Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “EM”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

1/f noise measurements for faster evaluation of electromigration in advanced microelectronics interconnections

The use of 1/f noise measurements is explored for the purpose of finding faster techniques for electromigration (EM) characterization in advanced microelectronic interconnects, which also enable a better understanding of its underlying physical mechanisms. Three different applications of 1/f noise for EM characterization are explored. First, whether 1/f noise measurements during EM stress can serve as an early indicator of EM damage. Second, whether the current dependence of the noise power spectral density (PSD) can be used for a qualitative comparison of the defect concentration of different interconnects and consequently also their EM lifetime t50. Third, whether the activation energies obtained from the temperature dependence of the 1/f noise PSD correspond to the activation energies found by means of classic EM tests. In this paper, the 1/f noise technique has been used to assess and compare the EM properties of various advanced integration schemes and different materials, as they are being explored by the industry to enable advanced interconnect scaling. More concrete, different types of copper interconnects and one type of tungsten interconnect are compared. The 1/f noise measurements confirm the excellent electromigration properties of tungsten and demonstrate a dependence of the EM failure mechanism on copper grain size and distribution, where grain boundary diffusion is found to be a dominant failure mechanism.

71 CLASSICAL AND QUANTUM MECHANICS, GENERAL PHYSIC↗

Constraining parameters of white-dwarf binaries using gravitational-wave and electromagnetic observations

The space-based gravitational wave (GW) detector, evolved Laser Interferometer Space Antenna (eLISA) is expected to observe millions of compact Galactic binaries that populate our Milky Way. GW measurements obtained from the eLISA detector are in many cases complimentary to possible electromagnetic (EM) data. In our previous papers, we have shown that the EM data can significantly enhance our knowledge of the astrophysically relevant GW parameters of Galactic binaries, such as the amplitude and inclination. This is possible due to the presence of some strong correlations between GW parameters that are measurable by both EM and GW observations, for example, the inclination and sky position. In this paper, we quantify the constraints in the physical parameters of the white-dwarf binaries, i.e., the individual masses, chirp mass, and the distance to the source that can be obtained by combining the full set of EM measurements such as the inclination, radial velocities, distances, and/or individual masses with the GW measurements. We find the following 2σ fractional uncertainties in the parameters of interest. The EM observations of distance constrain the chirp mass to ∼15%-25%, whereas EM data of a single-lined spectroscopic binary constrain the secondary mass and the distance with factors of two to ∼40%. The single-line spectroscopic data complemented with distance constrains the secondary mass to ∼25%-30%. Finally, EM data on double-lined spectroscopic binary constrain the distance to ∼30%. All of these constraints depend on the inclination and the signal strength of the binary systems. We also find that the EM information on distance and/or the radial velocity are the most useful in improving the estimate of the secondary mass, inclination, and/or distance.

79 ASTRONOMY AND ASTROPHYSICS↗

Real-time Implementation of Grid Code Compliant Grid Edge Energy Management System

Integrated distributed energy resources (DER) in a distribution system need to follow grid codes to avoid violations that result in DER/circuit segment disconnection. To comply with grid code requirements at the grid edge level, network constrained grid edge energy management system (EMS) can be deployed. The objective of grid edge EMS is to provide economic solution for active and reactive power DER setpoints at each dispatch interval and ensure voltage regulation to support secure interconnection of the grid edge segment to the distribution system with multiple inverter based DER units. In this work, real-time simulation of grid code compliant grid edge EMS is deployed in a realistic feeder circuit segment. For real-time simulation, communication between the grid edge EMS and DERs is done exploiting IEC 61850-7-420. It enables interoperability among different DERs and grid edge EMS. No prior art has deployed IEC 61850-7-420 GOOSE communication protocol for grid edge EMS. Conversion of IEC 61850 GOOSE messages to Modbus communication protocol is also performed to communicate with grid edge EMS in commodity-off the shelf embedded boards in this work. The real-time simulation in OPAL-RT real-time digital simulator shows the out-performance of grid edge EMS by reducing the voltage violation in the distribution circuit.

