Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Accelerator Design, Technology, Operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 577 records · Page 32

A Laser Technology Test Facility for Laser Inertial Fusion Energy (LIFE)

A LIFE laser driver needs to be designed and operated which meets the rigorous requirements of the NIF laser system while operating at high average power, and operate for a lifetime of >30 years. Ignition on NIF will serve to demonstrate laser driver functionality, operation of the Mercury laser system at LLNL demonstrates the ability of a diode-pumped solid-state laser to run at high average power, but the operational lifetime >30 yrs remains to be proven. A Laser Technology test Facility (LTF) has been designed to specifically address this issue. The LTF is a 100-Hz diode-pumped solid-state laser system intended for accelerated testing of the diodes, gain media, optics, frequency converters and final optics, providing system statistics for billion shot class tests. These statistics will be utilized for material and technology development as well as economic and reliability models for LIFE laser drivers.

42 ENGINEERING↗

Achievements and Lessons from Tevatron

For almost a quarter of a century, the Tevatron proton-antiproton collider was the centerpiece of the world's high energy physics program - beginning operation in December of 1985 until it was overtaken by LHC in 2011. The aim of the this unique scientific instrument was to explore the elementary particle physics reactions with center of mass collision energies of up to 1.96 TeV. The initial design luminosity of the Tevatron was 10{sup 30} cm{sup -2}s{sup -1}, however as a result of two decades of upgrades, the accelerator has been able to deliver 430 times higher luminosities to each of two high luminosity experiments, CDF and D0. Tevatron will be shut off September 30, 2011. The collider was arguably one of the most complex research instruments ever to reach the operation stage and is widely recognized for many technological breakthroughs and numerous physics discoveries. Below we briefly present the history of the Tevatron, major advances in accelerator physics, and technology implemented during the long quest for better and better performance. We also discuss some lessons learned from our experience.

43 PARTICLE ACCELERATORS↗

Low Power, Radiation Resilient Synchronous Edge Processing for Remote Monitoring

Next-generation space remote sensing systems may be equipped with imaging arrays that sense data at a rate that outstrips the processing capability of any computing hardware that can operate within a satellite’s power budget. This project developed novel convolutional and recurrent neural networks to detect and estimate point-like events amid clutter, and investigated their efficient and accurate implementation on analog in-memory computing systems that are 10-1000× more energy-efficient than digital processors. This project leveraged two memory devices at different levels of technological maturity: a large-scale analog computing prototype using commercial SONOS charge-trap memory, and electrochemical memory (ECRAM) with intrinsic radiation hardness. We experimentally demonstrated end-to-end analog processing of our neural networks on SONOS and characterized the radiation response of both SONOS and ECRAM. We advanced the state-of-the-art in ECRAM precision and reliability, and developed co-design methods to enable accurate long-term operation of SONOS analog accelerators in space radiation environments.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

The High Luminosity LHC interaction region magnets towards series production

The High Luminosity Large Hadron Collider (HL-LHC) is the new flagship project of CERN. First endorsed in 2013 and approved in 2016, HL-LHC is an upgrade of the accelerator aiming to increase by a factor of ten the statistics of the LHC collisions at the horizon of 2035-2040. HL-LHC relies on cutting edge technologies: among them, large aperture superconducting magnets will replace the present hardware to allow a smaller beam size in two interaction points (IPs). The project involves the construction of about 150 magnets of six different types: the quadrupole triplet, two main dipoles and three orbit correctors. The triplet, manufactured at CERN and in the USA, will consist of 30 magnets based on Nb3Sn technology, with an operational peak field of 11.4 T. These will be the first quadrupole Nb3Sn magnets installed in a particle accelerator. The other five types of magnets, all relying on Nb-Ti technology, present non-trivial challenges in the design and construction; they will be manufactured as part of in-kind contribution under the responsibility of institutes in Japan, China, Spain, and Italy. The project is now in the phase of transition between qualification through short models and prototypes and the beginning of the series construction. In this paper we review the magnet requirements, the reasons for selecting the design, the technological challenges with respect to previous projects, and we summarize the steps that have been taken to validate the baseline.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Prototyping the Light Detection of the DUNE Near Detector

