Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FUNDING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Offshore Testing Facility – Small Scale Turbine Testing and Development Final Technical Report

In July 2010 funding for an award was made available under contract DE-EE0004200 which is the focus of this report. Under this funding, The U.S. Department of Energy’s (USDOE) designated Florida Atlantic University’s (FAU) state of Florida marine renewable energy focused Center of Excellence for Ocean Energy Technology as the Southeast National Marine Renewable Energy Center (SNMREC). The award was advertised in 2008, when the USDOE Wind and Water Program issued a funding opportunity announcement (DE-PS36-08GO98030) to establish university-led National Marine Renewable Energy Centers (NMRECs). Although FAU was selected for this opportunity, funding did not become available until 2010 at which time three of the original five years of performance remained and scope was adjusted accordingly. This award was divided into two phases. The first phase focused on marine energy turbine system enhancement and research while the second phase aimed to advance offshore capabilities and testing opportunities for small-scale demonstration turbines. The project’s objective was to increase the nation’s capabilities, knowledge, and competitiveness with respect to ocean current energy technology. This project successfully achieved these goals by advancing marine energy technology testing opportunities and capabilities. This report details these accomplishments by phase and task. Descriptions include any relevant results, challenges, achievements, and outcomes. Additional intellectual products and publications are listed in the Appendix where detailed technical explanations can be found. Further, because this award designated SNMREC as a USDOE center, it challenges FAU to continue providing value for the marine energy sector in the long term. The direct accomplishments of this project, though noteworthy, are also the seeds for a greater partnership between the USDOE and FAU. SNMREC, leveraging its designation as an NMREC under this award, will expand these contributions for decades to come as a coordinated sustainable program that can serve the marine energy sector’s needs as they arise.

16 TIDAL AND WAVE POWER↗

Fiscal Year 2023 Software Quality Assurance Activities for the ARC Software

The Argonne Reactor Code (ARC) software suite [1-17] has been developed by Argonne researchers for fast reactor design and analysis since the 1970s. With the ARC software suite, a user can quickly build a model of a proposed or existing fast spectrum reactor and carry out fuel cycle, nominal thermal analysis and flow requirements, and assess, as is appropriate, whether the core design and constraint system yield an acceptable mechanical behavior. For transient reactor analysis with SAS4A [18], the ARC software suite can be used to generate reactivity coefficients and kinetics parameters at any modeled fuel cycle time point which forms part of the input to SAS4A. The ARC suite was consistently being developed until the 1990s and followed a software QA program which was an appropriate standard for the time. In the 1990s, the DOE funding to fast reactor research and development was all but eliminated and the ARC software was put into maintenance mode. In the early 2000s, the software quality assurance (SQA) program for ARC was still in place to define an official version, but by 2005 it all but was abandoned as there were insufficient staff to fill the work roles. Since 2005, there has been a considerable increase in research and design work on fast spectrum reactors. The ARC software as a whole has since been exported to many universities and commercial companies and ANL support has been given to the various projects over the years [19-23]. Further, MC 2 -3, PERSENT, and DASSH were all developed after 2005 without any adherence to a software standard. In recent time, the DOE VTR project [22] paid for verification work to be done on the ARC software as part of the goal of making it NQA-1 complaint. The VTR project was not considered the appropriate pathway to fund and maintain a SQA program for the ARC software and while software developments (DASSH) were made and several manuals were updated and software verification work was carried out, the ARC software is not NQA-1 compliant. More recently the Advanced Reactor Development Program (ARDP [23]) has funded the creation of manuals for some ARC utility programs and funded additional software verification work on DIF3D [6, 7] and MC 2 -3 [2-5] for the purpose of commercial grade dedication. Because of the VTR and ARDP projects, software verification work was completed on MC 2 -3 and DIF3D, and detailed reports were created for each piece of software, which discuss the inputs and outputs from the codes that are covered by the verification work and link various analytic, code-to-code, and hand calculation based verification work presented in the report with verification test problems provided with the software. This is a key part of the commercial grade dedication work and constitutes the bulk of the cost to get the ARC software to commercial grade. The ARC software suite is a valuable asset as a fast reactor design and analysis tool set that has been reasonably well verified and validated with various fast reactor benchmark problems and experiments over decades. Some or all of the ARC software suite has been utilized for designing the IFR [20], PGSFR [21], VTR [22], and Natrium [23] reactors and we can expect it to continue to be used for advanced fast reactor design and/or confirmatory calculation purposes in the future. Due to increased interest by commercial companies and regulatory bodies, it is becoming more important to make the ARC software suite complete and ready-to-use in terms of its SQA pedigree and commercial grade dedication needs. This report discusses the achievements made towards building a new SQA program for the ARC software and dealing with outstanding identified QA gaps.

