Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Facility Construction”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Special Analyses for the Hanford Integrated Disposal Facility Performance Assessment - 20102

In 2014, the Department of Energy (DOE) Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Site's Integrated Disposal Facility (IDF). The IDF is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste that will be produced at the Waste Treatment and Immobilization Plant (WTP). IDF is also expected to receive solid secondary waste produced at the WTP and other solid wastes from site activities. The IDF has been in a preoperational state awaiting authorization from DOE and a RCRA permit modification from the State of Washington Department of Ecology to receive waste. Both the Disposal Authorization Statement and permit modification require a performance assessment demonstrating that the system of engineered and natural features will limit releases of radionuclides and hazardous chemicals from the IDF and be protective of human health and the environment. The simulated duration is 10,000 years. Based on the analyses presented in the 2017 Integrated Disposal Facility Performance Assessment, DOE issued a conditional Operating Disposal Authorization Statement for the IDF in June 2018. The long-term performance of the IDF to be protective of human health and the environment was evaluated under the requirements of DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the IDF would comply with DOE requirements. In the time that has passed since the performance assessment was approved by DOE, new information has been discovered that had not been considered in the performance assessment. Since this new information has not been evaluated, the potential impact of the changes have not been taken into consideration in DoE's disposal authorization. DOE and its contractors follow a change control process to screen and, when necessary, evaluate new information that could potentially impact the conclusions of the completed performance assessment. This paper will describe the change control process and provide two examples of evaluations performed following the change control process. The first example evaluates a new waste form for liquid secondary waste that was not evaluated in the performance assessment. In the performance assessment, liquid secondary waste was assumed to be solidified with grout. A new recommendation to dispose of the liquid secondary waste after drying it to a powder was evaluated. The second example evaluates inventory implications from changes to the flow sheet that estimates the feed composition to the low-activity waste vitrification facility. The changes result in higher strontium concentrations in the vitrified waste stream. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shuttle Rocket Motor Program: NASA should delay awarding some construction contracts. Report to the Chair, Subcommittee on Government Activities and Transportation, Committee on Government Operations, House of Representatives

Even though the executive branch has proposed terminating the Advanced Solid Rocket Motor (ASRM) program, NASA is proceeding with all construction activity planned for FY 1992 to avoid schedule slippage if the program is reinstated by Congress. However, NASA could delay some construction activities for at least a few months without affecting the current launch data schedule. For example, NASA could delay Yellow Creek's motor storage and dock projects, Stennis' dock project, and Kennedy's rotation processing and surge facility and dock projects. Starting all construction activities as originally planned could result in unnecessarily incurring additional costs and termination liability if the funding for FY 1993 is not provided. If Congress decides to continue the program, construction could still be completed in time to avoid schedule slippage.

Source record↗

A subsonic to Mach 5.5 subscale engine test facility

The NASA-Langley Mach 4 facility, in which air-hydrogen combustion is used to heat the test gas, was modified to make the facility suitable for tests of ramjet-type models at subsonic and transonic, as well as supersonic, Mach numbers. The construction details and the instrumentation of this facility, designated the Combustion-Heated Scramjet Test Facility, are described, and modifications to enhance the test capability range from the subsonic/transonic and Mach 3.5 to 5.5 are discussed. Design diagrams and test result graphs are included.

Andrews, Earl H., Jr.↗

Evaluation of selected chemical processes for production of low-cost silicon, phases 1 and 2

A miniplant, consisting of a 5 cm-diameter fluidized-bed reactor and associated equipment was used to study the deposition parameters, temperature, reactant composition, seed particle size, bed depth, reactant throughput, and methods of reactant introduction. It was confirmed that the permissible range of fluidized-bed temperature was limited at the lower end by zinc condensation (918 C) and at higher temperatures by rapidly decreasing conversion efficiency. Use of a graded bed temperature was shown to increase the conversion efficiency over that obtained in an isothermal bed. Other aspects of the process such as the condensation and fused-salt electrolysis of the ZnCl2 by-product for recycle of zinc and chlorine were studied to provide information required for design of a 50 MT/year experimental facility. In view of the favorable technical and economic indications obtained, it was recommended that construction and operation of the 50 MT/year experimental facility be implemented.

