Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Design for Manufacture and Assembly”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Zero-CO Residential Natural Gas Furnace

Residential natural gas furnaces are widely used in the US homes. Manufacturers dedicate significant design and testing resources to meet requirements of design standards. One area of these standards is controlling flue gas carbon monoxide (CO) emissions. To more effectively reduce CO emissions at the flue, we developed a novel catalyst-assisted approach that integrated a low Pt/Rh loading acidic gas reduction (AGR) catalyst with three-way catalyst (TWC) or diesel oxidation catalyst (DOC) components. Compact catalysts were fabricated and assembled into tubular components, which can be seamlessly incorporated into the primary heat exchanger of a representative commercially available condensing furnace. The retrofitted furnace was demonstrated and tested following ANSI/ASHRAE Standard 103-2017. Experimental results showed that both AGR/TWC and AGR/DOC configurations achieved near-zero CO emissions under steady-state and cold-start conditions, compared with up to 500 ppm at a cold start and 17 ppm in a steady state in the OEM furnace. The catalyst-assisted furnaces also exhibited an annual fuel utilization efficiency improvement of more than 1.5% relative to the baseline unit, with a manageable pressure drop of 2.0−2.5 in. of water column. These results demonstrate that the catalyst-assisted approach can effectively eliminate CO emissions and improve energy efficiency. The technology has broad applicability for residential and commercial gas-fired heating systems.

Gao, Zhiming [ORNL] (ORCID:0000000271397995)↗

WRAP-RIB antenna technology development

The wrap-rib deployable antenna concept development is based on a combination of hardware development and testing along with extensive supporting analysis. The proof-of-concept hardware models are large in size so they will address the same basic problems associated with the design fabrication, assembly and test as the full-scale systems which were selected to be 100 meters at the beginning of the program. The hardware evaluation program consists of functional performance tests, design verification tests and analytical model verification tests. Functional testing consists of kinematic deployment, mesh management and verification of mechanical packaging efficiencies. Design verification consists of rib contour precision measurement, rib cross-section variation evaluation, rib materials characterizations and manufacturing imperfections assessment. Analytical model verification and refinement include mesh stiffness measurement, rib static and dynamic testing, mass measurement, and rib cross-section characterization. This concept was considered for a number of potential applications that include mobile communications, VLBI, and aircraft surveillance. In fact, baseline system configurations were developed by JPL, using the appropriate wrap-rib antenna, for all three classes of applications.

Freeland, R. E.↗

Flight set 360T004 (STS-30)

The performance of 360T004, Forth Flight, Redesigned Solid Rocket Motors (RSRM) is assessed in respect to joint sealing issues as seen from post-test inspection of the seals and sealing surfaces. The factory joint disassembly inspections for this flight set were omitted. The decision was based on the rational that there is sufficient information in the present data base, and this would give H-7 refurbishment operations faster turn around time for this set of hardware. The factory joint disassembly inspections will resume for 360H005, Fifth Flight, through 360L007, Seventh Flight, due to a new grease application being in effect during the assembly process. The left hand nozzle was forced into the snubbed position upon splash down. This required unique tooling to be manufactured to perform the disassembly of the internal nozzle joints. This was completed on February 5 and 6, 1990 at the H-5 Clearfield, Utah facility. The RSRM consisting of capture feature, field joints with the J-joint insulation configuration is illustrated. The nozzle-to-case joint design, which includes 100, 7/8-inch radial bolts in conjunction with a wiper O-ring and modified insulation design is also illustrated, as is the ignition system seals and a cross section of the igniter. The configuration of all internal nozzle joints is shown.

