sols, is that they possess robust Li-ion batteries, manufactured by Yardney Technical Products, which have demonstrated excellent life characteristics. Given the excellent performance characteristics displayed, similar lithium-ion batteries have been projected to successfully meet the mission requirements of the up-coming MSL mission. Although comparable in many facets, such as being required to operate over a wide temperature range (-20 to 40 C), the MSL mission has more demanding performance requirements compared to the MER mission, including much longer mission duration (approx. 687 sols vs. 90 sols), higher power capability, and the need to withstand higher temperature excursions. In addition, due to the larger rover size, the MSL mission necessitates the use of a much larger battery to meet the energy, life, and power requirements. In order to determine the viability of meeting these requirements, a number of performance verification tests were performed on 10 Ah Yardney lithium-ion cells (MER design) under MSL-relevant conditions, including mission surface operation simulation testing. In addition, the performance of on-going ground life testing of 10 Ah MER cells and 8-cell batteries will be discussed in the context of capacity loss and impedance growth predictions.

MSL Rover↗

Essentials for Team Based Rehearsals and the Differences Between Earth Orbiting and Deep Space Missions

The mission readiness environment is where spacecraft and ground systems converge to form the entire as built flight system for the final phase of operationally-themed testing. For most space missions, this phase starts between nine to twelve months prior to the planned launch. In the mission readiness environment, the goal is to perform sufficient testing to exercise the flight teams and systems through all mission phases in order to demonstrate that all elements are ready to support. As part of the maturation process, a mission rehearsal program is introduced to focus on team processes within the final flight system, in a more realistic operational environment. The overall goal for a mission rehearsal program is to: 1) ensure all flight system elements are able to meet mission objectives as a cohesive team; 2) reduce the risk in space based operations due to deficiencies in people, processes, procedures, or systems; and 3) instill confidence in the teams that will execute these first time flight activities. A good rehearsal program ensures critical events are exercised, discovers team or flight system nuances whose impact were previously unknown, and provides a real-time environment in which to interact with the various teams and systems. For flight team members, the rehearsal program provides experience and training in the event of planned (or unplanned) flight contingencies. To preserve the essence for team based rehearsals, this paper will explore the important elements necessary for a successful rehearsal program, document differences driven by Earth Orbiting (Aqua, Aura, Suomi-National Polar-orbiting Partnership (NPP)) and Deep Space missions (New Horizons, Mars Atmosphere and Volatile EvolutioN (MAVEN)) and discuss common challenges to both mission types. In addition, large scale program considerations and enhancements or additional steps for developing a rehearsal program will also be considered. For NASA missions, the mission rehearsal phase is a key milestone for predicting and ensuring on-orbit success.

Gomez-Rosa, Carlos↗

Xenon Acquisition Strategies for High-Power Electric Propulsion NASA Missions

Solar electric propulsion (SEP) has been used for station-keeping of geostationary communications satellites since the 1980s. Solar electric propulsion has also benefitted from success on NASA Science Missions such as Deep Space One and Dawn. The xenon propellant loads for these applications have been in the 100s of kilograms range. Recent studies performed for NASA's Human Exploration and Operations Mission Directorate (HEOMD) have demonstrated that SEP is critically enabling for both near-term and future exploration architectures. The high payoff for both human and science exploration missions and technology investment from NASA's Space Technology Mission Directorate (STMD) are providing the necessary convergence and impetus for a 30-kilowatt-class SEP mission. Multiple 30-50- kilowatt Solar Electric Propulsion Technology Demonstration Mission (SEP TDM) concepts have been developed based on the maturing electric propulsion and solar array technologies by STMD with recent efforts focusing on an Asteroid Redirect Robotic Mission (ARRM). Xenon is the optimal propellant for the existing state-of-the-art electric propulsion systems considering efficiency, storability, and contamination potential. NASA mission concepts developed and those proposed by contracted efforts for the 30-kilowatt-class demonstration have a range of xenon propellant loads from 100s of kilograms up to 10,000 kilograms. This paper examines the status of the xenon industry worldwide, including historical xenon supply and pricing. The paper will provide updated information on the xenon market relative to previous papers that discussed xenon production relative to NASA mission needs. The paper will discuss the various approaches for acquiring on the order of 10 metric tons of xenon propellant to support potential near-term NASA missions. Finally, the paper will discuss acquisitions strategies for larger NASA missions requiring 100s of metric tons of xenon will be discussed.

