Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BYPASSES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

Adaptive methods of generating complex light arrays

Structured light arrays of various shapes have been a cornerstone in optical science, driven by the complexities of precise and adaptable generation. This study introduces an approach using a spatial light modulator (SLM) as a generator for these arrays. By projecting a holographic mask onto the SLM, it functions simultaneously as an optical convolution device, focusing mechanism, and structured light beam mask. Our approach offers unmatched versatility, allowing for the experimental fabrication of traditional beam arrays like azimuthal Laguerre–Gaussian (LG), Bessel–Gaussian (BG), and Hermite–Gauss (HG) in the far-field. Notably, it has enabled a method of generating Ince–Gauss (IG) and LG radial mode beam arrays using a convolution solution. Our system provides exceptional control over array periodicity and intensity distribution, bypassing the Talbot self-imaging phenomenon seen in traditional setups. We provide an in-depth theoretical discussion, supported by empirical evidence, of our far-field results. This method has vast potential for applications in optical communication, data processing, and multi-particle manipulation. It paves the way for rapid generation of structured light with high spatial frequencies and complex shapes, promising transformative advances in these domains.

Optics↗

NGEE Arctic Integrated Modeling (IM3): Improved snow-vegetation interaction

This data product represents the integration of new code capability for arctic tundra snow-vegetation-terrain interactions into the Energy Exascale Earth System Model (E3SM), through the E3SM Land Model (ELM) component. This code integration is the result of collaborative effort between the NGEE Arctic project and the E3SM project. The NGEE Arctic project developed a total of six Integrated Modeling (IM) modules informed by observations and experiments. New ELM capability represented by this data product (IM3) falls into three categories: 1) Downscaling from gridcell to topographic unit level when working through the existing coupler bypass code. 2) Four new parameters (taper, stocking, bendresist, and vegshape) have been added to ELM to allow for flexible definition of snow-vegetation interactions. 3) Vegshape and bendresist parameters are used to calculate the fraction of leaf area and/or stem area buried by snow for a given snow depth. This data record consists of a single document (pdf format) that describes the theoretical basis for the snow-vegetation-terrain interactions added to ELM, and describes the modifications made to the ELM code. The Methods section of this metadata record includes a link to the public E3SM code repository where the exact code modifications as integrated in E3SM can be accessed. The Next-Generation Ecosystem Experiments: Arctic (NGEE Arctic), was a research effort to reduce uncertainty in Earth System Models by developing a predictive understanding of carbon-rich Arctic ecosystems and feedbacks to climate. NGEE Arctic was supported by the Department of Energy's Office of Biological and Environmental Research. The NGEE Arctic project had two field research sites: 1) located within the Arctic polygonal tundra coastal region on the Barrow Environmental Observatory (BEO) and the North Slope near Utqiagvik (Barrow), Alaska and 2) multiple areas on the discontinuous permafrost region of the Seward Peninsula north of Nome, Alaska. Through observations, experiments, and synthesis with existing datasets, NGEE Arctic provided an enhanced knowledge base for multi-scale modeling and contributed to improved process representation at global pan-Arctic scales within the Department of Energy's Earth system Model (the Energy Exascale Earth System Model, or E3SM), and specifically within the E3SM Land Model component (ELM).

Thornton, Peter E [ORNL] (ORCID:0000000247595158)↗

Acoustic Doppler Current Profiler Surveys of Velocity Downstream of Albeni Falls Dam

The U.S. Army Corps of Engineers (USACE), Seattle District, is studying the potential to locate fish bypass systems at Albeni Falls Dam. The USACE requested Pacific Northwest National Laboratory (PNNL) to survey velocity magnitude and direction in the dam tailrace. The empirical data collected will be used to support future numerical modeling, physical modeling, and evaluation of fish bypass system alternatives. In May 2010, PNNL conducted velocity surveys of the Albeni Falls Dam using a boat-mounted acoustic Doppler current profiler. The surveys were conducted over three days (May 25 through 27). During the survey period, total river discharge at the dam varied between 30.2 and 31.0 kcfs. A small amount of spill discharge, 2 kcfs, was present on two days (May 26 and 27). This report presents data plots showing measured velocity direction and magnitude averaged over the entire depth and over 5-ft depth increments from 5 to 30 ft.