Nelsen, Lowell V.↗

Z-2 Architecture Description and Requirements Verification Results

The Z-2 Prototype Planetary Extravehicular Space Suit Assembly is a continuation of NASA's Z series of spacesuits. The Z-2 is another step in NASA's technology development roadmap leading to human exploration of the Martian surface. The suit was designed for maximum mobility at 8.3 psid, reduced mass, and to have high fidelity life support interfaces. As Z-2 will be man-tested at full vacuum in NASA JSC's Chamber B, it was manufactured as Class II, making it the most flight-like planetary walking suit produced to date. The Z-2 suit architecture is an evolution of previous EVA suits, namely the ISS EMU, Mark III, Rear Entry I-Suit and Z-1 spacesuits. The suit is a hybrid hard and soft multi-bearing, rear entry spacesuit. The hard upper torso (HUT) is an all-composite structure and includes a 2-bearing rolling convolute shoulder with Vernier sizing mechanism, removable suit port interface plate (SIP), elliptical hemispherical helmet and self-don/doff shoulder harness. The hatch is a hybrid aluminum and composite construction with Apollo style gas connectors, custom water pass-thru, removable hatch cage and interfaces to primary and auxiliary life support feed water bags. The suit includes Z-1 style lower arms with cam brackets for Vernier sizing and government furnished equipment (GFE) Phase VI gloves. The lower torso includes a telescopic waist sizing system, waist bearing, rolling convolute waist joint, hard brief, 2 bearing soft hip thigh, Z-1 style legs with ISS EMU style cam brackets for sizing, and conformal walking boots with ankle bearings. The Z-2 Requirements Verification Plan includes the verification of more than 200 individual requirements. The verification methods include test, analysis, inspection, demonstration or a combination of methods. Examples of unmanned requirements include suit leakage, proof pressure testing, operational life, mass, isometric man-loads, sizing adjustment ranges, internal and external interfaces such as in-suit drink bag, partial pressure relief valve, purge valve, donning stand and ISS Body Restraint Tether (BRT). Examples of manned requirements include verification of anthropometric range, suit self-don/doff, secondary suit exit method, donning stand self-ingress/egress and manned mobility covering eight functional tasks. The eight functional tasks include kneeling with object pick-up, standing toe touch, cross-body reach, walking, reach to the SIP and helmet visor. This paper will provide an overview of the Z-2 design. Z-2 requirements verification testing was performed with NASA at the ILC Houston test facility. This paper will also discuss pre-delivery manned and unmanned test results as well as analysis performed in support of requirements verification.

Graziosi, Dave↗

Tension and Bending Testing of an Integral T-Cap for Stitched Composite Airframe Joints

The Pultruded Rod Stitched Efficient Unitized Structure (PRSEUS) is a structural concept that was developed by The Boeing Company to address the complex structural design aspects associated with a pressurized hybrid wing body aircraft configuration. An important design feature required for assembly is the integrally stitched T-cap, which provides connectivity of the corner (orthogonal) joint between adjacent panels. A series of tests were conducted on T-cap test articles, with and without a rod stiffener penetrating the T-cap web, under tension (pull-off) and bending loads. Three designs were tested, including the baseline design used in large-scale test articles. The baseline had only the manufacturing stitch row adjacent to the fillet at the base of the T-cap web. Two new designs added stitching rows to the T-cap web at either 0.5- or 1.0-inch spacing along the height of the web. Testing was conducted at NASA Langley Research Center to determine the behavior of the T-cap region resulting from the applied loading. Results show that stitching arrests the initial delamination failures so that the maximum strength capability exceeds the load at which the initial delaminations develop. However, it was seen that the added web stitching had very little effect on the initial delamination failure load, but actually decreased the initial delamination failure load for tension loading of test articles without a stiffener passing through the web. Additionally, the added web stitching only increased the maximum load capability by between 1% and 12.5%. The presence of the stiffener, however, did increase the initial and maximum loads for both tension and bending loading as compared to the stringerless baseline design. Based on the results of the few samples tested, the additional stitching in the T-cap web showed little advantage over the baseline design in terms of structural failure at the T-cap web/skin junction for the current test articles.

Lovejoy, Andrew E.↗

Discrete Lattice Material Vacuum Airship

Vacuum airships fueled by renewable energy would reduce reliance on fossil fuel-based modes of transport, lessen the need for limited and non-renewable lifting gases, and can be achieved using novel manufacturing techniques for ultra-light, discrete lattice material systems.The Discrete Lattice Material Vacuum Airships (DLMVA) system combines novel material science and manufacturing technologies for new modes of mass transportation, resulting in a disruptive approach to reduce national resource consumption and emissions. Through the use of high performance building block elements, modular, scalable and extensible aircraft can be rapidly assembled into positive net-buoyancy systems utilizing a vacuum instead of a lifting gas. By using architected lattice material principles, show that lattice materials can overcome stability limitations of previous vacuum balloon designs. Additionally, we show that lattice vacuum balloons are strength limited, rather than stability limited. As a result,airborne infrastructure can be developed to support the proliferation of modern systems such as e-commerce and distributed communications, while simultaneously reducing dependence on finite, non-renewable, emission-heavy resources.

