Integrated Multi-Scale Data Analytics and Machine Learning for the Distribution Grid and Building-to-Grid Interface

This white paper introduces the application of advanced data analytics to the modernized grid. In particular, we consider the field of machine learning and where it is both useful, and not useful, for the particular field of the distribution grid and buildings interface. While analytics, in general, is a growing field of interest, and often seen as the golden goose in the burgeoning distribution grid industry, its application is often limited by communications infrastructure, or lack of a focused technical application. Overall, the linkage of analytics to purposeful application in the grid space has been limited. In this paper we consider the field of machine learning as a subset of analytical techniques, and discuss its ability and limitations to enable the future distribution grid and the building-to-grid interface. To that end, we also consider the potential for mixing distributed and centralized analytics and the pros and cons of these approaches. Machine learning is a subfield of computer science that studies and constructs algorithms that can learn from data and make predictions and improve forecasts. Incorporation of machine learning in grid monitoring and analysis tools may have the potential to solve data and operational challenges that result from increasing penetration of distributed and behind-the-meter energy resources. There is an exponentially expanding volume of measured data being generated on the distribution grid, which, with appropriate application of analytics, may be transformed into intelligible, actionable information that can be provided to the right actors – such as grid and building operators, at the appropriate time to enhance grid or building resilience, efficiency, and operations against various metrics or goals – such as total carbon reduction or other economic benefit to customers. While some basic analysis into these data streams can provide a wealth of information, computational and human boundaries on performing the analysis are becoming significant, with more data and multi-objective concerns. Efficient applications of analysis and the machine learning field are being considered in the loop.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm)

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

Final Report Feasibility Study for the California Wave Energy Test Center (CalWavesm) - Volume #2 - Appendices #16-17

The California Wave Energy Test Center (CalWave) Feasibility Study project was funded over multiple phases by the Department of Energy to perform an interdisciplinary feasibility assessment to analyze the engineering, permitting, and stakeholder requirements to establish an open water, fully energetic, grid connected, wave energy test center off the coast of California for the purposes of advancing U.S. wave energy research, development, and testing capabilities. Work under this grant included wave energy resource characterization, grid impact and interconnection requirements, port infrastructure and maritime industry capability/suitability to accommodate the industry at research, demonstration and commercial scale, and macro and micro siting considerations. CalWave Phase I performed a macro-siting and down-selection process focusing on two potential test sites in California: Humboldt Bay and Vandenberg Air Force Base. This work resulted in the Vandenberg Air Force Base site being chosen as the most favorable site based on a peer reviewed criteria matrix. CalWave Phase II focused on four siting location alternatives along the Vandenberg Air Force Base coastline and culminated with a final siting down-selection. Key outcomes from this work include completion of preliminary engineering and systems integration work, a robust turnkey cost estimate, shoreside and subsea hazards assessment, storm wave analysis, lessons learned reports from several maritime disciplines, test center benchmarking as compared to existing international test sites, analysis of existing applicable environmental literature, the completion of a preliminary regulatory, permitting and licensing roadmap, robust interaction and engagement with state and federal regulatory agency personnel and local stakeholders, and the population of a Draft Federal Energy Regulatory Commission (FERC) Preliminary Application Document (PAD). Analysis of existing offshore oil and gas infrastructure was also performed to assess the potential value and re-use scenarios of offshore platform infrastructure and associated subsea power cables and shoreside substations. The CalWave project team was well balanced and was comprised of experts from industry, academia, state and federal regulatory agencies. The result of the CalWave feasibility study finds that the CalWave Test Center has the potential to provide the most viable path to commercialization for wave energy in the United States.