Energy management system↗

SU-F-J-152: Accuracy of Charge Particle Transport in Magnetic Fields Using EGSnrc

Purpose: Determine accuracy of the current implementation of electron transport under magnetic fields in EGSnrc by means of single scattering (SS) and Fano convergence tests, and establish quantitatively the electron step size restriction required to achieve a desired level of accuracy for ionization chamber dosimetry. Methods: Condensed history (CH) dose calculations are compared to SS results for a PTW30013 ionization chamber irradiated in air by a 60Co photon beam. CH dose results for this chamber irradiated in a water phantom by a source of mono-energetic electrons are compared to the prediction of Fano’s theorem for step size restrictions EM ESTEPE from 0.01 to 0.1 and strengths of 0.5 T, 1.0 T, and 1.5 T. Results: CH calculations in air for 60Co photons using an EM ESTEPE of 0.25 overestimate SS values by 6% for a 1.5 T field and by 1.5% for a 0.5 T field. Agreement improves with decreasing EM ESTEPE reducing this difference at 0.02 to 0.13% and 0.04% for 1.5 T and 0.5 T respectively. CH results converge with decreasing EM ESTEPE reaching an agreement of 0.2% at a value of EM ESTEPE of 0.01 for 100 keV electrons. SS results at 100 keV for 1.5 T show the same EM ESTEPE dependency as the CH results. Conclusion: Accurate transport of charged particles in magnetic fields is only possible if the step size is significantly restricted. An EM ESTEPE value of 0.02 is required to reproduce SS results at the 0.1% level for a calculation in air. The EM ESTEPE dependency of the SS results suggests SS is bypassed when simulating the transport of charged particles in magnetic fields. Fano test results for in water calculation suggest that only a 0.2% accuracy can be achieved with the current implementation.

60 APPLIED LIFE SCIENCES↗

Freeze It or Leave It? Evaluating the Role of Cryo-Electron Microscopy in Battery Research

Cryogenic electron microscopy (cryo-EM) continues to gain prominence in materials science, particularly in battery research where it has enabled high-resolution, multimodal characterization of electrode materials and interfaces that otherwise degrade quickly under electron beam irradiation. But as anyone who has attempted cryo-EM techniques knows, freezing comes at a cost; cryo-EM experiments are time-consuming, highly sensitive, and carry an increased risk of artifacts due to issues such as frost contamination. Thus, when planning new characterization of battery materials or other beam-sensitive samples, it is critical to consider whether (and which) cryo-EM techniques are appropriate, based on study goals and an understanding of electron beam-sample interactions. Here we review such considerations for battery materials to elucidate the questions of when, why, and how to freeze to achieve high-quality characterization.

25 ENERGY STORAGE↗

DOE/EM Criticality Safety Needs Assessment

The issue of nuclear criticality safety (NCS) in Department of Energy Environmental Management (DOE/EM) fissionable material operations presents challenges because of the large quantities of material present in the facilities and equipment that are committed to storage and/or material conditioning and dispositioning processes. Given the uncertainty associated with the material and conditions for many DOE/EM fissionable material operations, ensuring safety while maintaining operational efficiency requires the application of the most-effective criticality safety practices. In turn, more-efficient implementation of these practices can be achieved if the best NCS technologies are utilized. In 2002, DOE/EM-1 commissioned a survey of criticality safety technical needs at the major EM sites. These needs were documented in the report Analysis of Nuclear Criticality Safety Technology Supporting the Environmental Management Program, issued May 2002. Subsequent to this study, EM safety management personnel made a commitment to applying the best and latest criticality safety technology, as described by the DOE Nuclear Criticality Safety Program (NCSP). Over the past 7 years, this commitment has enabled the transfer of several new technologies to EM operations. In 2008, it was decided to broaden the basis of the EM NCS needs assessment to include not only current needs for technologies but also NCS operational areas with potential for improvements in controls, analysis, and regulations. A series of NCS workshops has been conducted over the past years, and needs have been identified and addressed by EM staff and contractor personnel. These workshops were organized and conducted by the EM Criticality Safety Program Manager with administrative and technical support by staff at Oak Ridge National Laboratory (ORNL). This report records the progress made in identifying the needs, determining the approaches for addressing these needs, and assimilating new NCS technologies into EM fissionable material operations. In addition, the report includes projections of future EM needs and associted recommendations.