97 MATHEMATICS AND COMPUTING↗

A Solar Fuels Nexus: Molecules and Materials for Light-Driven Catalysis

The American Chemical Society (ACS) selects two groups of graduate students each year to plan and host a one-day symposium at each national meeting (both fall and spring).This year our Graduate Student Symposium Planning Committee (GSSPC), composed of seven students from four universities, proposal entitled “A Solar Fuels Nexus: Molecules and Materials for Light-Driven Catalysis” was selected for the “Crossroads in Chemistry” ACS Meeting that will take place March 23-26, 2023 in Indianapolis, IN. All members of our GSSPC are affiliated with the DOE Fuels from Sunlight Energy Innovation Hub, with two from the Liquid Sunlight Alliance (LiSA) and five from the Center for Hybrid Approaches in Solar Energy to Liquid Fuels (CHASE). Here we request funds to support this symposium. This symposium will highlight research progress and perspectives in the solar fuels generation field and seeks to advance the four priority research objectives (PROs) established by the Department of Energy’s Office of Basic Energy Sciences (DOE-BES) Roundtable Report that are also central to many research goals within LiSA and CHASE. The symposium will consist of research presentations from 10 invited senior researcher speakers on topics such as molecular catalyst design, computational modeling of electron transfer systems, microenvironmental effects on CO2 reduction and H2O oxidation catalysis, and intelligent design of semiconductor interfaces with ample time for discussions. These research topics fit very well with the Solar Photochemistry supported research areas of “light-driven electron and energy transfer in condensed phase and interfacial molecular systems,” “electrocatalysis and photocatalysis of solar fuels reactions,” and “semiconductor photoelectrochemistry.” More broadly, this symposium seeks to advance the DOE-BES’s mission to: “support fundamental research to understand, predict, and ultimately control matter and energy at the level of electrons, atoms, and molecules” by providing a diverse atmosphere where such research will be disseminated, discussed, and debated. There will be a strong focus on Diversity, Equity, and Inclusivity (DEI) in our symposium. Of our 10 speakers, 7 will be from underrepresented demographics in STEM, including 5 who identify as women. Furthermore, we have representatives from academia accompanied by one national lab scientist and one officer from the Office of Fossil Energy and Carbon Management at the DOE. All speakers will be holding a short DEI moment ahead of their talks. In order to support the career development of attending early career scientists, we will also be hosting a luncheon specifically for graduate students and postdocs to provide them opportunities to network with the distinguished speakers and other attendees. DOE funds for this symposium will be used to support the attendance and participation of 15 graduate students from US institutions by defraying travel and registration costs. These funds will promote engagement and conversation between early career scientists in the solar fuels field, while disseminating solar fuels research funded by and relevant to the DOE.

30 DIRECT ENERGY CONVERSION↗

S4PST: Sustainability for Programming Systems and Tools: May Workshop Report

The US Department of Energy (DOE) Exascale Computing Project (ECP) has fostered and strengthened the use of modern software engineering practices for developing applications and libraries, and this effort has resulted in the coordinated and interoperable E4S1 and xSDK2 ecosystems. Although this approach is cost-effective, it relies on robust programming systems and tools (PST) as the underlying foundation for our HPC software. At present, our primary PST stack consists of traditional high-performance computing (HPC) languages, namely Fortran, C, C++, and the popular Python language for data analysis and AI workflows. These languages support various programming frameworks and run-time abstractions that enable parallelism and concurrency across multiple node architectures and thousands of nodes through a variety of interconnect systems. However, to accommodate users’ diverse needs, certain aspects of the HPC ecosystem are delegated to vendor-specific or third-party implementations that extend beyond a particular scientific domain. This broader scope results in a multitude of specifications and variations, which leads to a complex orchestration of many-ecosystems. Unfortunately, this complexity in the ecosystem imposes additional overhead costs on consumers during the latter stages of the development cycle. In addition to the software ecosystem challenge, the upcoming conclusion of the ECP by December 2023 has raised significant concerns within the HPC programming systems community, from both the economic and social perspectives. The ECP has implemented a management structure for software development and funding decisions across all ECP participants by following a conventional hierarchical and centralized approach. However, this structure has prompted certain considerations within the community, particularly in anticipation of the Software Sustainability initiative by the DOE’s Advanced Scientific Computing Research Program (ASCR). For the success of this new initiative, it is of utmost importance to secure consistent funding and foster close engagement with researchers and core developers of existing programming-system products. This collaboration is vital to maintaining the critical capabilities of the current software during the transition phase while proactively adapting to future technology and workforce trends. The community recognizes the significance of adapting to emerging trends and is aware of the inherent fragility of the HPC software ecosystem, particularly in relation to programming systems that cater to all users. The ability to adapt and evolve is essential to staying relevant and effectively addressing these technical, economic, and social challenges. The S4PST team, which represents one of the six ASCR Software Sustainability seedling projects, is dedicated to tackling these challenges through community-based approaches that go beyond the scope of the DOE. This involves collaboration between national laboratories with academia, non-DOE institutions, hardware and system vendors, and international partners. By fostering these partnerships, we aim to create a robust and sustainable HPC software ecosystem that can effectively meet the needs of the community. This new community effort, driven by the eight DOE labs, will take on the responsibility of guiding funding decisions for programming-systems development and maintenance with transparency and consistency across all decisions. Additionally, the team will offer common technical services to the programming systems community, irrespective of their funding situations, and facilitate community-wide incubation to proactively nurture the software ecosystem. By actively engaging with stakeholders and employing a collaborative approach, we can collectively shape the future of programming systems and ensure a robust and thriving HPC software landscape. On May 11–12, 2023, the S4PST team conducted its inaugural kick-off workshop at the Innovative Computing Laboratory (ICL) in the University of Tennessee, Knoxville, hosted by Hartwig Anzt. The workshop encompassed various sessions dedicated to presentations and discussions, with the aim of comprehending the team members’ perspectives on the vision of software sustainability. Additionally, the workshop aimed to identify the technical, economic, and social requirements for sustaining the programming-systems community in the field of HPC. This report provides a summary of the S4PST effort by highlighting five major thrust areas discussed during the workshop: (i) community, (ii) technical support, (iii) training and diversity, (iv) verification, validation and correctness, and (v) emerging technologies. It also encompasses an overview of the presentations and discussions held throughout the event, our views and potential synergies with other seedling efforts, along with the outcomes and key takeaways from our initial discussions.

97 MATHEMATICS AND COMPUTING↗

Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region

U.S. Department of Energy (DOE), Office of Science, Award DE-SC0023215, Expanding Collaborative Capacity to Address Climate Resiliency in the Great Lakes Region, supported capacity and partnership building between researchers at Central Michigan University (CMU) and scientists at DOE laboratories. The work involved identifying potential collaborations both internal to CMU and between CMU researchers and DOE staff, developing collaborative research proposals, and partnering on pilot-scale research projects focused on enhancing resilience of Great Lakes communities, ecosystems, and infrastructure to global change and environmental stressors. DOE funds supported travel, time to develop collaborations, investigate new research pathways, and draft grant proposals, and a loan of DOE equipment to collect pilot data in support of future work. The project achieved its goal of strengthening research collaborations between interdisciplinary researchers at CMU and establishing new collaborations and partnerships between CMU and DOE scientists. These collaborations resulted in 5 pre-applications and 4 full applications for funding to DOE BER Funding Opportunities, a successfully funded DOE BER award (DE-SC0025260), a new pilot project that leveraged DOE resources (AquaBOT) to improve understanding of water quality conditions in Michigan rivers, and two presentations of preliminary results at national scientific conferences. This project’s outcomes will benefit the Great Lakes Region via new lines of collaborative research focused on improving the resilience of Michigan communities, ecosystems, and infrastructure.

