Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “CONSTRUCTION INDUSTRY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Preliminary Evaluation of Cesium Distribution for Wet Sieving Process Planned for Soil Decontamination in Japan - 13104

For the purpose of decontaminating radioactive cesium from a huge amount of soil, which has been estimated to be 1.2x10{sup 8} m{sup 3} by excavating to a 5-cm depth from the surface of Fukushima Prefecture where a severe nuclear accident occurred at TEPCO's power generating site and has emitted a significant amount of radioactive materials, mainly radioactive cesium, a wet sieving process was selected as one of effective methods available in Japan. Some private companies have demonstrated this process for soil treatment in the Fukushima area by testing at their plants. The results were very promising, and a full-fledged application is expected to follow. In the present study, we spiked several aqueous samples containing soil collected from an industrial wet sieving plant located near our university for the recycling of construction wastes with non-radioactive cesium hydroxide. The present study provides scientific data concerning the effectiveness in volume reduction of the contaminated soil by a wet sieving process as well as the cesium distribution between the liquid phase and clay minerals for each sub-process of the full-scale one, but a simulating plant equipped with a process of coagulating sedimentation and operational safety fundamentals for the plant. Especially for the latter aspect, the study showed that clay minerals of submicron size strongly bind a high content of cesium, which was only slightly removed by coagulation with natural sedimentation (1 G) nor centrifugal sedimentation (3,700 G) and some of the cesium may be transferred to the effluent or recycled water. By applying ultracentrifugation (257,000 G), most of submicron clay minerals containing cesium was removed, and the cesium amount which might be transferred to the effluent or recycled water, could be reduced to less than 2.3 % of the original design by the addition of a cesium barrier consisting of ultracentrifugation or a hollow fiber membrane. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The INFODEM Information Centre at CEA Marcoule: A Unique Information Tool in Europe About Nuclear Decommissioning - 16217

In September 2014, the French Alternative Energies and Atomic Energy Commission (CEA) inaugurated a unique information center focused on decommissioning of its nuclear facilities. This facility, named INFODEM information center, is inside the main building of the G1 nuclear reactor at Marcoule, a nuclear site in the south of France with world-recognized expertise in decommissioning. Constructed in the 1950's, the G1 reactor was the first industrial-scale reactor for plutonium production in France; it was also used to produce electricity. Operations ceased in 1968, and it was progressively dismantled (through removal of fuel and main components) and placed in monitoring status. In the 1980s, mockups of fuel cycle process equipment were built under a temporary mission to support development activities for the La Hague reprocessing plant. When that ended, further dismantling occurred, and during 1996 through 2010, the site established itself as a reference example for worldwide nuclear dismantling activities. In 2012, the project to establish an information center at the reactor began, targeting three main audiences: the public, agency personnel and politicians, and technical professionals. Considerable thought went into the facility design, to address the interests and information needs of these three audiences. The INFODEM concept extended over 800 square meters (about 960 square yards), to host an informative tour addressing several major themes: CEA's D and D strategy, programs, skills, tools and methodologies and 'everyday life' on decommissioning projects. Illustrating its unique value and considerable success, INFODEM received the Public Information Prize from the French Nuclear Energy Society (SFEN) in June 2015. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

