Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “BNL”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

The Calibration System of the E989 Experiment at Fermilab

The muon anomaly aµ is one of the most precise quantity known in physics experimentally and theoretically. The high level of accuracy permits to use the measurement of aµ as a test of the Standard Model comparing with the theoretical calculation. After the impressive result obtained at Brookhaven National Laboratory in 2001 with a total accuracy of 0.54 ppm, a new experiment E989 is under construction at Fermilab, motivated by the diff of aexp SM µ − aµ ∼ 3σ. The purpose of the E989 experiment is a fourfold reduction of the error, with a goal of 0.14 ppm, improving both the systematic and statistical uncertainty. With the use of the Fermilab beam complex a statistic of × 21 with respect to BNL will be reached in almost 2 years of data taking improving the statistical uncertainty to 0.1 ppm. Improvement on the systematic error involves the measurement technique of ωa and ωp, the anomalous precession frequency of the muon and the Larmor precession frequency of the proton respectively. The measurement of ωp involves the magnetic field measurement and improvements on this sector related to the uniformity of the field should reduce the systematic uncertainty with respect to BNL from 170 ppb to 70 ppb. A reduction from 180 ppb to 70 ppb is also required for the measurement of ωa; new DAQ, a faster electronics and new detectors and calibration system will be implemented with respect to E821 to reach this goal. In particular the laser calibration system will reduce the systematic error due to gain fl of the photodetectors from 0.12 to 0.02 ppm. The 0.02 ppm limit on systematic requires a system with a stability of 10−4 on short time scale (700 µs) while on longer time scale the stability is at the percent level. The 10−4 stability level required is almost an order of magnitude better than the existing laser calibration system in particle physics, making the calibration system a very challenging item. In addition to the high level of stability a particular environment, due to the presence of a 14 m diameter storage ring, a highly uniform magnetic field and the detector distribution around the storage ring, set specific guidelines and constraints. This thesis will focus on the final design of the Laser Calibration System developed for the E989 experiment. Chapter 1 introduces the subject of the anomalous magnetic moment of the muon; chapter 2 presents previous measurement of g-2, while chapter 3 discusses the Standard Model prediction and possible new physics scenario. Chapter 4 describes the E989 experiment. In this chapter will be described the experimental technique and also will be presented the experimental apparatus focusing on the improvements necessary to reduce the statistical and systematic errors. The main item of the thesis is discussed in the last two chapters: chapter 5 is focused on the Laser Calibration system while chapter 6 describes the Test Beam performed at the Beam Test Facility of Laboratori Nazionali di Frascati from the 29th February to the 7th March as a final test for the full calibrations system. An introduction explain the physics motivation of the system and the diff t devices implemented. In the final chapter the setup used will be described and some of the results obtained will be presented.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Wildland Fire Management Plan

The Wildland Fire Management Plan (FMP) for Brookhaven National Lab (BNL) is written to comply with Department of Energy (DOE) Integrated Safety Management Policy; Federal Wildland Fire Management Policy and Program Review; and Wildland and Prescribed Fire Management Policy and Implementation Procedures Reference Guide. This current plan incorporates changes resulting from new policies on the national level as well as significant changes to available resources and other emerging issues, and replaces BNL's Wildland FMP dated 2014.

54 ENVIRONMENTAL SCIENCES↗

Science and Engineering Team Repository Selection and Validation

The National Nuclear Security Administration’s Office of Nuclear Smuggling Detection and Deterrence (NSDD), Science and Engineering Team (SET) has engaged Brookhaven National Laboratory (BNL) in the selection, development and management of a knowledge management platform. This platform will serve as a repository for programmatic documents, data, and other relevant files. In support of this effort, BNL implemented a sixteen-month process to ensure the selection of the most relevant and user-friendly repository from among several commercially available and open source options.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Using Monte Carlo methods to estimate occupational dosage during 225 Ac production