13 HYDRO ENERGY↗

ESA Protection for the American Eel: Implications for US Hydropower

The American eel (Anguilla rostrata) has been proposed for special protection in the United States under the Endangered Species Act (ESA). This conservation action could impact a significant number of hydropower plants. A spatial analysis of data from Oak Ridge National Laboratory’s HydroGIS estimated that 32,719 MW of nameplate capacity is at risk at existing hydropower projects in the eastern United States. Most of these plants, with a combined capacity of 20,827 MW, are located in coastal river basins, and many of these occur in New England and Mid-Atlantic states. For eels, upstream passage is both effective and relatively inexpensive to provide. However, ensuring safe downstream passage presents significant challenges. Combinations of technologies for guiding and/or collecting large, maturing eels during their downstream migration through the hydro-system are still in the early stages of development. Several promising future directions emerged from our review. These included design of eel-friendly turbines, intake screens, and bypasses and strategic approaches to bypass multiple hydropower projects by trapping eels upstream and transporting them around dams. In this report, we review the state of the science in eel passage, including both upstream and downstream passage, where considerations include turbine impacts, and eel biology. We highlight promising avenues to guide future research and development efforts toward effective solutions that minimize impacts to hydropower production. From a broader geographic perspective, we recommend evaluating where the best opportunities for eel recovery exist. Unlike other fish species that migrate between freshwater and the ocean, juvenile eels do not necessarily return to one of the rivers occupied by their parents. This implies that the species will likely be managed as a single genetic stock, and efforts to avoid listing under ESA by preventing decline will be most effective if they are coordinated. By understanding the species’ biology, it should be possible to focus eel conservation efforts in river systems with reduced impact to US hydropower production.

Jager, Henriette (Yetta) I.↗

Thermal Studies of the Laser Inertial Fusion Energy (LIFE) Target during Injection into the Fusion Chamber

The tests of the external heat transfer coefficient suggests that the values used in the numerical analysis for the temperature distribution within the fusion fuel target following flight into the target chamber are probably valid. The tests of the heat transfer phenomena occurring within the target due the rapid heating of the LEH window for the hot gasses within the fusion chamber show that the heat does indeed convect via the internal helium environment of the target towards the capsule and that the pressure in the front compartment of the target adjacent to the LEH window increases such that t bypass venting of the internal helium into the second chamber adjacent to the capsule is needed to prevent rupture of the membranes. The bypass flow is cooled by the hohlraum during this venting. However, the experiments suggest that our internal heat flow calculations may be low by about a factor of 2. Further studies need to be conducted to investigate the differences between the experiment and the numerical analysis. Future studies could also possibly bring the test conditions closer to those expected in the fusion chamber to better validate the results. A sacrificial layer will probably be required on the LEH window of the target and this can be used to mitigate any unexpected target heating.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OECD MCCI Project: Small-Scale Water Ingression and Crust Strength Tests (SSWICS) SSWICS-11 Test Data Report (Thermal Hydraulic Results)

During the course of the first MCCI program (MCCI-1), seven small-scale water ingression tests were performed with 75 kg corium melts made up of UO 2 and varying amounts of either siliceous or limestone common sand concrete. The concrete contents varied from a low of 4 wt% to a high of 23 wt%. These tests demonstrated that melt cooling can be enhanced by water ingression made possible by thermal stress-induced cracking, and that the role of water ingression increases with decreasing concrete content. The dependence of the water ingression cooling rate on concrete content is strongest for melts containing less than 14% concrete. For melts with 14% or more concrete, little evidence of water ingression cooling was discernible. It was also found that melts with siliceous concrete cooled at about the same rate as melts with a similar amount of limestone common sand concrete. One aim of the current MCCI program (MCCI-2) is to investigate the role of gas sparging on the corium cooling rate. The gases are a byproduct of the decomposition of concrete, which occurs when the material overheats. Gases generated near the corium/concrete interaction zone at the bottom of the melt are propelled up through the corium by buoyancy forces and the resultant gas flow has the potential to create melt porosity. This porosity is expected to supplement the fissures induced by thermal stress cracking. It is thought that these extra pathways could enhance the amount of water ingression cooling and quench the melt more rapidly than the case without sparging gases. The first test of the MCCI-2 program was SSWICS-8, a melt quench experiment that duplicated the conditions of SSWICS-6 while adding gas sparging to simulate the flow of concrete decomposition gases. The melts for these tests were formulated to simulate a fully oxidized PWR corium melt containing 15 wt% siliceous concrete. They were both quenched at a system pressure of 1 bar. The new data was to be used to make a comparison between the cooling rates and crust morphologies of corium quenched with and without sparging gases. SSWICS-8 was an operational success in every respect except for the fact that the injected gas appeared to bypass the melt by escaping through the basemat/liner joint and/or flowing up around the melt between the melt/liner interface. Post test examinations of the ingot and a review of the data determined that SSWICS-8 was effectively a repeat of SSWICS-6, i.e., a melt quenched in the absence of sparging gases. SSWICS-11, the subject of this report, is a repeat of SSWICS-8 with a modified sparging system designed with the goal of ensuring that the injected gas does not bypass the melt. The test was conducted on November 5, 2008. This report includes a description of the test apparatus, the instrumentation used, plots of the recorded data, and some rudimentary data reduction to obtain an estimate of the heat flux from the corium to the overlying water pool.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Brigham City Hydro Generation Project