Westfall, Robert Michael↗

Deep Cyber-Physical Situational Awareness for Energy Systems: A Secure Foundation for Next-Generation Energy Management

This document provides the final report for the CYPRES project. The purpose is (1) to highlight and summarize its major accomplishments and (2) to provide guidance on how its outcomes have informed and can inform important additional research and technology transfer. The goal of CYPRES was the research, development, and demonstration of a security-oriented next generation cyber-physical EMS for electric power systems that detects malicious and abnormal events through the fusion of cyber and physical data. To achieve this, the CYPRES project team researched, developed, and built a prototype of the solution, referred to as the CYPRES EMS. The CYPRES EMS is a proof-of-concept cyber-physical platform that demonstrates the management of the energy system, communications, security, and cyber-physical grid modeling and analytics. As part of the capabilities of the CYPRES EMS, the team designed and developed a suite of power system applications for monitoring, risk analyses, detection, and control that are inherently cyberaware. At its core, the project aimed to research, develop, and demonstrate a security-oriented next-generation cyber-physical Energy Management System (EMS) capable of detecting malicious and abnormal events through the innovative fusion of cyber and physical data. This approach represents a fundamental shift from traditional EMS, reimagining how critical infrastructure can be protected through unified cyber-aware and physics-aware secure data flow pipelines. The project’s cornerstone deliverable, the CYPRES EMS, serves as a proof-of-concept cyber-physical platform that revolutionizes the management of energy systems, communications, security, and cyber-physical grid modeling and analytics. This prototype implements a comprehensive suite of power system applications for monitoring, risk analyses, detection, and control, all designed with inherent cyber awareness. The system’s architecture extends from end-devices in the field through to control center applications, establishing a secure and resilient control framework that addresses the challenges posed by diverse devices of unknown trustworthiness connecting to modern power systems. Through this innovative approach to deep cyber-physical situational awareness, the CYPRES project not only advances the state-of-the-art in energy infrastructure protection but also establishes a new paradigm for how EMS can be designed, deployed, and operated in an increasingly complex threat landscape. The findings and developments from this project provide crucial insights for stakeholders across the energy sector, offering a blueprint for enhancing the reliability and resilience of our nation’s critical energy infrastructure in the face of evolving cyber threats.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Environmental Management System Plan

Executive Order 13423, Strengthening Federal Environmental, Energy, and Transportation Management establishes the policy that Federal agencies conduct their environmental, transportation, and energy-related activities in a manner that is environmentally, economically and fiscally sound, integrated, continually improving, efficient, and sustainable. The Department of Energy (DOE) has approved DOE Order 450.1A, Environmental Protection Program and DOE Order 430.2B, Departmental Energy, Renewable Energy and Transportation Management as the means of achieving the provisions of this Executive Order. DOE Order 450.1A mandates the development of Environmental Management Systems (EMS) to implement sustainable environmental stewardship practices that: (1) Protect the air, water, land, and other natural and cultural resources potentially impacted by facility operations; (2) Meet or exceed applicable environmental, public health, and resource protection laws and regulations; and (3) Implement cost-effective business practices. In addition, the DOE Order 450.1A mandates that the EMS must be integrated with a facility's Integrated Safety Management System (ISMS) established pursuant to DOE P 450.4, 'Safety Management System Policy'. DOE Order 430.2B mandates an energy management program that considers energy use and renewable energy, water, new and renovated buildings, and vehicle fleet activities. The Order incorporates the provisions of the Energy Policy Act of 2005 and Energy Independence and Security Act of 2007. The Order also includes the DOE's Transformational Energy Action Management initiative, which assures compliance is achieved through an Executable Plan that is prepared and updated annually by Lawrence Berkeley National Laboratory (LBNL, Berkeley Lab, or the Laboratory) and then approved by the DOE Berkeley Site Office. At the time of this revision to the EMS plan, the 'FY2009 LBNL Sustainability Executable Plan' represented the most current Executable Plan. These DOE Orders and associated policies establish goals and sustainable stewardship practices that are protective of environmental, natural, and cultural resources, and take a life cycle approach that considers aspects such as: (1) Acquisition and use of environmentally preferable products; (2) Electronics stewardship; (3) Energy conservation, energy efficiency, and renewable energy; (4) Pollution prevention, with emphasis on toxic and hazardous chemical and material reduction; (5) Procurement of efficient energy and water consuming materials and equipment; (6) Recycling and reuse; (7) Sustainable and high-performance building design; (8) Transportation and fleet management; and (9) Water conservation. LBNL's approach to sustainable environmental stewardship required under Order 450.1A poses the challenge of implementing its EMS in a compliance-based, performance-based, and cost-effective manner. In other words, the EMS must deliver real and tangible business value at a minimal cost. The purpose of this plan is to describe Berkeley Lab's approach for achieving such an EMS, including an overview of the roles and responsibilities of key Laboratory parties. This approach begins with a broad-based environmental policy consistent with that stated in Chapter 11 of the LBNL Health and Safety Manual (PUB-3000). This policy states that Berkeley Lab is committed to the following: (1) Complying with applicable environmental, public health, and resource conservation laws and regulations. (2) Preventing pollution, minimizing waste, and conserving natural resources. (3) Correcting environmental hazards and cleaning up existing environmental problems, and (4) Continually improving the Laboratory's environmental performance while maintaining operational capability and sustaining the overall mission of the Laboratory. A continual cycle of planning, implementing, evaluating, and improving processes will be performed to achieve goals, objectives, and targets that will help LBNL carry out this policy. Each year, environmental aspects will be identified and their impacts to the environment will be evaluated. Objectives and targets will be developed (or updated) for each aspect that is determined to have a significant impact. Environmental Management Programs (EMPs) will be prepared (or updated) to document actions necessary for reducing certain environmental impacts. Each EMP will identify responsible parties and associated target deadlines for each action. Quarterly, environmental programs will be reviewed for compliance issues and effectiveness. Annually, an internal assessment will be performed to evaluate the progress of the EMS, and LBNL senior management will review the results. In addition, at least once every 3 years a third-party audit will be performed to validate that the EMS is being implemented according to plan.