16 TIDAL AND WAVE POWER↗

VOLTTRON 2016

VOLTTRON is a flexible, reliable, and scalable platform for distributed control and sensing. VOLTTRON serves in four primary roles: •A reference platform for researchers to quickly develop control applications for transactive energy. •A reference platform with flexible data store support for energy analytics applications either in academia or in commercial enterprise. •A platform from which commercial enterprise can develop products without license issues and easily integrate into their product line. •An accelerator to drive industry adoption of transactive energy and advanced building energy analytics. Pacific Northwest National Laboratory, with funding from the U.S. Department of Energy’s Building Technologies Office, developed and maintains VOLTTRON as an open-source community project. VOLTTRON source code includes agent execution software; agents that perform critical services that enable and enhance VOLTTRON functionality; and numerous agents that utilize the platform to perform a specific function (fault detection, demand response, etc.). The platform supports energy, operational, and financial transactions between networked entities (equipment, organizations, buildings, grid, etc.) and enhance the control infrastructure of existing buildings through the use of open-source device communication, control protocols, and integrated analytics.

97 MATHEMATICS AND COMPUTING↗

Empirical Estimates of Transmission Value using Locational Marginal Prices [Slides]

This study focuses on one potential benefit of transmission infrastructure—congestion relief. It explores historical grid conditions from 2012 through the first half of 2022, and evaluates the marginal value of transmission in facilitating trade within and across regional boundaries by calculating differences in observed nodal wholesale power prices. The study finds that wholesale power prices exhibit stark geographic differences that, in many cases, are stable over time. Many regional and interregional transmission links have significant potential economic value from reducing congestion and expanding opportunities for trade. In fact, many links have hourly average pricing differences in 2021 that exceeded $\$15$/MWh—equivalent to $130 million per year for a 1000 MW link. The value of transmission is correlated with overall energy prices and varies by region and year. Critically, extreme conditions and high-value periods play an outsized role in the value of transmission, with 50% of transmission’s congestion value coming from only 5% of hours. Transmission planners run the risk of understating the benefits of regional and interregional transmission if extreme conditions and high-value periods are not adequately considered. These periods are natural features of actual market operations. As such, the study highlights the need for planners to more-comprehensively assess the value of transmission under both normal and extreme conditions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Preliminary Analysis of Nuclear-Powered Data Center Scenarios

This report provides a comprehensive analysis of the potential for nuclear energy to meet the growing energy demands of data centers (DCs). It evaluates the technical, economic, and socio-environmental implications of coupling Nuclear Power Plants (NPPs) with DCs, providing initial responses to several key research questions: What is the potential increased energy demand from DCs in the U.S., in the short, medium and long term? The U.S. is experiencing a rapid increase in energy demand from DCs, with projections indicating a total increase of 24-74 GWy(e) by 2028. Meeting this demand with nuclear energy would require 27–85 GWe of installed capacity. While this surge is expected to slow in the long term, the DC industry needs reliable, scalable, and clean energy sources. How much nuclear capacity can be deployed to meet DC demand and in which timeframe? Several pathways for increasing nuclear capacity were identified, including uprates, restarts of recently retired reactors, power purchase agreements with existing fleet, and new construction. Approximately 20‒28 GWe of nuclear capacity could be dedicated to DCs by the early 2030s. How much High Assay Low Enriched Uranium (HALEU) would be needed to support some nuclear deployment scenarios for DCs? Meeting the deployment targets announced by Google and Amazon for the Kairos Power Fluoride-Salt-Cooled High-Temperature Reactor or KP-FHR (~500 MWe by 2035) and the Xe-100 (~1 GWe by 2040), respectively, requires ramping up 19.75% enriched HALEU production to ~6 t/yr by 2040. What types of nuclear energy/DC coupling options exist, and what are the different benefits/challenges? Five coupling options were analyzed, ranging from grid-connected configurations to colocated, behind-the-meter setups. Key design considerations include the proximity to high- and/or medium-voltage transmission lines, the desired internal fault tolerance, and the sources of alternative/backup power during outages. Each coupling option offers unique benefits and challenges in terms of reliability, system costs, regulation, timeline, etc. A list of NPP/DC deployment scenarios was developed, considering existing or newly built NPP or DC projects. Colocated DCs with new small modular reactors or large reactors on greenfield and brownfield sites are the focus of this report. What types of reactors, especially what size, may be incentivized by DCs? Reactor sizing optimization revealed that the ideal reactor size and number of units depend on DC demand, coupling configurations defined in this report, and other economic factors. Larger reactors are preferred for high-demand DCs and grid-connected systems, while larger number of smaller reactors are better suited for DC configurations without grid backup. Which sites may be compatible with co-located nuclear-powered DCs? Siting those projects is a complicated evaluation factoring local water resources, grid connection availability and reliability, IT infrastructure, local work force, proximity to population zones, etc. For this effort greenfield and brownfield sites such as retired coal-fired plants were used to evaluate this question. This evaluation is not meant to recommend any particular site but it highlights key siting criteria and demonstrates large-scale site availability. What are the socio-economic impacts of co-located nuclear-powered DCs? Those projects generate substantial economic benefits to the local economy, particularly in urban settings. Hyperscale DCs colocated with nuclear power plants (sized around 1 GW of power) can create nearly 1,700 jobs for annual operations and more than 7,300 jobs among the supply chain and local businesses as a result of increased household spending. Rural projects also provide significant benefits, but at lower magnitudes compared to urban deployments.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Commercialization of Pumped Storage Hydropower Technologies