Brigham City owns and operates its own municipal power system which currently includes several hydroelectric facilities. This project was to update the efficiency and capacity of current hydro production due to increased water flow demands that could pass through existing generation facilities. During 2006-2012, this project completed efficiency evaluation as it related to its main objective by completing a feasibility study, undergoing necessary City Council approvals and required federal environmental reviews. As a result of Phase 1 of the project, a feasibility study was conducted to determine feasibility of hydro and solar portions of the original proposal. The results indicated that the existing Hydro plant which was constructed in the 1960’s was running at approximately 77% efficiency or less. Brigham City proposes that the efficiency calculations be refined to determine the economic feasibility of improving or replacing the existing equipment with new high efficiency equipment design specifically for the site. Brigham City completed the Feasibility Assessment of this project, and determined that the Upper Hydro that supplies the main culinary water to the city was feasible to continue with. Brigham City Council provided their approval of feasibility assessment’s results. The Upper Hydro Project include removal of the existing powerhouse equipment and controls and demolition of a section of concrete encased penstock, replacement of penstock just upstream of the turbine inlet, turbine bypass, turbine shut-off and bypass valves, turbine and generator package, control equipment, assembly, start-up, commissioning, Supervisory Control And Data Acquisition (SCADA), and the replacement of a section of conductors to the step-up transformer. Brigham City increased the existing 575 KW turbine and generator with an 825 KW turbine and generator. Following the results of the feasibility assessment Brigham City pursued required environmental reviews with the DOE and the U.S. Fish and Wildlife Services (USFWS) concurring with the National Environmental Policy Act of 1969 (NEPA) It was determined that Brigham City’s Upper Hydroelectric Power Plant upgrade would have no effect to federally listed or candidate species. However Brigham City has contributed a onetime lump sum towards Bonneville cutthroat trout conservation in the Northern Bonneville Geographic Management Unit with the intention to offset any impacts from the Upper Hydro Project needed to move forward with design and construction and is sufficient for NEPA compliance. No work was done in the river or river bank. During construction, the penstock was disconnected and water was diverted through and existing system around the powerhouse and back into the water system. The penstock, which is currently a 30-inch steel pipe, would be removed and replaced with a new section of 30-inch pipe. Brigham City worked with the DOE and was awarded a new modification and the permission to proceed with Phase III of our Hydro Project in Dec. 2013; with the exception to the modification of the award for the construction phase. Brigham City developed and issued a Request for Proposal for Engineer and Design vendor. Sunrise Engineering was selected for the Design and throughout the Construction Phase of the Upper Hydroelectric Power Plant. Brigham City conducted a Kickoff Meeting with Sunrise June 28, 2013 and received a Scope of Work Brigham City along with engineering firm sent out a RFP for Turbine, Generator and Equipment for Upper Hydro. We select Turbine/Generator Equipment from Canyon Industries located in Deming, WA. DOE awarded Brigham City a new modification and the permission to proceed with Phase III Construction of our Hydro Project. Brigham City Crews removed existing turbine/generator and old equipment alone with feeder wires coming into the building basically giving Caribou Construction an empty shell to begin demolition. Brigham City contracted with Caribou Construction from Jerome, Idaho for the Upper Power Plant construction. A kickoff meeting was June 24, 2014 and demolition was immediately started on building. Because of a delivery delay of Turbine, Generator and Equipment from Canyon Brigham City had to request another extension for the final date of completion. DOE awarded modification (.007) to Brigham City with a new completion date of August 1, 2015. The Turbine has had a few adjustments to help with efficiency; but the Generator had a slight vibration when generator got hot so Canyon Industries had U S Motor’s that manufactured the generator come to check out the issue. The other Equipment seems to be running normal. Brigham City, Sunrise Engineering and Canyon Industries met to determine what the vibration in the generator was and how to solve the issue Us Motor’s found some welds that failed: they have been repaired. U S Motor’s delivered the repaired generator Feb. 17, 2015. Canyon Industries arranged for a crane to installed generator in Power Plant. U S Motor’s balanced and wired generator. Plant Operators put the generator back on line. Canyon Industries returned and gave their approval to keep Hydro online. After Hydro was put back into operations it kept going off line because of overheating issues. Canyon Industries returned and replaced sensors and adjusted them to the proper settings for normal operations. Brigham City added additional steel screens to windows to increase air flow in Power Plant Building. After construction phase of the Upper Hydro Plant some landscaping has been restored around the building additional gravel brought in and leveled out and the road that was cut through for conduits to run wires. A retaining wall was installed to protect penstock. The Upper Hydro Plant is complete and in full operations. The final reimbursement was submitted.