FCC-hh: The Hadron Collider

Particle physics has arrived at an important moment of its history. The discovery of the Higgs boson, with a mass of 125 GeV, completes the matrix of particles and interactions that has constituted the “Standard Model” for several decades. This model is a consistent and predictive theory, which has so far proven successful at describing all phenomena accessible to collider experiments. However, several experimental facts do require the extension of the Standard Model and explanations are needed for observations such as the abundance of matter over antimatter, the striking evidence for dark matter and the non-zero neutrino masses. Theoretical issues such as the hierarchy problem, and, more in general, the dynamical origin of the Higgs mechanism, do likewise point to the existence of physics beyond the Standard Model. This report contains the description of a novel research infrastructure based on a highest-energy hadron collider with a centre-of-mass collision energy of 100 TeV and an integrated luminosity of at least a factor of 5 larger than the HL-LHC. It will extend the current energy frontier by almost an order of magnitude. The mass reach for direct discovery will reach several tens of TeV, and allow, for example, to produce new particles whose existence could be indirectly exposed by precision measurements during the earlier preceding e+e– collider phase. This collider will also precisely measure the Higgs self-coupling and thoroughly explore the dynamics of electroweak symmetry breaking at the TeV scale, to elucidate the nature of the electroweak phase transition. WIMPs as thermal dark matter candidates will be discovered, or ruled out. As a single project, this particle collider infrastructure will serve the world-wide physics community for about 25 years and, in combination with a lepton collider (see FCC conceptual design report volume 2), will provide a research tool until the end of the 21st century. Collision energies beyond 100 TeV can be considered when using high-temperature superconductors. The European Strategy for Particle Physics (ESPP) update 2013 stated “To stay at the forefront of particle physics, Europe needs to be in a position to propose an ambitious post-LHC accelerator project at CERN by the time of the next Strategy update”. The FCC study has implemented the ESPP recommendation by developing a long-term vision for an “accelerator project in a global context”. This document describes the detailed design and preparation of a construction project for a post-LHC circular energy frontier collider “in collaboration with national institutes, laboratories and universities worldwide”, and enhanced by a strong participation of industrial partners. Now, a coordinated preparation effort can be based on a core of an ever-growing consortium of already more than 135 institutes worldwide. The technology for constructing a high-energy circular hadron collider can be brought to the technology readiness level required for constructing within the coming ten years through a focused R&D programme. The FCC-hh concept comprises in the baseline scenario a power-saving, low-temperature superconducting magnet system based on an evolution of the Nb3Sn technology pioneered at the HL-LHC, an energy-efficient cryogenic refrigeration infrastructure based on a neon-helium (Nelium) light gas mixture, a high-reliability and low loss cryogen distribution infrastructure based on Invar, high-power distributed beam transfer using superconducting elements and local magnet energy recovery and re-use technologies that are already gradually introduced at other CERN accelerators. On a longer timescale, high-temperature superconductors can be developed together with industrial partners to achieve an even more energy efficient particle collider or to reach even higher collision energies.The re-use of the LHC and its injector chain, which also serve for a concurrently running physics programme, is an essential lever to come to an overall sustainable research infrastructure at the energy frontier. Strategic R&D for FCC-hh aims at minimising construction cost and energy consumption, while maximising the socio-economic impact. It will mitigate technology-related risks and ensure that industry can benefit from an acceptable utility. Concerning the implementation, a preparatory phase of about eight years is both necessary and adequate to establish the project governance and organisation structures, to build the international machine and experiment consortia, to develop a territorial implantation plan in agreement with the host-states’ requirements, to optimise the disposal of land and underground volumes, and to prepare the civil engineering project. Such a large-scale, international fundamental research infrastructure, tightly involving industrial partners and providing training at all education levels, will be a strong motor of economic and societal development in all participating nations. The FCC study has implemented a set of actions towards a coherent vision for the world-wide high-energy and particle physics community, providing a collaborative framework for topically complementary and geographically well-balanced contributions. This conceptual design report lays the foundation for a subsequent infrastructure preparatory and technical design phase.

43 PARTICLE ACCELERATORS↗

First Experiments: New Science Opportunities at the Spallation Neutron Source Second Target Station (abridged)