The Deep Underground Neutrino Experiment (DUNE) is a long-baseline neutrino oscillation experiment with a 70kt liquid argon time projection chamber (LAr TPC) at the Far Detector complex at the Sanford Underground Research Facility (SURF) and a Near Detector (ND) complex planned for the Fermi National Accelerator Laboratory. The ND complex plans for three detector subsystems, including a modular LAr TPC comprised of 35 optically segregated modules. The modular detector design required the development a novel dielectric light readout, the ArCLight technology, which can be operated in a high voltage environment and has a large active surface. A demonstrator of four modular detectors, DUNE ND-LAr 2x2, will operate in 2023 in Fermilab's NuMI beam. After the construction of the modules was completed, they were successfully operated and commissioned in liquid argon using cosmic-ray muons at the University of Bern. This talk will discuss the designs of the light readout systems used in these modules with focus on the construction and commissioning of the ArCLights as well as the performance of the LRS during the tests at Bern.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Marrying Quality Assurance with Design Engineering - A Winning Partnership! But, a Cultural Divide

Investors would like to be confident that a PV plant will work as promised before investing large sums of money. Data showing that PV modules can withstand thousands of hours of accelerated testing are a comfort, but are not sufficient to characterize the economic useful life (EUL) of the whole PV system. An inability to be confident of every aspect of the system can motivate less favorable contract terms. In the end, a winning partnership is obtained when a carefully engineered, durable design is married with a robust quality management system and the marriage is extended across all parts of the value chain. However, this marriage is challenging because of the conventional cultural divide between design engineers and quality management specialists. International standards are being developed to facilitate this partnership and include technology-specific requirements in the quality management systems used for component manufacture and system design, construction and operation.

14 SOLAR ENERGY↗

Initial Radiation of Nuclear Power Plant Components (CRADA NFE-17-06892 Final Report)

As advanced reactor concepts are developed, instrumentation and control (I&C) cables and sensors will play a significant role in assuring their operation is well understood, and safety-related process information can be collected reliably over the course of their design life. As a first step to develop acceptance criteria and define the limits of currently available nuclear I&C cable and sensor technology, a collaboration between Oak Ridge National Laboratory and Analysis and Measurement Services (AMS) Corporation was initiated under the Gateway for Accelerated Innovation in Nuclear (GAIN) Program. This collaborative effort focused on providing technical information related to the combined thermal and radiation aging of nuclear power plant (NPP) cables, companion NPP cable insulation samples, and two prototype temperature and two pressure sensors. This work was carried out using the instrumented gamma irradiation system that is part of the High Flux Isotope Reactor Gamma Irradiation Facility (HFIR GIF). This system provided the opportunity for the condition of the prototype sensors to be tracked during the irradiation in order to determine their functional limits with greater granularity when compared to a simple irradiation insertion at the HFIRGIF. Experimental assemblies for sensor irradiation were successfully completed, and sensor irradiation to accumulated dose of 3000 kGy at a rate of approximately 6 kGy/hr was carried out. Two prototype temperature assemblies were continuously monitored during exposure to 3000 kGy and found to have no observable degradation from the irradiation. Two pressure sensors were first irradiated to 1000 kGy. At which point, one of the sensors was found to operate normally; however, a second sensor failed the operability test. The operable pressure sensor output was then continuously monitored from 1000 kGy to 3000 kGy. The sensor output exhibited steady trendable drift versus the accumulated radiation dose. At the conclusion of the irradiation, the four test sensors were released for laboratory calibration checks. The calibration check of the temperature sensors found no significant change after irradiation compared to baseline measurements before irradiation; however, both pressure sensors failed the post-test calibration checks and both sensors were not functioning properly. These results will help inform sensor manufacturers and I&C design engineers of potential limitations of these types of sensors for use in high radiation environments associated with the compact configuration of new Small Modular Reactors (SMRs) such as NuScale’s reactor power module. Irradiations on NPP cables and companion samples were not completed due to programmatic delays, however a path forward that was based on lessons learned from this project was defined to accommodate future, comparable instrumented gamma irradiations at the HFIR GIF.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Mechanical design and fabrication of the VHF-gun, the Berkeley normal-conducting continuous-wave high-brightness electron source