99 GENERAL AND MISCELLANEOUS↗

Review of Evaluation, Measurement and Verification Approaches Used to Estimate the Load Impacts and Effectiveness of Energy Efficiency Programs

Public and private funding for end-use energy efficiency actions is expected to increase significantly in the United States over the next decade. For example, Barbose et al (2009) estimate that spending on ratepayer-funded energy efficiency programs in the U.S. could increase from $3.1 billion in 2008 to $7.5 and 12.4 billion by 2020 under their medium and high scenarios. This increase in spending could yield annual electric energy savings ranging from 0.58% - 0.93% of total U.S. retail sales in 2020, up from 0.34% of retail sales in 2008. Interest in and support for energy efficiency has broadened among national and state policymakers. Prominent examples include {approx}$18 billion in new funding for energy efficiency programs (e.g., State Energy Program, Weatherization, and Energy Efficiency and Conservation Block Grants) in the 2009 American Recovery and Reinvestment Act (ARRA). Increased funding for energy efficiency should result in more benefits as well as more scrutiny of these results. As energy efficiency becomes a more prominent component of the U.S. national energy strategy and policies, assessing the effectiveness and energy saving impacts of energy efficiency programs is likely to become increasingly important for policymakers and private and public funders of efficiency actions. Thus, it is critical that evaluation, measurement, and verification (EM&V) is carried out effectively and efficiently, which implies that: (1) Effective program evaluation, measurement, and verification (EM&V) methodologies and tools are available to key stakeholders (e.g., regulatory agencies, program administrators, consumers, and evaluation consultants); and (2) Capacity (people and infrastructure resources) is available to conduct EM&V activities and report results in ways that support program improvement and provide data that reliably compares achieved results against goals and similar programs in other jurisdictions (benchmarking). The National Action Plan for Energy Efficiency (2007) presented commonly used definitions for EM&V in the context of energy efficiency programs: (1) Evaluation (E) - The performance of studies and activities aimed at determining the effects and effectiveness of EE programs; (2) Measurement and Verification (M&V) - Data collection, monitoring, and analysis associated with the calculation of gross energy and demand savings from individual measures, sites or projects. M&V can be a subset of program evaluation; and (3) Evaluation, Measurement, and Verification (EM&V) - This term is frequently seen in evaluation literature. EM&V is a catchall acronym for determining both the effectiveness of program designs and estimates of load impacts at the portfolio, program and project level. This report is a scoping study that assesses current practices and methods in the evaluation, measurement and verification (EM&V) of ratepayer-funded energy efficiency programs, with a focus on methods and practices currently used for determining whether projected (ex-ante) energy and demand savings have been achieved (ex-post). M&V practices for privately-funded energy efficiency projects (e.g., ESCO projects) or programs where the primary focus is greenhouse gas reductions were not part of the scope of this study. We identify and discuss key purposes and uses of current evaluations of end-use energy efficiency programs, methods used to evaluate these programs, processes used to determine those methods; and key issues that need to be addressed now and in the future, based on discussions with regulatory agencies, policymakers, program administrators, and evaluation practitioners in 14 states and national experts in the evaluation field. We also explore how EM&V may evolve in a future in which efficiency funding increases significantly, innovative mechanisms for rewarding program performance are adopted, the role of efficiency in greenhouse gas mitigation is more closely linked, and programs are increasingly funded from multiple sources often with multiple program administrators and intended to meet multiple purposes.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT REPORT FISCAL YEAR 2010

