Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Integrated Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Creating a Prototype Web Application for Spacecraft Real-Time Data Visualization on Mobile Devices

Mobile devices (smart phones, tablets) have become commonplace among almost all sectors of the workforce, especially in the technical and scientific communities. These devices provide individuals the ability to be constantly connected to any area of interest they may have, whenever and wherever they are located. The Huntsville Operations Support Center (HOSC) is attempting to take advantage of this constant connectivity to extend the data visualization component of the Payload Operations and Integration Center (POIC) to a person's mobile device. POIC users currently have a rather unique capability to create custom user interfaces in order to view International Space Station (ISS) payload health and status telemetry. These displays are used at various console positions within the POIC. The Software Engineering team has created a Mobile Display capability that will allow authenticated users to view the same displays created for the console positions on the mobile device of their choice. Utilizing modern technologies including ASP.net, JavaScript, and HTML5, we have created a web application that renders the user's displays in any modern desktop or mobile web browser, regardless of the operating system on the device. Additionally, the application is device aware which enables it to render its configuration and selection menus with themes that correspond to the particular device. The Mobile Display application uses a communication mechanism known as signalR to push updates to the web client. This communication mechanism automatically detects the best communication protocol between the client and server and also manages disconnections and reconnections of the client to the server. One benefit of this application is that the user can monitor important telemetry even while away from their console position. If expanded to the scientific community, this application would allow a scientist to view a snapshot of the state of their particular experiment at any time or place. Because the web application renders the displays that can currently be created with the POIC ground system, the user can tailor their displays for a particular device using tools that they are already trained to use.

Lang, Jeremy S.↗

Controllers and Pilots Play a Key Role in Runway Safety Initiatives Through Real-Time Simulation

A new and innovative way to evaluate runway safety initiatives for airports is through the use of interactive real-time simulation. The National Aeronautics and Space Administration (NASA) operates an integrated suite of simulators that can give both pilots and tower controllers the ability to simultaneously "try out" ideas in the safety of virtual reality. In February of 2003, the FAA conducted a demonstration in the NASA facilities for Dallas/Fort Worth International Airport (DFW) of a concept to reduce runway crossings and enhance the efficiency of the airport. Currently DFW experiences about 1,700 runway crossings per day, which contribute to arrival and departure delays and the potential for runway incursions. The proposed concept included the addition of new perimeter taxiways on the East and West sides of the airport. Through use of NASA's unique simulation capabilities, DFW controllers and commercial pilots provided expert feedback on the safety and operational implications by directly experiencing the proposed changes. Overall, the data collected from the participants and the simulators demonstrated that the concept would improve operations at DFW, if implemented. Improvements were observed in many areas including departure rates, taxi duration, runway crossings, and controller and pilot communications.

