Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “test system”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Friction testing and torque sensing systems

The present invention relates, in part, to systems for characterizing force (e.g., friction, wear, and/or torque). In one embodiment, the system allows for wear testing of samples in a high throughput manner. In another embodiment, the system allows for torque sensing in a non-contact manner.

Nation, Brendan L.↗

Metal Oxide Varistor (MOV) Lifetime Estimation with Impulse-Based Testing in PV Inverter Systems: Preprint

Surges caused by lightning strikes could damage electrical components in photovoltaic (PV) systems. Metal oxide varistors (MOVs) are commonly used to protect PV systems from lightning strikes. In this paper, a holistic impulse-based MOV lifetime estimation framework is proposed. The impacts of peak current and fault duration induced by lightning events are considered in the MOV lifetime estimation framework. Moreover, the impact of different parameter combinations on MOV lifetime estimation is analyzed. The effectiveness of the proposed work is validated in a PV inverter test system developed in MATLAB/Simulink.

lifetime estimation↗

Prioritizing ICS Beachhead Systems for Cyber Vulnerability Testing

Cyber Testing for Resilient Industrial Control Systems™ (CyTRICS™) is the Department of Energy’s (DOE’s) program for cybersecurity vulnerability testing, digital subcomponent enumeration, and forensic assessment. CyTRICS leverages best-in-class test facilities and analytic capabilities at six DOE National Laboratories and strategic partnerships with key stakeholders including technology developers, manufacturers, asset owners and operators, and interagency partners. During the program’s development, CyTRICS established a unique methodology for prioritizing digital components within operational technology (OT) and industrial control systems (ICS) in the Energy Sector Industrial Base (ESIB) for cyber vulnerability testing. The CyTRICS Prioritization Process leverages multiple characteristics of systems, components, and their contextual deployment to calculate a quantification of individual digital components for CyTRICS testing. The initial version of the CyTRICS Prioritization Process was premised largely upon the impact which could result to an industrial control system if the digital component under testing was compromised, either through malicious means, faulty engineering, or other modes. The worldwide compromise of the SolarWinds Orion platform, first reported in December 2020, through malicious interference with the digital patching cycle was a watershed event in cyber supply chain security. The SolarWinds compromised demonstrated the strategic importance of certain types of ubiquitous software, and the ability to generate widespread cybersecurity effects. To address this challenge and as a part of the Department of Energy’s response to the SolarWinds compromise, DOE’s Office of Cybersecurity, Energy Security, and Emergency Response (CESER) directed the National Laboratories to evolve the CyTRICS Prioritization Process methodology to encompass additional factors related to the strategic importance of digital components. CESER directed CyTRICS researchers to identify, characterize, and append strategic factors to the CyTRICS Prioritization Process to provide additional weight to these characteristics. National Laboratory expert researchers identified functionality, distribution, and platform characteristics for digital components in ICS and OT that they assessed would be likely targeted in strategic initial-access cyber attack. CyTRICS has termed these factors “ICS Beachhead Systems,” leveraging a definition first advanced by Schneider Electric, which is intended as a blanket term to encompass digital components, products, and systems in OT. This paper describes the ICS Beachhead Systems identified and the rationale for inclusion. As a next step in the research and refinement process, the National Laboratories will validate this initial set of characteristics against digital components evaluated by the CyTRICS program and current implementation of the CyTRICS Prioritization Process. After validation, CyTRICS researchers will then develop a scoring methodology to generate a quantitative score to assess the degree to which a digital component is characterized as an ICS Beachhead System. Finally, the National Laboratories will append this scoring to the existing CyTRICS Prioritization Process algorithm.

