Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DEACTIVATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Investigation of Aging Mechanisms in Lean NOx Traps

Lean NO{sub x} traps (LNTs) represent a promising technology for the abatement of NO{sub x} under lean conditions. Although LNTs are starting to find commercial application, the issue of catalyst durability remains problematic. LNT susceptibility to sulfur poisoning is the single most important factor determining effective catalyst lifetime. The NO{sub x} storage element of the catalyst has a greater affinity for SO{sub 3} than it does for NO{sub 2}, and the resulting sulfate is more stable than the stored nitrate. Although this sulfate can be removed from the catalyst by means of high temperature treatment under rich conditions, the required conditions give rise to deactivation mechanisms such as precious metal sintering, total surface area loss, and solid state reactions between the various oxides present. The principle objective of this project was to improve understanding of the mechanisms of lean NO{sub x} trap aging, and to understand the effect of washcoat composition on catalyst aging characteristics. The approach utilized involved detailed characterization of model catalysts prior to and after aging, in tandem with measurement of catalyst performance in NO{sub x} storage and reduction. In this manner, NO{sub x} storage and reduction characteristics were correlated with the evolution of catalyst physico-chemical properties upon aging. Rather than using poorly characterized proprietary catalysts, or simple model catalysts of the Pt/BaO/Al{sub 2}O{sub 3} type (representing the first generation of LNTs), Pt/Rh/BaO/Al{sub 2}O{sub 3} catalysts were employed which also incorporated CeO{sub 2} or CeO{sub 2}-ZrO{sub 2}, representing a model system which more accurately reflects current LNT formulations. Catalysts were prepared in which the concentration of each of the main components was systematically varied: Pt (50, 75 or 100 g/ft{sup 3}), Rh (10 or 20 g/ft{sup 3}), BaO (15, 30 or 45 g/L), and either CeO{sub 2} (0, 50 or 100 g/L) or CeO{sub 2}-ZrO{sub 2} (0, 50 or 100 g/L). A high surface area La-stabilized alumina was used to support the BaO phase. Catalysts were obtained by washcoating onto standard cordierite substrates, the total washcoat loading being set at 260 g/L. La-stabilized alumina was used as the balance. Subsequent to de-greening, the NO{sub x} storage and reduction characteristics of the catalysts were evaluated on a bench reactor, after which the catalysts were aged on a bench reactor to the equivalent of ca. 75,000 miles of road aging using a published accelerated aging protocol. The aged catalysts were then subjected to the same evaluation proecdure used for the de-greened catalysts. In addition to the use of standard physico-chemical analytical techniques for studying the fresh and aged model catalysts, use was made of advanced analytical tools for characterizing their NO{sub x} storage/reduction and sulfation/desulfation characteristics, such as Spatially resolved capillary-inlet Mass Spectrometry (SpaciMS) and in situ Diffuse Reflectance Infrared Fourier Transform Spectroscopy (DRIFTS).

54 ENVIRONMENTAL SCIENCES↗

UNITED STATES DEPARTMENT OF ENERGY OFFICE OF ENVIRONMENTAL MANAGEMENT TECHNOLOGY DEVELOPMENT REPORT FISCAL YEAR 2010

The mission of the Department of Energy's (DOE's) Office of Environmental Management (EM) is to clean up the environmental legacy of nuclear weapons research and production during the Cold War. That mission includes cleaning up nuclear waste, contaminated groundwater and soil, nuclear materials, and contaminated facilities covering two million acres of land in thirty-five states. EM's principal program goals include timely completion of tank waste treatment facilities, reduction of the life-cycle costs and acceleration of the cleanup of the Cold War legacy, and reduction of the EM footprint. The mission of the EM Technology Innovation and Development program is to transform science and innovation into practical solutions to achieve the EM mission. During fiscal year 2010 (October 2009-September 2010), EM focused upon accelerating environmental cleanup by expeditiously filling identified gaps in available knowledge and technology in the EM program areas. This report describes some of the approaches and transformational technologies in tank waste processing, groundwater and soil remediation, nuclear materials disposition, and facility deactivation and decommissioning developed during fiscal year 2010 that will enable EM to meet its most pressing program goals.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Investigating potential light-duty efficiency improvements through simulation of turbo-compounding and waste-heat recovery systems