58 GEOSCIENCES↗

Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART): Data Format and Preparation Guidance (V.5.0)

The Joint Office of Energy and Transportation maintains the Electric Vehicle Charging Analytics and Reporting Tool (EV-ChART), which provides a centralized hub for submitting electric vehicle (EV) charging infrastructure data directed by the Federal Highway Administration (23 CFR 680.112(a)-(c)). EV-ChART provides a streamlined data submission process and an integrated set of analytic tools, connects to other data sources, and empowers data sharing and access across stakeholders, including the public. Any data shared publicly will be aggregated and anonymized to stay in accordance with 23 CFR 680. This EV-ChART Data Format and Preparation Guidance provides a comprehensive overview of the data reporting requirements as authorized under 23 CFR 680.112(a)-(c)). The guidance is intended to be used alongside the EV-ChART Data Input Template, which defines the tabular data structure that these data submissions must follow. Per 23 CFR 680.112(a)-(c), the annual and quarterly data submissions are required of all National Electric Vehicle Infrastructure (NEVI) Formula Program projects, as well as projects for the construction of publicly accessible EV chargers that are funded with funds made available under Title 23, United States Code, including any EV charging infrastructure project funded with federal funds that is treated as a project on a federal-aid highway. One-time data submissions are required of both the NEVI Formula Program projects and grants awarded under 23 U.S.C. 151(f) for projects that are for EV charging stations located along and designed to serve the users of designated Alternative Fuel Corridors (AFCs). Other information and data required in 23 CFR 680, such as 23 CFR 680.112(d), 23 CFR 680.116(c), and 23 CFR 680.106(a), are not discussed in this guidance.

33 ADVANCED PROPULSION SYSTEMS↗

Alaska Liquid Natural Gas Pipeline Front-End Engineering & Design (Final Technical Report)

The Alaska Gasline Development Corporation (AGDC) is Alaska’s natural gas infrastructure development corporation established in 2013. AGDC’s mission is to maximize the benefit of Alaska’s vast North Slope natural gas resources for Alaskans through the development of infrastructure necessary to move the gas into local and international markets. AGDC was identified for a Congressionally Directed Spending (CDS) project for funding in the Energy and Water Development and Related Agencies Appropriations Act, 2023 under the heading: “Congressionally Directed Energy Efficiency and Renewable Energy Projects.” The CDS included $\$$4,000,000 of direct funding, with required match funds, to move the project forward. Alaska’s North Slope holds America’s largest proven and conventional natural gas supply. The integrated Alaska LNG Project will deliver 3.5 billion cubic feet of natural gas per day from Alaska’s North Slope gas fields to Alaskans as well as to a marine terminal located at tidewater in Cook Inlet. Alaska LNG is an integrated gas infrastructure project with three major components: a gas treatment plant (GTP) located at Prudhoe Bay, an 807-mile (1,287 km) gas pipeline (Mainline Pipeline) to Southcentral Alaska with interconnections for in-state gas use, and a natural gas liquefaction facility (LNG Facility) in Nikiski, Alaska. The integrated Alaska LNG Project has several strategic advantages including proven gas resources, existing upstream infrastructure, an advantageous arctic climate for LNG production, proximity to LNG markets, a track record of reliability from a state that first began exporting LNG to Japan in 1969, and broad support from Alaskans. North Slope natural gas is a conventional resource and can be produced with minimal drilling at a fraction of the carbon dioxide emissions of shale gas from the Lower 48 states. Through the development of the Alaska LNG Project, Alaska can provide energy security to Alaskans and a stable source of LNG to the Asia-Pacific region for generations. The Alaska LNG Project has been progressed through Pre-Front-End Engineering Design (Pre-FEED) and has obtained all major federal and State of Alaska permits and authorizations to construct the project, including the Federal Energy Regulatory Commission (FERC) Order Granting Authorization Under Section 3 of the Natural Gas Act. On September 5, 2024, the U.S. Department of Energy (DOE), National Energy Technology Laboratory (NETL) awarded Project No. DE-FE0032307 to AGDC with the objective to progress the project to Front-End Engineering Design (FEED) entry for the Alaska LNG Project Phase 1 Pipeline. The award Start Date was made effective July 1, 2023, with a Period of Performance through June 30, 2025. On March 27, 2025, AGDC announced the execution of definitive commercial agreements with Glenfarne Alaska LNG, LLC, an affiliate of Glenfarne Group, LLC, (together as “Glenfarne”), to lead the development of the Alaska LNG Project and enter FEED for the Phase 1 Pipeline. Project activities are now funded and directed by this private sector partner who holds a 75% interest in 8 Star Alaska, LLC (8 Star). 8 Star holds the assets of the Alaska LNG Project. As planned, AGDC continues to hold 25% minority interest in 8 Star and will play a governance role moving forward with Alaska LNG. This definitive commercial agreement milestone led to the successful completion of AGDC’s Statement of Project Objectives (SOPO) for FEED entry and led to the completion of DOE Project No. DE-FE0032307. At conclusion of the SOPO, AGDC also reached the award’s maximum federal cost share of $\$$4,000,000. AGDC is, therefore, providing Final Technical Report to close out DOE Project No. DE-FE0032307.