Ion Propulsion↗

Utilizing the ISS Mission as a Testbed to Develop Cognitive Communications Systems

The ISS provides an excellent opportunity for pioneering artificial intelligence software to meet the challenges of real-time communications (comm) link management. This opportunity empowers the ISS Program to forge a testbed for developing cognitive communications systems for the benefit of the ISS mission, manned Low Earth Orbit (LEO) science programs and future planetary exploration programs. In November, 1998, the Flight Operations Directorate (FOD) started the ISS Antenna Manager (IAM) project to develop a single processor supporting multiple comm satellite tracking for two different antenna systems. Further, the processor was developed to be highly adaptable as it supported the ISS mission through all assembly stages. The ISS mission mandated communications specialists with complete knowledge of when the ISS was about to lose or gain comm link service. The current specialty mandated cognizance of large sun-tracking solar arrays and thermal management panels in addition to the highly-dynamic satellite service schedules and rise/set tables. This mission requirement makes the ISS the ideal communications management analogue for future LEO space station and long-duration planetary exploration missions. Future missions, with their precision-pointed, dynamic, laser-based comm links, require complete autonomy for managing high-data rate communications systems. Development of cognitive communications management systems that permit any crew member or payload science specialist, regardless of experience level, to control communications is one of the greater benefits the ISS can offer new space exploration programs. The IAM project met a new mission requirement never previously levied against US space-born communications systems management: process and display the orientation of large solar arrays and thermal control panels based on real-time joint angle telemetry. However, IAM leaves the actual communications availability assessment to human judgment, which introduces unwanted variability because each specialist has a different core of experience with comm link performance. Because the ISS utilizes two different frequency bands, dynamic structure can be occasionally translucent at one frequency while it can completely interdict service at the other frequency. The impact of articulating structure on the comm link can depend on its orientation at the time it impinges on the link. It can become easy for a human specialist to cross-associate experience at one frequency with experience at the other frequency. Additionally, the specialist's experience is incremental, occurring one nine-hour shift at a time. Only the IAM processor experiences the complete 24x7x365 communications link performance for both communications links but, it has no "learning capability." If the IAM processor could be endowed with a cognitive ability to remember past structure-induced comm link outages, based on its knowledge of the ISS position, attitude, communications gear, array joint angles and tracking accuracy, it could convey such experience to the human operator. It could also use its learned communications link behaviors to accurately convey the availability of future communications sessions. Further, the tool could remember how accurately or inaccurately it predicted availability and correct future predictions based on past performance. The IAM tool could learn frequency-specific impacts due to spacecraft structures and pass that information along as "experience." Such development would provide a single artificial intelligence processor that could provide two different experience bases. If it also "knew" the satellite service schedule, it could distinguish structure blockage from schedule or planet blockage and then quickly switch to another satellite. Alternatively, just as a human operator could judge, a cognizant comm system based on the IAM model could "know" that the blockage is not going to last very long and continue tracking a comm satellite, waiting for it to track away from structure. Ultimately, once this capability was fully developed and tested in the Mission Control Center, it could be transferred on-orbit to support development of operations concepts that include more advanced cognitive communications systems. Future applications of this capability are easily foreseen because even more dynamic satellite constellations with more nodes and greater capability are coming. Currently, the ISS fully employs a 300 million bit-per-second (Mbps) return link for harvesting payload science. In the coming eighteen months, it will step up to 600 Mbps. Already there is talk of a 1.2 billion bit-per-second (Gbps) upgrade for the ISS and laser comm links have already been tested from the ISS. Every data rate upgrade mandates more complicated and sensitive communications equipment which implies greater expertise invested in the human operator. Future on-orbit cognizant comm systems will be needed to meet greater performance demands aboard larger, far more complicated spacecraft. In the LEO environment, the old-style one-satellite-per-spacecraft operations concept will give way to a new concept of a single customer spacecraft simultaneously using multiple comm satellites. Much more highly-dynamic manned LEO missions with decades of crew members potentially increase the demand for communications link performance. A cognizant on-board communications system will meet advanced communications demands from future LEO missions and future planetary missions. The ISS has fledgling components of future exploration programs, both LEO and planetary. Further, the Flight Operations Directorate, through the IAM project, has already begun to develop a communications management system that attempts to solve advanced problems ideally represented by dynamic structure impacting scheduled satellite service. With an earnest project to integrate artificial intelligence into the IAM processor, the ISS Program could develop a cognizant communications system that could be adapted and transferred to future on-orbit avionics designs.

