Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Recovery”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

End-Use Savings Shapes Measure Documentation: Heat Pump Rooftop Units

The heat pump rooftop units (RTUs) measure replaces gas furnace and electric resistance RTUs with high-efficiency heat pump rooftop units (HP-RTUs). The HP-RTUs are intended to be top-of-the line, including high-efficiency fans and heat pump systems. The fans are variable speed, allowing the HP-RTUs to operate as single-zone variable air volume systems. The heat pumps are also variable speed, allowing for high part load performance. All schedules in the existing RTUs are transferred to the new HP-RTUs for consistency. Furthermore, any energy efficiency features in the existing baseline RTUs such as energy recovery or economizers are also transferred to the new HP-RTUs for consistency. This measure is applicable to approximately 45% of the ComStock floor area. The HP-RTU measure demonstrates 10.3% total site energy savings (449 trillion British thermal units [TBtu]) for the U.S. commercial building stock modeled in ComStock.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Beam Dynamics of the Strong Hadron Cooler ERL at the Electron-Ion Collider

The Strong Hadron Cooler Energy Recovery Linac (SHC-ERL) for the Electron-Ion Collider (EIC) is required to produce an electron beam with a bunch charge of 1 nC, an average current of 100 mA, and a beam energy of both 150 and 55 MeV, with strict requirements for the transverse emittance, slice energy spread, and longitudinal distribution. This paper covers the design in detail, including preliminary considerations of higher order effects and diagnostics.

Deitrick, K.↗

Thermocatalytic Heat Pipes for Geothermal Resource Recovery

Heat pipes are an important technology that allow orders of magnitude faster heat transfer than simple conduction. However, operating principles in heat pipes place fundamental bounds on their performance (critical heat flux and efficiency). Conventional heat pipe functionality is inherently tied to vaporization and condensation of the working fluid charged in the heat pipe. These fluids each have different operating temperature ranges based on the capillary, entrainment, sonic, and boiling limits of the heat pipe design. These limits, typically the capillary limit, dictate the maximum heat flux a heat pipe can carry, and most importantly for geothermal systems, the distance over which the pipes can operate (100 to 200 m maximum under optimum conditions). A thermocatalytic heat pipe breaks the inherent limitations of phase change thermo- and hydrodynamics and can transform heat pipe technology as a potentially more efficient means of extracting heat from a geothermal resource. The thermocatalytic heat pipe uses a working fluid to transport both sensible and chemical heat. An endothermic chemical reaction at depth removes heat from the reservoir and produces reactive intermediates, which are transported to the surface and used to run a reverse exothermic reaction that releases heat for use in power generation or other useful purposes. This technology offers two distinct advantages over conventional geothermal heat recovery technologies: (1) lower heat loss to the rock outside of the geothermal reservoir, and (2) higher heat transfer rates to the well field within the geothermal reservoir. Both advantages offer opportunity to reduce risks and lower costs of geothermal energy recovery. In this report, we discuss an initial effort to assess the efficacy and limitations of this technology for extracting heat from both porous/permeable and nominally impermeable geothermal reservoirs. Numerical simulation capabilities of the STOMP-GT code were enhanced to enable simulations of thermochemical heat pipes traversing geothermal reservoirs. An array of potential thermochemical reaction systems was evaluated and screened. Of these, an ethanol dehydration reaction was most promising in the vapor-liquid reaction set. A solid-phase dehydration reaction (CuSO4·5H2O) showed the highest reaction enthalpy per unit volume but would require development of a nonaqueous carrier fluid to implement it in a heat pipe. Subsurface reservoir simulations predicted long-term performance of the heat pipes for each geothermal reservoir type. The performance of U-shaped wells and coaxial wells was evaluated for a suite of reactions for both hydrothermal and hot dry rock reservoirs and was compared with a baseline case of simply pumping water through the wells. The heat pipe technology was additionally evaluated for an enhanced geothermal system (EGS) with an injection borehole, production borehole, and intervening hydraulically conductive fracture. All reservoir types showed significant improvement in heat recovered over a 20-year operating period ranging from a 1.8X increase for the hot dry rock case to more than 2.5X more energy recovered for the EGS case.

15 GEOTHERMAL ENERGY↗

Beam halo formation with different cathode distributions

Beam halo refers to the low-density distribution of particles extending beyond the beam core, and its generation and mitigation are important topics in particle accelerator design. Effective mitigation of beam halo is essential for the cooler design based on Energy Recovery Linac (ERL), which must deliver an electron beam with average beam current of 100 mA and a charge 1 nC per bunch. In the ERL injector and booster linacs, space charge effects are stronger due to relatively low beam energy (6 MeV). Additionally, the longer bunch length of approximately 100 ps in this regime vs the RF period of 5.08 ns makes the formation of beam halos more likely. Therefore, effective collimation of beam halo is critical to maintaining the required beam parameters. To design an effective collimation scheme, several halo distributions were generated at the cathode and used to study halo formation within the injector-merger. This paper presents different halo distributions and halo formation, providing insights on halo collimation strategy.

