Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “unit testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

HERO CarbonSAFE Phase 2 Project in the Columbia River Basalt Group

The Hermiston, Oregon Basalt CarbonSAFE Phase II project (HERO CarbonSAFE) seeks to accelerate the deployment of commercial carbon dioxide (CO2) storage projects in basaltic rocks. Basalt CO2 storage has several advantages to conventional saline storage reservoirs including 1. The potential for rapid mineralization of CO2, 2. Associated decreases in pressure and CO2 migration risks, 3. Reduced long-term monitoring requirements with respect to plume tracking, 4. Widespread geographic distribution and, 5. Large storage potential due to thickness, porosity, and CO2 interactions with basalt. And for locations such as the Pacific Northwest, Hawaii, Iceland, India and Japan, basalts may offer the only economically feasible option for local CO2 storage. However, there are limited field-scale assessments of CO2 storage in basalt, and current carbon capture utilization and storage (CCUS) permitting and regulatory frameworks were developed for conventional saline reservoirs. HERO CarbonSAFE is designed to address research gaps and uncertainties associated with basalt storage. Specifically, the project will assess the feasibility of CO2 injection in the deep layered basalts, long-term storage (mineralization), practical approaches for large-scale implementation (50+ million metric tons of CO2 over 30 years), lithology-specific risks, and the technoeconomic potential for CO2 storage in basalts. The HERO CarbonSAFE project will assess feasibility of developing a commercial-scale (50+ million metric tons of CO2) geological storage complex within the Columbia River Basalt Group (CRBG), a layered continental flood basalt complex that underlies Calpine’s natural gas-fired Hermiston Power Project (HPP) in Hermiston, OR (Figure 1). Under this 2-year CarbonSAFE Phase II project, the HERO team will conduct a data acquisition campaign that includes drilling a stratigraphic well to a total depth of ~1,500 m into the thick layered basalts proximal to HPP. A comprehensive well logging and hydrologic testing program will be augmented with new core collected from flow zones and sealing units, and comprehensive laboratory testing to help refine the kinetic rates of mineralization. The newly acquired information will be integrated with existing data from regional wells to correlate basalt injection zone properties to develop storage hub/commercial-scale models. Using these models, the project team will evaluate injection scenarios to define the technical and economic potential for storing a minimum of 50 million metric tons of CO2 over a 30-year period, along with a robust sensitivity analysis on key parameters governing reservoir viability for sustainable injection over a commercial project lifetime. Specific technical objectives of HERO are: (1) assessing the reservoir response of a series of stacked layered reservoir flowtop sequences occurring in this area of the CRBG to commercial-scale injection volumes; (2) extending prior efforts by the project team to characterize the deep layered basalts encountered in regional studies, to leverage prior investments by U.S. Department of Energy’s (DOE) Carbon Storage program; (3) leveraging DOE’s mineralization characterization efforts to advance model parametrization for commercial scale injection of CO2 in basalts; (4) conducting risk assessments associated with scaling up to commercial storage hub injection goals, while validating DOE’s National Risk Assessment Partnership (NRAP) tools, to identify potential constraints that would prevent the CRBG from serving as a commercial-scale storage complex; (5) developing mitigation plans to address identified risks; (6) developing a commercial-scale injection and monitoring, verification and accounting (MVA) strategy; (7) utilizing computational models to define and minimize, if possible, the Area of Review (AoR) under Class VI regulations; and (8) developing a robust CO2 management strategy for CRBG that also considers a regional source/sink approach that is responsive to stakeholder needs and industrial demand. Specific institutional objectives are: (1) identifying and developing plans to mitigate the nontechnical challenges associated with the build-out of a commercial-scale storage complex within the CRBG with integrated CO2 sources; (2) implementing the community outreach plan; (3) conducting regulatory research, including a survey of issues related to pore space ownership, MVA and long-term assurance of mineralization-based storage, to support an eventual application for a UIC Class VI permit; (4) advancing the project’s plan for CO2 liability management; and (5) continuing to refine and update the project’s economic model. The final objective is the preparation of a comprehensive Site Characterization Plan that draws upon the technical and institutional feasibility assessments to prepare the project for future commercialization efforts.