Jackson, Dan↗

Kickstarting a New Era of Lunar Industrialization via Campaign of Lunar COTS Missions

To support the goals of expanding our human presence and current economic sphere beyond LEO, a new plan was constructed for NASA to enter into partnerships with industry to foster and incentivize a new era of lunar industrialization. For NASA to finally be successful in achieving sustainable human exploration missions beyond LEO, lessons learned from our space history have shown that it is essential for current program planning to include affordable and economic development goals as well as address top national priorities to obtain much needed public support. In the last 58 years of NASA's existence, only Apollo's human exploration missions beyond LEO were successful since it was proclaimed to be a top national priority during the 1960's. However, the missions were not sustainable and ended abruptly in 1972 due to lack of funding and insufficient economic gain. Ever since Apollo, there have not been any human missions beyond LEO because none of the proposed program plans were economical or proclaimed a top national priority. The proposed plan outlines a new campaign of low-cost, commercial-enabled lunar COTS (Commercial Orbital Transfer Services) missions which is an update to the Lunar COTS plan previously described. The objectives of this new campaign of missions are to prospect for resources, determine the economic viability of extracting those resources and assess the value proposition of using these resources in future exploration architectures such as Mars. These missions would be accomplished in partnership with commercial industry using the wellproven COTS Program acquisition model. This model proved to be very beneficial to both NASA and its industry partners as NASA saved significantly in development and operational costs, as much as tenfold, while industry partners successfully expanded their market share and demonstrated substantial economic gain. Similar to COTS, the goals for this new initiative are 1) to develop and demonstrate cost-effective, cis-lunar commercial services, such as lunar transportation, lunar mining and lunar ISRU operations; 2) enable development of an affordable and economical exploration architecture for future missions to Mars and beyond; and 3) to incentivize the creation of new lunar markets through use of lunar resources for economic benefit to NASA, commercial industry and the international community. These cost-effective services would not only enable NASA to economically and sustainably achieve its human exploration missions to the Moon, Mars and beyond but it would also kickstart a new era of lunar industrialization. This paper will describe the goals, objectives and approach for implementing this new campaign of missions. It will also describe the potential benefits and progress that can be accomplished with these low-cost, Lunar COTS missions. Lastly, a preliminary economic analysis approach is proposed for understanding the cost and potential return on investment in the use of lunar resources to reach the goal of lunar industrialization and an expanded and sustainable human presence into cis-lunar space and beyond.