Modern diesel engines used in light-duty transportation applications have peak brake thermal efficiencies in the range of 40-42% for high-load operation with substantially lower efficiencies at realistic road-load conditions. Thermodynamic energy and exergy analysis reveals that the largest losses from these engines are due to combustion irreversibility and heat loss to the coolant, through the exhaust, and by direct convection and radiation to the environment. Substantial improvement in overall engine efficiency requires reducing or recovering these losses. Unfortunately, much of the heat transfer either occurs at relatively low temperatures resulting in large entropy generation (such as in the air-charge cooler), is transferred to low-exergy flow streams (such as the oil and engine coolant), or is radiated or convected directly to the environment. While there are significant opportunities for recovery from the exhaust and EGR cooler for heavy-duty applications, achieving similar benefits for light-duty applications is complicated by transient, low-load operation at typical driving conditions and competition with the turbocharger and aftertreatment system for the limited thermal resources. We have developed an organic Rankine cycle model using GT-Suite to investigate the potential for efficiency improvement through waste-heat recovery from the exhaust and EGR cooler of a light-duty diesel engine. The model is used to examine the effects of efficiency-improvement strategies such as cylinder deactivation, use of advanced materials and improved insulation to limit ambient heat loss, and turbo-compounding on the steady-state performance of the ORC system and the availability of thermal energy for downstream aftertreatment systems. Results from transient drive-cycle simulations are also presented, and we discuss strategies to address operational difficulties associated with transient drive cycles and balancing the thermal requirements of waste-heat recovery, turbocharging or turbo-compounding, and exhaust aftertreatment.

33 ADVANCED PROPULSION SYSTEMS↗

Integrating catalytic coal gasifiers with solid oxide fuel cells

A review was conducted for coal gasification technologies that integrate with solid oxide fuel cells (SOFC) to achieve system efficiencies near 60% while capturing and sequestering >90% of the carbon dioxide [1-2]. The overall system efficiency can reach 60% when a) the coal gasifier produces a syngas with a methane composition of roughly 25% on a dry volume basis, b) the carbon dioxide is separated from the methane-rich synthesis gas, c) the methane-rich syngas is sent to a SOFC, and d) the off-gases from the SOFC are recycled back to coal gasifier. The thermodynamics of this process will be reviewed and compared to conventional processes in order to highlight where available work (i.e. exergy) is lost in entrained-flow, high-temperature gasification, and where exergy is lost in hydrogen oxidation within the SOFC. The main advantage of steam gasification of coal to methane and carbon dioxide is that the amount of exergy consumed in the gasifier is small compared to conventional, high temperature, oxygen-blown gasifiers. However, the goal of limiting the amount of exergy destruction in the gasifier has the effect of limiting the rates of chemical reactions. Thus, one of the main advantages of steam gasification leads to one of its main problems: slow reaction kinetics. While conventional entrained-flow, high-temperature gasifiers consume a sizable portion of the available work in the coal oxidation, the consumed exergy speeds up the rates of reactions. And while the rates of steam gasification reactions can be increased through the use of catalysts, only a few catalysts can meet cost requirements because there is often significant deactivation due to chemical reactions between the inorganic species in the coal and the catalyst. Previous research into increasing the kinetics of steam gasification will be reviewed. The goal of this paper is to highlight both the challenges and advantages of integrating catalytic coal gasifiers with SOFCs.

01 COAL, LIGNITE, AND PEAT↗

Spatially Resolved Luminescence Spectroscopy on Multicrystalline Silicon

Luminescence spectroscopy is applied to multicrystalline p-type silicon. Photoluminescence spectroscopy, cathodoluminescence spectrum imaging, and defect luminescence imaging are used for the characterization at temperatures from 21 K to 300 K. A defect line, persistent up to ambient temperature, was found in the photoluminescence spectrum of highly defective areas of the silicon samples under test. The line was associated with the dislocation characteristic emission and identified as the D2' band. Temperature dependent analysis of the peak position and peak intensity together with the application of a theoretical description of the thermal deactivation process of the luminescence transitions are used to estimate the energy positions of the involved defects.