The mission of the Department of Energy's (DOE's) Office of Environmental Management (EM) is to clean up the environmental legacy of nuclear weapons research and production during the Cold War. That mission includes cleaning up nuclear waste, contaminated groundwater and soil, nuclear materials, and contaminated facilities covering two million acres of land in thirty-five states. EM's principal program goals include timely completion of tank waste treatment facilities, reduction of the life-cycle costs and acceleration of the cleanup of the Cold War legacy, and reduction of the EM footprint. The mission of the EM Technology Innovation and Development program is to transform science and innovation into practical solutions to achieve the EM mission. During fiscal year 2010 (October 2009-September 2010), EM focused upon accelerating environmental cleanup by expeditiously filling identified gaps in available knowledge and technology in the EM program areas. This report describes some of the approaches and transformational technologies in tank waste processing, groundwater and soil remediation, nuclear materials disposition, and facility deactivation and decommissioning developed during fiscal year 2010 that will enable EM to meet its most pressing program goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fine structure in plasma waves and radiation near the plasma frequency in Earth's foreshock

Novel observations are presented of intrunsic fine structure in the frequency spectrum of electomagnetic (EM) radiation and plasma waves near the electron plasma frequency f(sub p) during a period of unusually high interplanetary magnetic field strength. Measured using the wideband receiver on the International Sun-Earth Explorer (ISEE) 1 spacecraft, fine-structured emissions are observed both in the solar wind and the foreshock, The fine structure is shown to correspond to emissions spaced above f(sub p) near half harmonies of the electon cyclotron frequency f(sub ce), i.e., near f(sub p) + nf(sub ce)/2. These appear to be the first space physics observations of emissions spaced by f(sub ce)/2. Indirect but strong arguments are used to discriminate between EM and electrostatic (ES) signals, to identify whether ISEE 1 is in the solar wind or the foreshock, and to determine the relative frequencies of the emissions and the local f(sub p). The data are consistent with generation of the ES and EM emissions in the foreshock, with subsequent propagation of the EM emissions into the solar wind. It remains possible that some emissions currently identified as ES have significant EM character. The ES and EM emisions often merge into one another with minimal changes in frequency, arguing that their source regions and generation mechanisms are related and imposing significant constraints on theories. The f(sub ce)/2 ES and EM fine structures observed may be intrinsic to the emission mechanisms or to superposition of two series of signals with f(sub ce) spacing that differ in starting frequency by f(sub ce)/2. Present theories for nonlinear wave coupling processes, cyclotron maser emission, and other linear instability processes are all unable to explain multiple EM and/or ES components spaced by approximately f(sub ce)/2 above f(sub p) for f(sub p)/f(sub ce) much greater than 1 and typical for shock beams parameters. Suitable avenues for further theoretical research are identified. Empirically, the observed fine structures appear very similar to those in split bnad and multiple-lane type II solar radio bursts; interpretation of both these type II fine structures in terms of f(sub ce)/2 splitting is suggested, thereby supporting and generalizing a suggestion by Wild (1950). A possible application to continuum radiation is mentioned. The ubiquity of these fine structures in the Earth's f(sub p) radiation and foreshock waves remains unknown. Only the ISEE 1 wideband receiver has sufficient frequency resolution (approximately less than or equal to 100 Hz) to perform a dedicated search. Further study of the ubiquity of these fine structures, of how reliably the splitting corresponds to f(sub ce)/2, and of the other interpretations above is necessary.

