Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Biochemical upgrading of high-protein biomass and grain products

The present invention relates to methods of upgrading biomass to provide useful chemical intermediates, fuels, amino acids, nutrients, etc. In particular examples, the biomass is a by-product of ethanol production and is mainly used as high-protein feed. Described herein are methods for upgrading such biomass, such as by implementing pre-treatment conditions and by employing fermentation conditions including modified organisms.

Davis, Ryan Wesley↗

Progress on the Proton Power Upgrade Project at the Spallation Neutron Source

The Proton Power Upgrade Project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion of the project, 2 MW of beam power will be available for neutron production at the existing first target station with the remaining beam power available for the future second target station. The project will install seven superconducting RF cryomodules and supporting RF power systems and ancillaries to increase the beam energy to 1.3 GeV . The injection and extraction region of the accumulator ring will be upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. Equipment is being received from vendors and partner laboratories, and installation is underway with three major installation outages planned in 2022-2024. The project is planned to be completed in 2025.

Barbier, Charlotte↗

IRIS-HEP Strategic Plan for the Next Phase of Software Upgrades for HL-LHC Physics

The quest to understand the fundamental building blocks of nature and their interactions is one of the oldest and most ambitious of human scientific endeavors. CERN's Large Hadron Collider (LHC) represents a huge step forward in this quest. The discovery of the Higgs boson, the observation of exceedingly rare decays of $B$ mesons, and stringent constraints on many viable theories of physics beyond the Standard Model (SM) demonstrate the great scientific value of the LHC physics program. The next phase of this global scientific project will be the High-Luminosity LHC (HL-LHC) which will collect data starting circa 2029 and continue through the 2030s. The primary science goal is to search for physics beyond the SM and, should it be discovered, to study its implications. In the HL-LHC era, the ATLAS and CMS experiments will record around 100 times as many collisions as were used to discover the Higgs boson (and at twice the energy). Both NSF and DOE are making large detector upgrade investments so the HL-LHC can operate in this high-rate environment. Similar investment in software R&D for acquiring, managing, processing and analyzing HL-LHC data is critical to maximize the return-on-investment in the upgraded accelerator and detectors. This report presents a strategic plan for a possible second 5-year funded phase (2023 through 2028) for the Institute for Research and Innovation in Software for High Energy Physics (IRIS-HEP) which will close remaining software and computing gaps to deliver HL-LHC science.

43 PARTICLE ACCELERATORS↗

12 GeV Upgrade and the study of 3D imaging of nucleon

The 12 GeV upgrade of Continuous Electron Beam Accelerator Facility (CEBAF) at Jefferson Lab will enable a new experimental program with substantial discovery potential in hadronic and nuclear physics. One of the flagship science programs is the study of multidimensional images of hadrons. A broad experimental program has been developed to map the nucleon's intrinsic correlated spin and momentum distribution through measurement of deeply exclusive and semi- inclusive processes. These multidimensional distributions open a new window on the elusive spin content of the nucleon through observables that are directly related to the orbital angular momentum of quarks and gluons. An overview of the 12 GeV upgrade with focus on the study of the multidimensional imaging of hadrons with the CLAS12 detector will be presented.

Elouadrhiri, Latifa↗

Conversion of Wet Waste to Sustainable Aviation Fuel and Chemical Intermediates via Catalytic Upgrading

Wet waste is a low-cost, abundant feedstock capable of displacing significant amounts of domestic petrofuel and petrochemical consumption. We present a sequential biochemical-thermochemical pathway to upgrade wet waste into hydrocarbon sustainable aviation fuel blendstock and chemical intermediates with near-zero or net-negative life-cycle CO2 emissions. Waste is initially upgraded to carboxylic acids via arrested anaerobic digestion, then catalytically converted to hydrocarbons via sequential heterogeneous catalytic ketonization, cyclization, and hydrodeoxygenation. We will discuss kinetics, durability, and reactor design of key catalytic processes, as well as applicability of final products to targeted applications.