14 SOLAR ENERGY↗

Model electrode structures for studies of electrocatalyst degradation.

Proton exchange membrane fuel cells are being extensively studied as power sources because of their technological advantages such as high energy efficiency and environmental friendliness. The most effective catalyst in these systems consists of nanoparticles of Pt or Pt-based alloys on carbon supports. Understanding the role of the nanoparticle size and structure on the catalytic activity and degradation is needed to optimize the fuel cell performance and reduce the noble metal loading. One of the more significant causes of fuel cell performance degradation is the cathode catalyst deactivation. There are four mechanisms considered relevant to the loss of electrochemically active surface area of Pt in the fuel cell electrodes that contribute to cathode catalyst degradation including: catalyst particle sintering such as Ostwald ripening, migration and coalescence, carbon corrosion and catalyst dissolution. Most approaches to study this catalyst degradation utilize membrane electrode assemblies (MEAs), which results in a complex system where it is difficult to deconvolute the effects of the metal nanoparticles. Our research addresses catalyst degradation by taking a fundamental approach to study electrocatalyst using model supports. Nanostructured particle arrays are engineered directly onto planar glassy carbon electrodes. These model electrocatalyst structures are applied to electrochemical activity measurements using a rotating disk electrode and surface characterization by scanning electron microscopy. Sample transfer between these measurement techniques enables examination of the same catalyst area before and after electrochemical cycling. This is useful to probe relationships between electrochemical activity and catalyst structure such as particle size and spacing. These model systems are applied to accelerated aging studies of activity degradation. We will present our work demonstrating the mechanistic aspects of catalyst degradation using this simplified geometric system. The active surface area loss observed in repeated cyclic voltammetry is explained through characterization and imaging of the same RDE electrode structures throughout the aging process.

30 DIRECT ENERGY CONVERSION↗

Structural Basis for the cAMP-dependent Gating in the Human HCN4 Channel

Hyperpolarization-activated cAMP-regulated (HCN) channels play important physiological roles in both cardiovascular and central nervous systems. Among the four HCN isoforms, HCN2 and HCN4 show high expression levels in the human heart, with HCN4 being the major cardiac isoform. The previously published crystal structure of the mouse HCN2 (mHCN2) C-terminal fragment, including the C-linker and the cyclic-nucleotide binding domain (CNBD), has provided many insights into cAMP-dependent gating in HCN channels. However, structures of other mammalian HCN channel isoforms have been lacking. Here we used a combination of approaches including structural biology, biochemistry, and electrophysiology to study cAMP-dependent gating in HCN4 channel. First we solved the crystal structure of the C-terminal fragment of human HCN4 (hHCN4) channel at 2.4 {angstrom}. Overall we observed a high similarity between mHCN2 and hHCN4 crystal structures. Functional comparison between two isoforms revealed that compared with mHCN2, the hHCN4 protein exhibited marked different contributions to channel function, such as a {approx}3-fold reduction in the response to cAMP. Guided by structural differences in the loop region between {beta}4 and {beta}5 strands, we identified residues that could partially account for the differences in response to cAMP between mHCN2 and hHCN4 proteins. Moreover, upon cAMP binding, the hHCN4 C-terminal protein exerts a much prolonged effect in channel deactivation that could have significant physiological contributions.

59 BASIC BIOLOGICAL SCIENCES↗

Operating Reserves and Wind Power Integration: An International Comparison

The determination of additional operating reserves in power systems with high wind penetration is attracting a significant amount of attention and research. Wind integration analysis over the past several years has shown that the level of operating reserve that is induced by wind is not a constant function of the installed capacity. Observations and analysis of actual wind plant operating data has shown that wind does not change its output fast enough to be considered as a contingency event. However, the variability that wind adds to the system does require the activation or deactivation of additional operating reserves. This paper provides a high-level international comparison of methods and key results from both operating practice and integration analysis, based on the work in International Energy Agency IEA WIND Task 25 on Large-scale Wind Integration. The paper concludes with an assessment of the common themes and important differences, along with recent emerging trends.