Cairns, Iver H.↗

HUMAN FACTORS AND BEHAVIORAL PERFORMANCE EXPLORATION MEASURES: ASSESSING ASTRONAUT RISK

INTRODUCTION: The Human Factors and Behavioral Performance Exploration Measures (HFBP-EM) suite is a set of standardized measures to assess behavioral health and performance risk related to future exploration class missions, and to support reduction of the Human Research Program’s (HRP) Behavioral Medicine (BMed), Team, Sleep, and Human Systems Integration Architecture (HSIA) risks. This presentation will provide an overview of the HFBP-EM program, describe its implementation across spaceflight analogs and the international space station (ISS), and discuss its applicability to audience members. TOPIC: HFBP-EM is a research program designed to develop a standard set of measures that can be used in space and space-analog research to characterize BMed, Team, Sleep, and HSIA risks. It is an ongoing research project that is used examine the validity and reliability of HFBP measures, as well as their shorter forms. It also serves as a test bed for HFBP measures being considered for the spaceflight standard measures. The suite of measures is used to test the efficacy of countermeasures. To date, HFBP-EM has been collected in Human Exploration Research Analogs campaigns 4 and 5, and the SIRIUS 19 mission in the Russian Ground Based Experiment Complex. A subset of the HFBP-EM suite was collected during spaceflight as part of HRP’s Standard Measures in Spaceflight Project. Data was collected from a total of 55 multinational astronaut and astronaut-like crewmembers (mean age: 39.5, SD = 7.6; 31% female; 91% with advanced degrees). Three broad categories of HFBP-EM measures and their relevance to HRP risks will be discussed: 1) surveys that assess team functioning (Teams risk) as well as mood and affect (Bmed risk), 2) performance-based tasks of cognitive functioning and operationally relevant performance (Bmed risk), and 3) physiological biomarkers of sleep (sleep risk) and heart rate (Bmed risk). We will provide an overview of the background of the HFBP-EM program, what the suite currently includes, and next steps in its future development. We will also discuss the application to aerospace practitioners and researchers. APPLICATION: Astronaut teams selected for future space exploration missions will face several challenges that pose significant yet still unknown risks to the behavioral health and performance of astronauts. The HFBP-EM suite provides a comprehensive assessment of behavioral health and performance in space analog and spaceflight settings. This suite can be applied to both operational and research settings to advance risk reduction research for long duration space exploration missions.

S T Bell↗

External Technical Reviews in the Environmental Management Program

The Environmental Management (EM) program believes strongly in reducing the technical risk of its projects and has initiated External Technical Reviews (ETR) as one of several steps to ensure the timely resolution of engineering and technology issues. EM's Office of Engineering and Technology is leading the ETR process and is working closely with Federal Project Directors to review such issues as technology development, systems integration, design, operations, maintenance, and nuclear safety. EM has completed several successful reviews using expert engineers and scientists from private industry and academia over the last two years. Additional external technical reviews will be conducted to support key project decisions and will be a mainstay of the EM program. The purpose of an ETR is to reduce technical risk and uncertainty. These independent reviews provide pertinent information for EM to assess technical risk associated with projects and develop strategies for reducing the technical risk, and provide technical information needed to support critical project decisions. Technical risk reduction increases the probability of successful implementation of technical scope. In general, an ETR assesses technical bases, technology development, and technical risk identification and handling strategies. The three key objectives of every ETR are: - To determine if the technology, process, system, or design under review will meet project objectives and requirements, - To identify any issues (show-stoppers) preventing successful implementation of the technology, process, system, or design under review, and - To identify issues or data needed to support critical or other project or program decisions. The specific objectives of ETRs may vary, but generally include: - Determining if technical objectives are well known and defined; - Determining if alternatives have been identified and effectively evaluated; - Determining if technology development is well planned and executed; - Determining the adequacy of quality assurance and scientific investigation; - Determining if technical bases are substantial and adequately documented; - Validating the technical basis and appropriateness of the technology, process, system, or design to technical risk reduction; - Determining if the technology can be deployed and implemented. In conclusion, ETRs have proven to be a valuable tool for reducing technical risk and uncertainty in EM projects. An ETR Process Guide is currently being developed that will provide a standard review and reporting process for all EM ETRs. EM plans to conduct ETRs in the future to support key project decisions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A History of the Environmental Management Advisory Board: 20 Years of Service and Partnership - 13219