Lunar Exploration↗

Creative Analytics of Mission Ops Event Messages

Historically, tremendous effort has been put into processing and displaying mission health and safety telemetry data; and relatively little attention has been paid to extracting information from missions time-tagged event log messages. Todays missions may log tens of thousands of messages per day and the numbers are expected to dramatically increase as satellite fleets and constellations are launched, as security monitoring continues to evolve, and as the overall complexity of ground system operations increases. The logs may contain information about orbital events, scheduled and actual observations, device status and anomalies, when operators were logged on, when commands were resent, when there were data drop outs or system failures, and much much more. When dealing with distributed space missions or operational fleets, it becomes even more important to systematically analyze this data. Several advanced information systems technologies make it appropriate to now develop analytic capabilities which can increase mission situational awareness, reduce mission risk, enable better event-driven automation and cross-mission collaborations, and lead to improved operations strategies: Industry Standard for Log Messages. The Object Management Group (OMG) Space Domain Task Force (SDTF) standards organization is in the process of creating a formal standard for industry for event log messages. The format is based on work at NASA GSFC. Open System Architectures. The DoD, NASA, and others are moving towards common open system architectures for mission ground data systems based on work at NASA GSFC with the full support of the commercial product industry and major integration contractors. Text Analytics. A specific area of data analytics which applies statistical, linguistic, and structural techniques to extract and classify information from textual sources. This presentation describes work now underway at NASA to increase situational awareness through the collection of non-telemetry mission operations information into a common log format and then providing display and analytics tools to provide in-depth assessment of the log contents. The work includes: Common interface formats for acquiring time-tagged text messages Conversion of common files for schedules, orbital events, and stored commands to the common log format Innovative displays to depict thousands of messages on a single display Structured English text queries against the log message data store, extensible to a more mature natural language query capability Goal of speech-to-text and text-to-speech additions to create a personal mission operations assistant to aid on-console operations. A wide variety of planned uses identified by the mission operations teams will be discussed.

events↗

Dust Storm Impacts on Human Mars Mission Equipment and Operations

Although it is tempting to use dust impacts on Apollo lunar exploration mission equipment and operations as an analog for human Mars exploration, there are a number of important differences to consider. Apollo missions were about a week long; a human Mars mission will start at least two years before crew depart from Earth, when cargo is pre-deployed, and crewed mission duration may be over 800 days. Each Apollo mission landed at a different site; although no decisions have been made, NASA is investigating multiple human missions to a single Mars landing site, building up capability over time and lowering costs by re-using surface infrastructure. Apollo missions used two, single-use spacecraft; a human Mars mission may require as many as six craft for different phases of the mission, most of which would be re-used by subsequent crews. Apollo crews never ventured more than a few kilometers from their lander; Mars crews may take "camping trips" a hundred kilo-meters or more from their landing site, utilizing pressurized rovers to explore far from their base. Apollo mission designers weren't constrained by human for-ward contamination of the Moon; if we plan to search for evidence of life on Mars we'll have to be more careful. These differences all impact how we will mitigate and manage dust on our human Mars mission equipment and operations.

Rucker, M. A.↗

Predicting Crew Time Allocations for Lunar Orbital Missions Based on Historical ISS Operational Activities

As the National Aeronautics and Space Administration continues to define candidate architectures for the planned lunar “Gateway”, it will be necessary to have a detailed understanding of how the crew will inhabit, operate, and maintain the spacecraft. The nature of the Gateway vehicle systems configuration and operations will have a direct impact on the scope of work activities required of the crew. Crew work schedules are sensitive to variations in spacecraft architecture, visiting vehicle activities, and logistics operations – particularly within short duration missions as initially planned for the lunar Gateway. These system and operational configurations must be taken into account when planning for crew time availability to conduct science activities on Gateway missions. This paper presents a methodology that is used to predict crew time distributions for lunar Gateway missions, as applied in NASA’s Exploration Crew Time Model (ECTM). The process utilized for evaluating crew time distributions is based on the categorization of all crew activities into a standardized ontology. Historical ISS daily crew timeline data from July 20, 2011 (post STS retirement) to present day was captured via the Operational Planning Timeline Integration System (OPTimIS) database and characterized according to the standardized ontology. This process enabled correlation and statistical analysis of the ISS data according to common mission parameters such as crew size, ECLSS system design, vehicle traffic operations, and logistics delivery operations. The results of the statistical analysis are a set of crew time distributions for each activity category. These distributions are then utilized within the ECTM to examine crew time allocations based on mission parameter inputs, which serve to characterize the Gateway mission configurations. Results for predicted crew time allocations for representative short duration Gateway missions are presented. These results can be used to evaluate crew schedule availability for science and utilization activities. Variations in expected mission architectures and mission operations are accounted for to correct crew time predictions. The analysis is being leveraged to plan utilization capability objectives that are achievable on the Gateway missions, as well as inform the viability of various mission architecture options.