13 HYDRO ENERGY↗

Simulation of IST Turbomachinery Power-Neutral Tests with the ANL Plant Dynamics Code

The validation of the Plant Dynamics Code (PDC) developed at Argonne National Laboratory (ANL) for the steady-state and transient analysis of supercritical carbon dioxide (sCO2) systems has been continued with new test data from the Naval Nuclear Laboratory (operated by Bechtel Marine Propulsion Corporation) Integrated System Test (IST). Although data from three runs were provided to ANL, only two of the data sets were analyzed and described in this report. The common feature of these tests is the power-neutral operation of the turbine-compressor shaft, where no external power through the alternator was provided during the tests. Instead, the shaft speed was allowed to change dictated by the power balance between the turbine, the compressor, and the power losses in the shaft. The new test data turned out to be important for code validation for several reasons. First, the power-neutral operation of the shaft allows validation of the shaft dynamics equations in asynchronous mode, when the shaft is disconnected from the grid. Second, the shaft speed control with the compressor recirculation (CR) valve not only allows for testing the code control logic itself, but it also serves as a good test for validation of both the compressor surge control and the turbine bypass control actions, since the effect of the CR action on the loop conditions is similar for both of these controls. Third, the varying compressor-inlet temperature change test allows validation of the transient response of the precooler, a shell-and-tube heat exchanger. The first transient simulation of the compressor-inlet temperature variation Test 64661 showed a much slower calculated response of the precooler in the calculations than the test data. Further investigation revealed an error in calculating the heat exchanger tube mass for the PDC dynamic equations that resulted in a slower change in the tube wall temperature than measured. The transient calculations for both tests were done in two steps. The first step was done in the same fashion as the FY15 IST analysis, where the CR valve position and the turbine-compressor shaft speed were specified through the PDC input based on the test values. On the second step, the turbine-compressor shaft dynamics equations were invoked by specifying that the shaft is disconnected from the grid. In addition, the CR valve control was used to control the shaft speed, based on the turbine bypass control logic already implemented in the PDC. For the shaft power balance, the friction (windage) loss is calculated based on the shaft balance at the steady-state conditions and is assumed to be scaled to the third power of shaft speed in the transient. Both the steady-state and transient simulations of both tests showed good agreement with the test data. The only significant difference was the turbine performance, which was not predicted as well as it was in the previous IST simulation, resulting in the prediction of a somewhat different flow split between the two turbines. This flow split difference is believed to be the result of not addressing the recent turbine modifications in the model. In addition, the full simulation of the turbine-compressor speed variation Test 65261-P with shaft speed control showed greater a difference with the test data later in the transient than the other test. Further analysis of the results revealed that this difference is most likely due to scaling the shaft windage losses only with the shaft speed and ignoring its dependency on the fluid density in the shaft cavity. Based on the results of steady state and transient calculations of the Tests 64661 and 65216-P, several areas of future improvements for the PDC simulation of the IST are identified.

42 ENGINEERING↗

Cost and Performance Baseline for Fossil Energy Plants Supplement: Sensitivity to CO 2 Capture Rate in Coal-Fired Power Plants

The cost and performance of various plants designed to meet a range of carbon dioxide (CO 2 ) emissions are evaluated in this report by varying the CO 2 capture rate. The base cases for these designs are the supercritical (SC) pulverized coal (PC) plant from the National Energy Technology Laboratory’s (NETL) report “Cost and Performance Baseline for Fossil Energy Plants, Volume 1a: Bituminous Coal (PC) and Natural Gas to Electricity, Revision 3” and the General Electric Energy (GEE) integrated gasification combined cycle (IGCC) plant in NETL’s report, “Cost and Performance Baseline for Fossil Energy Plants, Volume 1b: Bituminous Coal (IGCC) to Electricity, Revision 2 – Year Dollar Update.” The chosen SC PC plants were based on the Case B12B, differing only in the addition of a bypass flow path that allows for an appropriate portion of the flue gas stream exiting the desulfurization step to be directed towards the stack, which reduces the amount CO 2 captured in the Cansolv process. The chosen IGCC plants were based on the Case B5B, differing by bypassing (either partially or entirely) the water gas shift reactors and thereby reducing the amount of CO 2 captured in the Selexol process. The major components of the underlying CO 2 capture technology in the plants were preserved with minimal modifications to the overall processes. The SC PC cases include up-to-date cost and performance information from recent vendor quotes whereas the IGCC performance and cost are based upon the older quotes used for the Revision 2 report, with standard adjustments made to update the costs to 2011 dollars.

01 COAL, LIGNITE, AND PEAT↗

Center for Frontiers of Subsurface Energy Security (Final Report)