BIOMASS FUELS,INORGANIC, ORGANIC, PHYSICAL, AND AN↗

DESIGNING THE SPREADERS AND SPLITTERS FOR THE FFA@CEBAF ENERGY UPGRADE

The FFA@CEBAF energy upgrade study aims to approximately double the final energy of the electron beam at the Continuous Electron Beam Accelerator Facility (CEBAF). It will do this by replacing the highest-energy recirculating arcs with fixed-field alternating gradient (FFA) arcs, allowing for several more passes to circulate through the machine. This upgrade necessitates the re-design of the vertical spreader sections, which separates each pass into different recirculation arcs. Additionally, the FFA arcs will need horizontal splitter lines to correct for time of flight and R56. This work will present the current state of the spreader re-design and splitter design.

Benesch, J.↗

Radiation Tolerant Electronics and Digital Processing for the Phase-1 Read-out Upgrade of the ATLAS Liquid Argon Calorimeters

The ATLAS Liquid Argon calorimeters are designed and built to study proton-proton collisions produced at the LHC at centre-of-mass energies up to 14 TeV. Liquid argon (LAr) sampling calorimeters are employed for all electromagnetic calorimetry in the pseudorapidity region |η|<3.2, and for hadronic calorimetry in the region from |η|=1.5 to |η|=4.9. Although the nominal LHC experimental programme is still in progress, an upgrade of the read-out electronics is being launched to cope with luminosities of up to 3x10{sup 34} cm{sup -2}s{sup -1}, which are beyond the original design by a factor of 3. An improved spatial granularity of the trigger primitives is therefore proposed in order to improve the identification performance for trigger signatures, like electrons, photons, tau leptons, jets, total and missing energy, at high background rejection rates. For the upgrade Phase-1 in 2018, new LAr Trigger Digitizer Boards (LTDB) are being designed to receive higher granularity signals, digitize them on detector and send them via fast optical links to a new LAr digital processing system (LDPS). The LDPS applies a digital filtering and identifies significant energy depositions in each trigger channel. The refined trigger primitives are then transmitted to the first level trigger system to extract improved trigger signatures. The read-out of the trigger signals will process 34000 so-called Super Cells at every LHC bunch-crossing at a frequency of 40 MHz. The new LTDB on-detector electronics is designed to be radiation tolerant in order to be operated for the remaining live-time of the ATLAS detector up to a total luminosity of 3000 fb{sup -1}. For the analog-to-digital conversion (12-bit ADC at 40 MSPS), the data serialization and the fast optical link (5.44 Gb/s) custom components have been developed. They have been qualified for the expected radiation environment of a total ionization dose of 1.3 kGy and a hadron fluence of 6 x 10{sup 13} h/cm{sup 2} with energies above 20 MeV. For the digital components like the ADC, cross-sections for single event effects have been determined. This talk will present R and D results from tests of the radiation tolerant components, the fast data processing electronics and prototypes of the LTDB and LDPS boards. First experience from a Demonstrator setup will be reported, in which about 1/10 of the full Super Cell readout will be equipped with prototype versions of the LTDB and LDPS boards. The Demonstrator will be operated in parallel to the regular ATLAS trigger read-out during the upcoming LHC run. (authors)

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Upgrading the JET Remote Handling System - 18356

The Joint European Torus (JET) has employed advanced remote-maintenance techniques for over three decades to avoid exposing humans to a potentially hazardous environment and to develop techniques for future power-generating fusion reactors where environments will be too hazardous for any manned maintenance. As a unique application of robotics, virtual reality and operations management systems, JET's remote handling unit, now a part of RACE, has driven the state-of-the-art with each upgrade programme in its history. This conference paper presents the current capabilities of the JET remote handling system, and the future capabilities being delivered by its latest upgrade programme, which makes use of cutting edge advances. RACE (Remote Applications in Challenging Environments) aims to shape the technologies being developed for JET in such a way that they will have wider applications, such as in nuclear decommissioning. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of functional requirements specification for digital instrumentation and control systems upgrades used at nuclear power plants (NPPs) - 396