17 WIND ENERGY↗

Don't Mess with the NEST

NEST stands for Nuclear Emergency Support Team. The NEST Mission Statement as first established: (1) Conduct, direct, coordinate search and recovery operations for nuclear material, weapons or devices; and (2) Assist in identification and deactivation of Improvised Nuclear Devices (INDs) and Radiological Dispersal Devices (RDDs). Then in 1980 a very sophisticated improvised explosive device was found at Harvey's Casino at Lake Tahoe, Nevada. The FBI and Bomb Squads were unprepared and it detonated. As a result the additional phrase 'and Sophisticated Improvised Explosive Devices (SIEDs)' was added to the Mission Statement.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Active lithium analysis for the elimination of battery thermal runaway

Active lithium that is still present in end-of-life batteries poses threats of flammability and reactivity, making disposal and transportation unsafe and costly. OnTo’s deactivation method uses supercritical CO2 to eliminate the hazards of active lithium. Until now, there has been no quantitative method to determine the active lithium content within a battery. The objective of this project is to demonstrate a simple, rapid measurement of active lithium to evaluate battery treatment processes and eliminate class 9 hazards.

battery safety↗

The Cold and Dark Process at the Savannah River Site

The deactivation and decommissioning (D and D) of a facility exposes D and D workers to numerous hazards. One of the more serious hazards is coming into contact to hazardous energy sources (e.g. electrical, pressurized steam). At the Savannah River Site (SRS) a formal process for identifying and eliminating sources of hazardous energy was developed and is called 'Cold and Dark'. Several 'near miss' events involving cutting of energized conductors during D and D work in buildings thought to be isolated identified the need to have a formal process to identify and isolate these potentially hazardous systems. This process was developed using lessons learned from D and D activities at the Rocky Flats Environmental Technology Site (Rocky Flats) in Colorado. The Cold and Dark process defines an isolation boundary (usually a building perimeter) and then systematically identifies all of the penetrations through this boundary. All penetrations that involve hazardous energy sources are then physically air-gapped. The final product is a documented declaration of isolation performed by a team involving operations, engineering, and project management. Once the Cold and Dark declaration is made for a building work can proceed without the usual controls used in an operational facility (e.g. lockout/tag-out, arc flash PPE). It is important to note that the Cold and Dark process does not remove all hazards from a facility. Work planning and controls still need to address hazards that can be present from such things as chemicals, radiological contamination, residual liquids, etc., as well as standard industrial hazards. Savannah River Site experienced 6 electrical events prior to declaring a facility 'cold and dark' and has had zero electrical events after 'cold and dark' declaration (263 facilities to date). The formal Cold and Dark process developed at SRS has eliminated D and D worker exposures to hazardous energy sources. Since the implementation of the process there have been no incidents involving energized conductors or pressurized liquids/gases. During this time SRS has demolished over 200 facilities. The ability to perform intrusive D and D activities without the normal controls such as lock outs results in shorter schedule durations and lower overall costs for a facility D and D.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Area Completion Strategies at Savannah River Site: Characterization for Closure and Beyond