For the past two decades a slowly growing consensus has been that rising temperature is being caused by increases in carbon dioxide (CO 2 ) in the Earth’s atmosphere. What is less consensual is what to do about it. Solutions range from reducing emissions to various ways to capture CO 2 (from effluents of power plants, as plants, etc.) and store it away from the atmosphere. The problem is of such magnitude that it is likely that we will need many methods. Also some methods would cause draconian harm to global economies. This work is about the storage part of the reducing of CO 2 in the atmosphere. There have been many methods proposed for storing CO 2 : in vegetation, at the bottom of oceans, in land farms, and in subsurface formations. The latter is particularly prominent given the large estimated volume in porous formation in the Earth, and the 50-year old experience in injecting CO 2 for enhanced oil recovery. This report is about the science behind subsurface storage, called here geological carbon storage or GCS. Effective GCS requires that billions of metric tons of CO 2 be injected into storage reservoirs annually. GCS feasibility requires balancing the opposing impacts of large emplacement (injection) rates without compromising caprock seal integrity during injection. Once injected, the challenge is to assure the injected CO 2 remains permanently stored. Under most conditions, CO 2 is in a supercritical state, or scCO 2 . scCO 2 is immiscible with the subsurface brine and has a factor of ten smaller viscosity, leading to the development of two-phase fluid flow and scCO 2 bypassing. After the injection of large volumes of scCO 2 , the pore pressure, state of stress, chemical, thermal, and biological steady-state or equilibrium conditions in the subsurface are disrupted, which may lead to unpredictable behavior because the responses to these changes are often non-linear. Current challenges for efficient and reliable scCO 2 storage are: (1) sustaining large injection rates; (2) using available pore space efficiently, and (3) controlling undesired or unexpected behavior, such as scCO 2 leakage. Various aspects of these challenges are addressed by collaborative projects within Center for Frontiers in Subsurface Energy Security (CFSES). Challenge 1 – Sustaining large storage rates. To offset the annual CO 2 emissions of in the United States, ~7 billion metric tons of CO 2 must be injected into the storage reservoirs annually. Injected CO 2 forms a plume that starts spreading, displacing originally resident brine, though inefficiently so. Because of its low viscosity, and buoyant forces, a CO 2 plume rises to the reservoir rock-caprock interface. Injecting large volumes of scCO 2 at sufficiently high rates into subsurface storage formations leads to increases in pore pressures, potential expansion of the reservoir rock, and may result in fracturing of the reservoir rock and/or caprock. CFSES research uses existing and new experimental and modeling approaches to identify chemical-physical controls on the permeability and pore pressure dynamics, anticipating geomechanical (fracturing) events, predicting multi-phase flow patterns and trapping of CO 2 . Challenge 2 – Using pore space with unprecedented efficiency. Since large volumes of scCO 2 are to be stored, the volume available in storage reservoirs must be used efficiently. Storage efficiency is defined as a fraction of pore space occupied by carbon dioxide. Current estimates are that less than 5 percent of available pore volume is available for storage because scCO 2 , having a smaller density and viscosity than reservoir brine, tends to form viscous fingers, and bypass available pore space. This flow regime results in a CO 2 plume spreading over large areas in subsurface. The research goal in Challenge 2 is to advance the fundamental understanding of two-phase flow through porous media, including molecular-to meter- scale experimental and modeling approaches. This work leads to novel strategies to ensure that injected CO 2 occupies more than 5% of the pore space, ideally up to 50%. Challenge 3 – Controlling undesired or unexpected behavior. Following the injection of scCO 2 , the subsurface reservoir re-equilibrates to different physical and chemical states. This re-equilibration in space and time could lead to unexpected and/or undesired behavior: fracturing of reservoir rock and/or caprock, development of preferential flow paths, CO 2 leakage (to the surface or overlaying fresh water reservoirs), induced seismicity, and activation of faults. One of the main research goals of CFSES was to advance the fundamental understanding of how individual chemical and physical processes are coupled. We particularly focused on the chemical-mechanical coupling, and flow-mechanical coupling. We collected experimental and modeling data to determine the temporal and spatial scales of the coupled processes, which may lead to pore collapse caused by creep, activation of fractures and faults, chemically-induced fracture propagation, and self-focusing of scCO 2 flow.

54 ENVIRONMENTAL SCIENCES↗

Thermal Energy Storage for Dispatchable Geothermal Power

Dispatchable generation refers to sources of electricity that can be turned on or off, or can adjust their power output accordingly to an order. Geothermal plants are usually used for base-load power rather than dispatchable power. Flexibility is a challenge for a geothermal plant because the heat source does not naturally respond quickly to changes in demand. The current state-of-the-art approach to address this challenge is to maintain the geothermal fluid flows at relatively steady rates while providing a bypass around the generation equipment as needed. Under part load, some of the geothermal fluid is pumped to the surface, bypasses the generation equipment, and is re-injected to the ground without extracting any useful enthalpy. This approach is robust but necessarily incurs high parasitic power draws at part load due to the constant, full-flow pumping power requirements. There are even more challenges and unknowns for steam and flash geothermal plants, which were the focus for this project. As a process improvement to this existing configuration of a dispatchable geothermal plant, we examined the use of a phase-change thermal-energy storage (TES) unit that will provide some “inertia” against temperature fluctuations. The TES phase change material (PCM) could be in the form of eutectic molten nitrate salts, organic sugar alcohols, or the like based on the required temperature. This configuration allowed the power plant to meet the ramp rate requirements while allowing the geothermal resource to drawn down at the duty-cycle-averaged extraction rate rather than the full-rated-output extraction rate. The project team performed an experimental and computational evaluation of a peak shaving technical approach that used thermal storage to switch between two nominal operating points: full rated power and 50% power. In the initial requirements definition phase, the team decided to examine the PCM/TES-enhanced geothermal plant in the context of a 40-MW two-stage flash plant operating in mid-Southern California. Steady-state process simulations were used to understand the equipment sizing and the energetics. Dynamic process simulations were used to understand the response rate of the system to changes in requested power output from the utility. The technical approach was also guided by a techno-economic analysis (TEA) and a high-level analysis of the reservoir. Recognizing that performance of the thermal storage was a key risk element, high-fidelity finite-element simulations of the PCM-TES heat exchanger were performed to better understand its performance and temporal response. These simulations were validated with a subscale PCM-TES experimental apparatus that mimicked the geometry of the full-scale system. The key outcomes of this Phase I project were that: 1) the PCM-TES heat exchanger met the target for gravimetric energy storage density, 2) the dispatchable geothermal plant met its target for response rate, 3) the peak shaving approach reduces the number of production wells and does not disturb the wellfield, and 4) the incentives for properly remunerating dispatchable operation were identified.