This brochure is an abridged version of a more comprehensive companion report. DOE proposes to build a Second Target Station (STS) at SNS to produce beams of cold neutrons with world-leading peak brightness at a repetition rate of 15 Hz, providing broad energy/wavelength ranges that can be used simultaneously. Construction of the STS will provide transformative capabilities that allow thousands of users from national laboratories, universities, and industry to address grand scientific challenges [Hemminger 2015], advance energy research, and accelerate industrial innovations through the combination of cold (long-wavelength) neutrons of unprecedented peak brightness and short neutron pulses with broad ranges of usable wavelengths or energy. The STS Project, now in progress at ORNL, will design, construct, install, and commission the facilities and equipment needed to create a world-leading source of cold neutrons of unprecedented peak brightness at SNS. Key aspects of the STS design, including preliminary descriptions of an illustrative suite of eight instruments, are presented in the section “The STS at SNS.” The capabilities offered by the STS instruments (22 when fully built out) will complement those of the FTS and HFIR, providing the United States with unparalleled resources for neutron scattering at the world’s leading high–peak brightness cold neutron source.

43 PARTICLE ACCELERATORS↗

Andra's strategy and approach for operational safety of French underground facility Cigeo - 15127

According to the French Act on radioactive waste of 28 June 2006, Andra shall design a reversible repository. In response to this demand, Andra is developing the industrial project namely 'Cigeo', a reversible geological disposal facility for HLW and ILW located in Meuse/Haute-Marne. The previous safety cases of 2005, 2009 and 2012 give a sound basis to assess Cigeo's safety both for the operational and post-closure periods. Regarding operational safety, in this new stage of the project, the challenging issues for the preparation of the safety case are the following: - To adapt the various regulatory frameworks (nuclear and non-nuclear) to the underground facility - To design the underground facility and handling equipment's to reduce at first risks in the underground facility as such radioactive particles release, gas explosion, fire and co-activity and limit their consequence. - To establish waste acceptance criteria to be fulfilled by waste producers in line with operational safety and design options. The objective of the paper is to present the experience of Andra in operation safety of the underground facility of Cigeo. Operational safety for Cigeo is assessed as much as possible according to the existing French regulations and guidance for nuclear facilities. Indeed, compared to existing nuclear facilities, a geological repository is a specific case due to the existence of underground facilities with particularities such as: - ventilation management in a large scale underground facility, - fire risk management. As an input for the industrial design of Cigeo for operation, Andra defined a fire guidance and a specific reference safety guidance, based on the adaptation of the French nuclear regulatory texts for and when feasible to mines and tunnels regulatory texts and on its own experience gained through safety operational reports since 2005 and their reviews by the Safety Authority. - underground co-activity of nuclear operation with construction works. According to the common 'defense-in depth' principle for nuclear facilities, these guidelines for the industrial design of Cigeo for operation consider the successive levels of defense of: - Preventing the risk and its spreading by design and construction; - Detecting incidents and early fighting by design and operation dispositions (detection and control systems, survey procedure); - Controlling incidents and limiting of their consequences by safeguarding systems, specific procedures. At that stage, design options for Cigeo constitute an adequate response to the operational safety functions and requirements: - Two levels of containment are set up: the first one is ensured by the waste package, the second one is ensured from the surface facility to the disposal vaults by the transfer cask during the transfer of waste packages in the disposal vaults by the disposal vault itself and a nuclear ventilation with HEPA filter; - Favorable options for fire risk prevention and mitigation: transport system minimizing heat load (cable car for the transfer from the surface, electric transfer engines), twin access tunnels to ease fire-fighting and evacuation...; - Permanent complete physical separation of nuclear zone and construction zone (including ventilation systems). In practice, operation safety assessment of Cigeo, designed following the aforesaid reference safety guidelines, follows a common risk analysis (internal aggressions such as auxiliary losses, chemical and toxic risks, fall or collision, fire, human factors and external aggressions such as earthquake, air traffic, flooding) with the following steps: - Identification of the major risks and the design basis scenarios that have to be considered for dimensioning of the installations and the safety devices; - On the basis of these different situations, those who will have to be quantified are identified; one or more representative and envelop situations are chosen in order to evaluate robustness of the installation. Quantitative evaluation of these situations permits to: - identify the consequences on man, environment and installation, and in particular to gain confidence in the maintaining of the safety functions; - identify or define the technic and/or organisational dispositions classified as 'important elements for protection' (IEP); - Situations beyond dimensioning permit to verify the robustness of the installation. They permit, on one hand to identify possible complementary material or organisational dispositions; on the other hand, to define the 'hard core' i.e. structures, systems and components that permit to maintain the confinement function of radioactive substance. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Reimagining Heating, Ventilation, and Air Conditioning for New Manufactured Homes