Argonne National Laboratory and the National Laboratory of the Rockies were tasked by the U.S. Department of Energy’s Water Power Technology Office (WPTO) to conduct the Commercialization of Pumped Storage Hydropower Technologies study to investigate commercialization challenges faced by developers of pumped storage hydropower (PSH) projects and technologies by going beyond literature review to gather direct industry insights, lessons learned and best practices from interviews and webinars with industry specialists to create this report for PSH stakeholders and the general public. Researchers explored key challenges faced by PSH developers and innovators seeking to commercialize new technologies to improve PSH design, siting, construction, and operations. Along with highlighting challenges, the study sought to identify the best practices in developing and deploying new PSH projects and innovations. This report is designed to present insights, lessons learned, and best practices relevant to those with an interest in highlighting, informing, or advancing these PSH commercialization efforts. Along with highlighting challenges and best practices, the study sought to identify avenues by which DOE and national laboratories can help support and streamline PSH commercialization and project development processes.

13 HYDRO ENERGY↗

Guideline for Characterizing and Evaluating a Candidate Project Site for Solar Thermal Applications

This document presents a structured procedure for characterizing and evaluating candidate project sites for concentrating solar power (CSP) and solar heat for industrial processes (SHIP) applications. The objective is to provide project developers, researchers, and other stakeholders with a consistent, technology-agnostic framework for early-stage site assessment, enabling informed decision-making prior to significant investment in project development. Site selection is a critical factor in project success or failure for both CSP and SHIP projects. Key factors such as solar resource availability, land characteristics, environmental and regulatory constraints, infrastructure availability, and community context are determined by the choice of project site and can materially impact project performance, cost, schedule, and overall viability. This procedure is designed to systematically evaluate these factors, identify potential fatal flaws, and prioritize the most favorable candidate sites for further development. The process begins with rapid screening-level evaluation, using publicly available data to assess solar resource, land availability and suitability, zoning and land-use compatibility, and exclusion zones such as protected lands or sensitive habitats. Sites that meet the minimum screening criteria advance to a more detailed characterization. Subsequent sections of this report provide guidance for a next-level assessment of the most important technical and environmental parameters, including: 1) Solar resource quality, variability, and uncertainty using multiyear datasets and, where appropriate, on-site measurement campaigns; 2) Meteorological conditions such as wind, temperature, extreme weather events, and soiling impacts; 3) Land characteristics including slope, shading, and geotechnical conditions; and 4) Environmental and regulatory considerations, including permitting processes, endangered species, cultural resources, and visual impacts. The procedure also addresses infrastructure and integration considerations, including: 1) Grid interconnection requirements for CSP power generation projects; 2) Electrical and operational integration for SHIP facilities; 3) Water availability, quality, and permitting constraints, which are particularly critical for CSP in arid regions; and 4) Site access, construction logistics, and availability of workforce and supporting services. Recognizing the importance of social and economic context, the procedure includes evaluation of community engagement factors, such as stakeholder sentiment, proximity to sensitive visual receptors, workforce development opportunities, and local economic incentives. The outputs of these assessments are synthesized in a cost and risk evaluation, translating site characteristics into expected impacts on capital cost, operating cost, schedule, and technical risk. This is complemented by screening-level performance modeling, including 8760 simulations and long-term projections, to quantify expected energy or thermal output, assess variability thereof, and support comparison between candidate sites. Finally, the procedure provides high-level guidance on a structured go/no-go decision framework, categorizing sites based on identified risks and constraints, and outlining a clear path forward to feasibility studies and front-end engineering design for viable projects. By standardizing the site characterization process across both CSP and SHIP applications, this guideline aims to: 1) Improve consistency and transparency in early-stage project evaluation; 2) Reduce development risk and avoid investment in nonviable project sites; 3) Support collaboration between developers, researchers, and public agencies; and 4) Accelerate successful deployment of concentrating solar technologies for both power generation and industrial process heat.