15 GEOTHERMAL ENERGY↗

Use Cases and Model Development of Thermal Storage Coupling for Advanced Nuclear Reactors

This report discusses the different options for coupling thermal energy storage (TES) systems to advanced nuclear power plants (A-NPPs) in order to enable flexible and hybrid plant operation. An advanced light-water reactor (ALWR) and a high-temperature gas-cooled reactor (HTGR) were selected as the initial use cases for demonstrating a thermally balanced energy storage coupling design for thermal power extraction. Cost functions for the A-LWR were derived from the fully balanced models that were developed based on three different coupling options with three different thermal energy bypass ratios. For the next steps, cost functions for the HTGR will also be derived, and additional nuclear reactors (e.g., a liquid-cooled fast reactor [LFR] or molten-salt reactor [MSR]) will be evaluated for coupling with TES in similar fashion, including the evaluation of their steady-state condition models and cost functions. The models presented herein showcase several design considerations, focusing on optimal deployment methodologies for achieving steady-state operation with minimum disruption to the nuclear power generation cycle. This report presents the results of steady state models developed using Aspen HYSYS®, wherein the thermal energy bypass for an NPP-TES coupling was varied up to 50%. The various components were sized using Aspen Process Economic Analyzer (APEA) and Aspen Exchanger Design and Rating (EDR), when applicable. Cost functions from these models were developed using the latest publicly available data obtained from APEA V11. The current steady-state models and cost functions provide a baseline for additional work focusing on dynamic operation and process optimization by using Idaho National Laboratory (INL)’s Framework for Optimization of Resources and Economics (FORCE) tools to evaluate the technoeconomic viability and transient operations of TES-coupled A-NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Demonstration of Scaled-Production of Rare Earth Oxides and Critical Materials from U. S. Coal-Based Sources (Final Report)