Manufactured homes represent one of the most affordable paths to home ownership for American households, but minimum-efficiency equipment and poor-quality home installation can lead to excess energy use and high operating costs. Slipstream, with partners from the Florida Solar Energy Center (FSEC), Northwest Energy Works, and Washington State University, identified and tested manufactured home HVAC innovations targeted for new construction offering the most promising mix of improved energy performance and likelihood of industry uptake.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Advanced Membrane Separation Technologies for Energy Recovery from Industrial Process Streams

Recovery of energy from relatively low-temperature waste streams is a goal that has not been achieved on any large scale. Heat exchangers do not operate efficiently with low-temperature streams and thus require such large heat exchanger surface areas that they are not practical. Condensing economizers offer one option for heat recovery from such streams, but they have not been widely implemented by industry. A promising alternative to these heat exchangers and economizers is a prototype ceramic membrane system using transport membrane technology for separation of water vapor and recovery of heat. This system was successfully tested by the Gas Technology Institute (GTI) on a natural gas fired boiler where the flue gas is relatively clean and free of contaminants. However, since the tubes of the prototype system were constructed of aluminum oxide, the brittle nature of the tubes limited the robustness of the system and even limited the length of tubes that could be used. In order to improve the robustness of the membrane tubes and make the system more suitable for industrial applications, this project was initiated with the objective of developing a system with materials that would permit the system to function successfully on a larger scale and in contaminated and potentially corrosive industrial environments. This required identifying likely industrial environments and the hazards associated with those environments. Based on the hazardous components in these environments, candidate metallic materials were identified that are expected to have sufficient strength, thermal conductivity and corrosion resistance to permit production of longer tubes that could function in the industrial environments identified. Tests were conducted to determine the corrosion resistance of these candidate alloys, and the feasibility of forming these materials into porous substrates was assessed. Once the most promising metallic materials were identified, the ability to form an alumina membrane layer on the surface of the metallic tubes was evaluated. Evaluation of this new style of membrane tube involved exposure to SO 2 containing gases as well as to materials with a potential for fouling. Once the choice of substrate and membrane materials and design were confirmed, about 150 tubes were fabricated and assembled into three modules. These modules were mounted on an industrial size boiler and their performance carefully monitored during a limited testing period. The positive results of this performance test confirm the feasibility of utilizing such a system for recovery of heat and water from industrial waste streams. The improved module design along with use of long metallic substrate tubes with a ceramic membrane on the outer surface resulted in the successful, limited scale demonstration of the Transport Membrane Condenser (TMC) technology in the GTI test facility. This test showed this technology can successfully recover a significant amount of heat and water from gaseous waste streams. However, before industry will make the investment to install a full scale TMC, a full scale system will need to be constructed, installed and successfully operated at a few industrial sites. Companies were identified that had an interest in serving as a host site for a demonstration system.