02 PETROLEUM↗

Research Reactors Division Infrastructure Investment Plan for the High Flux Isotope Reactor

The High Flux Isotope Reactor (HFIR) is a unique national asset. Operational for nearly 60 years, continued investment into the aging infrastructure is necessary to ensure operation for another 6 decades. Additionally, growing missions require HFIR as well as important upgrades. Consequently, carefully integrated planning is required to ensure that infrastructure investments are timely executed to ensure long-term, reliable operation of HFIR. Concerns about challenges to the operational reliability of HFIR resulted in a recommendation from the 2023 Operations Review by the US Department of Energy (DOE) Office of Basic Energy Sciences that a HFIR management strategy be developed to address the infrastructure needs. This report defines the investment needs, which are evolving as new upgrade efforts are better defined. HFIR is part of the three-source strategy within the Neutron Sciences Directorate (NScD) and contributes to the five strategic science areas outlined in the NScD 10 Year Strategic Science Plan: quantum materials, soft matter, materials and engineering, chemistry, and biosciences. Fundamental to this strategy are three core values: operational excellence, responsible stewardship, and servant leadership. These values guide our mission of safe and reliable operation of the reactor and require a strong and just nuclear safety culture, a solemn respect for responsible care of the facility, good workforce development, robust procedures and processes, an effective communication strategy, world-class asset management, a determined customer focus, and a commitment to protecting the environment, the safety and health of the public and our people, and the quality of work performed within our facility. These principles are all essential to operate HFIR at a world-class level. The Research Reactors Division (RRD) will lead a new era of neutron science and isotope production at HFIR through responsible and purposeful leadership and unwavering support of the science community. The approach outlined in this plan highlights the direction leadership is taking to ensure that HFIR is ready to support the science challenges and national needs of the future and that the United States maintains world leadership in neutron sciences. The plan is in alignment with the DOE’s desire to continue operating HFIR and with the NScD strategic science goals for the future. HFIR is an aging facility with numerous infrastructure challenges and needs. It has an aging workforce in relation to the general population of Oak Ridge National Laboratory (ORNL), with many expected retirements over the next 5–10 years. With an increase in work scope caused by changing national priorities and science goals, several critical hires have been identified. To manage HFIR’s infrastructure needs, a prioritized list of equipment upgrades has been identified along with an analysis of future staffing requirements. A desire to operate HFIR at eight cycles per year will necessarily require some significant changes to procedures and processes currently in place as well as targeted staffing additions. Many of the equipment upgrades identified in this plan will significantly increase the reliability of the plant, thus contributing to the effort to reach the goal of safely operating eight cycles per year. A plan to attain eight-cycle operation is being prepared in parallel with the activities identified in this plan, although the actions identified to satisfy both plans will overlap. This plan identifies new infrastructure needs—for both plant equipment and staffing—thus necessitating formulation of future budget requests to fund the increased work scope and improvement activities. Some activities are currently being scheduled with the expectation that funding will be received. Any delays to funding or reductions of funding from the identified cost estimations will directly and negatively affect the plan’s implementation.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Hydropower Game: An Interactive Learning Tool for the Future Hydropower Workforce

This report documents a Seedling project supported by the U.S. Department of Energy (DOE) Water Power Technologies Office (WPTO), conducted by Argonne National Laboratory (ANL) and the National Laboratory of the Rockies (NLR). The Seedling and Sapling Program provides small grants over short duration to enable early-stage research at national laboratories. This funding mechanism is intended to cultivate innovative ideas and expand research road maps in hydropower and marine energy technologies. Under this Seedling award, the project team developed an educational outreach tool, or “serious game”, built in Python and powered by the Pygame library, aimed at teaching fundamental hydropower concepts through an engaging, interactive learning experience. The game features multiple lessons covering several hydropower topics while allowing for expansion and customization in the instance of future funding availability: • Hydropower Plant Types: Players explore and compare the mechanics and applications of run-of-river, dam hydropower, and pumped-storage hydropower. • Flow Dynamics and Power Generation: Interactive tasks demonstrate how release rate and hydraulic head combine to determine power output. • Grid Operations and Load Following: Simulations illustrate how hydropower facilities respond to fluctuating electricity demand to balance the grid. • Market Integration: Levels scaffold understanding of how hydropower interfaces with the broader energy market, including operational and economic considerations. The tool was showcased at several science, technology, engineering, and mathematics (STEM) outreach events, where it was demoed to students, educators, and the general public. These events provided valuable opportunities to collect feedback on the gameplay, storyline, and educational objectives from a wide audience. The game was presented at STEMapalooza, Introduce a Girl to Engineering Day, STEMCON, and Clean Currents 2025. Insights gathered during these demonstrations informed refinements to the game’s user experience and strengthened its effectiveness as an educational tool for teaching hydropower concepts. This report outlines the game’s design philosophy, educational objectives, technical implementation, user experience insights, and potential for broader deployment within educational and workforce development contexts. It emphasizes how gamified learning can demystify complex hydropower science and inspire interest in water-power technologies. The project’s success demonstrates the value of Seedling funding in fostering creative, lowcost educational tools that support DOE’s mission to advance energy literacy and innovation. The report concludes with recommendations for expanding the tool by adding new levels, integrating assessment metrics, and exploring commercialization or deployment pathways through future Sapling funding. The official webpage of the Hydropower Game, which includes a link to the educational tool, can be accessed at www.anl.gov/hydropower/hydropower-game.