58 GEOSCIENCES↗

Data reduction methods, systems, and devices

Systems, methods, and apparatus are disclosed herein for data pattern detection and data reduction. Devices include an input port configured to receive data values that include a plurality of data units. The devices may also include a data analyzer configured to determine a test statistic based on at least some of the plurality of data units, the test statistic indicating a degree of difference between a first data unit and at least a second data unit, the second data unit being received at the input port before the first data unit. The data analyzer includes the first data unit in a first data block responsive to a determination that the test statistic indicates a low degree of difference, the determination being based on a comparison with a designated difference threshold, the first data block being a same data block as a second data block that includes the second data unit.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Large-Scale Pumping Test Recommendations for the 200-ZP-1 Operable Unit

CH2M Hill Plateau Remediation Company (CHPRC) is currently assessing aquifer characterization needs to optimize pump-and-treat remedial strategies (e.g., extraction well pumping rates, pumping schedule/design) in the 200-ZP-1 operable unit (OU), and in particular for the immediate area of the 241 TX-TY Tank Farm. Specifically, CHPRC is focusing on hydrologic characterization opportunities that may be available for newly constructed and planned ZP-1 extraction wells. These new extraction wells will be used to further refine the 3-dimensional subsurface contaminant distribution within this area and will be used in concert with other existing pump-and-treat wells to remediate the existing carbon tetrachloride contaminant plume. Currently, 14 extraction wells are actively used in the Interim Record of Decision ZP-1 pump-and-treat system for the purpose of remediating the existing carbon tetrachloride contamination in groundwater within this general area. As many as 20 new extraction wells and 17 injection wells may be installed to support final pump-and-treat operations within the OU area. It should be noted that although the report specifically refers to the 200-ZP-1 OU, the large-scale test recommendations are also applicable to the adjacent 200-UP-1 OU area. This is because of the similar hydrogeologic conditions exhibited within these two adjoining OU locations.

54 ENVIRONMENTAL SCIENCES↗

Streamlined Approach for Environmental Restoration (SAFER) Plan for Corrective Action Unit 539: Area 25 and Area 26 Railroad Tracks, Nevada Test Site, Nevada, Revision 0

This Streamlined Approach for Environmental Restoration (SAFER) Plan addresses the actions needed to achieve closure for Corrective Action Unit (CAU) 539, Areas 25 and 26 Railroad Tracks, as identified in the Federal Facility Agreement and Consent Order (FFACO). A modification to the FFACOwas approved in May 2010 to transfer the two Railroad Tracks corrective action sites (CASs) from CAU 114 into CAU539. The two CASs are located in Areas 25 and 26 of the Nevada Test Site: • 25-99-21, Area 25 Railroad Tracks • 26-99-05, Area 26 Railroad Tracks This plan provides the methodology for field activities needed to gather the necessary information for closing the two CASs. There is sufficient information and process knowledge from historical documentation and investigations of similar sites regarding the expected nature and extent of potential contaminants to recommend closure of the CAU 539 Railroad Tracks CASs using the SAFER process. Additional information will be obtained by conducting a field investigation before selecting the appropriate corrective action for each CAS. The results of the field investigation should support a defensible recommendation that no further corrective action is necessary. If it is determined that complete clean closure cannot be accomplished during the SAFER, then a hold point will have been reached and the Nevada Division of Environmental Protection (NDEP) will be consulted to determine whether the remaining contamination will be closed under the alternative corrective action of closure in place with use restrictions. This will be presented in a closure report that will be prepared and submitted to the NDEP for review and approval. The sites will be investigated based on the data quality objectives (DQOs) developed on December 14, 2009, by representatives of U.S.Department of Energy (DOE), National Nuclear Security Administration Nevada Site Office; Navarro Nevada Environmental Services, LLC (NNES); and National Security Technologies, LLC. The DQO process has been used to identify and define the type, amount, and quality of data needed to determine and implement appropriate corrective actions for each Railroad Tracks CAS in CAU 539. The following text summarizes the SAFER activities that will support the closure of CAU 539: • Perform site preparation activities (e.g., utilities clearances, radiological surveys). • Collect in situ dose measurements. • Collect environmental samples from designated target populations (e.g., lead bricks) to confirm or disprove the presence of contaminants of concern (COCs) as necessary to supplement existing information. • If no COCs are present at a CAS, establish no further action as the corrective action. • If COCs exist, collect environmental samples from designated target populations (e.g., clean soil adjacent to contaminated soil) and submit for laboratory analyses to define the extent of COC contamination. If a COC is present at a CAS, NNES will consult NDEP to determine the path forward, then either: • Establish clean closure as the corrective action. The material to be remediated will be removed, disposed of as waste, and verification samples will be collected from remaining soil, or • Establish closure in place as the corrective action and implement the appropriate use restrictions.