Since alpha emitting isotopes such as 225 Ac, ideal for radiation treatment, are in short supply, the Medical Isotope Research and Production program at Brookhaven National Laboratory (BNL) is devel- oping new pathways for 225 Ac production. One proposed pathway is to resurrect the EBCO cyclotron at BNL to irradiate a 226 Ra target for 40 hours in a 16 MeV proton beam. Using MCNPX and CINDER software to simulate this process, we found that 1.26 Ci of 225 Ac could be produced from 300 mg of 226 Ra. To ensure workplace safety, we modeled the detailed geometry of lab 2-66C in Bldg. 801 and performed Monte Carlo simulations to estimate the radiation outside the lab as the irradiated sample is processed in a hot cell. We found the maximum dose outside the lab to be about 9 x 10 -5 rem/h. To reduce occupational dose, we recommend 200 thick steel shielding covering the sample insertion passage. These 225 Ac production runs could help cover the EBCO cyclotron's operational costs.

43 PARTICLE ACCELERATORS↗

24.1.3.1.1 – Frisch Grid CZT Spectrometer

During FY18, BNL continued helping FLIR to integrate the instrument prototype, improving the readout software and testing electronics. BNL and LLNL carried out more measurements with the 4x4 arrays in laboratory conditions using several Cs sources and reanalyzed the raw data from the field measurements. LLNL processed the old recalibrated data and new data collected in the lab. These efforts allowed us to understand the cause of the discrepancies observed during the measurements at the Westinghouse Fuel Fabrication Facility (WFFF). The problem was traced back to the original ASIC and DAQ firmware provided by the ASIC developers. A program error and some other deficiencies were identified in the original firmware. These problems, which caused missing some detected events from the data stream, never showed up in the lab environment. So, they were not spotted before the field test. The ASIC designers are currently working to address these problems and will provide the updated firmware for the next field measurements.

36 MATERIALS SCIENCE↗

The Quality Assurance Measures for Laser Tracker

Laser tracker as a major survey instrument is widely used in BNL site. There will be totally at least 8 in NSLS, CAD and NSLS-II. The accuracy it can achieve will range from several to hundreds microns due to the effect of instrument performance, methodology, environment and operator etc. NSLS-II project have a very tight requirement to alignment error, for instance, the magnet relative alignment error in one common girder should be better than ±30 micron (2σ). In order to attain this goal, many measures will be taken, which have been elucidated in several technical notes. Those measures will immune the survey and alignment design from a laser tracker of potentially compromised performance; however, it’s still desirable that a precise instrument is present when performing most of the stringent alignment work. This entails the necessity of effective quality assurance for laser tracker system. Although not mandatory, it’s also a good metrology practices to keep them calibrated annually and have the traceability to certain national or international standard (i.e. NIST). However, the sent-out style calibration of laser tracker may cost us the down-time of a month for each tracker every year. It’s not affordable to us as we have a very busy alignment schedule. An in-house monitoring and calibration is strongly desired. This article will discuss the feasibility of calibration laser tracker by us at BNL site. The instrument’s performance will be monitored via the analysis of acquired observations on daily basis. The calibration routine will be carried out at least half-annually. They will be detailed later.

47 OTHER INSTRUMENTATION↗

Lessons Learned Study from the NSLS-II Storage Ring Magnet Procurement

This document was compiled in response to the suggestion made by the DOE SC Review of the NSLS-II Project on April 2012, and reiterated at the Review in July, 2013. The main contributors to this document are the SR magnet team A and other in-house participants in the Workshop B referred to below that took place on April 11 th and 12 th 2012 at BNL. The contributions also came from some external participants, including representatives of some of the suppliers who attended the workshop. Manufacturing of the magnets for the NSLS-II storage ring (~850 units of 15 types) took approximately 6 years from the beginning of the conceptual design to completion of manufacturing in October of 2012. The production in the early years did not go smoothly, and a DOE Review Committee expressed concerns in November of 2010 about the potential of significant delays in magnet deliveries. In response, the project undertook three major mitigation steps: 1) enhanced oversight by assignment of one technical representative for each of the seven suppliers, 2) appointment of a senior BNL scientist as the manager of the SR magnet production, and 3) streamlining the decision-making process. These steps led to a successful completion of magnet production and delivery with almost all magnets meeting their stringent specifications.