Jenett, Benjamin E.↗

Assembly and Integrated Systems Testing for the Flow Boiling and Condensation Experiment (FBCE)

The Flow Boiling and Condensation Experiment (FBCE) is a flight experiment that is designed to operate in the Fluids Integrated Rack (FIR) on the International Space Station (ISS). The objective of the FBCE is to develop an integrated two-phase flow experiment that will serve as a primary platform for obtaining flow boiling and condensation heat transfer data in microgravity. This data will enable the design and analysis of two-phase thermal management systems for future NASA missions that require increased efficiency beyond the current single-phase systems. The FBCE consists of seven modules, each of which must link together mechanically, electrically, and fluidically upon final integration. Five of the modules provide the fluidic and electronic components required to bring the test fluid to the inlet conditions required by the test module, where the primary science is conducted. These inlet conditions encompass fluid quality ranging from a superheated vapor to a subcooled liquid at a variety of flow rates and pressures. The FBCE is currently manufacturing two test modules, each of which has its own separate test campaign with the five support modules. Each of the modules presents a unique challenge in its assembly and checkout, particularly related to ensuring the final hardware configuration can meet the fluid and thermal requirements levied upon them. Following assembly, a series of flight verification tests will be performed, including thermal testing, EMI testing, and final integration in a FIR Ground Integration Unit. This presentation discusses the status of the FBCE as it continues through final verification testing, including current test results and lessons learned throughout the assembly and integration phase of the project. In addition, future options for additional flight test sections will be explored that will benefit the broader NASA thermal and fluids community.

deFiebre, Jesse↗

Design, fabrication, and performance of foil journal bearing for the brayton rotating unit

Foil bearings were designed and manufactured to replace pivoted-shoe journal bearings in an existing Brayton Cycle turbo-alternator-compressor. The design of this unconventional rotor support was accomplished within the constraints and space limitations imposed by the present machine, and the substitution of foil bearings was effected without changes or modification other machine components. A housing and a test rig were constructed to incorporate the new foil-bearing support into a unified assemble with an air-driven rotor and the gimbal-mounted thrust bearing, seals, and shrouds of an actual Brayton Rotating Unit. The foil bearing required no external pressure source, and stable self-acting rotation was achieved at all speeds up to 43,200 rpm. Excellent wipe-wear characteristics of the foil bearing permitted well over 1000 start-stop cycles with no deterioriation of performance in the entire speed range.

Licht, L.↗

Fiber optic combiner and duplicator

The investigation of the possible development of two optical devices, one to take two images as inputs and to present their arithmetic sum as a single output, the other to take one image as input and present two identical images as outputs is described. Significant engineering time was invested in establishing precision fiber optics drawing capabilities, real time monitoring of the fiber size and exact measuring of fiber optics ribbons. Various assembly procedures and tooling designs were investigated and prototype models were built and evaluated that established technical assurance that the device was feasible and could be fabricated. Although the interleaver specification in its entirety was not achieved, the techniques developed in the course of the program improved the quality of images transmitted by fiber optic arrays by at least an order of magnitude. These techniques are already being applied to the manufacture of precise fiber optic components.

Source record↗

Space station

The Space Station is being defined as a multi-purpose facility with emphasis in the following areas: scientific and technology research laboratory; permanent observatory; spacecraft servicing facility; construction and assembly facility; manufacturing facility; transportation node; and staging base for future space endeavors. The Station complex, in its initial operating capability configuration, includes a continuously habitable manned element, a polar orbiting unmanned platform, and a second unmanned platform co-orbiting with the manned element. All elements are dependent on the Space Transportation System (STS) for initial placement on-orbit and for subsequent logistical services. The manned element will be designed for long duration operations with systems maintainable on-orbit and operationally autonomous from ground control. A major feature of the Station will be its adaptability to evolutionary technology upgrades; and the Space Station, as a system, is to be designed for maximum ease of use by its users.

Thompson, D. R.↗

Active adhesion concepts for in-orbit structural construction

The in-orbit assembly of structural elements is presently addressed by means of a continuum-based theory of active-adhesion contact/impact which assumes the manufacturability of active adhesion elements by piezoelectric (and similarly behaving) materials. Block bonding characteristics can furnish an effective alternative to optimal control-based, impact surge force-mitigation strategies, especially in the numerous nonsmooth control problems that are difficult to synthesize and implement. Attention is given to design concepts employing combined serial/parallel-bonded active adhesion elements composed of cascaded piezoelectric devices.