During the first four decades of its 56 year existence, the Savannah River Site (SRS) was a key supplier of nuclear material for national defense. During the 1990's, the site's primary missions became waste site closure, environmental restoration, and deactivation and decommissioning (D and D) of remnant cold war apparatus. Since 1989, with the approval of State and Federal regulatory agencies and with the participation of interested stakeholders, SRS has implemented a final remedy for a majority of the more than 500 individual waste sites at the former nuclear materials complex. These waste sites range from small, inert rubble pits to large, heavy industrial areas and radioactive waste disposal grounds. The closure and final remediation of these waste sites mark significant progress toward achieving SRS's overarching goal of reducing or eliminating future environmental damage and human health threats. However, larger challenges remain. For example, what are appropriate and achievable end-states for decommissioned nuclear facilities? What environmental and human health risks are associated with these end-states? To answer these questions within the strictures of smaller budgets and accelerated schedules, SRS is implementing an 'area completion' strategy that: - unites several discrete waste units into one conceptual model, - integrates historically disparate environmental characterization and D and D activities - reduces the number of required regulatory documents, - and, in some cases, compresses schedules for achieving a stakeholder-approved end-state. The area completion approaches being implemented at SRS reflect an evolution of the traditional RCRA/ CERCLA remedial process. Area completion strategies: - group waste units and/or D and D facilities together for characterization, remediation, and possible reuse; - identify data needs and integrate data collection activities for D and D, characterization, and remediation; - identify problems that require action and match areas of concern with appropriate likely responses based on anticipated land use and end-states; - streamline the regulatory process and reduce the number of required regulatory documents; - and accelerate remedial and D and D decisions and reduce project costs versus the traditional 'piecemeal' approach. These strategies are achieving faster, more responsible, and less expensive solutions to managing the Cold War legacy while assuring protection of human and ecological receptors and future industrial workers.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Unusual Decommissioning of Contaminated Facilities at the Savannah River Site - The Demolition of Cooling Towers 285-H and 285-F

Savannah River Site is an 800-square kilometer (310-square mile) U.S. Department of Energy (DOE) industrial facility located in Aiken, Allendale, and Barnwell Counties in South Carolina. The site is dedicated to environmental cleanup, developing and deploying technologies to support the cleanup mission, processing and storing nuclear materials, and supporting national security missions. The current focus in environmental management is on the cleanup of legacy materials, facilities and wastes left from the Cold War. In 2002 the DOE initiated actions to expedite cleanup focusing on significant risk reduction coupled with reducing costs. SRS published the Savannah River Site Environmental Management Integrated Deactivation and Decommissioning Plan in 2003 which addressed the final disposition and physical end state of all 1,013 Environmental Management facilities on site by the year 2025. Included in this list of facilities are reactors, fabrication facilities, process facilities and the support facilities that were required during the past 50 years. By the end of FY06, over 200 facilities had been decommissioned. This paper describes the demolition of two facilities, cooling towers 285-H and 285-F that were associated with the operation of the process canyons. Because of the circumstances surrounding these decommissions, unique and unusual techniques were safely employed to demolish and remove the cooling towers. Both 285-H and 285-F were safely felled by pulling the columns remotely to weaken the internal portion of the structure so it would collapse inwards into the basin. Cooling tower 285-H fell in less than 1 second after approximately two-thirds of the columns had been broken. See Figure 3 for a photo of 285-H after its collapse. 285-F, which was larger than 285-H, fell in three sections, two cells at a time. Once the towers were felled conventional demolition equipment was used to segregate and remove the debris. All protective measures used to protect surrounding equipment and structures were successful and the basins were cleaned out and returned to service in less than two weeks. The demolition of both cooling towers 285- H and 285-F was completed safely and timely using unconventional means to fell the towers due to structural degradation, height, limited access, radiological and asbestos hazards, and a requirement to protect equipment on all sides of the facility as well as preservation of the basins. During felling operations personnel were required to stay outside the fall zone equivalent to a distance of 150% of the height of the towers. Remote operations outside the fall zone required a tracked vehicle to pull cables attached to the columns in a predetermined sequence so as to fell the tower straight down into the basin. Once the towers fell traditional demolition equipment segregated and removed the waste. Wooden cooling towers of this vintage present a difficult challenge to traditional demolition techniques. Because of the height and potential instability of these types of facilities, considerable effort is placed on reducing the potential energy to a point where heavy equipment can reach safely without endangering the operators. The column-pulling technique chosen for both 285-H and 285-F cooling towers proved to be a safe and efficient method for demolition of these types of facilities.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Area Factor Determinations for an Industrial Worker Exposed to a Concrete Slab End-State