54 ENVIRONMENTAL SCIENCES↗

Mock-Up activities for the extraction of samples from a salt-stone disposal unit - 15502

Mock-up testing with respect to the core-drilling of simulant salt-stone grout was conducted to support the future retrieval of field-emplaced salt-stone samples from salt-stone Disposal Unit (SDU) Cell 2A. The primary objectives of extracting samples from SDU Cell 2A are to enable measurement of field-emplaced samples with respect to properties that influence long-term performance, such as saturated hydraulic conductivity, and to compare the measured properties for field-emplaced and comparable samples prepared in the laboratory. Initial mock-up activities (Phases 1 and 2) were conducted in Fiscal Years (FY) 2013 and 2014 in order to demonstrate the viability of standard core-drilling techniques that are typically employed for sampling concrete structures. The primary requirement for the core-drilling technique was that it should minimize the potential of physical or chemical sample changes that would artificially degrade key grout properties. Mock-up activities were aimed at optimizing the techniques for core-drilling, and subsequent sample extraction, using a set-up that mimicked, to the extent practical, both the physical characteristics, and operational complexities, of core-drilling salt-stone grout from the roof of the SDU. Samples extracted from the grout monolith were subsequently characterized with respect to saturated hydraulic conductivity and compressive strength, and compared to data for cast samples prepared using the same simulant salt-stone material. The comparison of these properties for the two sample types was expected to highlight potential flaws (e.g., micro-cracking) introduced by the core-drilling process. While the data for saturated hydraulic conductivity were virtually identical (approximately 2 E-09 cm/sec), the compressive strength of the core-drilled samples (approximately 3.5 MPa (500 psi)) was on average half that measured for the cast samples. It was suspected that increased water saturation and surface scoring of the core-drilled samples might account for the disparate compressive Strength data. During Phases 1 and 2 it was determined that cores could be successfully drilled and extracted to a depth of approximately 0.9 meters (3 feet) below the grout surface. Phase 3 (FY 2105) has been initiated and is primarily directed at demonstrating the ability to core-drill through approximately 1.8 meters (6 feet) of overlying grout to retrieve the desired sample from the SDU. The original drill depth of 0.6 - 0.9 meters (2-3 feet) was based on an SDU fill height of 5.6 meters (18.5 feet) and sample location of approximately 4.9 meters (16 feet); recently the allowable fill height in the SDUs has been increased to 6.5 meters (21.25 feet); hence the increased depth of overlying grout above the samples to be retrieved. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 1958 Nuclear Test Moratorium

Against the backdrop of international concern about radioactive fallout, the United States, the Soviet Union, and Great Britain agreed to a moratorium on nuclear testing. Neither monitored nor enforceable, the moratorium was not much more than a gentleman’s agreement. Nonetheless, it proved remarkedly durable, beginning on October 31, 1958, and lasting until September 1961. After France began nuclear testing in 1960, followed by the shooting down of an American U-2 spy plane over Soviet air space, and a failed summit meeting of international leaders, the Soviet Union resumed testing. The United States followed shortly thereafter.

99 GENERAL AND MISCELLANEOUS↗

Field Evaluation of the Performance of the RTU Challenge Unit: Daikin Rebel

This report documents the testing of a state-of-art packaged rooftop unit (RTU) (HVAC) and a standard reference unit in the field and compares the seasonal efficiency of the two units.The goal of the RTU Challenge demonstration was to estimate the seasonal performance of the RTU Challenge unit and the annual savings that could be achieved by installing the challenge unit instead of an alternate standard unit. The demonstration took place at two grocery stores located in New Smyrna Beach and Port Orange, Florida. The Rebel unit was installed as a replacement of an existing unit in July 2013 at the New Smyrna Beach store. The reference unit was an existing rooftop unit in the Port Orange store that is about 6 years old. The reference unit had two compressors for staged cooling and a constant-speed supply fan. Both units had the same rated cooling capacity of 7.5 tons and served each store’s office spaces with similar footprints.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