Accelerator Physics↗

Two design of the S4.BEN01 magnet for the CBETA splitter/merger

The splitter/merger section of the CBETA project [1] consists of 4 beam lines as shown in Fig. 1. Two of the functions of the splitter’s/merger’s lines is to match the beam parameters at the exit of the Energy Recovery Linac (ERL) to the beam parameters at the entrance of the Fixed Field Alternating Gradient (FFAG) arc, and also place the reference particles of the beam bunches at the entrance of the FFAG arc on specified trajectories according to their energies. In this technical note we are presenting results from the 2D and 3D electromagnetic analysis of the S4.BEN01 magnet which is one of the dipole magnets of the 150 MeV line of the splitter/merger. In particular we present results from two designs of the S4.BEN01 magnet, one based on iron dominated current-excited magnet, and the other design based on Halbach-type permanent magnet. An evaluation of the two designs will be given in the section under “conclusion”.

43 PARTICLE ACCELERATORS↗

An electrified boom actuation system with energy regeneration capability driven by a novel electro-hydraulic unit

This paper presents a novel electrified solution for linear actuation systems, which has undergone a successful in-vehicle demonstration, marking a significant advancement in this field. Aligned with the growing trend towards electrification, this solution holds promise for a wide range of off-road applications. The showcased electrohydraulic actuation architecture enables efficient four-quadrant operation and incorporates energy recovery capabilities. At the core of the system lies a distinctive electro-hydraulic unit, integrating a fixed hydraulic pump and a variable-speed electric motor into a compact and powerful entity. A specialized hydraulic system is designed to efficiently transform electrical energy from the electro-hydraulic unit into boom cylinder actuation. The sizing of the system is determined by the boom operation of a commercial compact loader. The maximum power output of the electro-hydraulic system is approximately 15 kW. The components of the proposed system are integrated into the reference vehicle, and comprehensive performance tests are conducted. The results of the tests performed on the vehicle with the boom lifting and lowering cycle indicate an overall system efficiency of 60%. The electrified solution consumes only about one-third of the energy used by the conventional boom actuation system on the reference machine, while exhibiting energy savings exceeding 75% during specific work phases. The energy savings come mainly from energy regeneration and minimal loss from throttling through the specialized hydraulic circuit design. Finally, the successful demonstration on the reference vehicle underscores the practicality and effectiveness of the proposed electrified solution in current mobile hydraulic applications

42 ENGINEERING↗

Foundation Heat Exchanger Final Report: Demonstration, Measured Performance, and Validated Model and Design Tool