14 SOLAR ENERGY↗

Presentation for LDRD FY19 proposal: An Innovative Secure millimeter wave (mmWave) Machine to Machine (M2M) Communication Network for Operating Drones

We propose to prove the principle that a novel 5G wireless network using newly available millimeter wave (mmWave) frequency bands can operate Unmanned Aerial Vehicles (UAVs) with Machine to Machine (M2M) communication. If successful, this proposed network will provide a superior alternative to existing methods with improved radio frequency (RF) coverage and resiliency against cyberattacks. The use of UAVs or drones for non-military applications has been advancing rapidly for a large number of applications in the United States. They include public safety search and rescue of natural disaster victims, surveillance of remote critical infrastructure, surveys of environmental quality in protected regions, and detection of threats during major public events. The proposed approach involves research with modeling, simulation, and experimentation to validate the hypothesis in the following thrusts: 1) Using mmWave beams with antennas tilted upward for RF coverage in the sky to analyze the security, reliability, and spectral efficiency of this wireless network for UAV/drone operation; 2) Adding non orthogonal multiple access (NOMA) to analyze increase in security and spectral efficiency when compared to existing methods; 3) Adding intra-drone communication among the swarm of drones to analyze further increase in reliability and spectral efficiency; 4) Concluding the proof of principle/concept with modeling and experiment to demonstrate that a swarm of drones controlled with this advanced network can be effectively used during the simulated recovery of a critical infrastructure e.g. a cyber compromised power grid that requires a black restart. The experiments will be executed at the North Carolina State University (NCSU) using NCSU’s 28 GHz mmWave system. A conceptual Invention Record Disclosure (IDR) has been filed and we expect Intellectual Property (IP) from this proposed research to advance the IRD towards patent filing by INL with support from NCSU. Successful outcome from this work will pave the way for significant future research needed to mature the technology for a nationwide secure and reliable network supporting a large number of government and public safety drones.

99 GENERAL AND MISCELLANEOUS↗

Building Cyber-Physical Security

Cyber-attacks are becoming more common and brazen. You may already have been a victim of one of these attacks and only find out when your credit card company calls to asks about suspicious activity. Many of the attacks that are in the news are focused on obtaining “personal identifiable information” such as credit card numbers, bank accounts and social security numbers. But there is a whole other target for these cyber criminals, and that is the area of cyber-physical systems including industrial control systems, infrastructure controls such as the electrical grid, and even controls for building systems. While not as well publicized as financial and personal information attacks are both a very real risk and a clear and present danger.

Cyber Physical Security↗

Hydrogen Production, Grid Integration, and Scaling for the Future

The Hydrogen Production, Grid Integration, and Scaling for the Future project will inform clean hydrogen production deployment across the planning, procurement, and operation stages of hydrogen production on the grid. Hydrogen production from renewables is a clean source of fuel which is near zero for greenhouse gas emissions and criteria pollutants. The results from this project will inform entities looking to build clean energy projects that produce good paying jobs in manufacturing, installation, maintenance and operation of these facilities. This project provides system characterization examples, multiple configurations, optimizations, and suggested metering and custody transfer points through multiple scenarios and hardware testing of NREL's state-of-the-art 1.25 MW polymer electrolyte membrane (PEM) electrolyzer system to characterize system performance in relevant scenarios. This work also creates a digital twin for emulation in the Advanced Research on Integrated Systems (ARIES) virtual environment and performs hardware-in-the-loop (HIL) testing of pilot-scale, decentralized, and centralized hydrogen systems.