Madson, Mike↗

Uncrewed Lunar Surface Operations and Support Activities

Sustained human presence on the surface of the Moon and future missions to Mars require increased independence from surface crews and Earth-based mission control to operate efficiently, safely, and reliably. The time for surface crews to perform tasks will be limited. Extravehicular activities by surface personnel are burdensome and time-consuming, even when a continuous human presence on the surface occurs. Identifying and balancing human/automation roles and tasks and infusing automation and autonomy practices early in a system’s lifecycle will be essential to achieve mission objectives. Among these objectives are attaining a sustained human presence, improving performance and mission effectiveness, reducing operations and maintenance (O&M) costs, and ensuring operations that are robust to communication delays. To achieve these objectives, an operational shift toward increased automation and autonomy with less reliance on humans is needed. Uncrewed lunar surface operations and support activities occur when surface crews are not present or are independent of surface crew timeline activities requiring no surface crew oversight or intervention. These uncrewed surface opportunities can also be planned to minimize crew workload that avoids routine maintenance and support tasks, thus maximizing crew exploration time. Uncrewed preparations such as staging and prepositioning equipment and materials before the crew arrives could improve crew task efficiency. Additional opportunities exist to conduct uncrewed science, exploration, and utilization. Uncrewed surface architecture functions can include science and exploration; habitation; launch and landing support; surface communication and navigation; surface power generation and distribution; human surface mobility; lifting, handling, manipulating; excavation, construction, and site preparation; logistics management; maintenance and repair; surface resource utilization; integrated site operations and shared support services (e.g., site scheduling/prioritization, dust mitigation/contamination control, and surface safety). Early robotic lunar surface campaigns will provide information on the availability of resources, such as oxygen and water, and demonstrate surface-based technologies. After the Artemis III human lunar return mission, a series of landers will deliver surface systems, cargo, supplies, science packages, spare parts, and commodities. A balance of crewed and uncrewed surface operations will enable a sustained lunar surface presence at the South Pole of the Moon at a site that will be known as the Artemis Base Camp (ABC). It is envisioned that base camp operations on and around the Moon will then help prepare for the mission durations and activities needed to support the first human mission to Mars. Before long-duration crew missions to the base camp can occur, the necessary surface infrastructure will be pre-deployed and verified operational. Surface assets will be teleoperated and remotely managed from Earth. Additionally, robotic and short-duration crewed missions to the ABC will ensure the site’s merit to achieve long-term science objectives, availability of usable resources, and that terrain, seasonal variations, and illumination conditions are acceptable. ABC will consist of different areas where specific functions and services are rendered, including: • Launch and Landing Area • Habitation Area • Power Production Area • Resource Areas Launch and Landing Area—The launch and landing area will support associated functions for the arrival and departure of vehicles, such as crewed landing and ascent and uncrewed cargo deliveries and offloading. It will evolve from an unimproved site at the beginning of the exploration campaign to a more sustainable landing and launch area that can support repeated arrivals and departures. Initial uncrewed Lunar Terrain Vehicle (LTV) surface operations may include emplacement of navigation beacons and communication equipment, real-time video and photography of landing/liftoff events, and element repositioning, such as portable utility power (PUP) (applicable for other landed assets at other areas). Site preparations, such as surface leveling, soil compaction, and berm/path construction, may be needed for a more sustainable launch and landing area capable of accommodating vehicles that are increasingly more reusable and reduce the effects of plume surface interactions and ejecta impacts on nearby surface assets. During the ABC missions, cargo and logistics will be delivered to the lunar surface via robotic cargo landers before the crew arrives. These shipments, which can arrive in pressurized logistics carriers, will deliver the logistics necessary to support a crewed mission and include items such as food, water, equipment spares, etc. Providing the capability to retrieve, offload, and transport the logistics closer to the ABC site before the arrival of the crew will increase the overall efficiency of crew operations once they arrive. In the sustained phase of exploration, other supporting services may be needed, such as lander propellant servicing, surface power services, commodity refreshes, and additional inspection, maintenance, and repair capabilities, to sustain a cadence of extended personnel stays and cargo arrivals and departures. Habitation Area—Uncrewed support to surface habitation could involve supporting activation and pre-entry operations of the habitat while the crew is in orbit at the Gateway outpost preparing for a surface landing. Surface Habitat (SH) uncrewed operations may include bringing the cabin environment to a habitable temperature and air mix and activating other critical crew support systems. Potential crop production uncrewed tasks in the SH could also include autonomous watering and tending. Additionally, when the crew departs, the SH enters dormancy for the long period of uncrewed operation. A logistical staging area could also be collocated near the SH. If so, staging operations for crew supplies, waste re-location, and recycling operations may be opportunities for uncrewed operations. Power Production Area—The Fission Surface Power (FSP) element and its supporting distribution equipment provide power to surface elements as needed across the ABC to supplement day-to-day operations and survive lunar nights. Uncrewed support of this power system includes any initial LTV-assisted deployments of cables and other distributed equipment, associated electrical connections, and system testing and activation operations. Robotically performing some inspections, maintenance, or repair tasks on the power distribution equipment could reduce the surface crew workload. Resource Area— Uncrewed resource prospecting, mapping, and characterizing possible resource sites is likely to be time-consuming and represents an opportunity for uncrewed operations between crewed missions. Uncrewed mobile equipment operations will be needed in the extreme environments of permanently shadowed locations where resource extractions occur. As In-Situ Resource Utilization (ISRU) pilot plant operations begin, uncrewed surface support activities with available mobile and portable assets (LTV, PUP, etc.) will better support these operations. Any produced commodities can be stored at a centralized storage location for future use. Also associated with these operations is the use of mobile robotic excavators for resource acquisition and robotic/autonomous regolith processing. The waste tailings generated during excavation and regolith processing would also need to be transported and deposited at a dedicated location. Surface assets will continue operating between crew visits to maintain surface capabilities, conduct lunar surface science, technology demonstrations, and public outreach opportunities. Additionally, certain sustaining tasks that would consume valuable crew time could be performed before crew arrival, or after their departure. This capability may offer more affordable options to construct, activate, test, and maintain a broad set of surface assets. Telerobotically operated human surface mobility systems, such as the LTV and Pressurized Rover (PR), can be utilized for various tasks. Surface environmental conditions pose a distinct challenge for all these activities. Surface illumination and localized shadows are one such factor. Night-survival operations could consist of thermal management, battery pre-charging, and load shedding. Some surface systems may hibernate through the night and then awake and continue nominal operations. Uncrewed mobile assets may use a more adaptive approach to optimize their power and operations; one method is to follow the sunlight. Night-survival operations may be initiated remotely by teleoperation, automated, or accomplished by supervised autonomous operation. The ability to pre-deploy and control remote assets in orbit or on Mars before the arrival of the mission crew is a key capability that can be simulated on the moon. The base camp provides a venue where these advanced operational concepts, technologies, and autonomous methods and techniques, including the incorporation of time delays to simulate Earth-Mars latency can be replicated to help buy down future Mars mission risks. This paper will examine the evolution of uncrewed lunar surface operations and support activities. It will also discuss the lunar surface environmental conditions (thermal, lighting, terrain, topography, communications) along with the challenges they pose on uncrewed surface operations, and the performance of these activities with limited to minimal human interaction and/or teleoperation. Since lunar missions include Mars mission analogs, such investigation provides the framework for future uncrewed Mars mission support.