The U.S. Department of Energy's (DOE) Savannah River Site (SRS) is decommissioning many of its excess facilities through removal of the facility structures leaving only the concrete-slab foundations in place. Site-specific, risk-based derived concentration guideline levels (DCGLs) for radionuclides have been determined for a future industrial worker potentially exposed to residual contamination on these concrete slabs as described in Jannik. These risk-based DCGLs were estimated for an exposure area of 100 m{sup 2}. During deactivation and decommissioning (D and D) operations at SRS, the need for area factors for larger and smaller contaminated areas arose. This paper compares the area factors determined for an industrial worker exposed to a concrete slab end-state for several radionuclides of concern at SRS with 1) the illustrative area factors provided in MARSSIM, 2) the area correction factors provided in the U.S. Environmental Protection Agency's (EPA) Soil Screening Guidance, and 3) the hot spot criterion for field application provided in the RESRAD User's Manual. The purpose of this site-specific assessment is to determine if any of the recommended area factors provided in the guidance documents could be utilized at SRS for field applications of the industrial worker DCGLs. Results show the area factors that were determined for an SRS industrial worker exposed to concrete slab end-states for the common radionuclides provided in the referenced guidance documents. In addition to the SRS site-specific area factors, the following area factors are provided for comparison: - Illustrative examples of outdoor area dose factors (MARSSIM); - Area correction factors as a function of source area (Soil Screening Guidance). Note: the area correction factors were inverted to correspond to a DCGL area factor. - Recommended area correction factors as a function of source area (Soil Screening Guidance); - Ranges for hot spot multiplication factors (RESRAD). As it can be seen, because the MARSSIM area factors are highly affected by ingestion and inhalation pathways, they do not compare well with the SRS area factors. The Soil Screening Guidance area factors are in general more conservative than the SRS area factors because they are based exclusively on external exposures. The RESRAD multiplication factors (though limited to area less than 25 m{sup 2}), are in general more conservative than the SRS area factors but compare well with them. These are the factors that were recommended for use in SRS D and D projects field applications.

61 RADIATION PROTECTION AND DOSIMETRY↗

Polychlorinated Biphenyl Compliance Issues in the 21. Century: Poorly Recognized and Potentially Devastating

Thirty-one years have passed since the United States Congress passed the Toxic Substances Control Act (TSCA). The 1976 law essentially eliminated future production of polychlorinated biphenyls (PCBs) within the United States and greatly limited the use of previously manufactured PCBs and PCB products. The ultimate objective of the law was the complete elimination of these chemicals due to concerns about their potentially toxic effects on health and the environment. PCBs were manufactured in the United States between 1929 and 1977. They were highly valued for their fire and heat-resistance properties and for their chemical stability. As a result, PCBs were used in a variety of thermally and/or chemically stressful applications. They did not conduct electricity and therefore were particularly well-suited for use as insulating fluids in high-voltage electric equipment. PCBs were also used in various other applications, such as in hydraulic and heat transfer fluids. Strict controls on the use and disposal of PCBs were imposed by the TSCA implementing regulations at 40 CFR 761. As a result, most heavy users of PCB products worked hard to curtail their PCB use. Many organizations that once used substantial amounts of PCBs, subsequently declared themselves 'PCB free'. Unfortunately, in many cases, these 'PCB-free' declarations were premature, as PCBs were used in many more applications than insulating fluids. From the 1990's and to the present day, PCBs increasingly have been discovered in non-liquid forms. These materials were used or installed in facilities constructed before the 1979 'PCB ban'. Examples include applied paints and coatings, caulking, pre-formed joint filler, and plastic or rubber wire and cable insulation. Proper identification of these materials is necessary for appropriate and compliant waste management during deactivation and decommissioning (D and D) activities. PCBs can pose other significant waste management issues for D and D projects, particularly for nuclear facilities. Depending upon the waste form and the intended disposal path, PCBs can be regulated at thresholds in the low parts-per-billion (ppb). These low regulatory thresholds often are overlooked due to the erroneous belief by many waste management professionals that materials containing PCBs are regulated by TSCA only if their PCB concentration is at least 50 parts-per-million (ppm). Failure to recognize when and how the lower thresholds apply can lead to rejection of the waste materials by treatment, storage and disposal (TSD) facilities as well as potential regulatory non-compliance. Furthermore, re-use of 'excess' materials with PCBs is also regulated by TSCA. In the event of a characterization error, the costs required to make necessary corrections can be very high. This paper will focus on PCB characterization and waste management issues associated with D and D of DOE nuclear facilities. It will identify PCB materials that are likely to be present in such facilities, with emphasis on the nonliquid PCB forms. The paper will discuss characterization pitfalls associated with Non-Liquid PCBs (NLPCBs), including circumstances in which NLPCBs can migrate into other materials. The paper also will identify TSCA requirements for materials with very low concentrations of PCBs; certain materials are regulated at concentrations as low as 0.5 {mu}g/L PCBs (approximately 0.5 ppb). The paper will then examine the potentially extensive impacts to a facility if the materials are not managed in a TSCA-compliant manner. Examples from a recent D and D project at the DOE Savannah River Site will be used to illustrate key points and lessons learned. It is expected that this information would be useful to other DOE sites, DoD installations and commercial nuclear facilities constructed prior to 1979. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