The project objective was to demonstrate scaled production of high purity rare earth oxides (REO), nominally exceeding 90% grade, from coal refuse sources using innovative technologies that reduce cost and improve environmental outcomes relative to traditional rare earth processing technologies. The project utilized a critical material pilot plant constructed and tested as part of a previous U.S. Department of Energy project. Target performance criteria was a 50% reduction in production cost based on previous optimum values, 150% increase in recovery and greater than 2% concentrates of rare earth oxides, cobalt and manganese. Concentrate production goals were to produce a rare earth mix oxide product at a rate of 200 grams per day having a minimum purity of 50% as well as products of cobalt and manganese having a minimum purity of 2%. A previous pilot plant investigation identified acid cost as the major contributor to an operating cost that made the recovery of rare earth and other critical metals from bituminous coal sources economically challenging. As such, acid cost reduction was a major target using bio-oxidation reactors to produce sulfuric acid from naturally occurring coal pyrite. Based on laboratory data, a bio-oxidation circuit was designed for the pilot plant to produce 7.5 l/min of acid using two 11-m3 (3000 gallon) reactors equipped with 40 hp aerators for air dispersion. The pilot-scale tests revealed that acid concentration equivalent to as high as 1.0 M sulfuric acid could be continuously produced. However, the bio-acid contained exceptionally high iron concentrations, which complicated downstream processing of the pregnant leach solution (PLS). A TEA of the bio-oxidation circuit showed that production cost was approximately $0.13 per kg acid equivalent if produced using a four-day retention time in the reactors. This value represents a 48% reduction from that of purchased bulk sulfuric acid. Calcination (or roasting) studies were conducted on coarse refuse from West Kentucky No. 13 and Fire Clay coal seam sources. The test results revealed the potential to increase recovery by nearly 100% using temperatures between 500°C to 700°C with light REE recovery value being the most improved. Acid baking of the calcined products using sulfuric acid at 250°C increased heavy rare earth recovery from around 40% to 80% while decreasing the acid requirements by over 50%. The existing pilot plant was upgraded for the pilot scale demonstration of REE and CM recovery. The primary feedstocks were West Kentucky No.13 and heap leach pregnant leach solution (PLS) while a secondary feedstock was a lignite waste material from a construction sand operation. The pilot scale operation started with PLS generation through leaching followed by iron and aluminum removal, nominally at 3.3 and 4.5 pH, respectively. Leaching lixiviants used for the test were industrial grade sulfuric acid or bio-acid generated at the pilot scale facility. For most of the tests, the solid feed rate was 200 lb/hr whereas lixiviant was added at 2 gpm to provide an optimal residence time of 45 minutes. Following the contaminant removal step, several different process schematics were tested with the goal of maximizing REE recovery and purity. In the first test, direct processing of aluminum precipitation raffinate for REE recovery using oxalic acid at pH 1.5 was investigated. Overall REE recovery was approximately 45%. Unfortunately, elevated calcium content in the PLS significantly impacted the RE-Oxide product grade. Similarly, high calcium content decreased both the product purity and grades of CM products. As such, a new flowsheet was tested with the same initial process schematic but different precipitation stages for REEs and CMs at pH 6.0 and 9.0, respectively. It was noted that the overlapping precipitation behavior of Co, Ni and Zn with REEs limited the applicability of this process schematic. While this change increased the RE-Oxide grade from 36% in the first test to 87%, the loss of critical metals to the REE cake and bypass of the REEs to the CM cake significantly impacted the recovery of both REEs and CMs. Therefore, the modified process flowsheet combined oxalic acid precipitation stage raffinate and redissolved CM cake filtrate to maximize both the recovery and purity of the products. Consequently, a RE-Oxide product with 85% purity and CM cakes with over 19% Co, 38% Ni, 14% Zn and 9% Mn content were generated with significantly higher recoveries. While the modified process flowsheet improved recoveries and grades, elemental losses observed in separate precipitation and redissolution losses inspired the adaptation of a single precipitation stage at pH 9.0 for both REEs and CMs. This change was anticipated to maximize the REE recovery while minimizing the costs associated with separated redissolution and processing stages. As expected, REE recovery in this new circuit arrangement was over 56% with a product grade of over 87% RE-Oxide content. Similarly, Co, Ni, Mn, and Zn recoveries of 54%, 40%, 67%, and 66%, respectively, were achieved. Unfortunately, the elevated calcium content present in the solution due to its precipitation at pH 9.0 caused a decrease in the CM cake quality. Therefore, the final process flowsheet involved the addition of calcium oxalate precipitation following the oxalic acid precipitation stage, which effectively eliminated calcium contamination of the CM products. Finally, the pilot scale experiments conducted using bio-acid achieved comparable REE leaching recoveries to the conventional sulfuric acid leaching. Elevated iron concentration in the solution caused the co-precipitation of REEs with the iron and aluminum cake, resulting in the REE losses. Furthermore, elevated iron content bypassing the iron and aluminum precipitation stages contaminated the metal sulfide and manganese cake, respectively. A techno-economic analysis was performed based on a commercial facility capable of treating 500 tph of coal-based material. The production cost for West Kentucky No. 13 coarse refuse material ranged from approximately $500-$700/kg of total rare earth oxide whereas the lignite source had significantly lower production cost of $100-$300/kg. The significant difference in cost was due to the easier leaching characteristics of the lignite material and the higher feed concentrations. All process scenarios resulted in a negative net present value (NPV). For the lignite feedstock, laboratory REE leach recovery values were about 30% higher than the pilot plant data. Using the lab leach results, a positive net present value was achieved and the production cost decreased from $100-$300 $/kg to less than $150/kg of total REO.

01 COAL, LIGNITE, AND PEAT↗

Modeling Flow and Particle Deposition in a Spent Nuclear Fuel Assembly

CFD (Computational Fluid Dynamic) simulation of aerosol-laden natural convective flow and particle deposition in a spent fuel storage canister with 37 assemblies is currently computationally prohibitive. PWR (Pressurized Water Reactor) assemblies have up to 289 pins or tubes with several spacer grids to align the pins. Spacer grids with mixing vanes induce swirling during operation to increase heat transfer. Each spacer grid contains hundreds of small structures such as retaining clips, channel walls, and openings. The largest canisters store 37 PWR assemblies thus, there are numerous pins, tubes, and spacer grids for which the flow region between and around these structures needs to be determined along with the movement and deposition of aerosol particles. Because of the complicated geometry, modeling the intricate flow even for just one assembly is currently impractical. Nonetheless, we are developing techniques for a practical model to assess the natural aerosol particle deposition process in a canister in the event that a release occurs from one or more fuel pins. In the previous work it was demonstrated that CFD can model the flow through a PWR spacer grid with mixing vanes, including particle deposition, in a reasonable amount of time on a personal computer. In this work, the analysis is extended to include the bypass region between an assembly and the canister basket walls. It is shown that the flow velocity in the bypass region is about three times that of the interstitial region between the pins. The lengths before and after the spacer grid are also extended to determine when the flow becomes fully developed. In addition, the approach of computationally “stitching together” segments of an assembly is demonstrated with the plan to ultimately model a full assembly. The fraction of particles that are deposited in a segment with a spacer grid is determined as a function of particle size and flow velocity.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Heat exchanger temperature response for duty-cycle transients in the NGNP/HTE.