Keiser, James R.↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

The human dimensions of energy use in buildings: A review

The “human dimensions” of energy use in buildings refer to the energy-related behaviors of key stakeholders that affect energy use over the building life cycle. Stakeholders include building designers, operators, managers, engineers, occupants, industry, vendors, and policymakers, who directly or indirectly influence the acts of designing, constructing, living, operating, managing, and regulating the built environments, from individual building up to the urban scale. Among factors driving high-performance buildings, human dimensions play a role that is as significant as that of technological advances. However, this factor is not well understood, and, as a result, human dimensions are often ignored or simplified by stakeholders. This work presents a review of the literature on human dimensions of building energy use to assess the state-of-the-art in this topic area. The paper highlights research needs for fully integrating human dimensions into the building design and operation processes with the goal of reducing energy use in buildings while enhancing occupant comfort and productivity. This research focuses on identifying key needs for each stakeholder involved in a building's life cycle and takes an interdisciplinary focus that spans the fields of architecture and engineering design, sociology, data science, energy policy, codes, and standards to provide targeted insights. Greater understanding of the human dimensions of energy use has several potential benefits including reductions in operating cost for building owners; enhanced comfort conditions and productivity for building occupants; more effective building energy management and automation systems for building operators and energy managers; and the integration of more accurate control logic into the next generation of human-in-the-loop technologies. The review concludes by summarizing recommendations for policy makers and industry stakeholders for developing codes, standards, and technologies that can leverage the human dimensions of energy use to reliably predict and achieve energy use reductions in the residential and commercial buildings sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Opportunities for Energy Development in Water Conduits: A Report Prepared in Response to Section 7 of the Hydropower Regulatory Efficiency Act of 2013

In Section 7 of the Hydropower Regulatory Efficiency Act (HREA) of 2013 (P.L. 113-23), Congress directed the U.S. Department of Energy (DOE) to prepare an analysis of conduit hydropower opportunities available in the United States and to present case studies that describe the potential energy generation from these types of hydropower projects. Those analyses have been included in a new DOE report to Congress, and this ORNL/TM provides additional technical details supporting that report. Conduit hydropower offers important new ways to enhance renewable energy portfolios in the United States, as well as to increase the energy efficiency of water delivery systems. Conduit hydropower projects are constructed on existing water-conveyance structures, such as irrigation canals or pressurized pipelines that deliver water to municipalities, industry, or agricultural water users. Although water conveyance infrastructures are usually designed for non-power purposes, new renewable energy can often be harvested from them without affecting their original purpose and without the need to construct new dams or diversions. Conduit hydropower differs from more conventional hydropower development in that it is generally not located on natural rivers or waterways and therefore does not involve the types of environmental impacts that are associated with hydropower. The addition of hydropower to existing water conduits can provide valuable new revenue sources from clean, renewable energy. The new energy can be used within the existing water distribution systems to offset other energy demands, or it can be sold into regional transmission systems.

13 HYDRO ENERGY↗

Turkey opens electricity markets as demand grows

Turkey's growing power market has attracted investors and project developers for over a decade, yet their plans have been dashed by unexpected political or financial crises or, worse, obstructed by a lengthy bureaucratic approval process. Now, with a more transparent retail electricity market, government regulators and investors are bullish on Turkey. Is Turkey ready to turn the power on? This report closely examine Turkey's plans to create a power infrastructure capable of providing the reliable electricity supplies necessary for sustained economic growth. It was compiled with on-the-ground research and extensive interview with key industrial and political figures. Today, hard coal and lignite account for 21% of Turkey's electricity generation and gas-fired plants account for 50%. The Alfin Elbistan-B lignite-fired plant has attracted criticism for its lack of desulfurization units and ash dam facilities that have tarnished the industry's image. A 1,100 MW hard-coal fired plant using supercritical technology is under construction. 9 figs., 1 tab.

20 FOSSIL-FUELED POWER PLANTS↗

Crowder College MARET Center (Final Scientific Technical Report)