Stromgren, Chel↗

Using Systems Engineering to Develop an Integrated Crew Health and Performance System to Mitigate Risk for Human Exploration Missions

New space exploration missions are currently being designed to take humanity beyond low Earth orbit (LEO) to cis-lunar space, the lunar surface, and eventually to Mars. These missions carry increased risks due to a number of factors, including distance from Earth, exposure to deep space hazards, reduced capacity and ability to resupply and evacuate, and increased communication delays. As distance from Earth grows and mission length increases, a growing proportion of mission risk can be attributed to the “human system.” Almost twenty years ago, the Institute of Medicine in the United States recommended the early and complete integration of the human system into the spacecraft and mission design process to mitigate this increased risk inherent in exploration missions. Exploration missions will require increasing levels of crew self-sufficiency that will challenge the current operational paradigms established in LEO. Enabling progressive Earth independence requires management of the increasingly complex interactions among spacecraft systems and integration of all the data and functions that affect human health and performance into one coordinated system –the Crew Health and Performance (CHP) system. This system is a critical spacecraft system that is analogous to other systems such as propulsion, guidance and navigation, or avionics. Design and integration of the CHP system requires the evidence-based merger of typically disparate disciplines such as medicine, human factors, and life support system design, using systems engineering (SE) practices. SE provides traceability of spacecraft requirements and enables reliable and repeatable trade space analysis of the many competing options for hardware and software to be included in the mission architecture. The approach described here enables spacecraft and mission designers to align the scope of a CHP system with mission specific requirements, decrease risk to the crew, and increase the probability of mission success.

Kerry McGuire↗

NASA’s Space Launch System: New Launch Capability for Artemis Lunar and Deep Space Science Missions

With stacking and integration of the initial Block 1 Space Launch System (SLS) expected to begin in 2020, NASA’s powerful new launch vehicle is ready to take center stage in the agency’s Artemis program to return astronauts to the Moon. Combining the highest launch thrust and largest payload capacity ever developed, SLS also enables a new generation of high-C3 science missions to destinations such as the gas and ice giants, the Kuiper Belt, and even beyond the solar system. Block 1 is only the beginning, as the vehicle has a planned evolution path to progressively more powerful variants. In addition to these block upgrades providing increased lift capability, the vehicle can be configured to fly in crew configuration with the Orion spacecraft or in cargo configuration with payload fairings for launching science mission or large infrastructure, providing a flexible launch option. For Artemis I, the first SLS flight, the Block 1 vehicle in the crew configuration will send an uncrewed Orion spacecraft to lunar orbit for a thorough systems checkout before the crewed Artemis II flight. The Block 1 vehicle uses a proven propulsion system consisting of solid rocket boosters and RS-25 engines to lift more than 27 metric tons [t] to trans-lunar injection (TLI). In its cargo configuration, Block 1 can be fitted with a 5 m payload fairing. The second variant, Block 1B, uses a more powerful upper stage to increase payload mass to TLI to 38-42 t, depending on crew or cargo configuration. In the crew configuration, a co-manifested payload of up to 10 t can ride along in the Universal Stage Adapter (USA), which has as much volume for payloads as a 5 m-class payload fairing. The Block 2 evolved variant will lift 43-46 t to TLI, depending on crew or cargo configuration. The Block 1B and Block 2 vehicles can be outfitted with an 8.4 m-diameter payload fairing, available in 19.1 m and 27.4 m lengths, providing unprecedented volume for payloads. Larger-diameter 10 m fairings may also be an option in the future on the Block 2 vehicle. The unrivalled mass, volume and high-energy launches of SLS can provide significant mission flexibility for payloads and/or additional upper stages to open trade space for a new generation of exploration missions. SLS was designed to meet requirements for launching large-volume infrastructure as outlined in numerous studies of missions to cislunar space or Mars. Mission concept studies from the science community also point toward new possibilities enabled by SLS. Probes with more robust science packages can be sent to the gas giants. Dual spacecraft can be manifested for missions to Uranus and Neptune. Additional third or fourth payload stages can be encapsulated in the payload fairings to achieve missions to the Kuiper Belt or beyond. In addition, the large volume can be used to design and deploy wide-aperture mirrors on future space telescopes and to enable nuclear-thermal propulsion missions. At AIAA Ascend, the SLS Program will provide technical information on vehicle capabilities as well as descriptions of ongoing discussions with mission planners for utilizing the vehicle for an array of deep space missions.