A high repetition rate, MHz-class, high-brightness electron source is a key element in future high-repetition-rate x-ray free electron laser-based light sources. The VHF-gun, a novel low frequency radio-frequency gun, is the Lawrence Berkeley National Laboratory (LBNL) response to that need. The gun design is based on a normal conducting, single cell cavity resonating at 186 MHz in the VHF band and capable of continuous wave operation while still delivering the high accelerating fields at the cathode required for the high brightness performance. The VHF-gun was fabricated and successfully commissioned in the framework of the Advanced Photo-injector EXperiment, an injector built at LBNL to demonstrate the capability of the gun to deliver the required beam quality. In conclusion, the basis for the selection of the VHF-gun technology, novel design features, and fabrication techniques are described.

47 OTHER INSTRUMENTATION↗

The Science DMZ: A Network Design Pattern for Data-Intensive Science

The ever-increasing scale of scientific data has become a significant challenge for researchers that rely on networks to interact with remote computing systems and transfer results to collaborators worldwide. Despite the availability of high-capacity connections, scientists struggle with inadequate cyberinfrastructure that cripples data transfer performance, and impedes scientific progress. The Science DMZ paradigm comprises a proven set of network design patterns that collectively address these problems for scientists. We explain the Science DMZ model, including network architecture, system configuration, cybersecurity, and performance tools, that creates an optimized network environment for science. We describe use cases from universities, supercomputing centers and research laboratories, highlighting the effectiveness of the Science DMZ model in diverse operational settings. In all, the Science DMZ model is a solid platform that supports any science workflow, and flexibly accommodates emerging network technologies. As a result, the Science DMZ vastly improves collaboration, accelerating scientific discovery.

42 ENGINEERING↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center (GRC) is supporting the development of high-efficiency power convertors for use in Radioisotope Power Systems (RPS). Significant progress was made towards such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was cancelled in 2013 by the Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton designs. The technology development contracts each consist of up to three phases: Design, Fabricate, and Test. As of May 2018, all contracts have completed the Design Phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the Phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, NASA GRC is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects which have similarities and relevance to current contract designs. Four of which are flexure-bearing based, and another six are gas-bearing based. One of the flexure-bearing convertors has accumulated over 110,000 hours of operation, and holds the current record for maintenance-free heat-engine run-time. Another flexure-bearing convertor was recently manually shutdown after 105,620 hours of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of runtime on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Amongst the gas-bearing convertors, the longest running unit has accumulated over 70,000 hours of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously, for which the longest runtime has reached 28,000 hours.

Oriti, Salvatore M.↗

Low-Energy Solvents For Carbon Dioxide Capture Enabled By A Combination Of Enzymes And Vacuum Regeneration