Following decades of success in solar energy projects, the Missouri Legislature designated Crowder College in 1992 as the State's renewable energy education center. The resulting Missouri Alternative and Renewable Energy Technology (MARET) Center is recognized internationally for its contributions to the energy field. The mission of the MARET Center is to expand renewable energy throughout the region with education, applied research, and economic development. Educational programs include certification and transfer degrees encompassing green construction, solar thermal energy, solar electricity, and wind. The MARET Center also assists in new product development and other business support services in renewable energy. The Missouri Alternative and Renewable Energy Technology (MARET) Center at Crowder College hopes to eventually develop a 27,500 ft 2 facility as a living laboratory to support solar and other renewable and sustainable energy development through professional degrees, new product development and commercialization, renewable energy business incubation, and consumer education. The primary objective of the current project was to complete Stage One of this building, with solar, wind, and geothermal technologies installed to power its 9,216 ft 2 office, classroom, and research spaces. This MARET Center includes a modular roof structure that permits both solar module mounting and daylighting, PV/thermal hybrid modules pioneered in Crowder Solar Decathlon homes, modular electrical management subsystems; and modular delivery systems for heating and cooling the structure. The MARET Facility will operate as a Net Positive energy building, consistently producing surplus energy for distributed generation on the utility grid. The modular design of the energy systems within the building is to serve as a scalable and repeatable model for a wide variety of building applications and climate zones. As a living laboratory of renewable energy, exploring and validating new applications of solar and other renewable technologies, the MARET Facility will house a wide variety of programs which will advance implementation of renewable energy throughout the region. These program goals include; Curriculum in renewable energy for pre-engineering transfer programs; Certification and degree programs for technical degrees for Energy Efficiency, Wind, Photovoltaic and Solar Thermal professionals; Short courses and workshops for building management and design professionals; Public education and demonstration projects in renewable energy through conferences and K-12 educational outreach; Technical degree offering in building construction incorporating “best practices” for energy efficiency and renewables; and Business incubators for new renewable energy businesses and new product development. The new MARET facility will support the mission of the US Department of Energy (DOE) Solar Program, “to improve America’s security, environmental quality, and economic prosperity through public-private partnerships that bring reliable and affordable solar energy technologies to the marketplace,” through a variety of educational and business assistance programs. Further, technical innovations planned for the MARET facility and its applied research activities will advance the Solar Program strategic goals to “reduce the cost of solar energy to the point it becomes competitive in relevant energy markets (e.g., buildings, power plants) and for solar technology to enable a sustainable solar industry.” Overarching Goals relative to program needs, future expansion, flexibility, quality of materials, and construction and operational costs:; Experimental: The structure and systems of the building operate as an educational resource. The systems are meant to be a source for data collection and study for building users and instructors; Educational: Part of the evolution of this building and its ongoing goals is to use the building as an educational tool, one where new ideas developed in the world and especially at Crowder can be tested further as part of MARET's curriculum; LEED Platinum: achieve highest level of LEED certification; Net Zero: The building will utilize existing wind and alternate energy sources on campus and add solar PVT panels and achieve as close as possible to a net zero energy usage; and Phase II: The phase II portion of this project will expand the Internet student area, additional classrooms, and labs, as well as an auditorium and exhibit area.

14 SOLAR ENERGY↗

Watertube or Firetube Industrial Boiler, 150,000 lbs/hr Capacity

This unit process quantifies the total mass of steel required for the construction of a single 150,000 lbs/hr capacity watertube or firetube boiler. The boiler is assumed to be comprised entirely of steel plate. To access the model referenced in the report, please visit https://www.netl.doe.gov/energy-analysis/details?id=15451C24-413F-4840-9B16-E6E53F8AC751

42 ENGINEERING↗

Graphical Environment Tools for Application to Gamma-Ray Energy Tracking Arrays (Final Report)

Highly segmented, position-sensitive germanium detector systems are being developed for nuclear physics research where traditional electronic signal processing with mixed analog and digital function blocks would be enormously complex and costly. Future systems will be constructed using pipelined processing of high-speed digitized signals as is done in the telecommunications industry. Techniques which provide rapid algorithm and system development for future systems are desirable. This project has used digital signal processing concepts and existing graphical system design tools to develop a set of re-usable modular functions and libraries targeted for the nuclear physics community. Researchers working with complex nuclear detector arrays such as the Gamma-Ray Energy Tracking Array (GRETA) have been able to construct advanced data processing algorithms for implementation in field programmable gate arrays (FPGAs) through application of these library functions using intuitive graphical interfaces.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Microkinetic Modeling of the Transient CO 2 Methanation with DFT–Based Uncertainties in a Berty Reactor