Stephen Creech↗

Applications of Nuclear Thermal Propulsion Systems for Deep Space Science Missions

Nuclear thermal propulsion (NTP) systems occupy a unique area in the space propulsion technology landscape, due to their ability to combine moderate-to-high thrust systems normally seen in chemical propulsion systems with specific impulses that are higher than those of more traditional chemical propulsion systems. Thus, NTP systems have the potential to greatly expand our access to deep space and can enable or enhance capabilities for a variety of missions that achieve science goals as outlined in NASA’s decadal surveys. This paper leverages previous work performed on applying NTP systems for multiple science missions. It also expands the mission portfolio to additional NTP-powered science mission profiles, evaluating the system performance benefits delivered by this propulsion option. This paper will also outline efforts to improve the fidelity of the existing NTP design concepts and vehicles that are utilized, leveraging previous work on nuclear propulsion systems for human-Mars missions to enhance the fidelity of results obtained from previous science mission concept studies – specifically Triton lander, solar polar orbiter, and the interstellar medium probe missions. The work outlined in this paper will also examine additional missions that have been highlighted in the recent decadal surveys, which may include robotic missions to the ice giant Uranus, robotic missions to Venus, and missions to various Kuiper belt objects (KBOs).

K A Polzin↗

Data Production on Past and Future NASA Missions

Data return is a metric that is commonly publicized for all space science missions. In the early days of the Space Program, this figure was small, and could be described in bits or maybe even megabits. But now, missions are capable of returning data volumes two or three orders of magnitude larger. For example, Voyager 1 and 2 combined produced a little over 5 Terabits of data in 39 years of operation. In contrast, the Cassini mission, launched two decades after Voyager, produced about one and a half times those data volumes in half the time. NISAR, an Earth Science Mission currently in implementation, plans to produce over 28 Petabits of raw data in just 3 years. This means that NISAR will produce about as many data in 30 days as the combined data production of nearly all planetary missions to date. These increases in capability are a result of technology enhancements in two main areas: telecommunications architecture (both space and ground segments) and data storage technology. This paper describes the progression of these two technologies over the course of more than three decades of space missions and provides additional insight into the design of the end-to-end NISAR Data System Architecture. Trends in the data are briefly explored and compared to Moore’s Law which provides only a qualitative model for memory growth but not for data production. In summary, early missions are found to be driven by unrefined processes while later missions, having utilized earlier lessons learned, focus more on improvements to flight and ground capabilities. Data return seems to fall into three categories. First, deep space missions are driven by the large distances that limit data return to the Earth. Next, the orbiter infrastructure around Mars helps these missions generate more data than other deep space spacecraft. Finally, near-Earth missions have the greatest capabilities for the studied metrics due to their close proximity to Earth and the ground network availability.