An integrated bench-scale system combining the attributes of the bio-renewable enzyme carbonic anhydrase (CA) with low-enthalpy CO 2 absorption solvents and vacuum regeneration was designed, built and operated for 500 hours using simulated flue gas. The objective was to develop a CO 2 capture process with improved efficiency and sustainability when compared to NETL Case 10 monoethanolamine (MEA) scrubbing technology. The use of CA accelerates inter-conversion between dissolved CO 2 and bicarbonate ion to enhance CO 2 absorption, and the use of low enthalpy CO 2 absorption solvents makes it possible to regenerate the solvent at lower temperatures relative to the reference MEA-based solvent. The vacuum regeneration-based integrated bench-scale system operated successfully for an accumulated 500 hours using aqueous 23.5 wt% K 2 CO 3 -based solvent containing 2.5 g/L enzyme to deliver an average 84% CO 2 capture when operated with a 20% enzyme replenishment rate per ~7 hour steady-state run period. The total inlet gas flow was 30 standard liters per minute with 15% CO 2 and 85% N 2 . The absorber temperature was 40°C and the stripper operated under 35 kPa pressure with an approximate 77°C stripper bottom temperature. Tests with a 30°C absorber temperature delivered >90% capture. On- and off-line operational measurements provided a full process data set, with recirculating enzyme, that allowed for enzyme replenishment and absorption/desorption kinetic parameter calculations. Dissolved enzyme replenishment and conventional process controls were demonstrated as straightforward approaches to maintain system performance. Preliminary evaluation of a novel flow-through ultrasonically enhanced regeneration system was also conducted, yet resulted in CO2 release within the range of temperature-dependent release, and further work would be needed to validate the benefits of ultrasonic enhanced stripping. A full technology assessment was completed in which four techno-economic cases for enzyme-enhanced aqueous K 2 CO 3 solvent with vacuum stripping were considered and a corresponding set of sensitivity studies were developed. The cases were evaluated using bench-scale and laboratory-based observations, AspenPlus® process simulation and modeling, AspenTech’s CCE® Parametric Software, current vendor quotations, and project partners’ know-how of unit operations. Overall, the DOE target of 90% CO 2 capture could be met using the benign enzyme-enhanced aqueous K 2 CO 3 -based alternative to NETL Case 10. The model-predicted plant COE performance, scaled to 550 MWe net output, was 9% higher than NETL Case 10 for an enzyme-activated case with minimized technical risk and highest confidence in physical system performance utilizing commercially available equipment. A COE improvement of 2.8% versus NETL Case 10 was predicted when favorable features of improved enzyme longevity and additional power output from a very low pressure (VLP) turbine were combined, wherein corresponding high capital and operational costs limited the level of COE benefit. The environmental, health and safety (EH&S) profile of the system was found to be favorable and was compliant with the Federal EH&S legislation reviewed. Further work on a larger scale test unit is recommended to reduce the level of uncertainty inherent in extrapolating findings from a bench-scale unit to a full scale PCC plant, and to further investigate several identified opportunities for improvement. Production feasibility and suitability of carbonic anhydrases for scale-up testing was confirmed both through the current project and through parallel efforts.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Dynamic Power Convertor Development for Radioisotope Power Systems at NASA Glenn Research Center

The Thermal Energy Conversion Branch at NASA Glenn Research Center is supporting the development of high-efficiency power convertors for use in radioisotope power systems (RPS). Significant progress was made toward such a system that utilized Stirling conversion during the 2001 to 2015 timeframe. Flight development of the Advanced Stirling Radioisotope Generator (ASRG) was canceled in 2013 by the U.S. Department of Energy (DOE) and NASA Headquarters primarily due to budget constraints, and the Advanced Stirling Convertor (ASC) technology contract was subsequently concluded in 2015. A new chapter of technology development has recently been initiated by the NASA RPS Program. This effort is considering all dynamic power convertor options, such as Stirling and Brayton cycles. Four convertor development contracts supporting this effort were awarded in 2017. The awarded contracts include two free-piston Stirling, one thermoacoustic Stirling, and one turbo-Brayton design. The technology development contracts each consist of up to three phases: design, fabrication, and test. As of May 2018, all contracts have completed the design phase, and each underwent a design review with an independent review board. Three of the contracts are planned to execute the phase 2 option for fabrication. Convertors manifesting from these development efforts will then undergo independent validation and verification (IV and V) at NASA facilities, which will consist of convertor performance and RPS viability demonstrations. Example tests include launch vibration simulation, performance mapping over the environmental temperature range, and static acceleration exposure. In parallel with this renewed development effort, Glenn is still demonstrating free-piston Stirling convertor technology using assets from previous projects. The Stirling Research Laboratory (SRL) is still operating several convertors from previous development projects, which have similarities and relevance to current contract designs. Four of these are flexure-bearing based and another six are gas bearing based. One of the flexure-bearing convertors has accumulated over 110,000 h of operation and holds the current record for maintenance-free heat-engine run time. Another flexure-bearing convertor was recently manually shut down after 105,620 h of operation, then disassembled and inspected. This inspection produced a wealth of information about the effects of this amount of run time on the technology's components. One of the engineering unit flexure-bearing convertors recently underwent a launch simulation vibration test, a static acceleration exposure up to 20 g, and was then placed on extended operation. Among the gas-bearing convertors, the longest running unit has accumulated over 70,000 h of operation. Four high-fidelity gas-bearing convertors from the ASRG project are still operating continuously for which the longest run time has reached 28,000 h.