Blocher, J. M.↗

Satellite Power System (SPS). State and local regulations as applied to satellite power system microwave receiving antenna facilities

State and local regulation of power plant construction and operation of solar power satellite (SPS) receiving stations is presented. Each receiving antenna station occupies a land area 100-200 km square, receives microwave transmissions from the solar power satellite, and converts them into electricity for transmission to the power grid. The long lead time associated with the SPS and the changing status of state and local regulation dictated emphasis on: generic classification of the types of regulation, and identification of regulatory vectors which affect rectenna facilities.

Kotin, A. D.↗

Introduction and ISS assembly description

This introductory address provides a brief overview and a timeline for construction of the International Space Station, beginning with the July 2000 launch of the Russian Service Module, Zvezda, and ending with the Mission STS-112.

Facility Design and Construction↗

Living Together in Space: The International Space Station Internal Active Thermal Control System Issues and Solutions-Sustaining Engineering Activities at the Marshall Space Flight Center From 1998 to 2005

On board the International Space Station, heat generated by the crew and equipment is removed by the internal active thermal control system to maintain a comfortable working environment and prevent equipment overheating. Test facilities simulating the internal active thermal control system (IATCS) were constructed at the Marshall Space Flight Center as part of the sustaining engineering activities to address concerns related to operational issues, equipment capability, and reliability. A full-scale functional simulator of the Destiny lab module IATCS was constructed and activated prior to launch of Destiny in 2001. This facility simulates the flow and thermal characteristics of the flight system and has a similar control interface. A subscale simulator was built, and activated in 2000, with special attention to materials and proportions of wetted surfaces to address issues related to changes in fluid chemistry, material corrosion, and microbial activity. The flight issues that have arisen and the tests performed using the simulator facilities are discussed in detail. In addition, other test facilities at the MSFC have been used to perform specific tests related to IATCS issues. Future testing is discussed as well as potential modifications to the simulators to enhance their utility.

Wieland, P. O.↗

Ten questions concerning Large Language Models (LLMs) for building applications

Large Language Models (LLMs) are emerging as powerful AI tools capable of transforming how building information is collected, processed, analyzed, and applied across diverse research areas. Their capabilities can help building operators, facility managers and other stakeholders such as designers, architects and engineers by providing actionable insights for decision-making across planning, construction, operations, and maintenance of buildings and facilities. This paper explores ten key questions concerning the role of LLMs in shaping sustainable, intelligent, and human-centric buildings. From fundamental definitions to advanced applications, we examine how LLMs facilitate decision-making across the life cycle of buildings and energy systems. LLMs can enhance life cycle assessments (LCA), building energy simulations, and real-time data integration, empowering more efficient and adaptive human-AI environments. They can also contribute to streamlining regulatory compliance, improving post-occupancy evaluations, and fostering more inclusive and participatory design processes. Additionally, this paper addresses the ethical challenges posed by LLMs, such as bias, data privacy, and environmental impacts, and explores their potentials in advancing intelligent digital twins (DT) for ongoing building operations and maintenance. Built upon our applied research using LLMs and the review of tools, datasets, and research gaps, we provide a forward-looking perspective on how LLMs can drive innovation, collaboration, and productivity in the built environment while supporting ethical and effective implementation.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Scale Model Icing Research Tunnel

