Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “COMMISSION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Where the champsaur commission's critics Have got it wrong

In order to be constructive, the debate on markets versus electrical system regulation must be based on experience in real operating markets and regulated environments. If dogmatism prevails, it can fall into the contradiction of economical rationality. Unlike the U.S., where evolution has been driven by practice, the European Union wants to impose uniformity - electricity regulation regardless of individual countries' special circumstances. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

State environmental law and carbon emissions: Do public utility commissions use environmental statutes to fight global warming?

In many states environmental statutes provide the authority for public utility commissioners to make decisions to reduce greenhouse gases from electricity generation. This article looks at six such laws and how the presence of these laws affected CO{sub 2} emissions during a nine-year period from 1997 to 2005. (author)

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

EC power management in ITER for NTM control: the path from the commissioning phase to demonstration discharges

Time dependent simulations that evolve consistently the magnetic equilibrium and plasma pressure profiles and the width and frequency rotation of magnetic islands under the effect of the Electron Cyclotron feedback system are used to assess whether the control of NTMs on ITER is compatible with other simulataneous functionalities of the EC system, like core heating and current profile tailoring, or sawtooth control. Furthermore, results indicate that the power needs for control can be reduced if the EC power is reserved and if pre-emptive control is used as opposed to an active search for an already developed island.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

First commissioning results with the Grenoble test electron cyclotron resonance ion source at iThemba LABS

iThemba Laboratory for Accelerator Based Science (iThemba LABS) is a multi-disciplinary accelerator facility. One of its main activities is the operation of a separated-sector cyclotron with a K-value of 200, which provides beams of various ion species. These beams are used for fundamental nuclear physics research in the intermediate energy region, radioisotope production, and medical physics applications. Due to the requirements of nuclear physics for new ion species and higher energies, the decision was made to install a copy of the so-called Grenoble test source (GTS) at iThemba LABS. In this paper, we will report on the experimental setup and the first results obtained with the GTS2 at iThemba LABS.

43 PARTICLE ACCELERATORS↗

Commissioning of heating neutral beams for COMPASS-D tokamak

Two neutral beam injectors have been developed for plasma heating on COMPASS-D tokamak (Institute of Plasma Physics, Prague). The 4-electrodes multihole ion-optical system with beam focusing was chosen to provide the low divergence 300 kW power in both deuterium and hydrogen atoms. The accelerating voltage is 40 kV at extracted ion current up to 15 A. The power supply system provides the continuous and modulated mode of the beam injection at a maximal pulse length 300 ms. The optimal arrangement of the cryopanels and the beam duct elements provides sufficiently short-length beamline which reduces the beam losses. The evolution of the impurities and molecular fraction content is studied in the process of the high voltage conditioning of the newly made ion sources. Two injectors of the same type have been successfully tested and are ready for operation at tokamak in IPP, Prague.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Assembly and commissioning of a new SRF cryomodule for the ATLAS intensity upgrade

The Argonne National Laboratory Physics Division is in the final stages of a major upgrade to the Argonne Tandem Linear Accelerator System national user facility, referred to as the intensity upgrade. The intensity upgrade project will substantially increase beam currents for experimenters working with the existing ATLAS stable and in-flight rare isotope beams and for the neutron-rich beams from the Californium Rare Isotope Breeder Upgrade. This project includes the replacement of three existing cryomodules, containing 18 superconducting accelerator cavities and 9 superconducting solenoids, with a single cryomodule with seven SC 72.75 MHz accelerator cavities optimized for ion velocities of 7.7% the speed of light and 4 SC solenoids all operating at 4.5 K. This presentation will report: how we minimized the heat load into the 4 K and 80 K coolant streams feeding the cryomodule, a comparison of the calculated and measured static heat loads at 80 K and the mechanical design of the vacuum vessel.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

High-power helicon system commissioning and conditioning progress on DIII-D

The high-power helicon, aka fast wave in the lower hybrid range of frequencies (LHRF), program has completed initial experiments at DIII-D. A 30-element comb-line traveling wave antenna successfully coupled over 0.3 MW of rf power at 476 MHz into both L-mode and ELMing H-mode plasmas for approximately 0.2 s. Here, we describe the helicon systems that enabled high-power operations, and the progress of conditioning in June 2021. Upgraded vacuum feedthroughs are described.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Deuterium Extraction from Helium with a Vanadium Vacuum Permeator: Commissioning of the Tritium Extraction eXperiment (TEX)

Here, the Tritium Extraction eXperiment (TEX) is a forced-convection lead-lithium (PbLi) loop in the Safety and Tritium Applied Research (STAR) facility at Idaho National Laboratory (INL) with the purpose of providing validation data for the vacuum permeator tritium extraction concept. A vanadium tube of 1000 mm length, 12.7 mm outside diameter, and 0.50 mm wall thickness is installed in the test section of TEX. The installed vanadium tube is characterized to quantify impurity concentrations, surface chemistry, and microstructure to elucidate permeation phenomena observed in experimentation. Herein, the permeation properties of the vanadium tube are characterized by measuring deuterium permeation at 300 °C, 325 °C, and 350 °C at 100 kPa, 125 kPa, and 150 kPa total pressures with 5000 ppm deuterium in helium gas mixture in a once-through flow configuration. The hydrogen isotope permeation through the vanadium tube in the test section is measured with quadrupole mass spectrometers and the hydrogen isotope concentration in the feed and retentate gas stream is measured with gas chromatography. The transient permeation results are modeled with MELCOR-TMAP, a thermal-hydraulic tritium transport code, and compared well with literature data.

70 - PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Installation, commissioning, and testing of the HB650 CM at PIP2IT

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (LINAC) powering the accelerator complex to provide the world’s most intense high-energy neutrino beam. This paper describes the conversion of the PIP-II Injector Test Facility (PIP2IT) cryogenic system into a test stand for PIP-II High-Beta 650 MHz (HB650) cryomodules at Fermilab’s Cryomodule Test Facility (CMTF). A description of the associated mechanical, electrical, and controls modifications necessary for testing HB650 cryomodules are provided. The cooldown and warmup requirements, procedures and associated controls logic is described.

43 PARTICLE ACCELERATORS↗

Investigations of the output energy deviation and other parameters during commissioning of the four-rod radio frequency quadrupole at the Fermi National Accelerator Laboratory

After 30 years of operation, the Cockcroft-Walton based injector at the Fermi National Accelerator Laboratory has been replaced by a new beam line including a dimpled magnetron 35 keV source in combination with a 750 keV four-rod radio frequency quadrupole (RFQ). The new injector is followed by the existing drift tube linac. Prior to installation, a test beam line was built which included the magnetron source and the four-rod RFQ with a number of beam measurement instrumentation. The first beam test with the RFQ showed an output energy deviation greater than 2.5%. Other problems also showed up which led to investigations of the output energy, power consumption and transmission properties using rf simulations which were complemented with additional beam measurements. The sources of this deviation and the mechanical modifications of the RFQ to solve this matter will be presented in this paper. Meanwhile, the nominal output energy of 750 keV has been confirmed and the new injector with the four-rod RFQ is in full operation.

43 PARTICLE ACCELERATORS↗