Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technological readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Exploring the Adoption Challenges of Post-Quantum Cryptography in EV Charging Infrastructure

The rapid evolution of electric vehicle (EV) technology and the corresponding growth of the Electric Vehicle Charging Infrastructure (EVCI) brings to light significant cybersecurity concerns, notably in the context of emerging post-quantum computing capabilities. This report, prepared by Pacific Northwest National Laboratory (PNNL) under the U.S. Department of Energy contract, delves into the challenges associated with integrating Post-Quantum Cryptography (PQC) into EVCI to safeguard against potential quantum computing threats. Post-quantum computers will eventually be able to invalidate technologies secured through public key cryptography. As part of this effort, the primary gaps and challenges in the EVCI were investigated with a focus on comparing traditional algorithms against PQC algorithms. One of the notable findings was that the P-521 algorithm was frequently surpassed in performance by PQC algorithms. This document provides a thorough examination of the hurdles the industry can expect when transitioning to PQC within the EVCI, such as interoperability concerns, the computational and memory demands of PQC algorithms, and the organizational readiness for such a transition. It emphasizes the necessity of a forward-thinking approach to cybersecurity, advocating for early and strategic engagement among EVCI stakeholders to ensure a seamless and cost-effective migration to quantum-resistant cryptographic standards. Through this report, the authors aim to catalyze awareness and action among policymakers, industry leaders, and cybersecurity professionals towards fortifying the EVCI against emerging quantum threats, thereby securing the infrastructure essential for the future of electric mobility.

33 ADVANCED PROPULSION SYSTEMS↗

Enabling particle applications for exascale computing platforms

The Exascale Computing Project (ECP) is invested in co-design to assure that key applications are ready for exascale computing. Within ECP, the Co-design Center for Particle Applications (CoPA) is addressing challenges faced by particle-based applications across four “sub-motifs”: short-range particle–particle interactions (e.g., those which often dominate molecular dynamics (MD) and smoothed particle hydrodynamics (SPH) methods), long-range particle–particle interactions (e.g., electrostatic MD and gravitational N-body), particle-in-cell (PIC) methods, and linear-scaling electronic structure and quantum molecular dynamics (QMD) algorithms. Our crosscutting co-designed technologies fall into two categories: proxy applications (or “apps”) and libraries. Proxy apps are vehicles used to evaluate the viability of incorporating various types of algorithms, data structures, and architecture-specific optimizations and the associated trade-offs; examples include ExaMiniMD, CabanaMD, CabanaPIC, and ExaSP2. Libraries are modular instantiations that multiple applications can utilize or be built upon; CoPA has developed the Cabana particle library, PROGRESS/BML libraries for QMD, and the SWFFT and fftMPI parallel FFT libraries. Success is measured by identifiable “lessons learned” that are translated either directly into parent production application codes or into libraries, with demonstrated performance and/or productivity improvement. The libraries and their use in CoPA’s ECP application partner codes are also addressed.

97 MATHEMATICS AND COMPUTING↗

Survey of Technologies to Meet PAG limits for Detection of Cesium-137 in Water

The goal of this report is to evaluate the process of adding a sorbent to the sampling process to preconcentrate Cs-137 and then analyze the sorbent to provide a rapid assessment of results to guide decisions on drinking water sources and the protection of the public. Multiple unit design variables were considered: sample configuration/geometry, sorbent efficiency, sample volume. Model simulations demonstrated through these unit design efficiencies that 10 L of sample volume processed through a sorbent provides nearly two orders of magnitude improvement in sample counting time to provide results to a decision maker than the current process. Over 60 publications and reports concerning Cs-137 and sorbents were evaluated. The key attributes were readiness of sorbent to be deployed in a mobile laboratory environment, and minimum sample preparation and conditioning. Examples of sorbents not considered further included nanomaterials, which have not been evaluated at a commercial scale and are limited in availability. The recommended sorbents for further consideration include: ferrocyanide salts, zeolite, and chemically modified granular activated carbon.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