The Environmental Management Advisory Board (EMAB or Board) was chartered under the Federal Advisory Committee Act (FACA) in 1992 to provide the Assistant Secretary for Environmental Management (EM) with independent and external advice, information, and recommendations on corporate issues relating to accelerated site clean-up and risk reduction throughout the EM complex. Over the course of the past 20 years, the composition and focus of the Board have varied widely to address the changing needs of the program. EMAB began as the Environmental Restoration and Waste Management Advisory Committee, formed to provide advice on an EM Programmatic Environmental Impact Statement. In 1994, the Board was restructured to function more as an executive-level, limited member advisory board whose membership provides insight of leading industry experts and the viewpoints of representatives from critical stakeholder constituencies. Throughout the 20 years of its existence, EMAB has covered a wide variety of topics and produced nearly 200 recommendations. These recommendations have resulted in several policy changes and improvements within EM. Most recently, EMAB has been credited for its contribution to the EM Energy Park Initiative, forerunner of the DOE Asset Revitalization Initiative; creation of the EM Offices of Communications and External Affairs; improvement of acquisition and project management strategies and culture; and several recommendations related to the Waste Treatment Plant and the tank waste programs at Hanford and the Savannah River Site. The wealth of experience and knowledge the Assistant Secretary can leverage through utilization of the Board continues to support fulfillment of EM's mission. In commemoration of EMAB's 20. anniversary, this paper will provide further context for the evolution of the Board, the role FACA plays in its administration, and a look at the members' current objectives and EM's expectations for the future. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Oak Ridge Cleanup Vision: Moving to the Future by Cleaning Up the Past - 13291

The Oak Ridge Office of Environmental Management (EM) strives to be the leader in the Department of Energy's (DOE's) EM Complex regarding successful and safe project execution and stakeholder interactions that yield positive results. EM's goal has been to become 'Investment Worthy' and, in order to accomplish that important objective, has also had to improve communications both within and outside of the Department. One of our most important missions is to assist the Department in achieving the sustainability goals set forth in Executive Order 13514. In this regard, EM's primary role is to return land to beneficial use and reduce energy impacts and maintenance costs by demolishing unneeded and deteriorating structures and remediating environmental contamination. Recent accomplishments toward meeting these goals include significant progress in the decontamination and demolition of the country's largest facility, the former K-25 Gaseous Diffusion Building, constructed in 1942 to enrich uranium to help end World War II; the disposition of the first phase of Uranium-233 material from the Oak Ridge National Laboratory (ORNL) which involved the transfer of Zero Power Reactor Plates to the National Nuclear Security Administration (NNSA); and a host of other project successes associated with transuranic (TRU) waste processing, hot cell decontamination and demolition, remediation of highly contaminated soils and burial grounds, and removal of mercury from storm sewers and surface waters. With regard to successful stakeholder interactions, recent accomplishments include a new method for collaboration that has renewed EM's working relationship with the regulators, and success in completing an extensive consultation process with over a dozen parties on the historic preservation of the former Oak Ridge Gaseous Diffusion Plant, which is now called the East Tennessee Technology Park (ETTP). Regarding improved communications, EM has successfully revised Program priorities and has received buy-in from the leadership in Headquarters, the regulators, and the community. Issues EM was facing in 2009 are presented. Resulting lessons learned and subsequent changes that the Office has gone through in the past several years in order to improve performance in the safe execution of work, relationships with external stakeholders, and communications both internally and externally are discussed. Results of these efforts are provided as a summary of Program accomplishments, including a strong focus on the future. EM's motto, Moving to the Future by Cleaning up the Past, will be demonstrated through the Program's mission, which includes protecting the region's health and environment; ensuring the continuation of ongoing vital missions being conducted by DOE on the Oak Ridge Reservation; and making clean land available for future use at all three sites, with a near-term focus on Re-industrialization of ETTP. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Role of the Environmental Management Site Specific Advisory Board under the Federal Advisory Committee Act, With Emphasis on the Northern New Mexico Citizens' Advisory Board - 12482