centralized hydrogen production↗

South Asia Group for Energy - Bhutan

Bhutan's electricity system is already low-carbon through the use of hydropower. However, generation from hydroelectric plants is reduced during the dry winter months and will be impacted by climate change and other extreme weather events. Bhutan is mitigating these risks by diversifying their energy mix with clean energy resources. Bhutan is exploring photovoltaic (PV) solar energy development to enhance its energy system's overall resilience. To ensure efficient grid planning and solar integration, Bhutan's power generator, Druk Green Power Corporation, and the transmission and distribution utility, Bhutan Power Corporation, are partnering with the South Asia Group for Energy (SAGE) to develop their solar capabilities, integrate solar energy into the grid, and strengthen Bhutan's energy infrastructure and efficiency.

Bhutan↗

Multiscale simulation of integrated energy system and electricity market interactions

Accelerating the deep decarbonization of the world's electric grids requires the coordination of complex energy systems and infrastructures across timescales from seconds to decades. Here, we present a new multiscale simulation framework that integrates process- and grid-centric modeling paradigms to better design, operate, and control integrated energy systems (IESs), which combine multiple technologies, in wholesale energy markets. Traditionally, IESs are analyzed with a process-centric paradigm such as levelized cost of electricity (LCOE) or annualized net revenue, ignoring important interactions with electricity markets. This framework explicitly models the complex interactions between an IES's bidding, scheduling, and control decisions and the energy market's clearing and settlement processes, while incorporating operational uncertainties. Through two case studies, we show the importance of understanding and quantifying complex resource-grid interactions. In case study 1, we demonstrate that optimized bidding from one resource shifts the profit distribution for all energy systems in the market. This result suggests new and more flexible IES technologies can disrupt the economics of all market participants, possibly leading to accelerated retirements of less flexible resources. Interestingly, the optimized bidding has little impact on grid-level aggregate statistics, such as total generation costs and renewable penetration rate. While aggregate modeling strategies may remain valid under some IES adoption scenarios for analysis focused on regional outcomes, direct comparisons of IES technologies at specific locations without considering these interactions may lead to misleading or incorrect conclusions. In case study 2, we consider the design and flexible operation of IESs that hybridize conventional generators with energy storage. Through a sensitivity analysis, we find that as the size of the storage system increases, the total number of start-ups for coal- and natural gas-based IESs reduced by 25% and 33.6%, and the total thermal generator ramping (i.e., mileage) reduced by 86.5% and 62.5%, respectively. This shows the primary benefit of storage may not be reduced operational costs (which do not change significantly) but fewer start-ups and less ramping, which may greatly simplify the design, operation, and control of carbon capture systems. The new modeling and optimization capabilities from this work enable the coupling of rigorous, dynamic process models with grid-level production cost models to quantitatively identify the nuanced interdependencies across these vast timescales that must be addressed to realize clean, safe, and secure energy production. Moreover, the proposed general multiscale simulation framework is applicable to all IES technologies and can be easily extended to consider other energy carriers (e.g., hydrogen, ammonia) and energy infrastructures (e.g., natural gas pipelines).

24 POWER TRANSMISSION AND DISTRIBUTION↗

Safety Design for Smart Electric Vehicle Charging with Current and Multiplexing Control

As Electric Vehicles (EVs) increase, charging infrastructure becomes more important. When during the day there is a power shortage, the charging infrastructure should have the options to either shut off the power to the charging stations or to lower the power to the EVs in order to satisfy the needs of the grid. This paper proposes a design for a smart charging infrastructure capable of providing power to several EVs from one circuit by multiplexing power and providing charge control and safety systems to prevent electric shock. The safety design is implemented in different levels that include both the server and the smart charging stations. With this smart charging infrastructure, the shortage of energy in a local grid could be solved by our EV charging management system.