In Situ Decommissioning (ISD) Concepts and Approaches for Excess Nuclear Facilities Decommissioning End State - 13367

The United States Department of Energy (DOE) currently has numerous radiologically contaminated excess nuclear facilities waiting decommissioning throughout the Complex. The traditional decommissioning end state is complete removal. This commonly involves demolishing the facility, often segregating various components and building materials and disposing of the highly contaminated, massive structures containing tons of highly contaminated equipment and piping in a (controlled and approved) landfill, at times hundreds of miles from the facility location. Traditional demolition is costly, and results in significant risks to workers, as well as risks and costs associated with transporting the materials to a disposal site. In situ decommissioning (ISD or entombment) is a viable alternative to demolition, offering comparable and potentially more protective protection of human health and the environment, but at a significantly reduced cost and worker risk. The Savannah River Site (SRS) has completed the initial ISD deployment for radiologically contaminated facilities. Two reactor (P and R Reactors) facilities were decommissioned in 2011 using the ISD approach through the American Recovery and Reinvestment Act. The SRS ISD approach resolved programmatic, regulatory and technical/engineering issues associated with avoiding the potential hazards and cost associated with generating and disposing of an estimated 124,300 metric tons (153,000 m{sup 3}) of contaminated debris per reactor. The DOE Environmental Management Office of Deactivation and Decommissioning and Facility Engineering, through the Savannah River National Laboratory, is currently investigating potential monitoring techniques and strategies to assess ISD effectiveness. As part of SRS's strategic planning, the site is seeking to leverage in situ decommissioning concepts, approaches and facilities to conduct research, design end states, and assist in regulatory interactions in broad national and international government and private industry decommissioning applications. SRS offers critical services based upon the SRS experience in decommissioning and reactor entombment technology (e.g., grout formulations for varying conditions, structural and material sciences). The SRS ISD approach follows a systems engineering framework to achieve a regulatory acceptable end state based on established protocols, attains the final end state with minimal long stewardship requirements, protects industrial workers, and protects groundwater and the environment. The ISD systems engineering framework addresses key areas of the remedial process planning, technology development and deployment, and assessment to attain the ultimate goal of natural resource stewardship and protecting the public. The development and deployment of the SRS ISD approach has established a path for ISD of other large nuclear facilities in the United States and around the globe as an acceptable remedial alternative for decommissioning nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Lessons-Learned from D and D Activities at the Five Gaseous Diffusion Buildings (K-25, K- 27, K-29, K-31 and K-33) East Tennessee Technology Park, Oak Ridge, TN - 13574