SDU7 Interior Liner Testing & Evaluation

The Saltstone Disposal Unit 7 (SDU7) project requested the Savannah River National Laboratory (SRNL), Materials Science & Engineering (MS&E) organization to evaluate an alternative bromobutyl liner and adhesives for potential use in SDU7 based on applicable ASTM testing standards. SRNL performed similar testing for the liner system used in SDU6. Bonded and non-bonded samples of the alternative liner (Blair Rubber Marflex™ RCHB60HT) were subjected to specific ASTM tests after immersion in two Saltstone leachate simulants, designated S1 and S2, for 1000 hours at 60 °C. Immersion exposures were performed at the Savannah River Ecology Laboratory (SREL). Post-immersion testing involved mechanical property and hardness testing of base material, lap-shear testing of bonded samples and rubber-to-concrete paver interrogation. The liner exhibited an approximate 40% drop in tensile strength and 25% drop in elongation at failure from baseline values after immersion, though final values are comparable to previous SDU6 liner values and are within liner manufacturer property ranges. Overall lap-shear strength behavior of the four adhesives showed a similar pattern, with short-term reduction and subsequent increase in peak load values. However, ranking of adhesives varied with the metric used for comparison. Two of the four adhesives tested (Normac 900 and REMA SC 4000) showed overall better behavior, collectively considering immersion performance, lap-shear data and bonded paver interrogation. Lap-shear samples bonded with the REMA adhesive showed the best combination of final retained bond strength, 6-week average bond strength and bond failure mode. Only one paver (REMA SC4000) was noted to have no defects after immersion. This document details the testing performed and provides conclusions and recommendations. The testing suggests that SDU liner performance is highly dependent upon seam integrity, which collectively depends on a combination of adhesive properties, installation workmanship and inspection/quality control.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Alstom's Chemical Looping Combustion Prototype for CO 2 Capture from Existing Pulverized Coal-Fired Power Plants

Alstom’s Limestone Chemical Looping (LCL™) process has the potential to capture CO 2 from new and existing coal-fired power plants while maintaining high plant power generation efficiency. This new power plant concept is based on a hybrid combustion- gasification process utilizing high temperature chemical and thermal looping technology. This process could also be potentially configured as a hybrid combustion-gasification process producing a syngas or hydrogen for various applications while also producing a separate stream of CO 2 for use or sequestration. The targets set for this technology is to capture over 90% of the total carbon in the coal at cost of electricity which is less than 20% greater than Conventional PC or CFB units. Previous work with bench scale test and a 65 kWt Process Development Unit Development (PDU) has validated the chemistry required for the chemical looping process and provided for the investigation of the solids transport mechanisms and design requirements. The objective of this project is to continue development of the combustion option of chemical looping (LCL-C™) by designing, building and testing a 3 MWt prototype facility. The prototype includes all of the equipment that is required to operate the chemical looping plant in a fully integrated manner with all major systems in service. Data from the design, construction, and testing will be used to characterize environmental performance, identify and address technical risks, reassess commercial plant economics, and develop design information for a demonstration plant planned to follow the proposed Prototype. A cold flow model of the prototype will be used to predict operating conditions for the prototype and help in operator training. Operation of the prototype will provide operator experience with this new technology and performance data of the LCL-C™ process, which will be applied to the commercial design and economics and plan for a future demonstration plant.

20 FOSSIL-FUELED POWER PLANTS↗

Addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada (Rev. 0)

This document constitutes an addendum to the Closure Report for Corrective Action Unit 165: Area 25 and 26 Dry Well and Washdown Areas, Nevada Test Site, Nevada as described in the document Recommendations and Justifications To Remove Use Restrictions Established under the U.S. Department of Energy, National Nuclear Security Administration Nevada Field Office Federal Facility Agreement and Consent Order dated September 2013. The Use Restriction Removal document was approved by the Nevada Division of Environmental Protection on October 16, 2013. The approval of the UR Removal document constituted approval of each of the recommended UR removals. In conformance with the UR Removal document, this addendum consists of: This page that refers the reader to the UR Removal document for additional information The cover, title, and signature pages of the UR Removal document The NDEP approval letter The corresponding section of the UR Removal document This addendum provides the documentation justifying the cancellation of the UR for CAS 25-20-01, Lab Drain Dry Well. This UR was established as part of FFACO corrective actions and was based on the presence of tetrachloroethene contamination at concentrations greater than the action level established at the time of the initial investigation. Although total petroleum hydrocarbon diesel-range organics contamination at concentrations greater than the NDEP action level was present at the site, no hazardous constituents of TPH-DRO exceeded the U.S. Environmental Protection Agency (EPA) Region 9 preliminary remediation goals established at the time of the initial investigation.