NASA Lewis Research Center's Icing Research Tunnel (IRT) is the world's largest refrigerated wind tunnel and one of only three icing wind tunnel facilities in the United States. The IRT was constructed in the 1940's and has been operated continually since it was built. In this facility, natural icing conditions are duplicated to test the effects of inflight icing on actual aircraft components as well as on models of airplanes and helicopters. IRT tests have been used successfully to reduce flight test hours for the certification of ice-detection instrumentation and ice protection systems. To ensure that the IRT will remain the world's premier icing facility well into the next century, Lewis is making some renovations and is planning others. These improvements include modernizing the control room, replacing the fan blades with new ones to increase the test section maximum velocity to 430 mph, installing new spray bars to increase the size and uniformity of the artificial icing cloud, and replacing the facility heat exchanger. Most of the improvements will have a first-order effect on the IRT's airflow quality. To help us understand these effects and evaluate potential improvements to the flow characteristics of the IRT, we built a modular 1/10th-scale aerodynamic model of the facility. This closed-loop scale-model pilot tunnel was fabricated onsite in the various shops of Lewis' Fabrication Support Division. The tunnel's rectangular sections are composed of acrylic walls supported by an aluminum angle framework. Its turning vanes are made of tubing machined to the contour of the IRT turning vanes. The fan leg of the tunnel, which transitions from rectangular to circular and back to rectangular cross sections, is fabricated of fiberglass sections. The contraction section of the tunnel is constructed from sheet aluminum. A 12-bladed aluminum fan is coupled to a turbine powered by high-pressure air capable of driving the maximum test section velocity to 550 ft/sec (Mach 0.45). The air turbine and instrumentation are housed inside a fiberglass nacelle. Total and static pressure measurements can be taken around the loop, and velocity and flow angularity measurements can be taken with hot-wire and five-hole probes at specific locations. The Scale Model Icing Research Tunnel (SMIRT) is undergoing checkout tests to determine how its airflow characteristics compare with the IRT. Near-term uses for this scale-model tunnel include determining the aerodynamic effects of replacing the 52-yearold W-shaped heat exchanger with a flat-faced heat exchanger. SMIRT is an integral part of the improvements planned for the IRT because testing the proposed IRT improvements in a scale-model tunnel will lower costs and improve productivity.

Canacci, Victor A.↗

Long-lived space observatories for astronomy and astrophysics

NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

Savage, Blair D.↗

LLNS Request for Variance From 10 CFR 851 for Construction of LLNL Emergency Operations Center

Lawrence Livermore National Security, LLC (LLNS) is submitting the following variance application requesting the use of the State of California’s Occupational Safety and Health Administration (Cal/OSHA) Regulations in lieu of Title 10 Code of Federal Regulations Part 851 (10 CFR 851, the Rule), Worker Safety and Health Program, Subpart B (Program Requirements), Subpart C (Specific Program Requirements), and Appendix A (Worker Safety and Health Functional Areas), solely with respect to the construction of the new Lawrence Livermore National Laboratory (LLNL) Emergency Operations Center (EOC) facility. The request is in support of the National Nuclear Security Administration (NNSA) “pilot” to streamline the delivery of commercial-like line item construction projects under $50 million. This pilot is aligned with the approved NA-50 safety approach for the projects in the pilot. This pilot is to test and demonstrate innovation leading to a reduced cost of construction for building commercial type structures at Department of Energy (DOE)/NNSA facilities. The variance proposes to permit local/regional construction businesses contracted to Management & Operation contractor operated facilities to bid, operate, execute, and comply with safety and health standards they utilize in their business outside of the DOE Complex. This will permit compliance to standards that are as safe and healthful as those in 10 CFR 851 without confusion, additional cost, and inefficiencies associated with the burden of compliance to an unfamiliar regulatory spectrum.