13 HYDRO ENERGY↗

The Transactive Energy Network Template Metamodel

While transactive energy, which is defined as an allocation of electricity based on dynamically discovered values or prices, has been extensively studied, its uptake and use has been slow. This report describes a tool, the transactive network template, which should hasten the creation and uptake of transactive energy networks. Some basic principles of transactive energy are familiar from existing wholesale electricity markets. Locational prices are calculated today for zones within bulk electric transmission systems. Locational prices differ while accounting for the locational costs of electricity generation and the losses and constraints incurred when electricity is transmitted from generators and distributed to consumers. A transactive energy network might include these transmission zones. However, current research strives to apply transactive energy also in electricity distribution circuits, buildings, and even for individual generating and consuming devices. At the same time, researchers explore how to apply transactive energy in real time during increasingly shorter time intervals. Automated computational agents become necessary as transactive energy becomes applied to smaller circuit zones and at faster dynamic timescales. A transactive energy network is an example of a multi-agent system. Each zone in the network is represented by its transactive agent, which makes decisions for and acts on behalf of a business entity that is responsible for and manages one of the circuit regions. A transactive energy network is also an example of a decentralized, distributed control system. Control decisions and responsibilities are distributed among the network’s transactive agents. The transactive agents are independent; that is, there typically is no centralized authority or oversight function. Instead, transactive agents exchange transactive signals and thereby negotiate the prices and quantities of electricity that they will exchange. Initially, the circuit regions and responsibilities of transactive agents appear to be very dissimilar. Each circuit region may comprise transmission, distribution, or building-level circuits. Each has a unique position and electrical connectivity within the transactive energy network. Each possesses unique assets that either generate or consume electricity, and these (e.g., renewable energy generator, diesel generator, aggregate utility load, building load, space conditioning, refrigerator, etc.) may further differ in their price flexibility and in their strategies for responding to dynamic electricity prices. Given such diversity, an implementer’s first inclination might be to start from scratch to define all these devices and to engineer their seemingly unique interactions. Given that each implementer’s perspective may be narrow within a transactive energy network, it is unlikely that uniquely engineered systems would interact well. This is where the transactive network template is applicable. The transactive network template is a metamodel that has been developed to guide implementers as they configure their own transactive agent within a network of such agents. The object-oriented design of the transactive network template provides basic code object types that may be used and extended by implementers to represent each of the assets in their circuit region. These objects further facilitate the transactive agent’s necessary computations, which are divided among responsibilities to schedule power usage, balance electric supply and demand, and coordinate the exchange of electricity with the other transactive agents. This report addresses the conceptual transactive network template design. Implementers are directed to more formal design documents and reference implementations. A Python™-based1 reference implementation of the transactive network template has been coded, and three implementations have been configured to represent a national laboratory and two university campuses. Version 2 of the transactive node template generalizes the market class and its methods to facilitate multiple, and more diverse market coordination mechanisms than were facilitated by and demonstrated using Version 1. Version 3 includes new Appendix B, which addresses the designs of methods that would make dynamic prices track approved electricity rates. In the future, the author wishes to make the transactive network template more generally applicable to networks that require more accurate power flow. Development of the transactive network template is jointly funded by the U.S. Department of Energy (DOE) Energy Efficiency and Renewable Energy and the DOE Office of Electricity. In late 2015, one of the first projects to be funded by the DOE Grid Laboratory Modernization Laboratory Consortium was the Clean Energy and Transactive Campus project, led by Pacific Northwest National Laboratory. DOE funds were matched by an investment by the Washington Department of Commerce through its Clean Energy Fund. The transactive network template was developed to guide the implementation of transactive energy networks within this project’s scope.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Zero-Emission Transit Bus Needs Assessment

The transition to zero-emissions vehicles (ZEVs) in public transit has gained traction due to significant federal investments from the Bipartisan Infrastructure Law (BIL) and the Inflation Reduction Act (IRA). This needs assessment, commissioned by the Joint Office of Energy and Transportation and conducted by researchers at the Idaho National Laboratory, explores the current state of electrification in transit agencies, identifying barriers to implementation, potential funding sources, and operational considerations necessary for a successful transition. The assessment involved qualitative interviews with representatives from 19 transit service providers across diverse geographic regions. Key findings highlight the challenges related to bus facilities and operations, which require careful planning for charging infrastructure and maintenance capabilities to accommodate battery electric buses (BEBs) and hydrogen fuel cell buses (HFCBs). Agencies reported operational hurdles due to the shorter range of BEBs compared to diesel buses, necessitating revised scheduling and routing strategies. Despite these challenges, many agencies expressed optimism about their capacity to adapt. Funding availability emerged as a critical factor influencing the transition to ZEVs. While agencies welcomed increased financial support, particularly from the Low or No Emission Grant Program (Lo-No), concerns about the sustainability of this funding and the ongoing operational costs were prevalent. The need for a comprehensive funding inventory was underscored to ensure transit agencies are aware of all available resources. Technological constraints were significant barriers to ZEV adoption. The limited range of BEBs was frequently cited as a concern, leading to operational challenges and reliability issues. Agencies reported difficulties in sourcing replacement parts, which exacerbated downtime and maintenance challenges. Workforce development and training were identified as pivotal for a successful transition. Many agencies rely heavily on manufacturers for technician training, highlighting the need for scalable training programs that equip staff with the necessary skills to maintain electric powertrains effectively. This assessment offers actionable recommendations for the Joint Office, including enhancing outreach to transit agencies, developing resources for effective utility partnerships, and facilitating comprehensive training programs. Establishing a zero-emission bus evaluation program to track performance metrics such as cost, range, and reliability could provide valuable insights for transit agencies. The needs assessment provides a detailed examination of the challenges and opportunities facing transit agencies in their transition to zero-emissions bus fleets. By addressing these issues through targeted support, stakeholders can collaboratively work towards a cleaner, more sustainable public transportation system that benefits all communities.

33 - ADVANCED PROPULSION SYSTEMS↗

Final Report- "An Algorithmic and Software Framework for Applied Partial Differential Equations (APDEC): A DOE SciDAC Integrated Software Infrastructure Center (ISIC)