Park, K. C.↗

Launch and Assembly Reliability Analysis for Human Space Exploration Missions

NASA's future human space exploration strategy includes single and multi-launch missions to various destinations including cis-lunar space, near Earth objects such as asteroids, and ultimately Mars. Each campaign is being defined by Design Reference Missions (DRMs). Many of these missions are complex, requiring multiple launches and assembly of vehicles in orbit. Certain missions also have constrained departure windows to the destination. These factors raise concerns regarding the reliability of launching and assembling all required elements in time to support planned departure. This paper describes an integrated methodology for analyzing launch and assembly reliability in any single DRM or set of DRMs starting with flight hardware manufacturing and ending with final departure to the destination. A discrete event simulation is built for each DRM that includes the pertinent risk factors including, but not limited to: manufacturing completion; ground transportation; ground processing; launch countdown; ascent; rendezvous and docking, assembly, and orbital operations leading up to trans-destination-injection. Each reliability factor can be selectively activated or deactivated so that the most critical risk factors can be identified. This enables NASA to prioritize mitigation actions so as to improve mission success.

Cates, Grant↗

Hexavalent Chrome Free Coatings for Electronics Electromagnetic Interference (EMI) Shielding Effectiveness (SE) Interim Test Report

Test specimen configuration was provided by Parker Chomerics. The EMI gasket used in this project was Cho-Seal 6503E. Black oxide alloy steel socket head bolts were used to hold the plates together. Non-conductive spacers were used to control the amount of compression on the gaskets. The following test fixture specifications were provided by Parker Chomerics. The CHO‐TP09 test plate sets selected for this project consist of two aluminum plates manufactured to the specifications detailed in CHO­‐TP09. The first plate, referred to as the test frame, is illustrated in Figure 1. The test frame is designed with a cutout in the center and two alternating bolt patterns. One pattern is used to bolt the test frame to the corresponding test cover plate (Figure 2), forming a test plate set. The second pattern accepts the hardware used to mount the fully assembled test plate set to the main adapter plate (Figure 3).

trivalent chromium↗

Gear Test Assembly - Report on Experimental Testing (FY2020)

The Gear Test Assembly (GTA) has completed Campaign #2 of in-sodium testing at the Mechanisms Engineering Test Loop (METL). Campaign #1 was conducted in 2019 and completed 19,600 cycles, correlating to 9,800 fuel assembly maneuvers. Campaign #1 was terminated following a shaft seizure caused by a failed bearing in the sodium gearbox. Campaign #2 was conducted in the spring of 2020 and completed 2,768 cycles, correlating to 1,384 fuel assembly maneuvers. Campaign #2 was terminated following elevated vibration measurements coming from the sodium gearbox. Following cleaning and disassembly, a bearing was found to have failed in the sodium gearbox. Campaign #1 used tapered roller bearings made of 52100 steel with a heat treatment from the manufacturer that allows for operation to 350°C. Campaign #2 used the same tapered roller bearings, but with no heat treatment. A new dynamic shaft seal design was used in Campaign #2 that led to significant reductions in argon consumption and graphite debris generation. A modified external gearbox system led to no external bearing failures and allowed for higher torque output. Finally, modifications to the Carbonation System led to a more effective carbonation process and all-around reduction in turnaround time.

42 ENGINEERING↗

Center punched solar cell module development effort

The results are given of an advanced module development program with the objective of providing a low cost solar cell mechanical interconnect design. The design approach, which avoids soldering or welding operations, lends itself to automated assembly techniques thus supporting the Low-Cost Silicon Solar Array Project goals. The first group of six modules contained aluminum contact cells and the second group of six modules contained silver-titanium-palladium contact cells. Extensive component and environmental testing at the module level showed that reliable cell mechanical interconnection can be achieved when utilizing the proper electrical contact materials and pressures. A discussion is given of the module design, manufacturing procedure, test program, significant problem areas and solutions, and conclusions and recommendations as formulated and conducted by XEOS.

Ross, R. E.↗

Thermal Test Verification of Emission Control through Directional Baffles for the James Webb Space Telescope

The thermal performance of NASA s planned James Webb Space Telescope is highly reliant on a collection of directional baffles that are part of the Integrated Science Instrument Module Electronics Compartment. In order to verify the performance of the baffle concept, two test assemblies were recently fabricated and tested at the Goddard Space Flight Center. The centerpiece of the testing was a fixture that used bolometers to measure the emission field through the baffles while the radiator panels and baffles ran a flight-like temperature. Although not all test goals were able to be met due to facility malfunctions, the test was able to prove the design viability enough to gain approval to begin manufacturing the flight article.