Recent market conditions have driven the nuclear industry to become more innovative at reducing cost in order to remain competitive. Instrumentation and Control (I and C) systems used by many NPPs are based on outdated 1960's and 70's technology. Many of the components used in these digital systems are no longer supported by Original Equipment Manufacturers (OEMs) and are rapidly becoming obsolete. Coping with the high cost of replacing I and C equipment due to obsolescence adds to this economic challenge. While other industries have migrated from analog to modern digital I and C technology, implementation of digital I and C controls within the nuclear industry has been very slow. This is primarily due to the high capital cost related to implementation of digital I and C upgrades, which is compounded by regulatory uncertainties that present significant licensing risks. The Nuclear Regulatory Commission (NRC), Nuclear Energy Institute (NEI) and the industry's Digital I and C Working Group are working to address many of the regulatory barriers that adversely impacts implementation of digital upgrades at NPPs. The NRC has developed an 'Integrated Action Plan to Modernize Digital Instrumentation and Controls Regulatory Infrastructure' (ML16097A182), Reference 1. Once fully implemented, this plan is expected to help reduce regulatory uncertainties that affects project cost. Excluding regulatory uncertainty, most OEM's will concur that one of the most important factors in reducing project cost is assuring that all requirements are well defined and complete prior to starting the project. A detailed and high quality Functional Requirements Specification (FRS) is critical in documenting these requirements. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Performance Analysis of Phase 2 Tracker Upgrade PS Module Before and After Irradiation

The Large Hadron Collider will undergo a luminosity upgrade targeting a peak instantaneous luminosity ranging from 5 up to 7.5$\times10^{34}$\,cm$^{-2}$s$^{-1}$. The ambitious goal of the High Luminosity LHC is to achieve a total of 3000--4000\,fb$^{-1}$ of proton-proton collisions at a center-of-mass energy of 14\,TeV. To cope with such challenging environmental conditions, the outer tracker of the CMS experiment will be upgraded using closely spaced silicon sensors (pixels and strips) to provide tracking information at the Level-1 trigger. A PS-Module, composed of both a pixel and a strip sensor, was tested at the Fermilab Test-Beam Facility to evaluate its ability to provide accurate tracking information, particle momentum discrimination capabilities and optimal performance at the irradiation levels expected after being exposed to the harsh conditions of the High Luminosity LHC. The results of the test and the comparison of the module performance before and after irradiation will be presented in this poster.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Performance Analysis of Phase 2 Tracker Upgrade PS Module Before and After Irradiation

The Large Hadron Collider will undergo a luminosity upgrade targeting a peak instantaneous luminosity ranging from 5 up to 7.5$\times10^{34}$\,cm$^{-2}$s$^{-1}$. The ambitious goal of the High Luminosity LHC is to achieve a total of 3000--4000\,fb$^{-1}$ of proton-proton collisions at a center-of-mass energy of 14\,TeV. To cope with such challenging environmental conditions, the outer tracker of the CMS experiment will be upgraded using closely spaced silicon sensors (pixels and strips) to provide tracking information at the Level-1 trigger. A PS-Module, composed of both a pixel and a strip sensor, was tested at the Fermilab Test-Beam Facility to evaluate its ability to provide accurate tracking information, particle momentum discrimination capabilities and optimal performance at the irradiation levels expected after being exposed to the harsh conditions of the High Luminosity LHC. The results of the test and the comparison of the module performance before and after irradiation will be presented in this poster.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Error and Correction Analysis for the FFA@CEBAF Energy Upgrade

An energy upgrade design for the Continuous Electron Beam Accelerator Facility (CEBAF) is under development, using fixed field alternating gradient (FFA) return arcs to recirculate electron beam up to an additional five times through the accelerating structures at CEBAF. A necessary component of any large accelerator is a beam steering and optical correction system. Small environmental changes and system errors can lower beam quality or even shut down the machine; and in pursuit of the scientific mission of JLab, high quality electron beams must be delivered to the experimental halls on a predictable schedule. Correction in the novel FFA arcs of the current upgrade design is complicated by several factors. These complexities inform the choice of correction algorithm structure and parameter values. A baseline algorithm in addition to diagnostic and correction hardware configuration is presented. The effect of this correction protocol is shown with respect to estimated errors, and several possible extensions of the algorithm are discussed. This work presents an important proof of concept for the FFA@CEBAF design effort, and provides a functional correction strategy which may be simply adjusted and optimized for future design changes.