Mark E Lewis↗

rHealth One Demonstration Aboard ISS: A Microfluidic Bioanalyzer Based on Sheath/Hydrodynamic Focusing Flow Cytometry

The Exploration Medical Capability (ExMC) element aims to provide astronauts with the means for their own health monitoring, diagnosis, and treatment during exploration missions. As space flight ventures further from earth, the need for autonomous medical care increases under greater constraints on size, mass, and resources. One pillar for diagnosis that crew would be separated from is laboratory analysis. Even now on ISS, blood samples must be collected and returned to earth for testing. In response, ExMC is assessing how assays for hematology, bone health, radiation exposure etc. could be addressed through commercial-off-the-shelf (COTS) and Small Business Innovation Research (SBIR) funded bioanalyzers that are miniaturizing lab technology. Since missions will reach distances where there are no timely replacements, validation on the International Space Station (ISS) is a necessary part of that assessment. In partnership with NASA Johnson Space Center (JSC) Immunology Lab and the Research Operations and Integration (ROI) element, ExMC conducted a technology demonstration on ISS of the rHEALTH ONE, a flow cytometry based bioanalyzer, to assess future devices based on this design. In flow cytometry, there are predominantly three ways to focus the cells (or particles) into a single file stream: hydrodynamic focusing, microcapillary, and acoustic focusing. The rHEALTH ONE utilizes the commercial standard, sheath-based hydrodynamic focusing. rHEALTH itself represents both a company and a suite of medical tools NASA has funded through SBIR grants towards the development of a promising diagnosis instrument for exploration missions. rHEALTH ONE is the interim version of the technology, functional as a benchtop analyzer and test bed for the next generation of rHEALTH in development. Several modifications were made to the rHEALTH ONE analyzer for operation in microgravity. For function, fluid management was key. A sheath-based analyzer uses sheath fluid to flow the sample, cleaning fluid to prevent biological contamination, and a reservoir to collect the liquid waste. The rHEALTH ONE analyzer uses bottles dependent on gravity to separate the air and liquid pathways and keep the liquids contained. It uses only 1 psig of air pressure to directly push the liquid through the device, requiring little-to-no resistance at inlet and outlet. A microtubing assembly with self-sealing luer connectors was designed – featuring 0.014 mm thick durable medical balloons to hold water inside the supply bottles – to create safe containment and easy access for the crew while maintaining the analyzer’s function. For safety, copper tape was added to the interior of the plastic housing to reduce electromagnetic interference, fluid and electrical connections were secured against vibration and leaks, and gaps were further sealed to ensure containment of the optical block and lasers. Water as the sheath and cleaning fluid and TOX 0 samples were used to reduce the biohazard risk to the crew. In May 2022, European Space Agency astronaut Samantha Cristoforetti demonstrated the rHEALTH ONE aboard ISS for its sample loading, flow cytometry, and data collection capability in microgravity. The JSC Immunology Lab provided flow cytometry expertise, designed the sample test protocol, and manufactured and benchmarked the flight samples on a ‘gold-standard’ flow cytometer. The analyzer was primed with water, purged of air, and four calibration solutions of polystyrene microparticles were tested to characterize its performance. Tightly controlled procedures and excellent execution prevented air bubble interference during air/water separation, fluid transfer, sample mixing and loading. Data showed a slight increase in signal noise on 3 of 5 channels and an anomaly of fluorophores migrating in one sample (confirmed by JSC post-flight). Flight results correctly detected the change in sample, matched the analyzer’s ground performance, and were consistent with the gold-standard’s ground results. Although areas were noted for improvement, these outcomes signified complete mission success.