Ductile adhesive elastomers with force-triggered ultra-high adhesion strength

Elastomers play a vital role in many forthcoming advanced technologies in which their adhesive properties determine materials’ interface performance. Despite great success in improving the adhesive properties of elastomers, permanent adhesives tend to stick to the surfaces prematurely or result in poor contact depending on the installation method. Thus, elastomers with on-demand adhesion that is not limited to being triggered by UV light or heat, which may not be practical for scenarios that do not allow an additional external source, provide a solution to various challenges in conventional adhesive elastomers. Herein, we report a novel, ready-to-use, ultra high-strength, ductile adhesive elastomer with an on-demand adhesion feature that can be easily triggered by a compression force. The precursor is mainly composed of a capsule-separated, two-component curing system. After a force-trigger and curing process, the ductile adhesive elastomer exhibits a peel strength and a lap shear strength of 1.2 × 10 4 N m -1 and 7.8 × 10 3 kPa, respectively, which exceed the reported values for advanced ductile adhesive elastomers. The ultra-high adhesion force is attributed to the excellent surface contact of the liquid-like precursor and to the high elastic modulus of the cured elastomer that is reinforced by a two-phase design. In conclusion, incorporation of such on-demand adhesion into an elastomer enables a controlled delay between installation and curing so that these can take place under their individual ideal conditions, effectively reducing the energy cost, preventing failures, and improving installation processes.

36 MATERIALS SCIENCE↗

Well-Controlled Hydro-thermo-chemical Stimulation of a Coso Geothermal Well to Enhance Productivity

The goal of this project was to demonstrate controlled fracturing and permeability increase to enhance resource production and power generation at Coso. It was planned to stimulate at least two intervals in the Well 73-18RD with zonal isolation using advanced high-temperature packer technology. The anticipation was that a hydraulic fracture would form in one zone and in the second zone natural fractures would reopen, shear and extend, thereby increasing fluid communication in the field. In both cases, the intent was to carefully design the stimulation to take advantage of the relative roles of hydraulic pressure, thermal stress and chemical (“hydro-thermo-chemical”) dissolution. The project had planned to use the Welltec Annular Barrier (WAB) system developed as part of another DOE-funded project which was on schedule to be ready for field deployment. If successful, the Coso Operating Company would incorporate this approach into their ongoing well maintenance in other wells increasing the total MWs produced. The project had multiple tasks and the objective of Task 1 was to develop a workover plan, to build a geologic model, to design a stimulation program, and to work with the operating and services companies to develop a detailed budget and obtain the necessary permits and sundry notices. In Phase 2 the workover plan would be implemented, the designed stimulation would be carried out, and subsequently the well would logged and tested to measure the impact of stimulation. Per sponsor request, a Pre-Task 1 activity with a Go/No Go decision point was scheduled in Task 1.

02 PETROLEUM↗

A Lithium Feedstock Pathway: Coupled Electrochemical Saltwater Extraction and Direct Battery Materials Manufacturing

Lithium (Li) is one of the critical industrial materials and an indispensable component in manufacturing Li batteries. However, Li resource is limited and geographically uneven in earth’s crust and its mining is not sustainable due to the low efficiency and complicated separation and refining processes. In this work, we develop a one-step technology to electrochemically extract Li from low concentration solutions (brines, seawater or used Li-ion batteries) into a form to directly produce commercial battery materials, eliminating the costly Li separation/purification steps. By using this approach, Li was selectively extracted and converted into battery cathodes (e.g., spinel LiMn 2 O 4 and layered LiNi x Mn y Co z O 2 ) through heat treatment. With the importance of Li-ion batteries to the overall decarbonization strategy, the demonstration of a one-step Li-extraction to a ready-to-use material could expand the access to Li resources at a lower cost by eliminating processing steps.