All of the work conducted under the auspices of DE-FC02-01ER25473 was characterized by exceptionally close collaboration with researchers at the Lawrence Berkeley National Laboratory (LBNL). This included having one of my graduate students - Sarah Williams - spend the summer working with Dr. Ann Almgren a staff scientist in the Center for Computational Sciences and Engineering (CCSE) which is a part of the National Energy Research Supercomputer Center (NERSC) at LBNL. As a result of this visit Sarah decided to work on a problem suggested by Dr. John Bell the head of CCSE for her PhD thesis, which she finished in June 2007. Writing a PhD thesis while working at one of the University of California (UC) managed DOE laboratories is a long established tradition at the University of California and I have always encouraged my students to consider doing this. For example, in 2000 one of my graduate students - Matthew Williams - finished his PhD thesis while working with Dr. Douglas Kothe at the Los Alamos National Laboratory (LANL). Matt is now a staff scientist in the Diagnostic Applications Group in the Applied Physics Division at LANL. Another one of my graduate students - Christopher Algieri - who was partially supported with funds from DE-FC02-01ER25473 wrote am MS Thesis that analyzed and extended work published by Dr. Phil Colella and his colleagues in 1998. Dr. Colella is the head of the Applied Numerical Algorithms Group (ANAG) in the National Energy Research Supercomputer Center at LBNL and is the lead PI for the APDEC ISIC which was comprised of several National Laboratory research groups and at least five University PI's at five different universities. Chris Algieri is now employed as a staff member in Dr. Bill Collins' research group at LBNL developing computational models for climate change research. Bill Collins was recently hired at LBNL to start and be the Head of the Climate Science Department in the Earth Sciences Division at LBNL. Prior to this he had been a Deputy Section Head at the National Center for Atmospheric Research in Colorado. My understanding is that Chris Algieri is the first person that Bill hired after coming to LBNL. The plan is that Chris Algieri will finish his PhD thesis while employed as a staff scientist in Bill's group. Both Sarah and Chris were supported in part with funds from DE-FC02-01ER25473. In Sarah's case she received support both while at U.C. Davis (UCD) taking classes and writing an MS thesis and during some of the time she was living in Berkeley, working at LBNL and finishing her PhD thesis. In Chris' case he was at U.C. Davis during the entire time he received support from DE-FC02-01ER25473. More specific details of their work are included in the report below. Finally my own research conducted under the auspices of DE-FC02-01ER25473 either involved direct collaboration with researchers at LBNL - Phil Colella and Peter Schwartz who is a member of Phil's Applied Numerical Algorithms Group - or was on problems that are closely related to research that has been and continues to be conducted by researchers at LBNL. Specific details of this work can be found below. Finally, I would like to note that the work conducted by my students and me under the auspices of this contract is closely related to work that I have performed with funding from my DOE MICS contract DE-FC02-03ER25579 'Development of High-Order Accurate Interface Tracking Algorithms and Improved Constitutive Models for Problems in Continuum Mechanics with Applications to Jetting' and with my CoPI on that grant Professor Greg Miller of the Department of Applied Science at UCD. In theory I tried to use funds from the SciDAC grant DE-FC02-01ER25473 to support work that directly involved implementing algorithms developed by my research group at U.C. Davis in software that was developed and is maintained by my SciDAC CoPI's at LBNL.

97 MATHEMATICS AND COMPUTING↗

Investigation of the Relationship between Green Design and Project Delivery Methods

The selection of the project delivery method (PDM) for any project is critical--it establishes communication, coordination, and contractual issues between the owner, contractor, and designer. With an increase in the number of green design projects, understanding the relationship between the PDM and green design is paramount to project and contract management. It is reasonable to assume that a positive relationship between green design and design-build (DB) exists since both theoretically are intended to foster an integrated, holistic, and collaborative project. This research examines the relationship between the design-bid-build (DBB), construction management (CM), and DB PDMs and green design with the goal of establishing best practices and identifying potential synergies between them. The research collected information by conducting primarily telephone interviews with approximately twenty-five individuals, including owners, contractors, and designers involved in completed green design projects, mainly in the public sector. The interviews developed a general understanding of the current state of knowledge and experience and not a rigorous quantitative analysis. Upon completion of the interviews, the tabulated results were summarized and green project characteristics and project-PDM interactions emerged. Existing published research was evaluated to reveal aspects of PDMs independent of green design. Best practices were ascertained by combining information from the interviews and published research. Best practices are as follows: (1) Project implementation features--The decision to use DB as PDM on green design or other projects should be based on the specific project features; e.g., well-defined scope and adequate owner staffing. DB will not produce successful results on all projects. (2) Collaboration--Project team collaboration early in the design and construction process is an important aspect of green projects, and collaboration was considered somewhat more important in projects that used DB. (3) Experience--Team experience is important on all green design projects independent of the PDM. Owners should use a 'best value' selection process, which is more prevalent in DB projects, and include team experience as a criterion. The owner's role is critical with DB. (4) Leadership--Leadership is an important feature for all contracting parties involved in green design projects and it is a dominant success factor in DB projects. (5) Scope of work--A well-defined scope of work is important on all projects, independent of the PDM. In DB, improving the scope of work definition by developing a set of documents, typically comparable to the design development phase, as the basis for awarding a contract is called DB bridging. Using contracting techniques such as DB bridging can result in better identification of expected quality and improves the owner's level of control. (6) Funding and Budget--Having adequate funding and budget for the given scope of work is particularly important in a green design project. Public funding restrictions may not allow use of certain PDMs, and the nature of public funding streams may make non-traditional PDMs more difficult. (7) Complexity and Flexibility--Complexity and flexibility is a project feature that is more specific to green design projects and is more frequently associated with DB. (8) Control and Accountability--Control and accountability is a problem associated with DB more than with DBB. It is not specific to green design projects. DB Bridging can be used to offset the lack of control with traditional DB. The use of green design and DB is increasing and understanding the linkage between the two is important. This research has found that while linkages do exist, the owner needs to carefully consider all aspects of a green design project before making the decision of the most appropriate PDM.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

FINAL REPORT DOE Grant: DE-FG02-89ER45391

The work reported here took place at the University of Minnesota from 07/01/1989 to 06/30/2006. Most of this work focused on computational materials applied to oxides during the first part of this funding period and to nanoscale materials toward the end of the funding period. This funding resulted in three monographs, 36 invited articles or book chapters, 160 articles in refereed journals and 89 invited talks. The funding helped train 13 PhD students and one masters student. The PI received two national research awards for this work. A list of these contributions are presented.