R. S. Miller↗

Going beyond reliability to robustness and resilience in space systems

The words reliability, robustness, and resilience, are often used interchangeably to describe tough and dependable systems but the distinctions between them suggest how to design more serviceable space systems. Reliability is simply the quality of consistently performing well. A system that dependably meets its design requirements in the specified environments is reliable. The designers may not consider themselves responsible for failures under unanticipated conditions. Robustness is the capability of performing without failure under a wide range of conditions, which can go beyond the expected range to include possible off-nominal conditions. Resilience is the ability to recover from or adapt to damaging events, such as failures, accidents, external disruptions, and repurposing. Such changes are usually unanticipated. They often invalidate the usual operating assumptions and cause system failure. Reliability, robustness, and resilience describe dependable performance under increasingly difficult conditions, first the specified environment, then a wider possible environment, and finally unanticipated damaging events. These three are increasingly desirable and increasingly difficult to achieve. Engineering for resilience would design systems that can ignore or repair failures, survive accidents, and recover from disruptions. Increasing the resilience of space systems, the ability to perform after unanticipated events, would greatly increase space crew safety. Improving reliability and robustness can be done by dealing with known sources of problems, but improving resilience requires implementing a general approach to reducing the impact of unknown future events. Two contrasting approaches are reducing system complexity and adding supervisory control. The need for resilience has been claimed for decades but little has been accomplished. Systems designers assume that they understand requirements, technologies, designs, architectures, integration, testing, operations, and environments. The potential problems of changes, failures, accidents, unknown environments, and unknown unknowns are ignored. Systems designers are typically overconfident and ignore the need for robustness and resilience.

Harry W Jones↗

Assessing C2 Communications for UAS Traffic Management

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

air traffic control↗

Assessing C2 Communications

The National Aeronautics and Space Administration's (NASA) Unmanned Aircraft Systems (UAS) Traffic Management (UTM) project works to develop tools and technologies essential for safely enabling civilian low-altitude UAS operations. Currently there is no established infrastructure to enable and safely manage the widespread use of low-altitude airspace and UAS operations, regardless of the type of UAS. The UTM technical challenge will develop comprehensive and validated airspace operations and integration requirements to safely enable large-scale persistent access to visual line of sight and autonomous beyond visual line of sight small UAS in low-altitude airspace. Within the UTM project, a number of communications technologies to support UTM command and control (C2) are under investigation. In particular, commercial networked cellular systems are being tested and assessed for their ability to meet the reliability, scalability, cybersecurity and redundancy required. NASA Glenn Research Center is studying some of the aspects of employing such networks for UTM C2 communications. This includes the development of a test platform for sensing and characterizing the airborne C2 communications environment at various altitudes and in various terrains and topologies, measuring such aspects as received signal strength and interference. System performance aspects such as latency in the link, handover performance, packet error loss rate, drop outs, coverage gaps and other aspects impacting UTM operation will also be assessed. In this paper we explore some of the C2 approaches being proposed and demonstrated in the UTM project, the reliability, availability and other general C2 performance requirements, and approaches to evaluating and analyzing UTM C2 links based on commercial cellular networks.

aircraft communications↗

Liquid Oxygen/Liquid Methane Integrated Power and Propulsion

The proposed paper will cover ongoing work at the National Aeronautics and Space Administration (NASA) Johnson Space Center (JSC) on integrated power and propulsion for advanced human exploration. Specifically, it will present findings of the integrated design, testing, and operational challenges of a liquid oxygen / liquid methane (LOx/LCH4) propulsion brassboard and Solid Oxide Fuel Cell (SOFC) system. Human-Mars architectures point to an oxygen-methane economy utilizing common commodities, scavenged from the planetary atmosphere and soil via In-Situ Resource Utilization (ISRU), and common commodities across sub-systems. Due to the enormous mass gear-ratio required for human exploration beyond low-earth orbit, (for every 1 kg of payload landed on Mars, 226 kg will be required on Earth) increasing commonality between spacecraft subsystems such as power and propulsion can result in tremendous launch mass and volume savings. Historically, propulsion and fuel cell power subsystems have had little interaction outside of the generation (fuel cell) and consumption (propulsion) of electrical power. This was largely due to a mismatch in preferred commodities (hypergolics for propulsion; oxygen & hydrogen for fuel cells). Although this stove-piped approach benefits from simplicity in the design process, it means each subsystem has its own tanks, pressurization system, fluid feed system, etc. increasing overall spacecraft mass and volume. A liquid oxygen / liquid methane commodities architecture across propulsion and power subsystems would enable the use of common tankage and associated pressurization and commodity delivery hardware for both. Furthermore, a spacecraft utilizing integrated power and propulsion could use propellant residuals - propellant which could not be expelled from the tank near depletion due to hydrodynamic considerations caused by large flow demands of a rocket engine - to generate power after all propulsive maneuvers are complete thus utilizing previously wasted mass. Such is the case for human and robotic planetary landers. Although many potential benefits through integrated power & propulsion exist, integrated operations have yet to be successfully demonstrated and many challenges have already been identified the most obvious of which is the large temperature gradient. SOFC chemistry is exothermic with operating temperatures in excess of 1,000 K; however, any shared commodities will be undoubtedly stored at cryogenic temperatures (90-112 K) for mass efficiency reasons. Spacecraft packaging will drive these two subsystems in close proximity thus heat leak into the commodity tankage must be minimized and/or mitigated. Furthermore, commodities must be gasified prior to consumption by the SOFC. Excess heat generated by the SOFC could be used to perform this phase change; however, this has yet to be demonstrated. A further identified challenge is the ability of the SOFC to handle the sudden power spikes created by the propulsion system. A power accumulator (battery) will likely be necessary to handle these sudden demands while the SOFC thermally adjusts. JSC's current SOFC test system consists of a 1 kW fuel cell designed by Delphi. The fuel cell is currently undergoing characterization testing at the NASA JSC Energy Systems Test Area (ESTA) after which a Steam Methane Reformer (SMR) will be integrated and the combined system tested in closed-loop. The propulsion brassboard is approximately the size of what could be flown on a sounding rocket. It consists of one 100 lbf thrust "main" engine developed for NASA by Aerojet and two 10 lbf thrusters to simulate a reaction control system developed at NASA JSC. This system is also under development and initial testing at ESTA. After initial testing, combined testing will occur which will provide data on the fuel cell's ability to sufficiently handle the power spikes created by the propulsion system. These two systems will also be modeled using General-Use Nodal Network Solver (GUNNS) software. Once anchored with test data, this model will be used to extrapolate onto other firing profiles and used to size the power accumulator.