Geothermal heat pumps, sometimes called ground-source heat pumps (GSHPs), have been proven capable of significantly reducing energy use and peak demand in buildings. Conventional equipment for controlling the temperature and humidity of a building, or supplying hot water and fresh outdoor air, must exchange energy (or heat) with the building's outdoor environment. Equipment using the ground as a heat source and heat sink consumes less non-renewable energy (electricity and fossil fuels) because the earth is cooler than outdoor air in summer and warmer in winter. The most important barrier to rapid growth of the GSHP industry is high first cost of GSHP systems to consumers. The most common GSHP system utilizes a closed-loop ground heat exchanger. This type of GSHP system can be used almost anywhere. There is reason to believe that reducing the cost of closed-loop systems is the strategy that would achieve the greatest energy savings with GSHP technology. The cost premium of closed-loop GSHP systems over conventional space conditioning and water heating systems is primarily associated with drilling boreholes or excavating trenches, installing vertical or horizontal ground heat exchangers, and backfilling the excavations. This project investigates reducing the cost of horizontal closed-loop ground heat exchangers by installing them in the construction excavations, augmented when necessary with additional trenches. This approach applies only to new construction of residential and light commercial buildings or additions to such buildings. In the business-as-usual scenario, construction excavations are not used for the horizontal ground heat exchanger (HGHX); instead the HGHX is installed entirely in trenches dug specifically for that purpose. The potential cost savings comes from using the construction excavations for the installation of ground heat exchangers, thereby minimizing the need and expense of digging additional trenches. The term foundation heat exchanger (FHX) has been coined to refer exclusively to ground heat exchangers installed in the overcut around the basement walls. The primary technical challenge undertaken by this project was the development and validation of energy performance models and design tools for FHX. In terms of performance modeling and design, ground heat exchangers in other construction excavations (e.g., utility trenches) are no different from conventional HGHX, and models and design tools for HGHX already exist. This project successfully developed and validated energy performance models and design tools so that FHX or hybrid FHX/HGHX systems can be engineered with confidence, enabling this technology to be applied in residential and light commercial buildings. The validated energy performance model also addresses and solves another problem, the longstanding inadequacy in the way ground-building thermal interaction is represented in building energy models, whether or not there is a ground heat exchanger nearby. Two side-by-side, three-level, unoccupied research houses with walkout basements, identical 3,700 ft{sup 2} floor plans, and hybrid FHX/HGHX systems were constructed to provide validation data sets for the energy performance model and design tool. The envelopes of both houses are very energy efficient and airtight, and the HERS ratings of the homes are 44 and 45 respectively. Both houses are mechanically ventilated with energy recovery ventilators, with space conditioning provided by water-to-air heat pumps with 2 ton nominal capacities. Separate water-to-water heat pumps with 1.5 ton nominal capacities were used for water heating. In these unoccupied research houses, human impact on energy use (hot water draw, etc.) is simulated to match the national average. At House 1 the hybrid FHX/HGHX system was installed in 300 linear feet of excavation, and 60% of that was construction excavation (needed to construct the home). At House 2 the hybrid FHX/HGHX system was installed in 360 feet of excavation, 50% of which was construction excavation. There are six pipes in all excavations (three parallel circuits - out and back), and the multiple instances of FHX and/or HGHX are all connected in series. The working fluid is 20% by weight propylene glycol in water. Model and design tool development was undertaken in parallel with constructing the houses, installing instrumentation, and monitoring performance for a year. Several detailed numerical models for FHX were developed as part of the project. Essentially the project team was searching for an energy performance model accurate enough to achieve project objectives while also having sufficient computational efficiency for practical use in EnergyPlus. A 3-dimensional, dual-coordinate-system, finite-volume model satisfied these criteria and was included in the October 2011 EnergyPlus Version 7 public release after being validated against measured data.

15 GEOTHERMAL ENERGY↗

Wing-tip vanes as vortex attenuation and induced drag reduction devices

Analytical studies have been conducted to examine the feasibility of utilizing wing tip turbines to remove swirl from the wing trailing vortex, and hence reduce the potential for upset of following aircraft. Energy recovery from the turbines is also analyzed. A computer routine has been developed to permit rapid parametric studies of various tip turbine designs. It is shown that the optimum turbine is a non-rotating set of vanes which reduce swirl and recover energy in the form of reduced overall configuration induced drag. A specific case study indicates a 23% reduction in induced drag for a rectangular wing of aspect ratio 5.33, operated at a lift coefficient at 1.0.

Wentz, W. H., Jr.↗

Plans for an ERL Test Facility at CERN

The baseline electron accelerator for LHeC and one option for FCC-he is an Energy Recovery Linac. To prepare and study the necessary key technologies, CERNhas started – in collaboration with JLAB and Mainz University – the conceptual design of an ERL Test Facility (ERL-TF). Staged construction will allow the study under different conditions with up to 3 passes, beam energies of up to about 1 GeV and currents of up to 50 mA. The design and development of superconducting cavity modules, including coupler and HOM damper designs, are also of central importance for other existing and future accelerators and their tests are at the heart of the current ERL-TF goals. However, the ERL-TF could also provide a unique infrastructure for several applications that go beyond developing and testing the ERL technology at CERN. In addition to experimental studies of beam dynamics, operational and reliability issues in an ERL, it could equally serve for quench tests of superconducting magnets, as physics experimental facility on its own right or as test stand for detector developments. This contribution will describe the goals and the concept of the facility and the status of the R&D.

Jensen, Erik↗

Paper and Plastics in Landfills: The Missed Opportunity

Landfilling paper and plastic waste represents missed opportunities for resource and energy recovery and significant loses in market value and disposal costs. More paper and plastics are landfilled than previously thought which highlights opportunities for improvement.