25 ENERGY STORAGE↗

Power market models for the clean energy transition: State of the art and future research needs

As power systems around the world are rapidly evolving to achieve decarbonization objectives, it is crucial that power system planners and operators use appropriate models and tools to analyze and address the associated challenges. This paper provides a detailed overview of the properties of power market models in the context of the clean energy transition. We review common power market model methodologies, their readiness for low- and zero-carbon grids, and new power market trends. Based on the review, we suggest model improvements and new designs to increase modeling capabilities for future grids. The paper highlights key modeling concepts related to power system flexibility, with a particular focus on hydropower and energy storage, as well as the representation of grid services, price formation, temporal structure, and the importance of uncertainty. We find that a changing resource mix, market restructuring, and growing price uncertainty require more precise modeling techniques to adequately capture the new technology constraints and the dynamics of future power markets. In particular, models must adequately represent resource opportunity costs, multi-horizon flexibility, and energy storage capabilities across the full range of grid services. Moreover, at the system level, it is increasingly important to consider sub-hourly time resolution, enhanced uncertainty representation, and introduce co-optimization for dual market clearing of energy and grid services. Likewise, models should capture interdependencies between multiple energy carriers and demand sectors.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Autonomous Energy Systems: Building Reliable, Resilient, and Secure Electrified Communities

Technological changes across energy systems are forcing utilities and operators to reconsider their methods for managing power delivery, but few operators have adopted advanced controls and operational software. Their challenge is that every system has peculiar requirements, and the available solutions are relatively new, untested, and difficult to integrate into an operational environment. Through extensive collaboration with utilities and cooperatives, the National Renewable Energy Laboratory has realized the need for autonomous and optimized management of energy resources, leading to the development of Autonomous Energy Systems, a packaged set of controls that is ready to be integrated into existing control rooms.

automation↗

Carbon Capture from ArcelorMittal Hot Briquetted Iron Plant Using Air Liquide Cryocap™ FG Technology – FEED Study

The process of steel production is energy and carbon intensive with global average energy consumption of 5.5 MWh/tonne of steel and CO2 emission intensity of 1.83 tonne CO2/tonne of steel. The steel making process has inherent CO2 emissions from mineral conversion and is considered major contributors to the global carbon emissions. The steel industry is responsible for 8% of global carbon emissions. The main objective of this research project is to execute and complete a front-end engineering and design (FEED) study for a commercial-scale, carbon capture project that separates 95% of the total CO2 emissions at the ArcelorMittal’s Hot Briquetted Iron (HBI) plant in Portland, TX (Figure 1). The HBI is an ore-based metallic that is used as high-grade feedstock for high-quality steel via an Electric Arc Furnace (EAF) route. The HBI plant produces 2.0 million metric tonnes of high-quality HBI and emits approximately 1 million tonnes CO2/yr. The capture system is a Pressure Swing Adsorption (PSA) system assisted Cryocap™ FG technology (Figure 2). The captured CO2 will be pipeline grade and will be geologically stored in a facility within 10 miles of the CO2 source. The Host Site location in Corpus Christi, TX, is near hydrocarbon processing facilities and near Environmental Justice (EJ) and Qualified Opportunity Zone (QOZ) communities. Due to the location of the Host Site, the retrofit project offers the ability to demonstrate how a workforce focused on the fossil energy sector can be redirected to the clean- energy sector. The Air Liquide Cryocap™ capture technology is a proven technology and has been extensively examined for large industrial applications. It has been shown to be applicable to a variety of industrial applications including the steel industry. Cryocap™ FG (specific setup for Flue Gas application) consists of a Pressure Swing Adsorption (PSA) unit coupled with a Cryogenic System. The PSA pre-concentrates the CO2 from the flue gas, while the cryogenic unit enables the CO2 purity to be increased to the desired level. The scope of this study incorporates completing FEED study of the CO2 capture system which includes point-source CO2 capture and balance-of-plant; Business Case Analysis (BCA) outlining the current and projected volumes of the steel plant’s point sources of CO2 and the potential utilization of tax credits, including its projected revenue and duration; Life Cycle Analysis (LCA); Environmental Justice Analysis; Economic Revitalization and Job Creation Outcomes Analysis; and Workforce Readiness Plan. The plant design work was divided into two components: Inside Battery Limits (ISBL) and Outside Battery Limits (OSBL). The ISBL focuses on the capture system, while the OSBL focuses on the utility feeds and ducting from the plant to the capture system. Various design and engineering deliverables will be developed to define commodity quantities, equipment specifications, and labour effort required to execute the project. These FEED study deliverables will be prepared with the intent to develop an overall project capital cost estimate consistent with an AACE Class 3 estimate. The modular approach for the Cryocap™ FG that is being designed for this study integrates compression, PSA, and cryogenic “bricks” to achieve the desired CO2 capture rates. This carbon capture system integrates easily with the existing plant, thus reducing project costs and risks. It is also capable of managing impurities such as nitrogen oxides (NOx), sulfur oxides (SOx), mercury, hydrocarbons, and particulate matter. The capture system has a smaller footprint than amine-based systems. The two-step process uses PSA to preconcentrate the CO2 in the feedstream and then uses the cryogenic portion to purify and compress the resulting high purity CO2 product. This combination of purification and compression (i.e., process intensification) significantly reduces the CAPEX associated with use of a separate compressor commonly utilized for amine solvent-based systems. Successful completion of the FEED study will provide DOE with a detailed understanding of the costs for scaling up this proven capture technology for commercial applications at industrial facilities.