Xaypraseuth, Peter↗

Crewed Mars Mission Mode Options for Nuclear Electric/Chemical Hybrid Transportation System

NASA's Human Exploration and Operation Mission Directorate is continuing to study different concepts and options to field human Mars missions as part of NASA's Moon2Mars directive. For crewed missions to Mars, the transportation system sizing is highly dependent on the total mission duration, Mars orbit dwell time, mission concept of operations, and the chosen propulsion system. NASA has been investigating the use of low-thrust electric propulsion systems to augment high-thrust chemical propulsion system for crewed Mars mission to enable a more energy-efficient operations. Recent studies on these missions have focused on ``All-Up'' piloted mission modes in which the in-space transportation system for crew transit departs Earth with everything it needs for the roundtrip journey, with only the Mars landers and surface assets pre-deployed. This design choice was made to minimize the mission operation risk, as the crew could return safely to Earth in the event of a failure to rendezvous or other failure of any pre-deployed assets. As the Mars Architecture Team continues to investigate and understand the Mars mission trade space, alternate mission mode studies were conducted to understand their impact to the transportation system. These include pre-positioning return assets and discarding expended stages to reduce the overall system mass.

Patrick R Chai↗

Planetary Protection Lunar Policy: A Case Study in Balancing COSPAR Guidelines, Scientific Consensus, NASA Policy, and Mission Implementation

With the increase of missions to the Earth’s Moon over the next decade, NASA initiated an assessment and review of the policy and protection of Earth’s Moon to enable scientific exploration. The assessment involved gathering scientific consensus regarding the Earth’s Moon and proposed mission operations considering an understanding of the desired science needs for the Moon. This process involved seeking advice from the National Academies of Science, Engineering, and Medicine’s (NASEM) Committee on Planetary Protection, engagement with the Committee on Space Research (COSPAR) Planetary Protection Panel (PPP), and consultation within NASA. To begin this process, NASA issued a NASA Interim Directive (NID) 8715.128 entitled, “Planetary Protection Categorization for Robotic and Crewed Missions to the Earth’s Moon” in July of 2019. This NID defined sensitive regions (e.g., permanently shadowed regions) on the Moon and required reporting on missions to these sensitive areas. Meanwhile, a NASEM study on the impact of human activities on lunar polar volatiles and the scientific value of protecting the surface and subsurface regions of the Earth’s Moon from organic and biological contamination was initiated. This resulted in a NASEM report entitled, “Planetary Protection for the Study of Lunar Volatiles” which enabled further dialogue within NASA and with COSPAR. COSPAR PPP then leveraged this scientific consensus along with multi-agency input to develop an updated COSPAR Policy on Planetary Protection in June 2021 resulting in updated mission categorizations for Earth’s Moon (existing Category II for orbiters, and new categories IIa and IIb for landed missions). NASA then updated its current planetary protection policy to apply directly to NASA and NASA partnered missions in NASA Procedural Requirements (NPR) 8715.24 entitled, “Planetary Protection Provisions for Robotic Extraterrestrial Missions”. Along with the policy update NASA’s Office of Planetary Protection has worked with mission and programmatic teams to streamline reporting requirements to a simplified checkbox and fill-in-the-blank type of template. Throughout the abovementioned process, open and transparent communication between the policy makers and implementers was essential to ensure a balance with the updated policy, scientific intent, and practicality for each mission to be responsive and achieve mission success, including Artemis I and each of its secondary payloads, Gateway, CAPSTONE and Lunar Trailblazer.