97 MATHEMATICS AND COMPUTING↗

Processing Aleatory and Epistemic Uncertainties in Experimental Data From Sparse Replicate Tests of Stochastic Systems for Real-Space Model Validation

This paper presents a practical methodology for propagating and processing uncertainties associated with random measurement and estimation errors (that vary from test-to-test) and systematic measurement and estimation errors (uncertain but similar from test-to-test) in inputs and outputs of replicate tests to characterize response variability of stochastically varying test units. Also treated are test condition control variability from test-to-test and sampling uncertainty due to limited numbers of replicate tests. These aleatory variabilities and epistemic uncertainties result in uncertainty on computed statistics of output response quantities. The methodology was developed in the context of processing experimental data for “real-space” (RS) model validation comparisons against model-predicted statistics and uncertainty thereof. The methodology is flexible and sufficient for many types of experimental and data uncertainty, offering the most extensive data uncertainty quantification (UQ) treatment of any model validation method the authors are aware of. It handles both interval and probabilistic uncertainty descriptions and can be performed with relatively little computational cost through use of simple and effective dimension- and order-adaptive polynomial response surfaces in a Monte Carlo (MC) uncertainty propagation approach. A key feature of the progressively upgraded response surfaces is that they enable estimation of propagation error contributed by the surrogate model. Sensitivity analysis of the relative contributions of the various uncertainty sources to the total uncertainty of statistical estimates is also presented. Finally, the methodologies are demonstrated on real experimental validation data involving all the mentioned sources and types of error and uncertainty in five replicate tests of pressure vessels heated and pressurized to failure. Simple spreadsheet procedures are used for all processing operations.

97 MATHEMATICS AND COMPUTING↗

Improving to the neutron fluence rate monitor measurement system at the Advanced Test Reactor

The existing fluence monitor wire scanning system at the Advanced Test Reactor (ATR) was designed and installed for use in the Engineering Test Reactor (ETR) when it began operation in 1958. The wire scanner was operated in ETR for over 20 years until ATR began operation, when it was moved to the ATR west canal area in 1971 and subsequently moved to the west canal in 2006 where it presently resides. With a continued service life of 65 years the system is well beyond the typical design life of 20 years for these types of systems. The need to update the data acquisition and control system was identified, and the benefits of replacing the existing sodium iodide (NaI) detector with an electronically cooled high-purity germanium (HPGe) detector are discussed.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Upgrade of Core Conduction Cooldown Test Facility Control System

The CCCTF was designed and installed at ORNL in the 1990s for high-temperature gas-cooled reactor accident simulation. It is located within a modular hot cell housed in the IFEL facility. In 2008 and 2009, modifications were made to the CCCTF in preparation for AGR safety testing. A new airlock was designed and installed to better support periodic exchange of the fission product deposition cups while maintaining the fuel at safety test temperature, and modifications were made to add routines to the existing user interface software for computer-controlled automation of the He sweep gas flow and liquid nitrogen supply to the 85Kr cold traps. However, the furnace control hardware and software remained essentially unchanged. At the conclusion of the AGR-1 and AGR-2 PIE campaigns, continued use of the CCCTF was in question because of the gradual obsolescence of the hardware and software used to control the furnace and ancillary systems that make up the CCCTF. Therefore, an effort was undertaken to replace all the obsolete components with new hardware and update the software to increase system reliability and ensure this capability’s maintenance for future research and fuel qualification efforts. The modifications included creating a new National Instruments (NI) LabVIEW-based control system with a graphical user interface (GUI).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Verification Testing of OLI Systems Mixed Solvent Electrolyte Model for the Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 ) System to High Ionic Strength at 25°C