42 ENGINEERING↗

Advancing Conduction-Cooled 650 MHz SRF Technology for Industrial Accelerators at Fermilab's IARC

The National Nuclear Security Administration (NNSA) funds the Illinois Accelerator Research Center (IARC) at Fermilab in developing a high-power, conduction-cooled Superconducting Radio Frequency (SRF) accelerator tailored for industrial applications requiring robust and efficient operation. A 650 MHz, 1.6 MeV, 20 kW SRF accelerator is currently under development, employing a conduction cooling approach to simplify cryogenic requirements and enhance accessibility for industrial use. The accelerator’s control system is implemented on the Blinky Lite platform, selected for its open-source architecture, secure remote access capabilities, and operational flexibility—attributes advantageous for industrial deployment and sustained operation. A dedicated beamline is designed to measure essential beam parameters and test the integrated performance of the accelerator and control systems, thereby validating their operational readiness for intended applications

Ji, Y. [Fermilab] (ORCID:0000000233981752)↗

Advancing Conduction-Cooled 650 MHZ SRF Technology for Industrial Accelerators at Fermilab S IARC

The National Nuclear Security Administration (NNSA) funds the Illinois Accelerator Research Center (IARC) at Fermilab in developing a high-power, conduction-cooled Superconducting Radio Frequency (SRF) accelerator tailored for industrial applications requiring robust and efficient operation. A 650 MHz, 1.6 MeV, 20 kW SRF accelerator is currently under development, employing a conduction cooling approach to simplify cryogenic requirements and enhance accessibility for industrial use. The accelerator's control system is implemented on the Blinky Lite platform, selected for its open-source architecture, secure remote access capabilities, and operational flexibility attributes advantageous for industrial deployment and sustained operation. A dedicated beamline is designed to measure essential beam parameters and test the integrated performance of the accelerator and control systems, thereby validating their operational readiness for intended applications.

