Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Energy Management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Strategies for Energy-Efficient Resource Management of Hybrid Programming Models

Many scientific applications are programmed using hybrid programming models that use both message passing and shared memory, due to the increasing prevalence of large-scale systems with multicore, multisocket nodes. Previous work has shown that energy efficiency can be improved using software-controlled execution schemes that consider both the programming model and the power-aware execution capabilities of the system. However, such approaches have focused on identifying optimal resource utilization for one programming model, either shared memory or message passing, in isolation. The potential solution space, thus the challenge, increases substantially when optimizing hybrid models since the possible resource configurations increase exponentially. Nonetheless, with the accelerating adoption of hybrid programming models, we increasingly need improved energy efficiency in hybrid parallel applications on large-scale systems. In this work, we present new software-controlled execution schemes that consider the effects of dynamic concurrency throttling (DCT) and dynamic voltage and frequency scaling (DVFS) in the context of hybrid programming models. Specifically, we present predictive models and novel algorithms based on statistical analysis that anticipate application power and time requirements under different concurrency and frequency configurations. Furthermore, we apply our models and methods to the NPB MZ benchmarks and selected applications from the ASC Sequoia codes. Overall, we achieve substantial energy savings (8.74 percent on average and up to 13.8 percent) with some performance gain (up to 7.5 percent) or negligible performance loss.

97 MATHEMATICS AND COMPUTING↗

A Hybrid Fuel Cell and Battery Storage Power Management for Grid-Interactive EV Charging Station

With the increasing adoption of renewable energy sources in grid-interactive Electric Vehicle (EV) charging stations, the role of energy storage systems has become critical. While large energy storage systems have mitigated the intermittency of renewable energy, integrating multi-source energy management with prioritized charging can further enhance the reliability of charging stations (CS). This paper presents a decentralized energy management (DEM) approach combining battery energy storage (BES) and fuel cell (FC) systems using a rule-based line resistance correction droop (LRCD) control technique. The proposed droop control dynamically adjusts the gain to balance the state-of-charge (SoC) of the BES, enhancing power support longevity and improving battery life under varying capacity conditions by reducing current stress. Additionally, the paper addresses the challenges of using fuel cells in linear regions to optimize efficiency and manage various charging scenarios. The CS integrates unity power factor grid interaction, and power support for auxiliary loads, maintaining harmonic distortion within 5% during grid islanding. The approach evaluates DC bus voltage regulation under various scenarios of PV array power fluctuations and dynamic load variations, in both grid-connected and standalone operations. In conclusion, the proposed control strategy is validated on a laboratory prototype through various dynamic load variation and grid islanding scenarios.

Khalid, Mohd [Oak Ridge National Laboratory (ORNL)↗

Renewable Energy Program Overview (Fact Sheet)

Fact sheet describing how the U.S. Department of Energy's (DOE) Federal Energy Management Program (FEMP) providesFederal agencies with information, guidance, and assistance in using renewable energy.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Flambeau River Papers Makes a Comeback with a Revised Energy Strategy

After the closure of the Flambeau River Papers mill in 2006, a new energy management approach has resulted in $2.6 million in annual energy savings and increased the facility's production by 11.9%. Read about Flambeau's successful energy management approach.

Flambeau River Papers, mill, Save Energy Now, LEAD↗

Integrating diagnostics and model-based optimization

Energy Management and Information Systems are a family of analytics technologies that include energy information systems, fault detection and diagnostics (FDD), and automated system optimization tools. Such systems have the potential to enable buildings to meet energy management goals of reducing total energy consumption and cost. Most current market offerings use data-driven and rule-based analytics. However, the use of physics-based models in the analytics offers potential improvements by providing an accurate estimation of outputs based on representation of the physical principles governing the building system behaviors. This also permits the use of design stage models to inform commissioning and operation. This paper describes the development and testing of a hybrid data-driven and physics model-based operational tool for energy efficiency in central cooling plants. The tool offers FDD functionality, setpoint optimization, and visualization of key performance parameters. It was demonstrated at a university campus in the mixed-humid ASHRAE Climate Zone 4A. Key performance metrics that were analyzed include plant electricity use reduction, plant model calibration, and system economics. Annual simulations indicate the tool can provide electricity savings of greater than 10% for approximately six months of the year, mainly during the winter season when wet bulb temperatures are low, though only 1.38% savings for the entire year. Additionally, over a 4-day period in April, recommended optimal setpoints were implemented, resulting in 17% savings versus metered baseline consumption. With respect to model calibration, the difference between model-predicted and measured parameters was less than 10% for 90% of data points acquired for three of six chillers, and for each ten cooling towers. Finally, the tool users reported that satisfaction with the capabilities was equal to or better than that with the preexisting BAS system.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Development of an Enhanced Payback Function for the Superior Energy Performance Program