42 ENGINEERING↗

24.1.3.1.1 – Frisch Grid CZT Spectrometer

During FY18, BNL continued helping FLIR to integrate the instrument prototype, improving the readout software and testing electronics. BNL and LLNL carried out more measurements with the 4x4 arrays in laboratory conditions using several Cs sources and reanalyzed the raw data from the field measurements. LLNL processed the old recalibrated data and new data collected in the lab. These efforts allowed us to understand the cause of the discrepancies observed during the measurements at the Westinghouse Fuel Fabrication Facility (WFFF). The problem was traced back to the original ASIC and DAQ firmware provided by the ASIC developers. A program error and some other deficiencies were identified in the original firmware. These problems, which caused missing some detected events from the data stream, never showed up in the lab environment. So, they were not spotted before the field test. The ASIC designers are currently working to address these problems and will provide the updated firmware for the next field measurements.

97 MATHEMATICS AND COMPUTING↗

The development, testing and characterisation of a straw tracking detector and readout system for the Fermilab muon g-2 experiment

The anomalous magnetic moments of leptons can be both measured and theoretically predicted with high precision, and as such provide stringent tests of the Standard Model (SM) of particle physics. The anomalous magnetic moment of the muon, $a_\mu$, in particular offers sensitivity to new physics within the reach of current experiments. The current world’s best measurement of aμ made at the Brookhaven National Laboratory (BNL) deviates from the SM prediction by over 3σ, providing a tantalising but inconclusive hint that contributions from new physics may be present. A new $a_\mu$ experiment is currently under construction at the Fermi National Accelerator Laboratory (Fermilab), known as the Fermilab muon g-2 experiment. Due to commence in 2017, this new experiment is expected to improve the experimental measurement precision of $a_\mu$ by a factor of 4, and is seeking to confirm or reject the current discrepancy. The experiment, like its BNL predecessor, will measure the precession of the $\mu^{+}$ spin in a magnetic storage-ring. This new experiment has three straw tracking detectors used to measure the beam profile of the stored $\mu^{+}$, as well as other dynamic properties of the beam. This thesis describes the design of these detectors, and the data acquisition system and subsequent data processing systems that have been developed to read them out and make their data available for physics analysis. The performance of the straw trackers and the readout systems at a number of beam tests and test stands is presented, in addition to Monte-Carlo simulations of the trackers in the final experiment.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Alkali-Activated Cement Composites for High Temperature Goethermal Wells

Under the Department of Energy, Energy Efficiency and Renewable Energy (DOE EERE) Geothermal Technologies Program (GTP), the scope of work at Brookhaven National Laboratory (BNL) was aimed at developing and characterizing multifunctional high-temperature geothermal well cement composites. These materials are suitable for both conventional hydrothermal reservoirs at temperature of 300°C and enhanced geothermal system (EGS) environments at heating temperatures up to 600°C. The multifunctional cements were being developed with the following five advanced properties: 1) thermal shock (TS) resistance under 5 cycle heatingcooling water quenching tests, where one cycle involved heating at 500 or 600°C for 24 h and then quenching in 25°C water; 2) improved compressive toughness; 3) enhanced protection of carbon steel (CS) against brine-induced corrosion; 4) superior durability of the bond between the CS and cement surfaces; and 5) good resistance to pH 0.5 H 2 SO 4 solution at 90°C, compared to two conventional geothermal well cements (Class G modified with SiO 2 and calcium aluminum phosphate (CaP)). The latter cement was originally formulated and developed at BNL as a CO 2 - resistant cement under the previous GTP project. Unlike Class G, CaP is classified as a chemically bonded cement; namely, chemical reactions are responsible for strengthening the cement at an earlier curing stage.