Ji, Yichen [Fermilab]↗

Materials for Advanced Ultra-Supercritical (A-USC) Steam Turbines --- A-USC Component Demonstration

The U.S. Advanced Ultra-Supercritical (A-USC) Consortium was formed in 2001 as a government/industry program, sponsored by the U.S. Department of Energy (DOE) and the Ohio Coal Development Office (OCDO) and cost shared by industrial and not-for-profit partners. The purpose of the consortium was to advance the state of the art for power generation by evaluating and developing materials that allow the use of advanced steam cycles in coal-based power plants. These advanced cycles, with steam temperatures up to 1400°F (760°C), can increase the efficiency of coal-fired boilers from an average of 35% (current U.S. fleet) to more than 45% higher heating value (HHV) (>49% lower heating value [LHV]). The increase in a plant’s efficiency is limited unless new materials able to withstand these higher operating temperatures and pressures are identified and approved for use. The A-USC Consortium identified these needed materials during earlier phases of the program. It developed the welding and joining techniques along with manufacturing processes for casting and wrought products made from these new high-nickel alloys. It subjected these materials to extensive laboratory and steam loop testing. It then obtained ASME code approval for their use in U.S. boiler systems. The program’s successes leave this last remaining activity (ComTest Phase 2) that the U.S. utility industry has recommended to be accomplished prior to commercialization. The focus of the activity is the evaluation and demonstration of commercial readiness for “full scale” components to be made from these nickel-based alloy materials and provided by a U.S. domestic supply chain that is new to working with these alloys. According to studies completed by the Electric Power Research Institute (EPRI), the cost of an A-USC plant is approximately 20% higher than a non-A-USC plant because of its use of nickel-based alloys needed for the high temperature operating conditions. However, CO 2 reductions of approximately 30% from the current fleet average provide a strong incentive for its consideration. The actual costs and perceived value for CO 2 abatement will determine whether new or retrofitted plants are undertaken, although decisions to build A-USC plants in India would indicate its economic feasibility while also being part of a global carbon emissions strategy. The work by the A-USC Consortium, prior to the start of the ComTest project, has included lab scale and pilot scale materials testing, both in air and oxy-combustion. This testing has included air-cooled and steam-cooled “loops” that were installed into existing operating utility boilers to gain exposure of these materials to realistic conditions of high temperature and corrosion caused by the constituents in the coal ash. The A-USC Consortium also gained ASME Code approval of the Inconel 740 material, has cast and extruded the largest high nickel precipitation hardened alloys, and developed unique welding techniques to avoid problems identified by the competing European program. However, as valuable as these material test loops and accomplishments have been for obtaining information, their scale is below that required to minimize the risk associated for a U.S. utility to build a multibillion-dollar A-USC power plant. To reduce the final identified risk barrier to full-scale commercialization of these advanced materials and systems, the A-USC Consortium (guided by a utility industry advisory committee) has identified the key areas of the technology they desire to see as being capable of full-scale manufacturing and/or fabrication from an identified, capable U.S. domestic supplier base. A significant amount of work was accomplished during Phase 1 to identity the components, as well as the component size, that would be manufactured from advanced alloys such as Inconel 740H or Haynes 282 alloys. Pathways to supply these components for ComTest have been identified, as well as any further development that would be required. The Phase 2 effort used Phase 1 findings for designing these key full-scale components for A-USC boilers and turbines to include large castings; extrusions, forgings, fabrication of water walls and steam loops with headers from advanced materials, raw material (such as pipe extrusion billets) are at the commercial readiness level to permit advancement to a demonstration project. The Phase 2 work scope was addressed by a diverse team, including government, industry, and not-for-profit partners. The work scope under Phase 2 addressed fabrication of components identified as being outside of the proven capabilities of the existing supply chain, including the following: Steam turbine rotor forging and Haynes 282 nozzle carrier casting Superheater and reheater header and tube assemblies Large-diameter pipe extrusions and forgings Test valve articles to support ASME Code approval. In addition, key fabrication steps were completed, including boiler weld overlays and simulated field repairs. Throughout, extensive inspection and quality assurance testing of the components were performed. The team worked to advance ASME Code approval for key components and processes. Although much of the focus of ComTest Phase 2 was the high-temperature nickel-based alloy materials, a broader range of materials were incorporated, which would be representative of the materials used in full-scale A-USC power plant applications and have cross-cutting applicability on other high-temperature power generation options, such as advanced nuclear, supercritical CO 2 cycles, and central solar receivers. This report that has been submitted is organized in the following manner: Section 1 contains an Executive Summary. Section 2 discusses the ComTest project background and organization. Section 3 discusses project management and reporting. Section 4 discusses the procurement of nickel-based alloy and other A-USC materials and components. Section 5 discusses the fabrication of procurement of nickel-based alloy and other A-USC materials and components. Section 6 discusses the fabrication of cast nickel-based A-USC steam turbine components. Section 7 discusses the fabrication of forged nickel-based A-USC steam turbine piping and steam pipe components. Section 8 discusses the qualification of pressure relieve valves (PRVs) for A-USC power plants. Section 9 discusses proposed plans for future evaluation of A-USC components. Section 10 contains the summary and conclusion.