99 GENERAL AND MISCELLANEOUS↗

Assessment of Baseline Monitoring Data for the Remote-Handled Low-Level Waste Disposal Facility at Idaho National Laboratory

The purpose of this document is to summarize environmental monitoring data collected at the Remote-Handled Low-Level Waste (RHLLW) Disposal Facility during the first four years of facility operations (FY 2019 through FY 2022). This summary provides a “baseline” condition for the facility, which can be used to distinguish contaminant releases from the RHLLW Disposal Facility from pre existing contamination as well as potential future releases from other sources (i.e., upgradient aquifer sources), as specified in the facility monitoring plan. Sufficient data has been collected over the first four years of operation of the RHLLW Disposal Facility to establish baseline conditions for future compliance monitoring of aquifer wells and performance monitoring of vadose zone lysimeters. Except for seven elevated tritium measurements from lysimeter HFEF-South believed to have been impacted by waste disposals, all data was deemed appropriate for establishing baseline concentrations. Monitoring of the aquifer detected indicator analytes gross alpha and gross beta and target analytes tritium and C-14. There were a few C-14 detections prior to an increase in the required detection level (RDL) after the first round of sampling. I-129 and Tc-99 were not detected above RDLs in aquifer samples. Lysimeter samples detected indicator analytes gross alpha and gross beta and target analyte tritium. Target analytes C-14, I-129, and Tc-99 were not detected above RDLs in lysimeter samples. Except for tritium, baseline concentrations of indicator and target analytes measured during the first four years of RHLLW facility operations are expected to represent conditions through the expected 20 year operating period of the facility. Elevated tritium in the aquifer, a result of past discharges of tritium at upgradient facilities, showed a decline over the first four years of operations, and levels are expected to continue to decline with time as a result of dilution and decay. Current tritium levels in lysimeter samples may be elevated due to tritium in the water applied during construction and infiltration testing of the facility. As a result, tritium concentrations in lysimeters may decline with time as a result of dilution and decay. Statistical measures (i.e., mean, standard deviation, and 99% upper confidence level [UCL]) were calculated for all detected analytes using the four years of concentration data. These measures will be used to evaluate future monitoring results and to demonstrate the facility is performing, or not performing, as established in the facility performance assessment (PA). Future monitoring results will also be combined with the baseline data in this report to further establish temporal trends and natural variability in the measurements. Based on the data collected during the baseline period, it is recommended the gross alpha action level for performance monitoring increase from 10 to 20 pCi/L due to several baseline measurements exceeding the preliminary action level of 10. An action level of 20 pCi/L is slightly greater than the 99% UCL, is protective of the aquifer, and would reduce unnecessary sampling. It is also recommended that tritium be added to the lysimeter analyte list for post-baseline period monitoring. Tritium, while not a dose concern, is a good tracer that can provide valuable information on water flow in and around the RHLLW Disposal Facility. Recommendations for a tritium action level are provided if considered necessary.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