36 MATERIALS SCIENCE↗

Lac Courte Oreilles Energy Analysis Project

The Lac Courte Oreilles Tribe applied for first step funding in 2007 and was awarded in October of that year. We wanted to perform an audit to begin fulfilling two commitments we made to our membership and resolutions that we adopted. One was the Kyoto Protocol and reduce our carbon emissions by 25% and to produce 25% of our energy by sustainable means. To complete these goals we needed to begin with first assessing what our carbon emissions are and begin taking the steps to conserve on the energy we currently use. The First Step Grant gave us the opportunity to do this. Upon funding the Energy Project was formed under the umbrella of the LCO Public Works Department and Denise Johnson was hired as the coordinator. She quickly began fulfilling the objectives of the project. Denise began by contact the LCO College and hiring interns who were able to go to each Tribal entity and perform line logging to read and document the energy used for each electrical appliance. Data was also gathered for one full year from each entity for all their utility bills (gasoline, electric, natural gas, fuel oil, etc.). Relationships were formed with the Green Team and other Green Committees in the area that could assist us in this undertaking. The Energy Task Force was of great assistance as well recommending other committees and guidance to completing our project. The data was gathered, compiled and placed into spreadsheets that would be understandable for anyone who didn't have a background in Renewable Resources. While gathering the data Denise was also looking for ways to conserve energy usage, policies changes to implement and any possible viable renewable energy resources. Changes in the social behaviors of our members and employees will require further education by workshops, energy fairs, etc.. This will be looked into and done in coordination with our schools. The renewable resources seem most feasible are wind resources as well as Bio Mass both of which need further assessment and funding to do so will be sought. While we already are in ownership of a Hydro Dam it is currently not functioning to its full capacity we are seeking operation and maintenance firm proposals and funding sources. One of our biggest accomplishment this project gave us was our total Carbon Emissions 9989.45 tons, this will be the number that we will use to base our reductions from. It will help us achieve our goals we have set for ourselves in achieving the Kyoto Protocol and saving our Earth for our future generations. Another major accomplishment and lesson learned is we need to educate ourselves and our people on how to conserve energy to both impact the environment and our own budgets. The Lac Courte Oreilles (LCO) Energy Analysis Project will perform an energy audit to gather information on the Tribe's energy usage and determine the carbon emissions. By performing the audit we will be able to identify areas where conservation efforts are most viable and recommend policies that can be implemented. These steps will enable LCO to begin achieving the goals that have been set by the Tribal Governing Board and adopted through resolutions. The goals are to reduce emissions by 25% and to produce 25% of its energy using sustainable sources. The project objectives were very definitive to assist the Tribe in achieving its goals; reducing carbon emissions and obtaining a sustainable source of energy. The following were the outlined objectives: (1) Coordinate LCO's current and future conservation and renewable energy projects; (2) Establish working relationships with outside entities to share information and collaborate on future projects; (3) Complete energy audit and analyze LCO's energy load and carbon emissions; (4) Identify policy changes, education programs and conservation efforts which are appropriate for the LCO Reservation; and (5) Create a plan to identify the most cost effective renewable energy options for LCO.

02 PETROLEUM↗

Tri-Lateral Noor al Salaam High Concentration Solar Central Receiver Program

This report documents the efforts conducted primarily under the Noor al Salaam (“Light of Peace”) program under DOE GRANT NUMBER DE-FC36-02GO12030, together with relevant technical results from a closely related technology development effort, the U.S./Israel Science and Technology Foundation (USISTF) High Concentration Solar Central Receiver program. These efforts involved preliminary design, development, and test of selected prototype power production subsystems and documentation of an initial version of the system definition for a high concentration solar hybrid/gas electrical power plant to be built in Zaafarana, Egypt as a first step in planned commercialization. A major part of the planned work was halted in 2007 with an amendment in October 2007 requiring that we complete the technical effort by December 31, 2007 and provide a final report to DOE within the following 90 days. This document summarizes the work conducted. The USISTF program was a 50/50 cost-shared program supported by the Department of Commerce through the U.S./Israel Science and Technology Commission (USISTC). The USISTC was cooperatively developed by President Clinton and the late Prime Minister Rabin of Israel "to encourage technological collaboration" and "support peace in the Middle East through economic development". The program was conducted as a follow-on effort to Israel's Magnet/CONSOLAR Program, which was an advanced development effort to design, fabricate, and test a solar central receiver and secondary optics for a "beam down" central receiver concept. The status of these hardware development programs is reviewed, since they form the basis for the Noor al Salaam program. Descriptions are provided of the integrated system and the major subsystems, including the heliostat, the high temperature air receiver, the power conversion unit, tower and tower reflector, compound parabolic concentrator, and the master control system. One objective of the USISTF program was to conduct marketing research, identify opportunities for use of this technology, and to the extent possible, secure an agreement leading to a pre-commercialization demonstration or prototype plant. This was accomplished with the agreement to conduct the Noor al Salaam program as a tri-lateral project between Egypt, Israel, and the U.S. The tri-lateral project was led by the University of Alabama in Huntsville (UAH); this included the Egyptian New and Renewable Energy Authority and the Israeli USISTC participants. This project, known was Noor al Salaam, was funded by the U.S. Agency for International Development (USAID) through the Department of Energy (DOE). The Egyptian activity was under the auspices of the Egyptian Ministry of Energy and Electricity, New and Renewable Energy Authority (NREA) as part of Egypt's plans for renewable energy development. The objective of the Noor al Salaam project was to develop the conditions necessary to obtain funding and construct and operate an approximately 10 to 20 Megawatt hybrid solar/natural gas demonstration power plant in Zaafarana, Egypt that could serve both as a test bed for advanced solar technology evaluations, and as a forerunner to commercial plant designs. This plant, termed Noor Al Salaam, or “Light of Peace”, reached the initial phase of system definition before being curtailed, in part by changes in USAID objectives, coupled with various delays that were beyond the scope of the program to resolve. The background of the USISTF technology development and pre-commercialization effort is provided in this report, together with documentation of the technology developments conducted under the Noor al Salaam program. It should be noted that only a relatively small part of the Noor al Salaam funding was expended over the approximately five years for which UAH was prime contractor before the program was ordered closed (Reference 1) so that the remaining funds could be returned to USAID.