01 COAL, LIGNITE, AND PEAT↗

Energy Technology Innovation Partnership Project Strategic Energy Plan for Washington County, Maine

This Strategic Energy Plan (SEP) for Washington County, Maine was developed through the U.S. Department of Energy's Energy Technology Innovation Partnership Project (ETIPP) to address local challenges related to electricity reliability, affordability, and safety. Grounded in a "relational infrastructure" approach, the plan recognizes that improved energy outcomes depend not only on physical grid investments but also on strengthened coordination and trust between utilities and communities. Using utility-provided reliability data, public datasets, and community input, the plan identifies key risks, including vegetation-related outages, high energy burden, and vulnerability among elderly and medically dependent populations. The SEP establishes three priority areas: hazard mitigation for energy infrastructure, outage safety and emergency readiness, and energy assistance and thermal safety. It outlines community-driven actions designed to complement utility-led system improvements, including targeted outreach, municipal coordination, and expanded access to energy programs. The plan also situates local conditions within broader state policy, market dynamics, and funding opportunities. Intended as a living document, this SEP provides a scalable framework for collaborative action to improve resilience, safety, and affordability in rural energy systems.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Designing a transactive electric vehicle agent with customer’s participation preference

The proliferation of electric vehicles (EVs) and their inherent flexibility in charging timings make them an asset to improve grid performance. In contrast to direct control by a utility or autonomous price-based charging, the transactive control framework not only provides benefits to both grid and customers but also ensures customer autonomy. In this work, we design a transactive electric vehicle (TEV) agent that incorporates the EV owner’s willingness to trade-off between savings and amenity in form of a slider, where the EV owner’s amenity is characterized as vehicle readiness. Further, a privacy-preserving bidding formulation is proposed that also represents the customer’s transactive preference. A transactive market mechanism is discussed that integrates the TEV Agents into the local retail market and reconciles with the current day-ahead and real-time market structure. It is demonstrated that the proposed slider is able to provide a preferred trade-off between savings and amenity to individual customers. At the same time, the market mechanism is shown to successfully reduce both peak prices and peak demand. A comparative investigation of V1G and V2G technologies with respect to the battery prices is also discussed. It reveals that the V2G does not offer significant additional benefits with current battery prices, but could be promising if battery costs decline in the future.

33 ADVANCED PROPULSION SYSTEMS↗

Barriers to adopting artificial intelligence and machine learning technologies in nuclear power

Artificial intelligence and machine learning (AI/ML) technologies offer unique opportunities to transform nuclear plant operations and power generation. Benefits will be felt not only within existing analog and digital instrumentation and control, but also within work processes, the integration of people with technology and most importantly, the business case. The application of this new technology can help simplify complex problems and produce more effective decision-making, making nuclear power safer, more efficient, and more economically viable in the current energy market. Nonetheless, there are potential barriers to its adoption that must be overcome. The purpose of this paper is to categorize, review, and discuss barriers to AI/ML adoption within the nuclear power industry, with a focus on existing commercial reactors. Unique considerations for advanced reactors are also offered. Here we provide a comprehensive overview of the historical, technical, and business barriers that the industry faces, as well as stakeholder readiness, and end-user acceptance. We underscore the importance of user experience and offer potential solutions in overcoming each barrier. These include provisions for easier plant data access, a friendly regulatory environment, and investment in user trust and explainable AI.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sustainable macroalgae production at large scale