Oriti, Salvatore M.↗

Pushing the Gradient Limitations of Superconducting Photonic Band Gap Structure Cells

Superconducting photonic band gap resonators present us with unique means to place higher order mode couples in an accelerating cavity and efficiently extract HOMs. An SRF PBG resonator with round rods was successfully tested at LANL demonstrating operation at 15 MV/m. Gradient in the SRF PBG resonator was limited by magnetic quench. To increase the quench threshold in PBG resonators one must design the new geometry with lower surface magnetic fields and preserve the resonator's effectiveness for HOM suppression. The main objective of this research is to push the limits for the high-gradient operation of SRF PBG cavities. A NCRF PBG cavity technology is established. The proof-of-principle operation of SRF PBG cavities is demonstrated. SRF PBG resonators are effective for outcoupling HOMs. PBG technology can significantly reduce the size of SRF accelerators and increase brightness for future FELs.

43 PARTICLE ACCELERATORS↗

Decision Point 2 of Statement of Project Objectives (SOPO) “Recovery Act: Development of ITM Oxygen Technology for Integration with Advanced Industrial Systems”

Air Products is carrying out a scope of work under Phase 5 of the ITM Oxygen Cooperative Agreement to design, build, and operate a ceramic membrane fabrication facility (the “CerFab”) to enable production of membrane modules to supply a conceptual 2000 ton per day (TPD) ITM Oxygen facility (the “ITM Oxygen Development Facility”), and to perform supporting development tasks in materials development an engineering development toward industrial, carbon capture and sequestration applications. Air Products is executing this project under the American Recovery and Reinvestment Act (ARRA) with the objective to accelerate the adoption of ITM Oxygen technology to help meet the country’s goals for deploying clean power plants. The objective of this Topical Report is to address the requirements of Decision Point 2, which pertains to progress in Materials Development, Engineering Development, and construction of the CerFab, with an emphasis on establishing the environmental permitting required prior to the next Decision Point. In the area of Materials Development, Air Products has specified a high pressure dilatometer system which will enable measurements of material expansion of ITM ceramic compounds at very high oxygen partial pressures consistent with CCS applications. Also in this area, Ceramatec has made significant progress in developing Advanced Architecture wafers and modules by advancing in parallel with two production methods of the Advanced Architecture components and determining the appropriate equipment required to make these components at high volume in the CerFab. Work in this area continues to refine the CerFab requirements. Under Engineering Development, Air Products has developed various concepts around use of ITM in industrial applications to reduce carbon footprint though process integrations that result in less fuel requirement. Air Products also developed notions around hybrid cryogenic air separation plants with ITM Oxygen plants for scale-up test applications. Toward the CerFab, Air Products and Ceramatec have refined the manufacturing process for ceramic membrane modules and developed an equipment layout in the Tooele, Utah, facility that was leased earlier this year. Based on the refined specification, Air Products determined material flows in the CerFab facility, including emissions calculations that form the basis for seeking the various environmental permits required by the project. The permits and permitting schedule is described. Finally, the Project and Staffing statuses are summarized. Based on the considerable progress at this juncture in the program, Air Products recommends proceeding to develop detailed equipment specifications for the CerFab and to continue the development work in the other tasks, such that a complete and comprehensive assessment of project prior to construction of the CerFab can be made at the next Decision Point.