New Hayabusa2 and OSIRIS REx Curation Facilities at Nasa Johnson Space Center

Asteroids are made up of rocky material that is left over from the formation of our solar system [1]. This material holds the key to unlocking information about the history of the planets and our sun. Hayabusa2 and OSIRIS-REx are two sample return missions that have collected rocky material from carbonaceous asteroids which are rich in water, carbon, and organic compounds [1]. Hayabusa2 is a spacecraft that collected samples from asteroid Ryugu launched by the Japan Aerospace Exploration Agency (JAXA). Samples were returned to Earth in December 2020 and 10 percent of the collected material is currently housed in a state-of-the-art laboratory at NASA Johnson Space Center (JSC) dedicated to Ryugu material [1]. OSIRIS-REx is a spacecraft launched by NASA that collected samples from asteroid Bennu. The samples are on their journey to Earth and will arrive in September 2023. They will be stored in a separate cleanroom dedicated to Bennu material. From these two missions, scientists will examine dust particles and rocky material to research clues on how the early solar system formed and how life began [2]. Because these samples are so precious and rare, it is important to keep them free from Earth contamination. In September of 2020, a massive construction project began to provide curation facilities to meet the needs of two incoming asteroid collections, Hayabusa2 and OSIRIS-REx. Despite numerous setbacks caused by the coronavirus pandemic, these facilities have been completed in the fall of 2021. Some of these setbacks included strict PPE requirements, keeping safe working distances as well as access to the facilities as NASA was operating under a Stage 3 condition in response to the pandemic. These facilities will provide curation laboratories to safely house the precious asteroid samples as well as facilities to manipulate samples, do sample preparation and process samples into and out of the labs for future studies by the scientific community. The lab suite consists of several different rooms including an initial anteroom (ISO 7), a staging area (ISO 7), two gowning areas (one for OSIRIS-REx and one for Hayabusa2; both ISO 6)), the Haybusa2 Curation Laboratory (ISO 5), the OSIRIS-REx Curation Laboratory (ISO 5), an ultramicrotomy laboratory (ISO 7) and a thin section laboratory (not a cleanroom). To maintain cleanliness levels necessary for these lab spaces quarterly to monthly Balazs organic and inorganic sampling has been conducted on a regular basis before, during and after the construction project to monitor the cleanliness levels in the new labs that will house the asteroid samples. These new facilities feature a Ruuvi (Grafana) monitoring system that measures temperature, humidity, and pressure of the lab suite. This is a small puck shaped sensor that sends signals to the Grafana cloud where the data can be plotted and set up on dashboards within the lab suite. These sensors are easy to set up and install and they run off a cell battery that is good for 3-5 years before needing replacement. This system can deliver text messages and emails to the appropriate personnel when values fall outside of set limits. In addition to the monitoring system, this new lab suite features viewing windows from several different locations and sliding motion censored doors. We have obtained some state-of-the-art equipment to outfit the lab spaces (desiccators, microscopes, ultramicrotome) and are in the process of outfitting the suite with additional items such as: nitrogen gloveboxes, additional desiccators, micromanipulators, etc. The Hayabusa2 samples provided to NASA by JAXA included 23 millimeter sized grains and 4 containers with finer material. OSIRIS-REx is expected to return as much as 400 grams of asteroid Bennu. Samples will be stored in a nitrogen glove box and separated into nitrogen sealed transfer containers. Small Bennu and Ryugu particles will be handled and prepared (e.g., ultra-thin sections for scanning electron microscopy (SEM) or transmission electron microscopy (TEM)) using an Axis Pro micromanipulator and Leica EM UC7 ultramicrotome. Analyzing samples at the atomic scale will provide greater insight to the origins of the solar system and life formation on Earth. All the curation preparation for these sample collections is essential to ongoing research and efforts to understand our solar system, both nowand for future generations.

Curation↗

10 Gbps Shuttle-to-Ground Adjunct Communication Link Capability Experiment

A 1.2 Gbps space-to-ground laser communication experiment being developed for use on an EXpedite the PRocessing of Experiments to the Space Station (EXPRESS) Pallet Adapter can be adapted to fit the Hitchhiker cross-bay-carrier pallet and upgraded to data rates exceeding 1O Gbps. So modified, this instrument would enable both real-time data delivery and increased data volume for payloads using the Space Shuttle. Applications such as synthetic aperture radar and multispectral imaging collect large data volumes at a high rate and would benefit from the capability for real-time data delivery and from increased data downlink volume. Current shuttle downlink capability is limited to 50 Mbps, forcing such instruments to store large amounts of data for later analysis. While the technology is not yet sufficiently proven to be relied on as the primary communication link, when in view of the ground station it would increase the shuttle downlink rate capability 200 times, with typical total daily downlinks of 200 GB - as much data as the shuttle could downlink if it were able to maintain its maximum data rate continuously for one day. The lasercomm experiment, the Optical Communication Demonstration and High-Rate Link Facility (OCDHRLF), is being developed by the Jet Propulsion Laboratory's (JPL) Optical Communication Group through support from the International Space Station Engineering Research and Technology Development program. It is designed to work in conjunction with the Optical Communication Telescope Laboratory (OCTL) NASA's first optical communication ground station, which is under construction at JPL's Table Mountain Facility near Wrightwood, California. This paper discusses the modifications to the preliminary design of the flight system that would be necessary to adapt it to fit the Hitchhiker Cross-Bay Carrier. It also discusses orbit geometries which are favorable to the OCTL and potential non-NASA ground stations, anticipated burst-error-rates and bit-error-rates, and requirements for data collection on the ground.