Pelagic, surface floating, macroalga, Sargassum is harvested at large scale from a free-roaming farm floating freely on the ocean surface, monitored and tracked with GPS drifters and contained only by naturally occurring circular currents known as eddies or gyres, without aquaculture equipment. The farming technique occurs in open ocean through the utilization of system design and technology. Satellite imagery is interpreted to locate naturally occurring Sargassum aggregations or mats. Harvest vessel(s) travel to an identified mat, where only a portion of the natural mat is harvested as starter culture for a free-roaming farm. Cuttings are left behind to become new plants to restore the “mother mat” for no net loss of habitat and for migration for cohabitating organisms. The remainder of the biomass is transported to the identified free-roaming farm site which is in a suitable Eddie. GPS drifters are adhered with seedlings until the crop is ready for harvest.

Myers, Alyson↗

3D high-fidelity automated neutronics guided optimization of fusion blanket designs

The compact Fusion Pilot Plant (FPP) is defined in the recent National Academies of Sciences, Engineering, and Medicine report as the next step of fusion energy demonstration with a $50$ MWe peak net electricity production, $Q_e$ greater than $1$, and at least $3$ hours of continuous operation. This fusion pilot plant will be a test bed enabling materials, designs, and fuel management assessment, and it will represent an engineering challenge because of its high-fusion power and compact design targets. Previous reactor data is limited to experiments operating in different design space ranges. Therefore, design iterations and assessments should rely on high-fidelity first-principle theoretical and computational models. The high-fidelity integrated modeling of the plasma is a fundamental part of fusion energy research. However, the whole device modeling is often neglected, utilizing low-fidelity, system-level analysis. Recently, the need for high-fidelity multi-physics modeling was recognized, resulting in a selection of integrated tools. Further, autonomous design optimization requires a streamlined framework that perturbs the design point, reruns the analysis, and examines the outputs. However, high-fidelity analysis requires complex geometry specification that is difficult to perturb. This work presents the parametric CAD generation tool TRACER and a new neutronic workflow. TRACER allows the perturbation of the geometry representation, creating geometry files ready for further analysis. The streamlined neutronic workflow allows efficient and accurate calculations. The two new tools coupled together were used to perform a 3D high-fidelity multi-objective, multi-input optimization of an "ARC Class" compact tokamak design. The workflow was driven by an optimization driver for full automation.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Operation of Argonne's Liquid Salt-Liquid Metal Separation Testbed for U/TRU Product Processing

Argonne National Laboratory has constructed a liquid salt-liquid metal separation testbed for use in the development and advancement of cathode processing of U/TRU co‑deposits generated by pyroprocessing of used nuclear fuel. The U/TRU product recovered from the electrorefiner contains adhered and entrained salt that must be removed prior to consolidation of the U/TRU alloy for use in advanced reactor fuel fabrication. The bottom pour operation utilizes the low melting points of U/TRU co‑deposits and higher densities of molten metals compared to molten salts to separate and consolidate the U/TRU product. Argonne’s testbed is designed to support the development and optimization of bottom-pouring configurations for batch and semi-continuous operations, integration of process monitoring and control technologies, and determination of operational requirements for implementing in an industrial setting. Scoping tests were performed to demonstrate operational aspects of the testbed, including operation using single-pour spout and dual-pour spout configurations, effectiveness of salt containment and extent of salt vaporization, and the use of sensor probes to detect the location of the interface between the metal and salt phases during pouring. Recommendations for process optimization testing for further development of bottom pour processing to separate U/TRU alloys from adhered salt were made based on the results of scoping tests. Completing the recommended activities will increase the technical readiness level (TRL) of the liquid salt-liquid metal separation operation and consolidation of U/TRU alloys to support industrialization of pyroprocessing.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