The Environmental Management Site Specific Advisory Board (EM SSAB) is comprised of eight Citizens' Advisory Boards, chartered under the Federal Advisory Committee Act (FACA) by the Assistant Secretary for Environmental Management for the U. S. Department of Energy (DOE). The purpose of the EM SSAB is to provide the DOE with recommendations regarding Environmental Management issues from legacy waste produced at major sites across the DOE Complex. The Northern New Mexico Citizens' Advisory Board (NNMCAB) is the site specific advisory board to the DOE on issues of environmental monitoring, remediation, waste management and long-term stewardship at Los Alamos National Laboratory (LANL). The other boards are located at: Hanford, Idaho, Nevada, Paducah, Portsmouth, Oak Ridge and Savannah River. Using broad citizen outreach and input, the SSAB provides an official mechanism for the citizenry at each of these sites to monitor current activities affecting the region and also to have input into the prioritization of future activities. 'The mission of the EM SSAB is to more directly involve stakeholders in EM Planning and decision-making processes for the nuclear weapons complex cleanup. DOE has various means of involving the public in its planning and decision-making processes; the EM SSAB is only one component of EM's public participation program, and is not intended to be an exclusive means of public participation. It is the policy of DOE and EM to conduct it programs in an open and responsive manner, thereby encouraging and providing the opportunity for public participation in its planning and decision-making processes. EM SSAB members are appointed to a two year term and may serve up to three terms. During this time, members are able to hear many presentation from subject matter experts, attend several site tours at their site and across the DOE complex and are able to express their concerns and give input to the prioritization of clean up at each site. It is an excellent education and it is hoped that these members will go out to their communities, friends and family and discuss these issues in an informed manner. Many times our citizens rely only on newspaper articles or the Internet, which are sometimes replete with fear and misinformation. The more stakeholders are able to be truly informed, the more accurate the discourse will be at each of the DOE sites. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of a Workforce for the Nuclear Industry - 16513

The US Department of Energy's Office of Environmental Management (DOE-EM) oversees one of the largest environmental restoration projects in the world. DOEEM's labor statistics show that 91% of EM employees are 40 years old or older and only 1% of its workforce is under 30 years old. In addition, it is estimated that within the next three years, DOE-EM will lose as much as 30-35% of its technical workforce due to retirement. DOE-EM is responding to the aging workforce problem by proactively partnering with universities to train and develop the new generation for the environmental restoration workforce. In 2007, DOE-EM and Florida International University's Applied Research Center (ARC) established the DOE-FIU Science and Technology Workforce Development Program. This is an innovative program designed to train and mentor FIU students in STEM (science, technology, engineering, and math) disciplines and provides them with career paths in environmental restoration and the nuclear industry. The selected students (called DOE Fellows) perform hands-on environmental remediation research and participate in internships at DOE Headquarters, DOE sites, national laboratories, and DOE contractors. Upon graduation and completion of the DOE fellowship, DOE Fellows pursue employment opportunities with DOE and its contractors. In addition, DOE-EM has also established a Minority Serving Institution STEM program targeting STEM students at Historically Black Colleges and Universities (HBCUs). Both programs have the purpose of enhancing educational and training opportunities to minority students. DOE Fellows support DOE-EM research at FIU's ARC. The Fellows work side by side with ARC's scientists and engineers in the research of technologies and methodologies in the areas of high level waste/waste disposal and treatment, soil and groundwater remediation and modeling, deactivation and decommissioning (D and D) technology test and evaluation, and engage in the development of information technology systems in support of the DOE-EM environmental remediation mission. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Integrated Environmental Management System Communication at Large Sites - 20480

At a large Department of Energy-owned (DOE) site, there are challenges to communicating Environmental Management System (EMS) topics effectively. With multiple contractors and Environmental Management System scopes, as well as a large number of employees, communication preferences and possibilities vary, providing both the benefit and the challenge of differing pathways for sharing information. Additionally, data collection for site-wide environmental reporting involves numerous points of contact spread across contractors and requires organization and integrated communication. Focusing on the value of communication to enhance EMS education and awareness to drive environmental performance, we discuss the communication methods used both at a site-wide level and by individual organizations. Example methods include site-wide working group meetings, internal Share Point, site-wide surveys, collaborative reporting, weekly newsletters, and combined communication efforts with the Integrated Safety Management System (ISMS). Using external audit results to gauge employee environmental awareness and culture, we analyze the effectiveness of EMS communications. In conclusion, integration of EMS communication in alignment with the ISMS has assisted in meeting International Organization of Standardization 14001 (ISO 14001) requirements and strengthened the concept that environmental protection is part of safety for workers and the site. Increased environmental enthusiasm and awareness supports the effectiveness of EMS communication methods and positive external audit results. These results benefit other sites with EMS to gain knowledge of integrated communication efforts that increase the effectiveness of the EMS, environmental performance, and conformance with ISO 14001. By assessing the effectiveness of actual EMS communication methods, contractors will be able to take away tools to enhance environmental communication in their workplace. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