The U.S. DOE Superior Energy Performance (SEP) program provides recognition to industrial and commercial facilities that achieve certification to the ISO 50001 energy management system standard and third party verification of energy performance improvements. Over 50 industrial facilities are participating and 28 facilities have been certified in the SEP program. These facilities find value in the robust, data driven energy performance improvement result that the SEP program delivers. Previous analysis of SEP certified facility data demonstrated the cost effectiveness of SEP and identified internal staff time to be the largest cost component related to SEP implementation and certification. This paper analyzes previously reported and newly collected data of costs and benefits associated with the implementation of an ISO 50001 and SEP certification. By disaggregating “sunk energy management system (EnMS) labor costs”, this analysis results in a more accurate and detailed understanding of the costs and benefits of SEP participation. SEP is shown to significantly improve and sustain energy performance and energy cost savings, resulting in a highly attractive return on investment. To illustrate these results, a payback function has been developed and is presented. On average facilities with annual energy spend greater than $2M can expect to implement SEP with a payback of less than 1.5 years. Finally, this paper also observes and details decreasing facility costs associated with implementing ISO 50001 and certifying to the SEP program, as the program has improved from pilot, to demonstration, to full launch.

Therkelsen, Peter↗

User-Preference-Driven Model Predictive Control of Residential Building Loads and Battery Storage for Demand Response: Preprint

This paper presents a user-preference-driven home energy management system (HEMS) for demand response (DR) with residential building loads and battery storage. The HEMS is based on a multi-objective model predictive control algorithm, where the objectives include energy cost, thermal comfort, and carbon emission. A multi-criterion decision making method originating from social science is used to quickly determine user preferences based on a brief survey and derive the weights of different objectives used in the optimization process. Besides the residential appliances used in the traditional DR programs, a home battery system is integrated into the HEMS to improve the flexibility and reliability of the DR resources. Simulation studies have been performed on field data from a residential building stock data set. Appliance models and usage patterns were learned from the data to predict the DR resource availability. Results indicate the HEMS was able to provide a significant amount of load reduction with less than 20% prediction error in both heating and cooling cases.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Integrated program for department of energy environmental management office of soil and groundwater remediation - 15426

The subsurface problems that remain at the U.S. Department of Energy (DOE) Office of Environmental Management (EM) sites are technically complex and the costs to complete the cleanup mission are expected to range from $17 billion to $21 billion. There is growing recognition that conventional remedies will not meet regulatory goals at a number of sites and alternative approaches will be required. To address the challenge, the EM Office of Soil and Groundwater Remediation created an integrated program to develop innovative scientific and technical in conjunction with engagement of stakeholders, regulators, and the public. The integrated program provides a holistic approach to assess the risk associated with the remaining challenges facing EM and develop solutions that achieve remediation goals and protect human health and the environment. The integrated program uses a systems-based framework for achieving environmental remediation goals. The framework is based on developing and updating a site conceptual model and includes steps to 1) provide the technical basis for remedial actions, 2) assessments of potential remedies, and 3) implementation and management of remedies to achieve site restoration goals. The Office of Soil and Groundwater remediation defines research and development needed to successfully define and apply the framework. Research opportunities and targets are identified in characterization and conceptual model development, predictions of site conditions, remediation, monitoring, and remediation decision support. Characterization and quantification of key subsurface uncertainties is needed to support conceptual model development, identify contaminant source zones, quantify the flux of contaminants from source terms to points of compliance, and characterize controlling processes for remediation approaches including natural attenuation. Predictive analyses are needed to support development of remediation endpoints, select and design active and in situ or passive remedies, assess remedy performance, and predict long-term contaminant behavior for design of monitoring systems. Advancements are needed to support adaptive remediation approaches and to develop long-term contaminant management strategies for complex sites, such as effective in situ treatment methods for long-lived contaminants ({sup 99}Tc, {sup 129}I, U, Hg, etc.). Monitoring tools and approaches are needed to evaluate remedy performance and plume behavior and decision support methods are needed to quantitatively evaluate remediation alternatives. The Office of Soil and Groundwater Remediation leverages scientific understanding provided through partnerships with the DOE Office of Science, the Department of Defense, and Environmental Protection Agency. These partnerships are helping EM develop scientific understanding and technologies for implementing the assessment framework. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluation of the Super ESPC Program: Level 2 -- Recalculated Cost Savings