15 GEOTHERMAL ENERGY↗

Lessons Learned NSLS-II Storage Magnet Production

This document was compiled in response to the suggestion made by the DOE SC Review of the NSLS-II Project on April 2012, and reiterated at the Review in July, 2013. The main contributors to this document are the SR magnet team A and other in-house participants in the Workshop B referred to below that took place on April 11 th and 12 th 2012 at BNL. The contributions also came from some external participants, including representatives of some of the suppliers who attended the workshop. Manufacturing of the magnets for the NSLS-II storage ring (~850 units of 15 types) took approximately 6 years from the beginning of the conceptual design to completion of manufacturing in October of 2012. The production in the early years did not go smoothly, and a DOE Review Committee expressed concerns in November of 2010 about the potential of significant delays in magnet deliveries. In response, the project undertook three major mitigation steps: 1) enhanced oversight by assignment of one technical representative for each of the seven suppliers, 2) appointment of a senior BNL scientist as the manager of the SR magnet production, and 3) streamlining the decision-making process. These steps led to a successful completion of magnet production and delivery with almost all magnets meeting their stringent specifications (see Appendix 2).

36 MATERIALS SCIENCE↗

Cultural Resource Management Plan for Brookhaven National Laboratory

The Cultural Resource Management Plan (CRMP) for Brookhaven National Laboratory (BNL) provides an organized guide that describes or references the facets and interrelationships of cultural resources at BNL. This document follows, where applicable, the format of the U.S. Department of Energy (DOE) Environmental Guidelines for Development of Cultural Resource Management Plans, DOE G 450.1-3 (9- 22-04).

54 ENVIRONMENTAL SCIENCES↗

RIKEN/RBRC Scientific Review Committee Meeting (Vol. 132)

The RIKEN BNL Research Center (RBRC) was established in April 1997 at Brookhaven National Laboratory*. It is funded by RIKEN, "Rikagaku Kenkyusho", of Japan and the U. S. Department of Energy’s Office of Science. The Memorandum of Understanding between RIKEN and BNL, initiated in 1997, has been renewed in 2002, 2007, 2012 and 2018. The Center is dedicated to the study of strong interactions, including spin physics, lattice QCD, and RHIC physics through the nurturing of a new generation of young physicists. The RBRC has an active workshop program on strong interaction physics with each workshop focused on a specific physics problem. For most of these workshops, the talks are made available on the RBRC website. To date there are over 116 proceedings volumes available. In 2017 RBRC celebrated its 20th anniversary since its inauguration in 1997. This was also the year of the 100th anniversary of RIKEN. The RBRC is well matured and moves into the new generation with dismantling of the PHENIX detector and construction of the new sPHENIX detector at RHIC. We are on track with growth plans in place. On April 1st 2017, Hideto En’yo, Director of RIKEN Nishina Center for Accelerator-Based Science, was named Acting Director of the RBRC, preceded by Samuel Aronson, Nicholas Samios and Tsung-Dao Lee.

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

A Magnetized Electron Source For Ion Beam Cooling

A number of electron-ion collider facilities for nuclear physics research are under consid- eration in the United States. At Brookhaven National Lab (BNL), the eRHIC (electron Relativistic Heavy Ion Collider) facility would augment the existing ion/proton facility with an electron accelerator. Thomas Jefferson National Accelerator Facility (JLab) plans to use the existing CEBAF machine and add an ion/proton accelerator, as part of the Jefferson Lab Electron-Ion Collider (JLEIC). All such facilities require cooling of the ion beams in order to reach the luminosity goals. Different methods of cooling the ions using an electron beam are envisaged. BNL is pursuing coherent electron cooling and non-magnetized, bunched-beam cooling, while JLab is considering magnetized cooling. In addition to electron cooling, magnetized beams are of interest for other applica- tions, such as flat beam klystrons and novel means for producing bright beams for micro- undulators and compact X-ray sources. For example, flat beams generated from a mag- netized injector, in conjunction with low emittance, enable RF sources with frequencies above 100 GHz. While the market for high-performance injectors for electron cooling is limited, the market for high-frequency RF sources and compact X-ray systems is con- siderable. Thus, the design methodologies developed in this project have a wide range of applicability. In Phase I of this SBIR project, Xelera Research LLC performed simulations and calcu- lations to develop a prototype design for a magnetized electron injector that can be used as a source for cooling an ion beam. We developed general design methodologies and tech- niques that are applicable not only to specific machine designs but to other applications requiring magnetized injectors as well. In this Phase II SBIR project, Xelera Research LLC, in collaboration with a team at JLab, designed, built, and tested a thermionic elec- tron source for driving a magnetized electron cooler in a future electron-ion collider project. This device was delivered to JLab in July 2019 and achieved first beam in December 2019.