This technical report summarizes model verification results and summary statistics for 41 evaporite mineral solubility cases evaluated by Savannah River National Laboratory using OLI Systems’ aqueous electrolyte thermodynamic modeling software. The 41 verification cases containing a total of 60 solubility curves comprise mineral solubility data from low to high ionic strength at 25°C for the eight-component system Na-K-Mg-Ca-H-Cl-SO 4 -OH-HCO 3 -CO 3 -CO 2 -H 2 O as reported by Harvie et al. (1984). Thermodynamic calculations were executed using OLI Systems’ Stream Analyzer computation module within the OLI Studio software platform (Ver. 11.0, Rev. 11.0.1.9). The Mixed Solvent Electrolyte (MSE) thermodynamic framework was chosen for this investigation because of its superiority in modeling high ionic-strength inorganic salt solutions and actinide redox chemistry and solubility, both of which are relevant to the geological repository conditions at the Waste Isolation Pilot Plant in Carlsbad, New Mexico. Mineral solubility data in various inorganic salt solutions were digitized and extracted from figures generated by Harvie et al. (1984). For each of the 60 solubility curves, a case-specific chemistry model and input file were generated in OLI Studio using OLI Stream Analyzer and the MSE (H 3 O + ion) public databank provided by OLI Systems. Model simulation results were exported to Microsoft Excel to calculate summary statistics and to generate graphs comparing the OLI model predictions to the solubility data. Summary statistics include residuals (model – data) and concordance (accuracy × precision, where precision is indicated by the Pearson correlation coefficient and accuracy accounts for bias and scale differential). Private databanks were not developed, and activity coefficient model regressions were not performed to improve OLI model fits to the data. Of the 41 model verification plots, 83% have a mean of the percent residuals less than or equal to 25%. Similarly, 75% display a concordance greater than or equal to 0.75. Only seven of the 41 verification plots fail to show good agreement between the model and data. Of these seven, three are relevant to the WIPP repository because they involve the Mg-OH-Cl-SO 4 -CO 3 aqueous system. The remaining four address salt solubilities at the pH extremes (strong acid and strong base). It should be noted that in two of the three Mg-OH-Cl-SO 4 -CO 3 system cases, the regressed Harvie et al. (1984) solubility curve also deviated from the data. Lack of agreement between the OLI model-predicted solubility curves and the data is attributable to one or more of the following: specific solid species are not included in the OLI MSE databank; there is significant variation among the different solubility datasets chosen by Harvie et al. (1984); the OLI MSE model’s thermodynamic parameters were determined using different solubility datasets; and the activity coefficient parameters for certain relevant ion-ion and ion-molecule pairs have not been optimized via data regression. Two recommendations for future work are to (1) evaluate solubility data for the Mg-OH-Cl-SO 4 -CO 3 system at high ionic strength and, if necessary, develop a private OLI MSE database that includes missing species and, where necessary, regressed standard state properties and interaction parameters; (2) perform similar verification testing of the OLI model for actinide solubility data.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Optimal electric-distribution-grid planning considering the demand-side flexibility of thermal building systems for a test case in Singapore

The planning of district-scale electric grids, i.e., distribution grids, has traditionally relied on finding the most cost-effective design such that they are able to supply the peak loads in a district. With the advent of electric demand side flexibility (DSF), there is the opportunity to reshape peak loads such that the investment cost of the electric grid decreases in exchange for a minor increase in the operation cost. This paper formulates an optimal planning approach for the electric grid at the district scale, which incorporates the DSF from thermal building systems, e.g., heating ventilation and air-conditioning (HVAC) systems. The problem is formulated as a mixed-integer linear program (MILP) and aims at minimizing the investment cost for the grid along with the operation cost of the flexible loads. This is subjected to the fixed electricity demand and thermal comfort constraints of building occupants. To this end, linear models for the thermal comfort in the buildings and the power flow in electric grid are considered. The approach is tested on a district planning test case based in Singapore, where the results show up to 30.9 % reductions in investment cost and up to 3.7 % reduction in total annualized cost. Urban planning authorities, developers and utility companies can all benefit from the presented approach to make optimized investment decisions. For building operators, the results point to the need of adopting their control systems for DSF.