This report presents the results of Level 2 of a three-tiered evaluation of the U.S. Department of Energy Federal Energy Management Program's Super Energy Savings Performance Contract (Super ESPC) Program. Level 1 of the analysis studied all of the Super ESPC projects for which at least one Annual Measurement & Verification (M&V) Report had been produced by April 2006. For those 102 projects in aggregate, we found that the value of cost savings reported by the energy service company (ESCO) in the Annual M&V Reports was 108% of the cost savings guaranteed in the contracts. We also compared estimated energy savings (which are not guaranteed, but are the basis for the guaranteed cost savings) to the energy savings reported by the ESCO in the Annual M&V Report. In aggregate, reported energy savings were 99.8% of estimated energy savings on the basis of site energy, or 102% of estimated energy savings based on source energy. Level 2 focused on a random sample of 27 projects taken from the 102 Super ESPC projects studied in Level 1. The objectives were, for each project in the sample, to: repeat the calculations of the annual energy and cost savings in the most recent Annual M&V Report to validate the ESCO's results or correct any errors, and recalculate the value of the reported energy, water, and operations and maintenance (O&M) savings using actual utility prices paid at the project site instead of the 'contract' energy prices - the prices that are established in the project contract as those to be used by the ESCO to calculate the annual cost savings, which determine whether the guarantee has been met. Level 3 analysis will be conducted on three to five projects from the Level 2 sample that meet validity criteria for whole-building or whole-facility data analysis. This effort will verify energy and cost savings using statistical analysis of actual utility use, cost, and weather data. This approach, which can only be used for projects meeting particular validity criteria, is described in Shonder and Florita (2003) and Shonder and Hughes (2005). To address the first objective of the Level 2 analysis, we first assembled all the necessary information, and then repeated the ESCOs' calculations of reported annual cost savings. Only minor errors were encountered, the most common being the use of incorrect escalation rates to calculate utility prices or O&M savings. Altogether, our corrected calculations of the ESCO's reported cost savings were within 0.6% of the ESCOs' reported cost savings, and errors found were as likely to favor the government as they were the ESCO. To address the second objective, we gathered data on utility use and cost from central databases maintained by the Department of Defense and the General Services Administration, and directly from some of the sites, to determine the prices of natural gas and electricity actually paid at the sites during the periods addressed by the annual reports. We used these data to compare the actual utility costs at the sites to the contract utility prices. For natural gas, as expected, we found that prices had risen much faster than had been anticipated in the contracts. In 17 of the 18 projects for which the comparison was possible, contract gas prices were found to be lower than the average actual prices being paid. We conclude that overall in the program, the estimates of gas prices and gas price escalation rates used in the Super ESPC projects have been conservative. For electricity, it was possible to compare contract prices with the actual (estimated) marginal prices of electricity in 20 projects. In 14 of these projects, the overall contract electricity price was found to be lower than the marginal price of electricity paid to the serving utility. Thus it appears that conservative estimates of electricity prices and escalation rates have been used in the program as well. Finally we calculated the value of the reported energy savings using the prices of utilities actually paid by the sites instead of the contract prices. In 16 of the 22 projects (where this calculation was possible), the recalculated annual cost savings were greater than the annual cost savings reported by the ESCO. In the aggregate for the 22 projects analyzed, the annual cost savings calculated using actual energy prices were found to be 111% of the ESCO-reported savings. Using statistical methods to expand this estimate to the entire 102-project population of Super ESPC projects, we estimate that the total annual cost savings calculated using actual energy prices instead of contract energy prices are about 110% of the reported annual cost savings. We can combine the results of the Level 1 and Level 2 studies to estimate overall cost savings realized by the government for the entire 102-project population of Super ESPC projects examined in Level 1.

03 NATURAL GAS↗

Pre-Commercial Demonstration of Direct Non-Iterative State Estimator (DNSE+)

The objective of this DOE co-funded project is to demonstrate functionality and performance of a production-grade Direct Non-iterative State Estimator (DNSE) through its integration with NYPA’s Energy Management System (EMS) and an enhanced Real Time Dynamics Monitoring System (RTDMS) synchrophasor platform from Electric Power Group (EPG). A production-grade DNSE aims to overcome a major obstacle to the operational use of synchrophasor data in Synchro-Phasor Management Systems (SPMS) by providing SPMS applications with a consistent and a complete synchrophasor data foundation in the same way that a traditional EMS State Estimator (SE) provides to EMS applications. Specifically, the DNSE uses synchrophasor measurements and Supervisory Control and Data Acquisition (SCADA) measurements, together with the complete power system model, to simultaneously obtain the complete state of the entire utility’s operating model at rates that are close to the synchrophasor data rates. The full system coverage property is what distinguishes the DNSE from the linear synchrophasor SEs (which cover only parts of the operating model that are visible through synchrophasor measurements), and DNSE differs from traditional EMS SE in that the solution is obtained without iterations, without initial values (hence the “direct” in the name), and at a much higher execution rate. This presentation provides an overview of the project objectives, a brief description of the main tasks including the development work to productize and optimize DNSE from its current MATLAB code base, RTDMS enhancement for interfacing with the DNSE, factory acceptance testing, field installation, testing and demonstration, as well as the current status of the project execution.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Y-12 Site Sustainability Plan