The East Tennessee Technology Park (ETTP) is the site of five former gaseous diffusion plant (GDP) process buildings that were used to enrich uranium from 1945 to 1985. The process equipment in the original two buildings (K-25 and K-27) was used for the production of highly enriched uranium (HEU), while that in the three later buildings (K-29, K-31 and K-33) produced low enriched uranium (LEU). Equipment was contaminated primarily with uranium and to a lesser extent technetium (Tc). Decommissioning of the GDP process buildings has presented several unique challenges and produced many lessons-learned. Among these is the importance of good, up-front characterization in developing the best demolition approach. Also, chemical cleaning of process gas equipment and piping (PGE) prior to shutdown should be considered to minimize the amount of hold-up material that must be removed by demolition crews. Another lesson learned is to maintain shutdown buildings in a dry state to minimize structural degradation which can significantly complicate characterization, deactivation and demolition efforts. Perhaps the most important lesson learned is that decommissioning GDP process buildings is first and foremost a waste logistics challenge. Innovative solutions are required to effectively manage the sheer volume of waste generated from decontamination and demolition (D and D) of these enormous facilities. Finally, close coordination with Security is mandatory to effectively manage Special Nuclear Material (SNM) and classified equipment issues. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Final Demolition and Disposition of 209-E Critical Mass Laboratory - 12267

The 209-E Critical Mass Laboratory was constructed in 1960 to provide a heavy shielded reactor room where quantities of plutonium or uranium in solution could be brought to near-critical configurations under carefully controlled and monitored conditions. In the late 1980's, the responsible contractor, Pacific Northwest National Laboratory (PNNL), was directed by the Department of Energy (DOE) to prepare the facility for unoccupied status. The facility was demolished under a Removal Action Work Plan pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act of 1980 (CERCLA). The funding for this project was provided by the American Recovery and Reinvestment Act (ARRA). The primary rooms of concern with regards to contamination in 209-E facility, which is over 9,000 square feet, are the criticality assembly room (CAR), the mix room, and the change room. The CAR contained two reactor hoods (HO-140 and HO-170), which each had a high efficiency particulate air (HEPA) filter system. The CAR contained 13 tanks ranging from 38 L (10 gal) to 401 L (106 gal). Tanks TK-109 and TK-110 are below grade, and were removed as part of this demolition and disposition remedy. Nonradiological and radiological hazardous substances were removed, decontaminated, or fixed in place, prior to demolition. Except for the removal of below grade tanks TK-109 and TK-110, the facility was demolished to slab-on-grade. PNNL performed stabilization and deactivation activities that included removal of bulk fissile material and chemicals, flushing tanks, stabilizing contamination within gloveboxes and hoods, and packaging and removing waste. The removal of the contaminated plutonium equipment and materials from the 209E facility presented a number of challenges similar in nature to those associated with the inventory reduction and cleanup activities at the Plutonium Finishing Plant. Although there were no bulk fissile materials or chemicals within the facility, there were residual radiological materials (isotopes of plutonium and americium) in the tanks and hoods. The complexity of the remedy was present because of the various configurations of the tanks and hoods, combined with the residual contaminants. Because of the weight and dimensional configuration, size reduction of the slab tanks, as well as removal and disposal of the different material used for moderation and absorption, were two examples of challenges that were resolved to complete the remedy. One of the key methods developed and implemented at the facility was the design and construction of a shroud to allow the cutting of the Pu contaminated tanks. The shroud design, development and implementation at the 209E Project was an example of enhanced work planning and task hazards analysis with worker involvement. This paper will present the lessons learned from the 209E facility inventory reduction activities including the shroud and other methodologies used. The initial Lessons Learned discussion for this project was scheduled for late January 2012. This facility is the first open-air demolition of a highly contaminated plutonium-contaminated facility accomplished by CH2M Hill under the Plateau Remediation Contract. The demolition was completed without spread of contamination to the workers and the surrounding area. As with any project of this complexity, there are significant accomplishments, as well as experience that can be applied to future demolition of plutonium-contaminated facilities on the Hanford Site. These experiences will be documented at a later date. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