Troitzsch, Sebastian↗

Thermal Hydraulic Experimental Test Article: Second Year of Testing with Secondary Sodium System (Fiscal Year 2025 Final Report)

The Thermal Hydraulic Experimental Test Article (THETA) is currently installed in the Mechanisms Engineering Test Loop (METL) 28” test vessel #4. Both the primary and secondary sodium systems remain online to facilitate continued testing. This fiscal year, work was performed using a COMSOL Multiphysics magnetohydrodynamic model to characterize flow more accurately in the secondary electromagnetic flowmeters. Experimental campaigns were then performed to study the thermal hydraulic differences between sodium and water as a surrogate fluid in the THETA geometry as well as a study to better characterize and understand temperature oscillations that exist at the outlet of the core to the hot pool. A peer-reviewed article was published in the ASME Journal of Nuclear Engineering and Radiation Science detailing the THETA facility and providing an overview of a test that was performed with the primary and secondary system online [1]. Work continues to develop a database to house experimental THETA data to better facilitate collaboration with industry and laboratory partners for their use of the data for code benchmarking/validation. THETA remains fully operational and is positioned for continued testing in fiscal year 2026.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Improving to the neutron fluence rate monitor measurement system at the Advanced Test Reactor [Poster]

The existing fluence monitor wire scanning system at the Advanced Test Reactor (ATR) was designed and installed for use in the Engineering Test Reactor (ETR) when it began operation in 1958. The wire scanner was operated in ETR for over 20 years until ATR began operation, when it was moved to the ATR west canal area in 1971 and subsequently moved to the west canal in 2006 where it presently resides. With a continued service life of 65 years the system is well beyond the typical design life of 20 years for these types of systems. The need to update the data acquisition and control system was identified, and the benefits of replacing the existing sodium iodide (NaI) detector with an electronically cooled high-purity germanium (HPGe) detector are discussed. The wirescanner system in the ATR canal is utilized after every reactor cycle by the ATR Radiation Measurements Laboratory (RML) to assess the activation of cobalt and nickel dosimeter wires during the cycle. These wires become activated through exposure to thermal and fast neutrons respectively during the irradiation cycle and are highly radioactive upon shutdown. It is for this reason that the wirescanner is used in the ATR canal rather than transporting the dosimeters to another facility. A scoping study was performed to develop a base-line design to ensure that existing capabilities could be replaced with a new system. The new hardware will enable automated measuring of several flux monitor holders without necessitating the removal of the flux wires. In this way, flux wire measurements will be performed with minimal dose to the technicians and will not be limited by canal operations as is presently the case. The new control and acquisition software will be based on commercially available and supported systems that have a wide user-base to provide long-term stability. An electronically cooled HPGe detector will be used to provide high-resolution gamma-ray measurements, an improvement from the low-resolution sodium-iodide detector that is presently deployed. The electronic cooler eliminates the need for liquid nitrogen to cool the detector head. A new collimator has been designed to house the new detector and allow for sufficient counting rates.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Grating Polarizers at 170 GHz for ECRH Systems: Low Power Tests and Simulations

The elliptical polarization produced by a pair of sinusoidally profiled miter-bend grating polarizers has been measured experimentally and found to be in excellent agreement with theory. The polarizers were designed to be used at 170 GHz in the miter bends of a 63.5 mm corrugated metallic waveguide for creating the arbitrary elliptically polarized microwave beam needed for electron cyclotron resonance heating of plasma. Using a vector network analyzer to generate a linearly polarized HE11 incident mode, each polarizer was individually tested to measure the rotation α and ellipticity β of the elliptically polarized reflected microwave beam as a function of the grating rotation angle. The grating polarizers were then tested together to measure the elliptical polarization as a function of the angles of the combination of the two polarizers arranged sequentially on the transmission line. The map of the ellipticity versus grating angles agreed very well with numerical simulations using high-frequency structure simulator. Numerical simulations show that up to eight combinations of rotation angles of the two grating polarizers can provide the same ellipticity but with the varying ohmic loss, thus allowing the choice of settings to minimize the ohmic loss, a necessary consideration to minimize heating effects in megawatt power level systems.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Prolonging photoperiod promotes testosterone synthesis of Leydig cells by directly targeting local melatonin system in rooster testes