54 ENVIRONMENTAL SCIENCES↗

Addendum to Underground Test Area (UGTA) Closure Report for Corrective Action Unit 98: Frenchman Flat Nevada National Security Site, Nevada

This addendum to the CR for CAU 98, Frenchman Flat, NNSS, Nevada (compiled in DOE/EMNV, 2019) defines the long-term monitoring approach after a five-year evaluation of water sampling results, water-level measurements, and trends in water-level measurements. The approach was developed by Navarro and discussed in the report Corrective Action Unit 98: Frenchman Flat Five-Year Evaluation Nevada National Security Site, Nevada (DOE/EMNV, 2022), which was approved by NDEP. Sections 4.0 and 5.0 of the CR were rewritten to reflect the approach discussed in the five-year evaluation. Appendix C contains well construction diagrams that have been updated since the original CR was published. Appendix D contains updated Use Restriction (UR) forms and maps. NDEP requested an addendum instead of a complete revision to the Frenchman Flat CR so the history of the CR would not be lost.

54 ENVIRONMENTAL SCIENCES↗

ENVIRONMENTAL REACTIVITY OF SOLID STATE HYDRIDE MATERIALS: MODELING AND TESTING FOR AIR AND WATER EXPOSURE

To make commercially acceptable condensed phase hydrogen storage systems, it is important to understand quantitatively the risks involved in using these materials. A rigorous set of environmental reactivity tests have been developed based on modified testing procedures codified by the United Nations for the transportation of dangerous goods. Potential hydrogen storage material, 2LiBH4{center_dot}MgH2 and NH3BH3, have been tested using these modified procedures to evaluate the relative risks of these materials coming in contact with the environment in hypothetical accident scenarios. It is apparent that an ignition event will only occur if both a flammable concentration of hydrogen and sufficient thermal energy were available to ignite the hydrogen gas mixture. In order to predict hydride behavior for hypothesized accident scenarios, an idealized finite element model was developed for dispersed hydride from a breached system. Empirical thermodynamic calculations based on precise calorimetric experiments were performed in order to quantify the energy and hydrogen release rates and to quantify the reaction products resulting from water and air exposure. Both thermal and compositional predictions were made with identification of potential ignition event scenarios.

08 HYDROGEN↗

Commercialization of an Atmospheric Iron-based CDCL Process for Power Production: Phase II

This project is focused on supporting the use of coal for power production through the continued development of the Coal Direct Chemical Looping (CDCL) technology. The objective of the program is to evaluate the commercial viability of the CDCL technology. This report describes the results of Phase II of the project up to the date of the period of performance as listed above. The Phase II objectives are to reduce the technology gaps associated with the oxygen-carrier properties, coal conversion, and reducer design of the CDCL process. During this project, a 250 kWth CDCL pilot unit was designed, fabricated, installed and subsequently tested to demonstrate critical components. The pilot unit simulates actual design concepts envisioned for the commercial unit. The knowledge gained from laboratory and pilot-scale testing is used to refine the commercial plant design and cost analyses.

20 FOSSIL-FUELED POWER PLANTS↗

Commercial Building HVAC Technology Challenge - Carrier (Final Report)

The purpose of this Cooperative Research and Development Agreement (CRADA) was to test two rooftop commercial heating, ventilation, and air conditioning (HVAC) systems supplied by Carrier Corporation to determine if they met the laboratory test requirements of the United States Department of Energy (DOE) Commercial Building HVAC Technology Challenge (hereafter noted as “the Challenge”). Results of the laboratory testing completed at Oak Ridge National Laboratory (ORNL) demonstrated that the systems met all requirements of the Challenge. Carrier Corporation has successfully completed this aspect of the Challenge. This CRADA report will briefly describe the Challenge, the test plan created to measure the success of systems provided by Challenge participants, and the results of laboratory testing of the Carrier commercial rooftop systems.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

ATR LEU Monolithic Foil-Type Fuel with Integral Cladding Burnable Absorber – Neutronics Performance Evaluation

The Advanced Test Reactor (ATR), currently operating in the United States, is used for material testing at very high neutron fluxes. Powered with highly enriched uranium (HEU), the ATR has a maximum thermal power rating of 250 MWth. Because of the large test volumes located in high flux areas, the ATR is an ideal candidate for assessing the feasibility of converting HEU driven reactor cores to low-enriched uranium (LEU) cores. The burnable absorber - 10B, was added in the inner and outer plates to reduce the initial excess reactivity, and to improve the peak ratio of the inner/outer heat flux. The present work investigates the LEU Monolithic foil-type fuel with 10B Integral Cladding Burnable Absorber (ICBA) design and evaluates the subsequent neutronics operating effects of this proposed fuel designs. The proposed LEU fuel specification in this work is directly related to both the RERTR LEU Development Program and the Advanced Test Reactor (ATR) LEU Conversion Project at Idaho National Laboratory (INL).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