Experience with decommissioning of the underground reservoirs of object No.41 at NPP A1 site -Bohunice, Slovakia - 15110
A new concept of measurement procedures for clearance of building have been developed and implemented at NPP A1 (Bohunice). They are based on measurements of total RN activity per unit of surface area at the erected building according to EU Recommendation RP-113 (pure Cs-137 limit - 10 Bq/cm{sup 2}). However, as a priority the requirements of national legislation had to be complied, which, in the case of concrete structures, limits the massic activity of the concrete bulk material to be rose from the building demolition (300 Bq/kg for pure Cs-137) and surface activity of (0,3 Bq/cm{sup 2} for pure Cs-137). Advantage of the new concept is that it avoids costly whole volume measurement of building rubble (e.g. 200 L drum monitor) and potentially decreases amount of produced radioactive waste. Whole volume measurement has been replaced by whole surface monitoring of surface contamination of the walls by portable devices in 1 x 1 m grid. The methodology was implemented on underground tanks as well, whose clearance is one of the primary goals of 2. stage of the NPP A1 decommissioning project. The measurements proved that contamination on the outer side is rarely present and it is caused by overflowing or leak of contaminated water from reservoir. The most expensive clearance activities were: soil excavation around the reservoir, dry decontamination of concrete, as well as whole volume measurement of crushed concrete ruble from the top of reservoir by drum monitor. A lot of obstacles had to be overcome because of lack of experience with methodology (procedures were implemented as a pilot project), measurement and sampling techniques. During the pilot project rose other difficulties which had to be overcome. (authors)