Banker, Brian↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy M. Mclaughlin↗

X-57 Flight Systems Integration Path

The foundation for a safe and successful flight test of the National Aeronautics and Space Administration (NASA) X-57 Maxwell all-electric experimental airplane, or any X-Plane, is comprehensive system testing on the ground. This test campaign includes verification and validation (V&V) that the integrated system operates as designed and expected, as well as understanding how the system reacts and responds to failures that can occur during flight by performing failure modes and effects testing (FMET). The aircraft should be in the final flight configuration for these test activities because any modifications, even those that appear insignificant, could affect test outcomes. Although the plan was to perform V&V and FMET testing once the airplane was in the flight configuration, due to multiple component redesigns, concurrent software development, and other problems with on-aircraft testing, the X-57 Maxwell never made it into a full-flight configuration. As a result, a build-up approach was followed to test software and hardware as they became ready in order to continue making progress wherever possible. Using this approach revealed problems with the hardware and software faster than waiting for a full-flight configuration, allowing solutions to be found more quickly and in parallel with other project tasks. Other than unloaded motor testing in a lab setting, the only other test setup was on the airplane itself. On-aircraft testing was preferrable in order to test things as close to a flight configuration as possible but was time consuming due to the requirements for testing on the airplane. To overcome some of the on-aircraft barriers, off-aircraft test configurations, such as the Systems Integration Laboratory (SIL) and hardware-in-the-loop (HIL) setups, were used, but each of these setups had limitations to be considered. As a result, solutions found in the SIL or HIL configurations did not always work as expected on the airplane, resulting in an iterative process between on- and off-aircraft testing to find the final solution. Having a dedicated test platform such as an iron bird that closely represents the aircraft - without flight hardware - would have been the most effective off-aircraft test setup, which could have allowed the project to save time and money and potentially reach flight. This paper will highlight the V&V and FMET considerations and testing prerequisites, the build-up approaches to both software and system testing, the benefits and drawbacks to different test configurations, as well as battery testing and operations.

Kassidy McLaughlin↗

Advanced Air Traffic Management Research (Human Factors and Automation): NASA Research Initiatives in Human-Centered Automation Design in Airspace Management

NASA has initiated a significant thrust of research and development focused on providing the flight crew and air traffic managers automation aids to increase capacity in en route and terminal area operations through the use of flexible, more fuel-efficient routing, while improving the level of safety in commercial carrier operations. In that system development, definition of cognitive requirements for integrated multi-operator dynamic aiding systems is fundamental. The core processes of control and the distribution of decision making in that control are undergoing extensive analysis. From our perspective, the human operators and the procedures by which they interact are the fundamental determinants of the safe, efficient, and flexible operation of the system. In that perspective, we have begun to explore what our experience has taught will be the most challenging aspects of designing and integrating human-centered automation in the advanced system. We have performed a full mission simulation looking at the role shift to self-separation on board the aircraft with the rules of the air guiding behavior and the provision of a cockpit display of traffic information and an on-board traffic alert system that seamlessly integrates into the TCAS operations. We have performed and initial investigation of the operational impact of "Dynamic Density" metrics on controller relinquishing and reestablishing full separation authority. (We follow the assumption that responsibility at all times resides with the controller.) This presentation will describe those efforts as well as describe the process by which we will guide the development of error tolerant systems that are sensitive to shifts in operator work load levels and dynamic shifts in the operating point of air traffic management.