Chung, Ching-Yen↗

Energy Research at Idaho National Laboratory

Energy-related research at Idaho National Laboratory (INL) takes many forms. In this presentation, Liam Boire will step through a specific, on-going research project at INL which seeks to understand transmission grid resilience, and the components which can be improved to increase the resilience of our electrical infrastructure. While utilities and researchers similarly strive to improve power grid reliability, the frequency of large power outages are increasing. Thus, the importance for developing efficient methodologies that enable utilities and researchers alike to identify the most effective areas for improvement within the electric grid is more critical than ever. The method developed during this project recognized that a variety of factors were important to consider when identifying areas for improvement in the electric grid. Physics-based simulators are able to calculate voltage stability, load draws and generation capacities, and enumerate the combinations of component failures which result in system-wide failures (blackout scenarios). Probabilistic Risk Assessment (PRA) is able to assign probabilities to these failure scenarios based on typical component data (or more specific data if a specific system is being analyzed), and thus prioritize the list of failure scenarios based on likelihood and the components based on importance. Finally, adaptive capacity models can simulate the candidate grid and evaluate real and reactive power generation versus demand over time, calculating the total adaptive capacity available in various regions of the grid. The less adaptive capacity a region has, the less “buffer” that region has from failure. Not only are the individual results of these analyses valuable in understanding grid resilience, but the results of these analyses can be cross-correlated for deeper insight. When a grid is analyzed with this approach, failure scenarios can be enumerated and ranked by likelihood, components can be ranked by likelihood to drive system-wide failure, regions can be evaluated for adaptive capacity, and sensitive regions can be identified by recognizing the locations of important components within sensitive regions. Following this detailed discussion, a brief overview of some of the other energy research and areas of interest for the lab will be presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Electric Vehicles into the Grid

Historically, transportation and power systems operated independently, but the rise of electric vehicles is transforming this relationship. In the United States, EV demands are expected to become the largest source of electricity load growth, posing challenges for the grid if not properly managed. This presentation highlights how managed charging strategies and strategic infrastructure deployment can integrate EVs into the power system to enhance grid efficiency and support renewable energy.

ADVANCED PROPULSION SYSTEMS,DIRECT ENERGY CONVERSI↗

Technology solutions for wind integration in ERCOT

Texas has for more than a decade led all other states in the U.S. with the most wind generation capacity on the U.S. electric grid. The State recognized the value that wind energy could provide, and committed early on to build out the transmission system necessary to move power from the windy regions in West Texas to the major population centers across the state. It also signaled support for renewables on the grid by adopting an aggressive renewable portfolio standard (RPS). The joining of these conditions with favorable Federal tax credits has driven the rapid growth in Texas wind capacity since its small beginning in 2000. In addition to the major transmission grid upgrades, there have been a number of technology and policy improvements that have kept the grid reliable while adding more and more intermittent wind generation. Technology advancements such as better wind forecasting and deployment of a nodal market system have improved the grid efficiency of wind. Successful large scale wind integration into the electric grid, however, continues to pose challenges. The continuing rapid growth in wind energy calls for a number of technology additions that will be needed to reliably accommodate an expected 65% increase in future wind resources. The Center for the Commercialization of Electric Technologies (CCET) recognized this technology challenge in 2009 when it submitted an application for funding of a regional demonstration project under the Recovery Act program administered by the U.S. Department of Energy1. Under that program the administration announced the largest energy grid modernization investment in U.S. history, making available some $3.4 billion in grants to fund development of a broad range of technologies for a more efficient and reliable electric system, including the growth of renewable energy sources like wind and solar. At that time, Texas was (and still is) the nation’s leader in the integration of wind into the grid, and was investing heavily in the infrastructure needed to increase the viability of this important resource. To help Texas and the rest of the nation address the challenges associated with the integration of large amounts of renewables, CCET seized on the federal opportunity to undertake a multi-faceted project aimed at demonstrating the viability of new “smart grid” technologies to facilitate larger amounts of wind energy through better system monitoring capabilities, enhanced operator visualization, and improved load management. In early 2010, CCET was awarded a $27 million grant, half funded by the Department of Energy and half-funded by project participants. With this funding, CCET undertook the project named Discovery Across Texas which has demonstrated how existing and new technologies can better integrate wind power into the state’s grid. The following pages summarize the results of seven technology demonstrations that will help Texas and the nation meet this wind integration challenge.

24 POWER TRANSMISSION AND DISTRIBUTION↗