43 PARTICLE ACCELERATORS↗

Evaluations of Advanced Thermal Shock-Resistant Cement (TSRC) Suitable to Withstand Frequent Thermal Cycling (Six-month Report)

This report documents additional evaluations of Thermal Shock-Resistant Cement (TSRC) developed by Brookhaven National Laboratory (BNL). Our work focused on thermal expansion, and fluid flow through the TSRC, and the application of thermal shock to a steel/TSRC sheathed sample. The key contributions of this work to the geothermal community are: 1) Development of a test system to make measurements of material properties at elevated temperature and pressure. 2) Measurements of thermal expansion and permeability of TSRC at elevated temperature and pressure conditions relevant to in situ geothermal conditions. 3) Development of a test system to thermally shock a steel/TSRC sheathed sample at elevated temperature and pressure conditions relevant to in situ geothermal conditions. Herein we report the results of the study of repeated testing upon 3 cylindrical samples supplied by BNL, one steel, one TSRC, and one steel/TSRC sheathed sample.

36 MATERIALS SCIENCE↗

Natural Resource Management Plan for Brookhaven National Laboratory

The purpose of the Natural Resource Management Plan (NRMP) is to provide management guidance, promote stewardship of the natural resources found at BNL, and to sustainably integrate their protection with pursuit of the Laboratory’s mission. The philosophy or guiding principles of the NRMP include stewardship, sustainability, adaptive ecosystem management, compliance, integration with other plans and requirements, and the incorporation of community involvement, where applicable. The NRMP is reviewed and updated every five years. The body of this plan establishes the management goals and actions necessary for managing the natural resources at BNL in a sustainable manner. The appendices provide specific management requirements for threatened and endangered species documented on site (Appendices A, B and C).

54 ENVIRONMENTAL SCIENCES↗

Advanced Solar and Load Forecasting Incorporating HD Sky Imaging (Phase III)

Due to rapidly changing sky conditions, the available solar irradiance for energy generation is subject to wide swings in amplitude. As the market penetration of solar energy continues to increase rapidly, these variations in solar power generation are beginning to have an impact on grid stability and increased wear on power switches. Solar power forecasting plays a critical role in operations for Independent System Operators (ISOs) and utilities. Accurate forecasts help maintain grid reliability, optimize generation from renewables, and reduce operating costs. Of particular interest to the ISOs and utilities are sudden changes in solar irradiance, termed “ramp events,” due to the movement of clouds. One significant impact of ramp events on the grid is additional ancillary service requirements necessary to manage such variability. Ramp events can also cause voltage fluctuations in the distribution grids and trigger actions of automated line equipment (e.g., tap changers), leading to additional maintenance costs. In high penetration solar regions, forecasts must be made for both transmission-connected and distribution-connected resources – either behind the meter or in front of it. Particularly for distributed solar energy resources, forecasting can be a challenge due to the lack of visibility of the energy resource. Brookhaven National Laboratory (BNL) has been working towards nowcasting Global Horizontal Irradiance (GHI) using low-cost technologies for several years now. The Solar NowCasting technology being developed by BNL is a 0 – 30 min solar “nowcasting” technology applicable to a scale covering both large generating facilities and residential, distributed solar installations that relies on a network of ground-based high-definition (HD) cameras and surface pyranometers. GHI forecasts are being produced for both regions using 8 ground-based HD cameras and at least 2 surface pyranometers. When stitched together, the camera images can be used to forecast the impact of clouds on available solar irradiance over a domain of ~50 km 2 . Phase I of the project was the engineering scale up conceptual design stage. Phase II was the initial field test and demonstration, in which the technology was scaled up by a factor of 20 times and successfully demonstrated in eastern Long Island. In Phase III, an additional forecasting network was added in upstate NY and both networks are currently being operated until at least a full year of data is gathered by the Albany network to allow for the collection of sufficient data to evaluate performance against the persistence and smart persistence models using the Solar Arbiter.

14 SOLAR ENERGY↗