Corker, Kevin M.↗

Vibro-Acoustic Analysis of NASA's Space Shuttle Launch Pad 39A Flame Trench Wall

A vital element to NASA's manned space flight launch operations is the Kennedy Space Center Launch Complex 39's launch pads A and B. Originally designed and constructed In the 1960s for the Saturn V rockets used for the Apollo missions, these pads were modified above grade to support Space Shuttle missions. But below grade, each of the pad's original walls (including a 42 feet deep, 58 feet wide, and 450 feet long tunnel designed to deflect flames and exhaust gases, the flame trench) remained unchanged. On May 31, 2008 during the launch of STS-124, over 3500 of the. 22000 interlocking refractory bricks that lined east wall of the flame trench, protecting the pad structure were liberated from pad 39A. The STS-124 launch anomaly spawned an agency-wide initiative to determine the failure root cause, to assess the impact of debris on vehicle and ground support equipment safety, and to prescribe corrective action. The investigation encompassed radar imaging, infrared video review, debris transport mechanism analysis using computational fluid dynamics, destructive testing, and non-destructive evaluation, including vibroacoustic analysis, in order to validate the corrective action. The primary focus of this paper is on the analytic approach, including static, modal, and vibro-acoustic analysis, required to certify the corrective action, and ensure Integrity and operational reliability for future launches. Due to the absence of instrumentation (including pressure transducers, acoustic pressure sensors, and accelerometers) in the flame trench, defining an accurate acoustic signature of the launch environment during shuttle main engine/solid rocket booster Ignition and vehicle ascent posed a significant challenge. Details of the analysis, including the derivation of launch environments, the finite element approach taken, and analysistest/ launch data correlation are discussed. Data obtained from the recent launch of STS-126 from Pad 39A was instrumental in validating the design analysis philosophies outlined in this paper.

Margasahayam, Ravi N.↗

Orbital Express Advanced Video Guidance Sensor

In May 2007 the first US fully autonomous rendezvous and capture was successfully performed by DARPA's Orbital Express (OE) mission. Since then, the Boeing ASTRO spacecraft and the Ball Aerospace NEXTSat have performed multiple rendezvous and docking maneuvers to demonstrate the technologies needed for satellite servicing. MSFC's Advanced Video Guidance Sensor (AVGS) is a primary near-field proximity operations sensor integrated into ASTRO's Autonomous Rendezvous and Capture Sensor System (ARCSS), which provides relative state knowledge to the ASTRO GN&C system. This paper provides an overview of the AVGS sensor flying on Orbital Express, and a summary of the ground testing and on-orbit performance of the AVGS for OE. The AVGS is a laser-based system that is capable of providing range and bearing at midrange distances and full six degree-of-freedom (6DOF) knowledge at near fields. The sensor fires lasers at two different frequencies to illuminate the Long Range Targets (LRTs) and the Short Range Targets (SRTs) on NEXTSat. Subtraction of one image from the other image removes extraneous light sources and reflections from anything other than the corner cubes on the LRTs and SRTs. This feature has played a significant role for Orbital Express in poor lighting conditions. The very bright spots that remain in the subtracted image are processed by the target recognition algorithms and the inverse-perspective algorithms, to provide 3DOF or 6DOF relative state information. Although Orbital Express has configured the ASTRO ARCSS system to only use AVGS at ranges of 120 m or less, some OE scenarios have provided opportunities for AVGS to acquire and track NEXTSat at greater distances. Orbital Express scenarios to date that have utilized AVGS include a berthing operation performed by the ASTRO robotic arm, sensor checkout maneuvers performed by the ASTRO robotic arm, 10-m unmated operations, 30-m unmated operations, and Scenario 3-1 anomaly recovery. The AVGS performed very well during the pre-unmated operations, effectively tracking beyond its 10-degree Pitch and Yaw limit-specifications, and did not require I-LOAD adjustments before unmated operations. AVGS provided excellent performance in the 10-m unmated operations, effectively tracking and maintaining lock for the duration of this scenario, and showing good agreement between the short and long range targets. During the 30-m unmated operations, the AVGS continuously tracked the SRT to 31.6 m, exceeding expectations, and continuously tracked the LRT from 8.8 m out to 31.6 m, with good agreement between these two target solutions. After this scenario was aborted at a 10-m separation during remate operations, the AVGS tracked the LRT out 54.3 m, until the relative attitude between the vehicles was too large. The vehicles remained apart for eight days, at ranges from 1 km to 6 km. During the approach to remate in this recovery operation, the AVGS began tracking the LRT at 150 m, well beyond the OE planned limits for AVGS ranges, and functioned as the primary sensor for the autonomous rendezvous and docking.