Ceniceros, J. M.↗

CSA, the French LILW Disposal Facility: Taking Stock of the 30 years' Operating Experience - 20009

French Andra's currently operational LILW repository, Aube disposal facility, is almost 30 years old. From the beginning, the repository has benefited from the lessons learned from the first disposal facility, the CSM. It has nevertheless continued to evolve, to improve and to adapt, seeking to gain in efficiency, safety and cost optimization. This is a look at what has changed at the CSA since 1992 - and the effect these changes had on its operating practices, construction principles and the entire management organization. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Area Modular Monitoring of Critical Facilities

The scope and pricipal objectives of the CRADA project is to (1) improve the design of patented Remote Area Modular Monitoring (RAMM) system, and (2) construct prototypes for testing and demonstration in nuclear facilities at Argonne National Laboratory and other DOE labs/sites.

97 MATHEMATICS AND COMPUTING↗

Conceptual Design of a Water Tank Critical Facility for SPARC

Critical experiments, sometimes referred to zero-power reactors, are crucial tools in developing and validating nuclear physics predictions and thus an indispensable capability to ensure criticality safety during all parts of the nuclear fuel cycle and in reducing uncertainties in reactor physics predictions toward optimizing nuclear energy production. The System Physics Advanced Reactor Facility (SPARC) project was recently initiated to enable large-scale criticality experiments using a horizontal split table machine well suited toward solid core materials systems (fuel, moderator, reflector). The facility selected for this mission was a former pool-type research reactor building and thus also well suited toward a second critical experiment capability able to house full-size light-water reactor (LWR) fuel bundles. A conceptual design study was undertaken to review past water tank critical experiments used for LWR physics experiments and to develop an early engineering design for a new critical assembly tank (CAT). The work described here shows that a relatively simple CAT concept can be constructed and deployed in the SPARC facility to meet the urgent demands for new critical experiments on advanced LWR fuel bundles designs. The SPARC facility layout is conducive to the receipt and upending of LWR fuel bundles using existing containers and equipment from the LWR industry. The facility’s overhead crane can then be used to handle fuel bundles and place them in a vertical storage rack or in the CAT for critical experiments, both of which fit within the building’s “open basement” alongside other equipment planned for SPARC and the horizontal split table. A slightly lower area in the basement can serve as a large drain tank so that fail-safe valves drain the CAT reactor tank for safe shutdown. Neutronic configurations were determined where a 3 × 3 array of fuel bundles can be surrounded by full-length “loose rods” to adjust reactivity so that critical is achieved when the bundles are fully submerged. Viable configurations were determined for both pressurized- and boiling-water-reactor-type fuel bundles. This design concept was used to develop an early planning basis for establishing the CAT capability alongside the otherwise planned SPARC project in order to help streamline the process. Recent presidential executive orders have highlighted the need to achieve power uprates in LWR plants and the CAT capability will be a crucial element of these initiatives. Based on the work described herein, it is recommended that an earnest and timely project begin in order to establish this urgently needed capability.

11 - NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar particle events and the International Space Station

The high inclination orbit for the International Space Station poses a risk to astronauts on EVA during occasional periods of enhanced high energy particle flux from the sun known as Solar Particle Events. We are currently unable to predict these events within the few-hour lead time required for evasive action. Compounding the threat is the fact that station construction occurs during increasing solar activity and through the peak of the solar cycle. In this paper we present an overview of the risk, the current methods to provide forecasts of SPEs, and potential risk mitigation options.

NASA Discipline Radiation Health↗