disposal cost↗

Novel Lattice Solutions for the LHeC

Unprecedently high luminosity of 10 34 cm -2 s -1 , promised by the LHeC accelerator complex poses several beam dynamics and lattice design challenges. As part of accelerator design process, exploration of innovative beam dynamics solutions and their lattice implementations is the key to mitigating performance limitations due to fundamental beam phenomena, such as: synchrotron radiation and collective instabilities. This article will present beam dynamics driven approach to accelerator design, which in particular, addresses emittance dilution due to quantum excitations and beam breakup instability in a large scale, multi-pass Energy Recovery Linac (ERL). The use of ERL accelerator technology to provide improved beam quality and higher brightness continues to be the subject of active community interest and active accelerator development of future Electron Ion Colliders (EIC). Here, we employ current state of though for ERLs aiming at the energy frontier EIC. We will follow conceptual design options recently identified for the LHeC. The main thrust of these studies was to enhance the collider performance, while limiting overall power consumption through exploring interplay between emittance preservation and efficiencies promised by the ERL technology. Here, this combined with a unique design of the Interaction Region (IR) optics gives the impression that luminosity of 10 34 cm -2 s -1 is indeed feasible.

43 PARTICLE ACCELERATORS↗

Energy balance for uranium recovery from seawater

The energy return on investment (EROI) of an energy resource is the ratio of the energy it ultimately produces to the energy used to recover it. EROI is a key viability measure for a new recovery technology, particularly in its early stages of development when financial cost assessment would be premature or highly uncertain. This paper estimates the EROI of uranium recovery from seawater via a braid adsorbent technology. In this paper, the energy cost of obtaining uranium from seawater is assessed by breaking the production chain into three processes: adsorbent production, adsorbent deployment and mooring, and uranium elution and purification. Both direct and embodied energy inputs are considered. Direct energy is the energy used by the processes themselves, while embodied energy is used to fabricate their material, equipment or chemical inputs. If the uranium is used in a once-through fuel cycle, the braid adsorbent technology EROI ranges from 12 to 27, depending on still-uncertain performance and system design parameters. It is highly sensitive to the adsorbent capacity in grams of U captured per kg of adsorbent as well as to potential economies in chemical use. This compares to an EROI of ca. 300 for contemporary terrestrial mining. It is important to note that these figures only consider the mineral extraction step in the fuel cycle. At a reference performance level of 2.76 g U recovered per kg adsorbent immersed, the largest energy consumers are the chemicals used in adsorbent production (63%), anchor chain mooring system fabrication and operations (17%), and unit processes in the adsorbent production step (12%). (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

THE LHeC ERL – OPTICS AND PERFORMANCE OPTIMIZATION

Unprecedently high luminosity of 1034 cm-2s-1, prom-ised by the LHeC accelerator complex poses several beam dynamics and lattice design challenges. Here we present beam dynamics driven approach to accelerator design, which in particular, addresses emittance dilution due to quantum excitations and beam breakup instability in a large scale, multi-pass Energy Recovery Linac (ERL). The use of ERL accelerator technology to provide im-proved beam quality and higher brightness continues to be the subject of active community interest and active accelerator development of future Electron Ion Colliders (EIC). Here, we employ current state of though for ERLs aiming at the energy frontier EIC. The main thrust of these studies was to enhance the collider performance, while limiting overall power consumption through explor-ing interplay between emittance preservation and effi-ciencies promised by the ERL technology.

Bogacz, Slawomir↗

Accelerating Optimal Integration of Energy Efficiency Strategies with Industrialized Modular Construction: Preprint

The National Renewable Energy Laboratory's (NREL's) Industrialized Construction Innovation team first introduced the Industrialized Construction Assessment Framework to achieve affordable, net-zero energy (NZE) modular multifamily buildings in the 2020 ACEEE paper "Integrating Energy Efficiency Strategies with Industrialized Construction for our Clean Energy Future." Since then, NREL has continued to drive the ambitious plan to accelerate optimal integration of energy efficiency strategies during industrialized construction with little or no additional cost, labor, and production time. This follow-on paper introduces the Energy in Modular (EMOD) buildings method and presents NREL's research efforts over the last two years in collaboration with industry, including affordable housing partners. NREL has developed an idealized NZE modular multifamily building design that incorporates five energy efficiency strategies well suited for industrialized construction in factories: (1) envelope thermal control, (2) envelope infiltration control, (3) mechanical, electrical, and plumbing systems, (4) smart controls, and (5) solar plus storage. This paper highlights results from leveraging design for manufacturing and assembly principles, testing, and validation pilots with factory partners; demonstrating pod prototypes in test stand at NREL; and performing simulations. Overall, these research efforts address barriers to whole-building system integration, such as poor installation quality of thermal and air barriers; lack of unitized systems for space conditioning, energy recovery and ventilation, and water heating; problematic on-site installation, commissioning, and configuration of controls; and lack of cost-effective integration for grid-friendly design and emerging technologies. Conclusively, the paper delineates next steps for future work with NREL's partners toward developing a transformational pathway for our clean energy future.

affordable housing↗