Howard, Ricky↗

NASA's Space Launch System: Deep-Space Delivery for Smallsats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed CubeSats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the CubeSats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth- Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

NASA's Space Launch System: Deep-Space Opportunities for SmallSats

Designed for human exploration missions into deep space, NASA's Space Launch System (SLS) represents a new spaceflight infrastructure asset, enabling a wide variety of unique utilization opportunities. While primarily focused on launching the large systems needed for crewed spaceflight beyond Earth orbit, SLS also offers a game-changing capability for the deployment of small satellites to deep-space destinations, beginning with its first flight. Currently, SLS is making rapid progress toward readiness for its first launch in two years, using the initial configuration of the vehicle, which is capable of delivering 70 metric tons (t) to Low Earth Orbit (LEO). On its first flight test of the Orion spacecraft around the moon, accompanying Orion on SLS will be small-satellite secondary payloads, which will deploy in cislunar space. The deployment berths are sized for "6U" CubeSats, and on EM-1 the spacecraft will be deployed into cislunar space following Orion separate from the SLS Interim Cryogenic Propulsion Stage. Payloads in 6U class will be limited to 14 kg maximum mass. Secondary payloads on EM-1 will be launched in the Orion Stage Adapter (OSA). Payload dispensers will be mounted on specially designed brackets, each attached to the interior wall of the OSA. For the EM-1 mission, a total of fourteen brackets will be installed, allowing for thirteen payload locations. The final location will be used for mounting an avionics unit, which will include a battery and sequencer for executing the mission deployment sequence. Following the launch of EM-1, deployments of the secondary payloads will commence after sufficient separation of the Orion spacecraft to the upper stage vehicle to minimize any possible contact of the deployed cubesats to Orion. Currently this is estimated to require approximately 4 hours. The allowed deployment window for the cubesats will be from the time the upper stage disposal maneuvers are complete to up to 10 days after launch. The upper stage will fly past the moon at a perigee of approximately 100km, and this closest approach will occur about 5 days after launch. The limiting factor for the latest deployment time is the available power in the sequencer system. Several NASA Mission Directorates were involved in the development of programs for the competition, selection, and development of EM-1 payloads that support directorate priorities. CubeSat payloads on EM-1 will include both NASA research experiments and spacecraft developed by industry, international and potentially academia partners. The Human Exploration and Operations Mission Directorate (HEOMD) Advanced Exploration Systems (AES) Division was allocated five payload opportunities on the EM-1 mission. Near Earth Asteroid (NEA) Scout is designed to rendezvous with and characterize a candidate NEA. A solar sail, an innovation the spacecraft will demonstrated for the CubeSat class, will provide propulsion. Lunar Flashlight will use a green propellant system and will search for potential ice deposits in the moon's permanently shadowed craters. BioSentinel is a yeast radiation biosensor, planned to measure the effects of space radiation on deoxyribonucleic acid (DNA). Lunar Icecube, a collaboration with Morehead State University, will prospect for water in ice, liquid, and vapor forms as well as other lunar volatiles from a low-perigee, highly inclined lunar orbit using a compact Infrared spectrometer. Skyfire, a partnership with Lockheed Martin, is a technology demonstration mission that will perform a lunar flyby, collecting spectroscopy, and thermography data to address questions related to surface characterization, remote sensing, and site selection. NASA's Space Technology Mission Directorate (STMD) was allocated three payload opportunities on the EM-1 mission. These slots will be filled via the 2 Centennial Challenges Program, NASA's flagship program for technology prize competitions, which directly engages the public, academia, and industry in open prize competitions to stimulate innovation. The NASA Science Mission Directorate (SMD) was allocated two payload opportunities on the EM-1 mission. The CubeSat Mission to Study Solar Particles (CuSP) payload will study the sources and acceleration mechanisms of solar and interplanetary particles in near-Earth orbit, support space weather research by determining proton radiation levels during Solar Energetic Particle (SEP) events and identifying suprathermal properties that could help predict geomagnetic storms. The LunaH-Map payload will help scientists understand the quantity of H-bearing materials in lunar cold traps (~10 km), determine the concentration of H-bearing materials with 1m depth, and constrain the vertical distribution of H-bearing materials. The final three payload opportunities for the EM-1 mission were allocated for NASA's international space agency counterparts. The flight opportunities are intended to benefit the international space agency and NASA as well as further the collective space exploration goals. ArgoMoon is sponsored by ESA/ASI and will fly along with the ICPS on its disposal trajectory to perform proximity operations with the ICPS post-disposal, take external imagery of engineering and historical significance, and perform an optical communications demonstration. EQUULEUS, sponsored by JAXA, will fly to a libration orbit around the Earth-Moon L2 point and demonstrate trajectory control techniques within the Sun-Earth-Moon region for the first time by a nano spacecraft. The mission will also contribute to the future human exploration scenario by understanding the radiation environment in geospace and deep space, characterizing the flux of impacting meteors on the far side of the moon, and demonstrating the future deep space exploration scenario using the "deep space port" at Lagrange points. OMOTENASHI, also sponsored by JAXA, will land the smallest lunar lander to date on the lunar surface to demonstrate the feasibility of the hardware for distributed cooperative exploration system. Small landers will enable multi-point exploration, which is complimentary with large-scale human exploration. Once on the lunar surface, the OMOTENASHI spacecraft will observe the radiation and soil environments of the lunar surface by active radiation measurements and soil shear measurements. Following EM-1, Space Launch System will evolve to the more-powerful Block 1B configuration, which uses a new Exploration Upper Stage to increase the vehicle's LEO payload capability from 70 t to 105 t. With that transition, the Orion Stage Adapter, which will carry the secondary payloads on EM-1, will be phased out, and a new Universal Stage Adapter will be introduced, creating opportunities for flying larger secondary payloads. This paper will provide a brief status of SLS progress toward first launch; an overview of smallsat accommodations, integration, and operations on EM-1; information about the specific payloads flying on that launch; and a discussion of future accommodations and opportunities for secondary payloads on SLS for Exploration Mission-2 and beyond.