James Benardini↗

Mission Planning for Trident: Discovery proposal to Neptune’s moon, Triton

Trident was one of the four Discovery-class Step-1 mission proposals selected by NASA in 2020 for further development and study; however, in 2021, the Step-2 proposal was not down-selected to transition into the next phase of mission development, i.e., a mission for flight.Neptune’s largest moon, Triton, was the primary focus of study for Trident. Triton’s physical and orbital characteristics make it a unique planetary target for scientific exploration, providing opportunities for investigations in a wide variety of scientific fields, including geomorphological, atmospheric, geophysical, magnetospheric, and ionospheric studies. The science objectives of the Trident mission encompassed an in-depth interior-to-exterior set of objectives, focused on multiple outstanding questions resulting from the 1989 encounter of Voyager 2, and subsequent analysis.Ball Aerospace Corp. was tasked with building the Trident spacecraft, with JPL responsible for providing Engineering Support (Mission Design & Navigation, Mission Planning, Flight Operations, Ground Data Systems, Systems Engineering) and leading Project Management. The observatory would carry a wide-ranging suite of scientific instruments onboard, including an Infrared Spectrometer (IRS) and Narrow Angle Camera (NAC) to be provided by Ball Aerospace Corp., a Wide Angle Camera (WAC) from JPL, a Magnetometer from UCLA, a contributed Plasma Science Suite from IRF (Sweden), and a contributed Radio Science instrument from ASI (Italy). All of these instruments would be used to collect unique datasets during the Triton encounter. Trident would have taken advantage of an ~13-yr, nearly-ballistic trajectory to Triton, utilizing a timely Jupiter Gravity Assist, to execute a 10-day long encounter in the Neptunian system. Launch was planned for October 2025, with Triton arrival scheduled for December 2038. The timeline for this mission would have been sub-divided into seven major phases: Launch, Commissioning, Inner Planet Cruise, Outer Planet Cruise, Approach, Encounter, and Science Data Return. Multiple planetary flybys were planned to be performed during the cruise, including three Earth flybys and one Venus flyby in the Inner Planet Cruise phase, and one Jupiter flyby in the Outer Planet Cruise phase. Along with conventional (Range and Doppler) tracking data, Delta-DOR and Optical Navigation data were also to be acquired to assist with spacecraft navigation during the Approach and Encounter phases. A 3 meter X-Band High Gain Antenna would allow playback of all science data at 1 kbps within 1 year after the Triton Encounter. The Mission Planning element on Trident encompassed and informed multiple aspects of this proposal, ranging from science observation planning during the Triton Encounter phase, to generation of activity timelines for all mission phases; performing ground coverage analysis for science observations to be acquired by all instruments and tracing them to science requirements; evaluation of spacecraft resources including data volume stored onboard, power/energy consumption, telecom (commanding/telemetry) requirements, and overall, working at the interface of science and engineering teams on the mission. All of these functions that were performed by the Mission Planning team on this proposal are discussed in this paper.

Prockter, Louise↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗

Logistics Rates and Assumptions for Future Human Spaceflight Missions Beyond LEO

As NASA prepares for future human spaceflight missions with extended crew duration in destinations beyond low Earth orbit (LEO), the Agency has focused itself on understanding the drivers to sustainably support human life beyond Earth’s atmosphere. Future missions to deep space, the lunar surface, and eventually the Martian surface pose new challenges in ensuring the crew is sufficiently supplied with all necessary materials. To mitigate the risk of not delivering sufficient consumables and logistics for human spaceflight missions, NASA has examined past human space mission data and developed metabolic modeling to determine estimates for the crew consumption rates of fluids, solid consumables, and additional equipment needed. This paper is a compilation of guidelines, rates, and assumptions necessary to evaluate the logistics needs for future human exploration conceptual missions beyond LEO, providing a starting point and resource of information regarding usage rates and overall logistics supply planning for crewed exploration missions. Logistics represent all equipment and supplies not installed as part of the vehicle that are needed to support mission activities. Logistics can be further divided into specific categories, including consumables, maintenance items, spares, utilization, outfitting, as well as any packaging required. This paper will also provide use case examples of logistics needs to support human missions in deep space, including a conceptual lunar surface mission. The paper provides information necessary to calculate the mass and volume of known logistics for conceptual future human exploration missions beyond LEO. The assumptions in the paper are updated versions of previous assumptions made by the Agency and were derived from a number of sources, including International Space Station (ISS) historical usage and resupply rates, the Life Support Baseline Values and Assumptions Document (BVAD) 2022, Human Integration Design Handbook (HIDH) 2014, and data gathered from NASA human spaceflight programs and projects. The primary goal of the paper is to establish a set of consistent reference rates that multiple teams and groups can utilize to conduct logistics analysis and compare cases. This methodology is for initial estimates of conceptual human missions and does not take the place of detailed analysis for programs, nor does it provide requirements for programs.

Human Spaceflight↗