The accomplishments to date and the long-range planning of the Y-12 Energy Management and Sustainability and Stewardship programs support the DOE and the National Nuclear Security Administration (NNSA) vision for a commitment to energy efficiency and sustainability and to achievement of the Guiding Principles. Specifically, the Y-12 vision is to support the Environment, Safety and Health Policy and the DOE Strategic Sustainability Performance Plan (SSPP) while promoting overall sustainability and reduction of greenhouse gas (GHG) emissions. Table ES.2 gives a comprehensive overview of Y-12's performance status and planned actions. B&W Y-12's Energy Management mission is to incorporate renewable energy and energy efficient technologies site-wide and to position Y-12 to meet NNSA energy requirement needs through 2025 and beyond. During FY 2011, the site formed a sustainability team (Fig. ES.1). The sustainability team provides a coordinated approach to meeting the various sustainability requirements and serves as a forum for increased communication and consistent implementation of sustainability activities at Y-12. The sustainability team serves as an information exchange mechanism to promote general awareness of sustainability information, while providing a system to document progress and to identify resources. These resources are necessary to implement activities that support the overall goals of sustainability, including reducing the use of resources and conserving energy. Additionally, the team's objectives include: (1) Foster a Y-12-wide philosophy to conserve resources; (2) Reduce the impacts of production operations in a cost-effective manner; (3) Increase materials recycling; (4) Use a minimum amount of energy and fuel; (5) Create a minimum of waste and pollution in achieving Y-12-strategic objectives; (6) Develop and implement techniques, technologies, process modifications, and programs that support sustainable acquisition; (7) Minimize the impacts to resources, including energy/fuel, water, waste, pesticides, and pollution generation; (8) Incorporate sustainable design principles into the design and construction of facility upgrades, new facilities, and infrastructure; and (9) Comply with federal and state regulations, executive orders, and DOE requirements. Y-12 is working to communicate its sustainment vision through procedural, engineering, operational, and management practices. The site will make informed decisions based on the application of the five Guiding Principles for HPSBs to the maximum extent possible.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Synchrophasor-based Application for Potential Distributed Energy Resources Management: Key Technology, Challenge and Vision

With an increasing number of distributed energy resources (DERs) integrating into the power system, the power grid is becoming more complex and uncertain. Owing to most of DERs are through grid-connected converters to integrate into the power system, the intermittent nature and resource-depended characteristic of the DERs are challenging their monitoring and control. Conventional synchronized measurement devices (SMDs) may be difficult to provide qualified data for DERs management for its accuracy and reporting-rate limitation. The monitoring systems developed basing on SMDs may be insufficient for depicting detailed dynamic manifestations of power systems with a high proportion integration of DERs. This paper shares some advanced synchrophasor-based applications developed in FNET/GridEye, which have a broad prospect for assisting system operator on the control and integration of the DERs.

Wang, Weikang↗

Energy Efficiency: Information Sources for New and Emerging Technologies

The purpose of this article is to share a list of useful organizations that provide reliable information on new and emerging energy-efficient technologies based on research and experience. Experienced energy managers may use the information provided by these organizations to enhance their knowledge and understanding, thereby improving their energy management programs. The scope is limited to publicly-available and open-membership organizations that deal with new and emerging, energy-efficient technologies, strategies, and products. The sources identified should not be considered exhaustive but rather a first step “go to” list suggested by the author when searching for useful information on new and emerging energy-efficient technologies.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Expert systems applied to fault isolation and energy storage management, phase 2

A user's guide for the Fault Isolation and Energy Storage (FIES) II system is provided. Included are a brief discussion of the background and scope of this project, a discussion of basic and advanced operating installation and problem determination procedures for the FIES II system and information on hardware and software design and implementation. A number of appendices are provided including a detailed specification for the microprocessor software, a detailed description of the expert system rule base and a description and listings of the LISP interface software.

Source record↗

Covered Product Categories (Fact Sheet)

List of Federal Energy Management Program (FEMP)-designated product categories for energy-efficient procurement requirements.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Desktop Audits: Overview, Case Studies, Guidance

The Energy Independence and Security Act (EISA) of 2007 requires that federal agencies audit 25% of their 3.1 billion square feet of covered facilities each year. Several newer, advanced options such as monitoring-based commissioning, fault detection and diagnostics, and energy management systems can help support data collection and analysis to be used for EISA compliance. The Federal Energy Management Program's (FEMP’s) Audit Decision Tree, Audit Definitions, and FEMP Guidance can be used by Agencies to determine the best approaches to evaluate their facilities. FEMP continues to develop additional resources to support agencies in meeting EISA compliance. This presentation gives an overview of desktop audits, including case studies and guidance.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