Armstrong, Phillip↗

Development of an L-Band Ferroelectric Phase Shifter

Effective operation of the RF cavities in the superconducting accelerators demands fast, high-power RF vector modulators. Recent progress in development of the new materials, ferroelectrics, having tunable dielectric constant and acceptable l osses [*] gives the possibility development of such devises. In previous papers [**-***] the authors described different L-band ferroelectric phase shifter designs . At low RF level high operation speed of 2 degree/nsec was demonstrated in waveguide phase shifter. However, the experiments show that a special technology is to be developed that provides a good electric contact between ceramics and the metallic wall. In present paper a new design of the fast highpower ferroelectric phase shifter is described based on the simple ferroelectric elements.

43 PARTICLE ACCELERATORS↗

New Pathways for Hydropower: Getting Hydropower Built--What Does it Take?

This report is the result of a collaboration of experts with diverse perspectives and a wealth of experience in designing, developing, owning, and operating small hydropower facilities. These experts met in Golden, Colorado, in December 2013 to put forth innovative ideas about accelerating the development of small hydropower projects. Innovations put forth by these experts can yield more than just technology advancements. Innovation is possible in all phases of project development, from concept to commissioning to operations and maintenance. These innovative ideas were refined and organized in subsequent collaborations among these experts to produce this final version of the report.

13 HYDRO ENERGY↗

Launch Alaska Transportation and Energy Accelerator (LATEA)

The Launch Alaska Transportation and Energy Accelerator (LATEA), funded through the U.S. Department of Energy Office of Technology Commercialization’s Energy Program for Innovation Clusters (EPIC),advanced deployment of innovative and efficient transportation and energy technology in Alaska from October 2021 through June 2025. The project was designed to leverage Launch Alaska’s accelerator model to identify, recruit, and support transportation technology companies with novel solutions to market needs while building the stakeholder networks, demonstration opportunities, and institutional capacity necessary to accelerate commercialization in one of the most challenging operating environments in the United States.

08 HYDROGEN↗

Extending Ion Engine Technology to NEXT and Beyond

Extending ion engine technology beyond the current state-of-the art primary interplanetary electric propulsion system, the 2.3-kW NASA Solar Electric Propulsion Technology and Applications Readiness (NSTAR) system, will require thrusters with improved propellant throughput and total impulse capability. Many of the design choices that culminated in the NSTAR thrusters must be revisited, and their application to next generation ion engine technology must be evaluated. The concept of derating, which was successfully employed in NSTAR, has been applied to the 40 cm NASA Evolutionary Xenon Thruster (NEXT) currently under development at NASA Glenn Research Center (GRC). At 5-kW, NEXT operates with the same average beam current density as NSTAR, and at 10-kW, the peak beam current density is only ten percent greater than NSTAR. The result is that similar Ion optics technology is expected to yield comparable lifetime. Thick-accelerator- grid ion optics are also being tested to realize additional lifetime benefits. A 40-A discharge cathode is being developed for NEXT based on scaling the NSTAR design. Nevertheless, the experiences of the NSTAR ground tests and the thruster on the Deep Space One spacecraft indicate that the discharge cathode wear must be studied experimentally and theoretically to ensure that it meets the lifetime requirements. Although NEXT is in its infancy, investigations have already begun to examine possible modifications to engine design for even higher-power and higher-specific impulse engines. Ion optics using alternate materials such as titanium, graphite, or carbon-carbon composite are currently being investigated due to their low sputter yields at high voltage. To avoid the difficulties encountered using electrodes at high-currents, the use of a microwave-based ion thruster is under investigation for potential high-power ion thruster systems requiring long lifetimes. Additionally, alternative propellants are being considered for applications requiring high-specific impulse (>> 5000 s) and extremely long-life (>> 15,000 hr). Testing requirements make condensable propellants attractive for high-power engines. Although the NSTAR ion engine demonstrated the flight maturity of ion thruster technology, many challenges remain for the development of thrusters with improved propellant throughput and power handling capabilities.

Domonkos, Matthew T.↗