14 SOLAR ENERGY↗

Special Report "The American Recovery and Reinvestment Act and the Department of Energy"

The American Recovery and Reinvestment Act of 2009 (Recovery Act) was signed into law on February 17, 2009, as a way to jumpstart the U.S. economy, create or save millions of jobs, spur technological advances in science and health, and invest in the Nation's energy future. This national effort will require an unprecedented level of transparency and accountability to ensure that U.S. citizens know where their tax dollars are going and how they are being spent. As part of the Recovery Act, the Department of Energy will receive more than $38 billion to support a number of science, energy, and environmental initiatives. Additionally, the Department's authority to make or guarantee energy-related loans has increased to about $127 billion. The Department plans to disburse the vast majority of the funds it receives through grants, cooperative agreements, contracts, and other financial instruments. The supplemental funding provided to the Department of Energy under the Recovery Act dwarfs the Department's annual budget of about $27 billion. The infusion of these funds and the corresponding increase in effort required to ensure that they are properly controlled and disbursed in a timely manner will, without doubt, strain existing resources. It will also have an equally challenging impact on the inherent risks associated with operating the Department's sizable portfolio of missions and activities and, this is complicated by the fact that, in many respects, the Recovery Act requirements represent a fundamental transformation of the Department's mission. If these challenges are to be met successfully, all levels of the Department's structure and its many constituents, including the existing contractor community; the national laboratory system; state and local governments; community action groups and literally thousands of other contract, grant, loan and cooperative agreement recipients throughout the Nation will have to strengthen existing or design new controls to safeguard Recovery Act funds.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Hood River and Pelton Ladder Evaluation Studies, Annual Report 2000-2001.

The Bonneville Power Administration (BPA) funded the development of two master plans which outline the rationale, and general approach, for implementing a defined group of projects that are an integral part of a comprehensive watershed goal to 'Protect, enhance and restore wild and natural populations of anadromous and resident fish within the Hood River Subbasin'. The Hood River Production Master Plan and the Pelton Ladder Master Plan were completed in 1991 and subsequently approved by the Northwest Power Planning Council in 1992. Action items identified in the two master plans, as well as in a later document entitled 'Hood River/Pelton Ladder Master Agreement' (ODFW and CTWSRO Undated), are designed to achieve two biological fish objectives: (1) to increase production of wild summer and winter steelhead (Oncorhynchus mykiss) to levels commensurate with the subbasins current carrying capacity and (2) re-establishing a self-sustaining population of spring chinook salmon (Oncorhynchus tshawytscha). Numerical fish objectives for subbasin escapement, spawner escapement, and subbasin harvest are defined for each of these species in Coccoli (2000). Several projects are presently funded by the BPA to achieve the Hood River subbasin's numerical fish objectives for summer and winter steelhead and spring chinook salmon. They include BPA project numbers 1998-021-00 (Hood River Fish Habitat), 1998-053-03 (Hood River Production Program - CTWSRO: M&E), 1998-053-07 (Parkdale Fish Facility), 1998-053-08 (Powerdale/Oak Springs O&M), and 1998-053-12 (Hood River Steelhead Genetics Study). Collectively, they are implemented under the umbrella of what has come to be defined as the Hood River Production Program (HRPP). The HRPP is jointly implemented by the Oregon Department of Fish and Wildlife (ODFW) and The Confederated Tribes of the Warm Springs Reservation of Oregon (CTWSRO). Strategies for achieving the HRPP's biological fish objectives for the Hood River subbasin were initially devised based on various assumptions about (1) subbasin carrying capacity, (2) survival rates for selected life history stages, and (3) historic and current escapements of wild, natural, and hatchery stocks of anadromous salmonids to the Hood River subbasin. The Oregon Department of Fish and Wildlife began funding a monitoring and evaluation (M&E) project in December 1991 to collect the quantitative biological information needed to (1) more accurately assess the validity of these assumptions and (2) evaluate the proposed hatchery supplementation component of the HRPP. Bonneville Power Administration assumed funding of the M&E project in August 1992. The M&E project was initially confined to sampling anadromous salmonids escaping to an adult trapping facility operated at Powerdale Dam; which is located at River Mile (RM) 4.5 on the mainstem of the Hood River. Stock specific life history and biological data was collected to (1) monitor subbasin spawner escapements and (2) collect pre-implementation data critical to evaluating the newly proposed HRPP's potential biological impact on indigenous populations of resident fish. The scope of the M&E project was expanded in 1994 to collect the data needed to quantify (1) subbasin smolt production and carrying capacity, (2) smolt to adult survival rates, and (3) the spatial distribution of indigenous populations of summer and winter steelhead, spring and fall chinook salmon, and coho salmon. A creel was incorporated into the M&E project in December 1996 to evaluate the HRPP with respect to its defined subbasin and spawner escapement objectives for Hood River stocks of wild and hatchery summer and winter steelhead and for natural and Deschutes stock hatchery spring chinook salmon. In 1996, the M&E project also began monitoring streamflow at various locations in the Hood River subbasin. Streamflow data will be used to correlate subbasin smolt production with summer streamflows. Data collected from 1991-1999 is reported in the following annual progress reports: Olsen et al. (1994), Olsen et al. (1995), Olsen and French (1996), Olsen et al. (1996), Olsen and French (1999), and Olsen and French (2000). The annual progress reports document information collected on (1) rearing densities of indigenous fish, (2) subbasin steelhead smolt production, (3) post-release survival of acclimated and direct released hatchery summer and winter steelhead smolts, (4) smolt to adult anadromous salmonid survival rates, (5) jack and adult anadromous salmonid escapements and harvest, (6) spatial distribution of adult anadromous salmonid holding in the Hood River subbasin, (7) selected life history patterns and morphological and meristic characteristics of wild, natural, and hatchery resident and anadromous salmonids, and (8) summer streamflows.

13 HYDRO ENERGY↗