Garrison, Matthew↗

NASA's Exploration and In-Space Services (NExIS) Division OSAM-1 Propellant Transfer Subsystem Progress 2020

National Aeronautics and Space Administration (NASA)’s Exploration and In-Space Services (NExIS) Division of Goddard Space Flight Center has been developing technology for the On-orbit Servicing, Assembly and Manufacturing Mission 1 (OSAM-1) to robotically refuel heritage and new satellites on-orbit. OSAM-1, formerly known as Restore-L, successfully passed an important NASA milestone called Key Decision Point-C (KDP-C), receiving agency-level approval for its implementation. The decision point also establishes the mission’s official schedule and budget. The OSAM-1 spacecraft, Servicing Payload and the Space Infrastructure Dexterous Robot (SPIDER) payload will refuel a satellite in space, assemble a communications antenna and manufacture a beam. By demonstrating these capabilities, the mission is advancing never-before tested technologies for use in future missions (by NASA and other government organizations and private industry). The mission is funded by the Technology Demonstration Missions program within NASA’s Space Technology Mission Directorate. This paper covers a review of servicing extensibility and critical technologies that are being developed within NExIS with a focus on the fluid transfer refueling technology within the framework of the Propellant Transfer Subsystem (PTS). An overview of the planned initial technology demonstration servicing mission via the OSAM-1 Space Vehicle is provided as an extension of the technology development progress reported in 20181, and 20192. The general objectives, challenges, and key technologies are presented as an introduction to the context of the OSAM-1 mission, and a precursor to the OSAM-1 PTS specific development status. Development and progress of the Hose Management Assembly (HMA) and Propellant Transfer Assembly (PTA) are discussed. HMA risk reduction test results including those of thermal vacuum testing are presented. Important analytical results are discussed and progress of drawings and procedures developed for the fabrication and testing phase are shown. A summary of the PTS overall verification status and design activities prepared for the critical design peer review are presented. Procurement progress is shown with status on long, medium, and short term efforts to acquire the hardware required to support the mission objectives. Technology development, challenges, and testing status are discussed with particular regard to the OSAM-1 specific key assemblies including the PTA and HMA along with the overall integrated flight mockup of the spacecraft to client fluid transfer testing conducted in the servicing testbeds. The paper concludes with key milestones leading to the goal of on-orbit refueling to be demonstrated in 2024. The overall mission Launch Readiness Date (LRD) has been realigned to accommodate budget profiles and incorporation of additional on-orbit assembly and manufacturing demonstration efforts.

Propellant transfer, satellite servicing↗

The Exploration of Mars Launch and Assembly Simulation

Advancing human exploration of space beyond Low Earth Orbit, and ultimately to Mars, is of great interest to NASA, other organizations, and space exploration advocates. Various strategies for getting to Mars have been proposed. These include NASA's Design Reference Architecture 5.0, a near-term flyby of Mars advocated by the group Inspiration Mars, and potential options developed for NASA's Evolvable Mars Campaign. Regardless of which approach is used to get to Mars, they all share a need to visualize and analyze their proposed campaign and evaluate the feasibility of the launch and on-orbit assembly segment of the campaign. The launch and assembly segment starts with flight hardware manufacturing and ends with final departure of a Mars Transfer Vehicle (MTV), or set of MTVs, from an assembly orbit near Earth. This paper describes a discrete event simulation based strategic visualization and analysis tool that can be used to evaluate the launch campaign reliability of any proposed strategy for exploration beyond low Earth orbit. The input to the simulation can be any manifest of multiple launches and their associated transit operations between Earth and the exploration destinations, including Earth orbit, lunar orbit, asteroids, moons of Mars, and ultimately Mars. The simulation output includes expected launch dates and ascent outcomes i.e., success or failure. Running 1,000 replications of the simulation provides the capability to perform launch campaign reliability analysis to determine the probability that all launches occur in a timely manner to support departure opportunities and to deliver their payloads to the intended orbit. This allows for quantitative comparisons between alternative scenarios, as well as the capability to analyze options for improving launch campaign reliability. Results are presented for representative strategies.

Cates, Grant↗