Abstract The study investigated the effects of prolonging photoperiod on the synthesis of testosterone and melatonin in roosters, and the effect of melatonin on testosterone synthesis in rooster Leydig cells as well as its molecular mechanisms. We randomly divided one hundred and twenty 20-week-old roosters into three groups and provided 6, 12.5 and 16 h light, respectively. The results showed that prolonging photoperiod promoted testosterone synthesis, decreased melatonin production, and inhibited the expression of melatonin membrane receptors MEL1A, MEL1B, MEL1C, and aralkylamine n-acetyltransferase (AANAT) in rooster testes. Subsequently, rooster Leydig cells were isolated and treated with 0, 0.1, 1, 10, and 100 ng/mL melatonin for 36 h. The results suggested that melatonin inhibited testosterone synthesis in rooster Leydig cells, and silencing MEL1A and MEL1B relieved the inhibition of melatonin on testosterone synthesis. Additionally, melatonin reduced the intracellular cyclic adenosine monophosphate (cAMP) level and the phosphorylation level of cAMP-response element binding protein (CREB), and CREB overexpression alleviated the inhibition of melatonin on testosterone synthesis. Furthermore, pretreatment with cAMP activator forskolin or protein kinase A (PKA) activator 8-bromo-cAMP blocked the inhibition of melatonin on CREB phosphorylation and testosterone synthesis. These results indicated that prolonging photoperiod promoted testosterone synthesis associated with the decrease in melatonin production and membrane receptors and biosynthetic enzyme of melatonin in rooster testes, and melatonin inhibited testosterone synthesis of rooster Leydig cells by inhibiting the cAMP/PKA/CREB pathway via MEL1A and MEL1B. This may be evidence that prolonging photoperiod could promote testosterone synthesis through the inhibition of the local melatonin pathway in rooster testes.

Xu, Gaoqing↗

nEXO Team Active Georgetown University: Systems Integration and Test

The nEXO experiment is the “next” tonne-scale enriched xenon observatory which will be fielded deep underground to search for neutrinoless double-beta decay. The observation of neutrinoless double-beta decay is important to the low-energy physics community, and confirmation of the phenomenon will allow physicists to extend current physics models and propose new theories for the evolution of matter in our universe.

42 ENGINEERING↗

Oklo Sponsored Testing using PELICAN: System, Subchannel, and High-Fidelity Software Validation (Final CRADA Report)

Argonne National Laboratory (the Contractor), located in Lemont IL, and Oklo, Inc., (the Participant), headquartered in Santa Clara, CA, propose to enter into a Cooperative Research and Development Agreement (CRADA) to perform a gap analysis of thermal hydraulic data, perform prototypical fuel assembly pressure drop and cavitation model validation, generate the experimental data as well as the corresponding uncertainties for this matrix and, finally, develop the validation models with the Argonne system level code SAS4A/SASSYS-1, the Argonne subchannel analysis code DASSH, the Argonne high fidelity code Nek5000, and/or the Idaho National Laboratory code Pronghorn Subchannel. The work outlined below will significantly improve the experimental and validation database currently available for liquid metal fast reactors, thus making it a viable part of a comprehensive reactor design and licensing suite to be used by the participant.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

OEDI—Solar Grid Integration Data and Analytics Library

As a part of the Open Energy Data Initiative, this effort aims to develop and demonstrate novel distribution state estimation, control optimization, and transient analysis as well as provide access to data, data integration, and mapping information. More specifically, the focus of the effort will be on physics-based distribution system state estimation, hybrid (physics-based and machine learning) distribution optimal power flow, and event detection/analysis for solar integration and analytics. This work will enable reproducible, robust, replicable, and generalizable R&D in simulation and emulation of solar system integration. These test models and datasets will provide an integrated library for developing and testing power system operation technologies. To make the library user-friendly, this project will provide data curation tools such as data translators, mapping scripts and APIs, database schemas and metadata, interfaces and user dashboard, source code for the reference algorithms, description of the use-cases/scenarios, and comprehensive information on all the assumptions.

14 SOLAR ENERGY↗