Robinson, Kimberly F.↗

Micro-Spec: An Ultracompact, High-sensitivity Spectrometer for Far-Infrared and Submillimeter Astronomy

High-performance, integrated spectrometers operating in the far-infrared and submillimeter ranges promise to be powerful tools for the exploration of the epochs of reionization and initial galaxy formation. These devices, using high-efficiency superconducting transmission lines, can achieve the performance of a meter-scale grating spectrometer in an instrument implemented on a 4 inch silicon wafer. Such a device, when combined with a cryogenic telescope in space, provides an enabling capability for studies of the early universe. Here, the optical design process for Micro-Spec (micron-Spec) is presented, with particular attention given to its two-dimensional diffractive region, where the light of different wavelengths is focused on the different detectors. The method is based on the stigmatization and minimization of the light path function in this bounded region, which results in an optimized geometrical configuration. A point design with an efficiency of (is) approximately 90% has been developed for initial demonstration and can serve as the basis for future instruments. Design variations on this implementation are also discussed, which can lead to lower efficiencies due to diffractive losses in the multimode region.

cryogenic telescope↗

Control Design Strategies to Enhance Long-Term Aircraft Structural Integrity

Over the operational lifetime of both military and civil aircraft, structural components are exposed to hundreds of thousands of low-stress repetitive load cycles and less frequent but higher-stress transient loads originating from maneuvering flight and atmospheric gusts. Micro-material imperfections in the structure, such as cracks and debonded laminates, expand and grow in this environment, reducing the structural integrity and shortening the life of the airframe. Extreme costs associated with refurbishment of critical load-bearing structural components in a large fleet, or altogether reinventoring the fleet with newer models, indicate alternative solutions for life extension of the airframe structure are highly desirable. Increased levels of operational safety and reliability are also important factors influencing the desirability of such solutions. One area having significant potential for impacting crack growth/fatigue damage reduction and structural life extension is flight control. To modify the airframe response dynamics arising from command inputs and gust disturbances, feedback loops are routinely applied to vehicles. A dexterous flight control system architecture senses key vehicle motions and generates critical forces/moments at multiple points distributed throughout the airframe to elicit the desired motion characteristics. In principle, these same control loops can be utilized to influence the level of exposure to harmful loads during flight on structural components. Project objectives are to investigate and/or assess the leverage control has on reducing fatigue damage and enhancing long-term structural integrity, without degrading attitude control and trajectory guidance performance levels. In particular, efforts have focused on the effects inner loop control parameters and architectures have on fatigue damage rate. To complete this research, an actively controlled flexible aircraft model and a new state space modeling procedure for crack growth have been utilized. Analysis of the analytical state space model for crack growth revealed the critical mathematical factors, and hence the physical mechanism they represent, that influenced high rates of airframe crack growth. The crack model was then exercised with simple load inputs to uncover and expose key crack growth behavior. To characterize crack growth behavior, both "short-term" laboratory specimen test type inputs and "long-term" operational flight type inputs were considered. Harmonic loading with a single overload revealed typical exponential crack growth behavior until the overload application, after which time the crack growth was retarded for a period of time depending on the overload strength. An optimum overload strength was identified which leads to maximum retardation of crack growth. Harmonic loading with a repeated overload of varying strength and frequency again revealed an optimum overload trait for maximizing growth retardation. The optimum overload strength ratio lies near the range of 2 to 3 with dependency on frequency. Experimental data was found to correlate well with the analytical predictions.

Newman, Brett A.↗