Control system studies were performed for the Next Generation Nuclear Plant (NGNP) interfaced to the High Temperature Electrolysis (HTE) plant. Temperature change and associated thermal stresses are important factors in determining plant lifetime. In the NGNP the design objective of a 40 year lifetime for the Intermediate Heat Exchanger (IHX) in particular is seen as a challenge. A control system was designed to minimize temperature changes in the IHX and more generally at all high-temperature locations in the plant for duty-cycle transients. In the NGNP this includes structures at the reactor outlet and at the inlet to the turbine. This problem was approached by identifying those high-level factors that determine temperature rates of change. First are the set of duty cycle transients over which the control engineer has little control but which none-the-less must be addressed. Second is the partitioning of the temperature response into a quasi-static component and a transient component. These two components are largely independent of each other and when addressed as such greater understanding of temperature change mechanisms and how to deal with them is achieved. Third is the manner in which energy and mass flow rates are managed. Generally one aims for a temperature distribution that minimizes spatial non-uniformity of thermal expansion in a component with time. This is can be achieved by maintaining a fixed spatial temperature distribution in a component during transients. A general rule of thumb for heat exchangers is to maintain flow rate proportional to thermal power. Additionally the product of instantaneous flow rate and heat capacity should be maintained the same on both sides of the heat exchanger. Fourth inherent mechanisms for stable behavior should not be compromised by active controllers that can introduce new feedback paths and potentially create under-damped response. Applications of these principles to the development of a plant control strategy for the reference NGNP/HTE plant can be found in the body of this report. The outcome is an integrated plant/control system design. The following conclusions are drawn from the analysis: (1) The plant load schedule can be managed to maintain near-constant hot side temperatures over the load range in both the nuclear and chemical plant. (2) The reactor open-loop response is inherently stable resulting mainly from a large Doppler temperature coefficient compared to the other reactivity temperature feedbacks. (3) The typical controller used to manage reactor power production to maintain reactor outlet temperature at a setpoint introduces a feedback path that tends to destabilize reactor power production in the NGNP. (4) A primary loop flow controller that forces primary flow to track PCU flow rate is effective in minimizing spatial temperature differentials within the IHX. (5) Inventory control in both the primary and PCU system during ramp load change transients is an effective means of maintaining high NGNP thermal efficiency while at reduced electric load. (6) Turbine bypass control is an effective means for responding to step changes in generator load when equipment capacity limitations prevent inventory control from being effective. (7) Turbine bypass control is effective in limiting PCU shaft over speed for the loss of generator load upset event. (8) The proposed control strategy is effective in limiting time variation of the differential spatial temperature distribution in the IHX during transients. Essentially the IHX can be made to behave in a manner where each point in the IHX experiences approximately the same temperature rate of change during a transient. (9) The stability of the closed-loop Brayton cycle was found to be sensitive to where one operates on the turbo-machine performance maps. There are competing interests: more stable operation means operating on the curves at points that reduce overall cycle efficiency. Future work should address in greater detail elements that came to light in the course of this work. Specifically: (1) A stability analysis should be performed to identify the phenomena that control reactor outlet temperature stability when operating with the Reactor Outlet Temperature Controller. The goal is to identify a better performing controller. (2) Future simulations should be performed with multiple axial nodes. The single axial node model for the core used in this work gives rise to an initial core reactor outlet temperature perturbation that is a numerical artifact. (3) The tradeoffs referred to above regarding the dependence of Brayton cycle stability and efficiency on performance curve characteristics and use need to be better understood. (4) The role of xenon was neglected in this work and needs to be included in future work.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

CH Packaging Operations Manual

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

CH Packaging Operations Manual (Rev. 10.1)

This document provides the user with instructions for assembling a payload. All the steps in Subsections 1.2, Preparing 55-Gallon Drum Payload Assembly; 1.3, Preparing "Short" 85-Gallon Drum Payload Assembly (TRUPACT-II and HalfPACT); 1.4, Preparing "Tall" 85-Gallon Drum Payload Assembly (HalfPACT only); 1.5, Preparing 100-Gallon Drum Payload Assembly; 1.6, Preparing Shielded Container Payload Assembly; 1.7, Preparing SWB Payload Assembly; and 1.8, Preparing TDOP Payload Assembly, must be completed, but may be performed in any order as long as radiological control steps are not bypassed. Transport trailer operations, package loading and unloading from transport trailers, hoisting and rigging activities such as ACGLF operations, equipment checkout and shutdown, and component inspection activities must be performed, but may be performed in any order and in parallel with other activities as long as radiological control steps are not bypassed. Steps involving OCA/ICV lid removal/installation and payload removal/loading may be performed in parallel if there are multiple operators working on the same packaging. Steps involving removal/installation of OCV/ICV upper and lower main O-rings must be performed in sequence, except as noted.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