Coxe, Alex [Old Dominion Univ., Norfolk, VA (Unite↗

Design and Testing of the Endcap Concentrator ASICs for the CMS High-Granularity Calorimeter Upgrade

A major upgrade of the High-Granularity Calorimeter (HGCAL) in the CMS detector is planned for Long-Shutdown 3 (LS3), currently expected to start in 2026. This upgrade will contain over 6 million channels and the electronics will be required to be low power and to withstand a radiation environment with a High-Energy Hadron flux of 3x10**6 particles per square centimeter per second. The solution to this significant challenge is the two Endcap Concentrator (ECON) ASICs, ECON-T and ECON-D, working in tandem with the HGCROC front-end ASIC. The two ECON ASICs provide critical on-detector data reduction for both the 40 MHz trigger path (ECON-T) and 750 kHz data acquisition path (ECON-D) of the HGCAL. The ASICs are fabricated in 65nm CMOS. They are rad-tolerant to 600 Mrad with low power consumption (<2.5 mW/channel). This presentation will be a comprehensive description of each ECON design, including the infrastructure that they share as well as the elements that make each unique. The presentation will also include functionality and radiation tests for both ASICs, and the first high statistics characterization results from the full production of 75k ECON-D and ECON-T ASICs.

Hoff, James R. [Fermilab] (ORCID:0000000163514592)↗

The Automatic Reactor Control System (ARCS) Upgrade, version 2.0 for TREAT

The Transient REActor Test Facility (TREAT) recently underwent an upgraded to the Automatic Reactor Control System (ARCS). The purpose of the upgrade was to institute a new software architecture that is better suited for the programming environment, patched software bugs and applied two new segments for reactor control. This paper will focus on the new segments for reactor control. The two new control segments added to ARCS are called Generic Power and Generic Rods. The original version of ARCS provided only two power related functions, namely periods and ramps, that had to be spliced together to generate any power shape. The Generic Power segment allows the user to input data points to define the function and then the algorithm does its best to create the desired shape. The original ARCS program utilized two direct rod commands (i.e. open loop control), these were a rod stop and clip. A Generic Rod segment extends the ability of the computer to directly command any rod position. The functionality of these new segments was proven during the TREAT outage in 2024.

46 - INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AN↗

Accelerator Upgrades Required for Beam Operation at Fermilab in the PIP-II/DUNE Era

The Proton Improvement Plan - II (PIP-II) injector linac is an 800 MeV superconducting H$^-$ linac, christened Linac2, that will replace the existing 400 MeV injector to the accelerator complex at Fermilab. The higher energy, intensity and repetition rate require various upgrades to the existing accelerator complex consisting of the Booster, the Recycler Ring and the Main Injector, in order to be able to accept and accelerate beam from PIP-II. In this paper we discuss various upgrades that are required and steps being taken to implement them.

Krishnagopal, S. [Fermilab]↗

Search for New Physics and Upgrade of the ATLAS Muon Spectrometer at the LHC

I report the research activities that my group has with the ATLAS (A Toroidal LHC ApparatuS) experiment at the Large Hadron Collider (LHC). The research focused on searches for new physics phenomena beyond the Standard Model (SM) using dilepton and diboson final states, on SM measurements with diboson, triboson and vector boson scattering processes, on the development of Phase-0, Phase-1 and Phase-2 upgrades of the ATLAS muon spectrometer.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Vector Boson Scattering Studies and Upgrades of Frontend Electronics for the ATLAS Muon Spectrometer

I report the research activities that my group has with the ATLAS experiment at the LHC for the period of 7/2017 to 3/2018. The research focused on observation of the same-sign WW vector boson scattering process, evidence of the WWW production, and search for new resonances in the WV final state. In addition, I also describe our work on the development of frontend electronics for Phase-1 and Phase-2 upgrades of the ATLAS muon spectrometer.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Metathesis, molecular redistribution of alkanes, and the chemical upgrading of low-density polyethylene

Here, a new strategy for polyethylene (PE) deconstruction via alkane metathesis is presented, in which WO x /SiO 2 catalyzes the olefin metathesis reaction step. Zeolite 4 A is an essential component to protect the metathesis active sites from poisoning by in-situ-generated oxygenates in a batch reaction system. High conversion of 1-hexadecene (96%) and n-hexadecane (92%)—surrogates of long-chain molecules—demonstrates the high reactivity of WO x /SiO 2 metathesis catalyst for olefin and alkane metathesis reactions, respectively, at moderate reaction temperatures of 300 °C for 2–3 h. Pretreatment temperature and length of the short n-alkane-chain solvent significantly affect the metathesis reactivity and selectivity. Results for the deconstruction of low-density PE (LDPE) in n-decane demonstrate a remarkable potential for PE upgrading with the advantages of short reaction times (3 h), the low mass ratio of solvent to LDPE, and the production of solid products with narrow molecular weight distributions.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