The transient operation of methanation reactors can become desirable when coupled with fluctuating renewable energies in Power-to-Gas scenarios, which requires suitable kinetic approaches that can describe the transient catalytic phenomena. A combined experimental and theoretical investigation of the transient CO 2 methanation is conducted using concentration forcing to derive a suitable microkinetic model. Methanation experiments are performed with a Ni/SiO 2 catalyst in a Berty-type reactor at industrially relevant conditions. The microkinetics are based on previous work and were automatically constructed for the Ni(111) facet using the Reaction Mechanism Generator. A feasible set of energetic parameters of the microkinetic models was identified in a theory-constrained optimization procedure within the DFT uncertainty space that can accurately reproduce the experimental results on a first-principles basis. The microkinetic model unravels that the formation of H 2 O* and CH 3 * control the activity and selectivity of Ni(111) under the investigated conditions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

ManiPIO - Manipulate Process I/O

SAND2021-15053 O ManiPIO is a Python-based tool used to test Programmable Logic Controllers (PLCs), Industrial Control Systems (ICS), and ICS networks. It reads an input script to construct complex Events on ICS networks and uses the ModBus communication standard to communicate. Users can use ManiPIO to construct complex timelines of ICS communication events to simulate any number of network-based scenarios. Sandia National Laboratories is a multimission laboratory managed and operated by National Technology & Engineering Solutions of Sandia, LLC, a wholly owned subsidiary of Honeywell International Inc., for the U.S. Department of Energy’s National Nuclear Security Administration under contract DE-NA0003525.

Hahn, Andrew↗

A new center for heavy ion research

Progress in cancer therapy with ions heavier than protons, i.e., helium, carbon, oxygen and neon, requires research and development capability. Ion research activity, however, is limited from the absence of U.S. accelerator facilities offering ion beams for therapy – placing the U.S. significantly behind Europe and Asia. With dramatic advances in beam delivery and compact accelerators, the potential exists to create a facility that can play a leadership role in particle therapy and ion-based research. This paper announces summary details of a new center for ion therapy research under construction in Waco, TX, in collaboration with recognized accelerator entities both academic and industrial. The advanced accelerator technologies will produce beams for both clinical and research applications, offering a complete range of ions, intensities and energies required by the medical community, including the capability to perform ultra-high dose irradiation (FLASH) research. FLASH, a recent research initiative, which has the potential of reducing cancer treatment toxicities, is an important if not critical capability for a competitive research center – requiring beam intensities well beyond those provided by current medical accelerators. Building a state-of-the-art cancer research center within a comprehensive facility will provide the resources to promote ion therapy in the U.S, including, preclinical/clinical trials and protocols between modalities, and also support broad ion R&D.

43 PARTICLE ACCELERATORS↗

Gulf Petro Initiative

In this report, technologies for petroleum production and exploration enhancement in deepwater and mature fields are developed through basic and applied research by: (1) Designing new fluids to efficiently drill deepwater wells that can not be cost-effectively drilled with current technologies. The new fluids will be heavy liquid foams that have low-density at shallow dept to avoid formation breakdown and high density at drilling depth to control formation pressure. The goal of this project is to provide industry with formulations of new fluids for reducing casing programs and thus well construction cost in deepwater development. (2) Studying the effects of flue gas/CO{sub 2} huff n puff on incremental oil recovery in Louisiana oilfields bearing light oil. An artificial neural network (ANN) model will be developed and used to map recovery efficiencies for candidate reservoirs in Louisiana. (3) Arriving at a quantitative understanding for the three-dimensional controlled-source electromagnetic (CSEM) geophysical response of typical Gulf of Mexico hydrocarbon reservoirs. We will seek to make available tools for the qualitative, rapid interpretation of marine CSEM signatures, and tools for efficient, three-dimensional subsurface conductivity modeling.

02 PETROLEUM↗