Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “scheduling software”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Knowledge based automated scheduling and planning tools for IUE

The International Ultraviolet Explorer has been successfully operated as a real time user-interactive space observatory for twelve years. It is expected to continue operation for up to five additional years, but under increasing constraints. The option to operate IUE in a more automated, non user-interactive mode is under consideration. A sophisticated software system to support such an operation is a clear requirement. The conceptual framework of such a system is described. Results of a preliminary tests are presented for which a hypothetical four day schedule of space-craft activities at a time resolutions as low as ten minutes was generated.

Shrader, Chris R.↗

Required Time of Arrival as a Control Mechanism to Mitigate Uncertainty in Arrival Traffic Demand Management

The objective of this study is to explore the use of Required Time of Arrival (RTA) capability on the flight deck as a control mechanism on arrival traffic management to improve traffic delivery accuracy by mitigating the effect of traffic demand uncertainty. The uncertainties are caused by various factors, such as departure error due to the difference between scheduled departure and the actual take-off time. A simulation study was conducted using the Multi Aircraft Control System (MACS) software, a comprehensive research platform developed in the Airspace Operations Laboratory (AOL) at NASA Ames Research Center. The Crossing Time (CT) performance (i.e. the difference between target crossing time and actual crossing time) of the RTA for uncertainty mitigation during cruise phase was evaluated under the influence of varying two main factors: wind severity (heavy wind vs. mild wind), and wind error (1 hour, 2 hours, and 5 hours wind forecast errors). To examine the CT performance improvement made by the RTA, the comparison to the CT of the aircraft that were not assigned with RTA (Non-RTA) under the influence of the selected factors was also made. The Newark Liberty International Airport (EWR) was chosen for this study. A total 66 inbound traffic to the EWR (34 of them were airborne when the simulation was initiated, 32 were pre-departures at that time) was simulated, where the pre-scripted departure error was assigned to each pre-departure (61 conform to their Expected Departure Clearance Time, which is +-300 seconds of their scheduled departure time). The results of the study show that the delivery accuracy improvement can be achieved by assigning RTA, regardless of the influence of the selected two factors (the wind severity and the wind information inaccuracy). Across all wind variances, 66.9 (265 out of 396) of the CT performance of the RTA assigned aircraft was within +- 60 seconds (i.e. target tolerance range) and 88.9 (352 out of 396) aircraft met +-300 seconds marginal tolerance range, while only 33.6 (133 out of 396) of the Non-RTA assigned aircrafts CT performance achieved the target tolerance range and 75.5 (299 out of 396) stayed within the marginal. Examination of the impact of different error sources i.e. departure error, wind severity, and wind error suggest that although large departure errors can significantly impact the CT performance, the impacts of wind severity and errors were modest relative the targeted +- 60 second conformance range.

required time of arrival (RTA)↗

Numerical simulations of vertical growth of hydraulic fractures and brine migration in geological formations above the Marcellus shale

One of the critical environmental questions about hydraulic fracturing in shales is the potential for contamination of ground and surface water. There are two specific concerns arising from hydraulic treatments: 1) whether hydraulic fractures extend upward through overlying strata to reach overlying aquifers containing drinking water, and 2) whether injected fluids push native fluids upward into these overlying aquifers. In this work, the extent of likely fracture growth through overlying layers during hydraulic treatment of the Marcellus shale was estimated using a hydraulic fracture model. A wide range of material and fluid flow properties in a multi-layered geologic model was considered. The model was based on conditions and characteristics applicable to the Marcellus shale in that part of the Appalachian basin within southwestern Pennsylvania. Predictions of vertical termination frequencies for hydraulic fractures were used in a multi-layer model of the strata and natural fractures for studying brine migration through the natural and induced fracture network. NFFLOW, the software for explicitly modeling flow within networks of fractures, was utilized to compute transient flow rates according to the schedule of injected fluid during hydraulic fracturing. To aid our analysis, the modeled sequence of geologic strata was capped with a fictitious unfractured, but moderately-permeable layer, which serves as a monitoring zone. The analysis assumes one well lateral was placed in the middle of the Marcellus shale with hydraulic fractures penetrating layers in the model. The newly-developed geomechanical module within NFFLOW was used to represent stress-sensitivity of the fractures. This allows the opening and closing of fracture apertures with changes in fluid pressures within fracture segments. Pressure increases in the formations overlying the Tully limestone, indicating fluid flow, was observed due to the hydraulic stimulation; and the impact of these increased pressures on brine migration towards the surface was considered.

03 NATURAL GAS↗

Integration of RNTuple in ATLAS Athena

After using ROOT’s TTree I/O subsystem for over two decades and storing more than an exabyte of compressed High Energy Physics (HEP) data, advances in technology have motivated a complete redesign, RNTuple, which breaks backward-compatibility to take better advantage of these storage options. The RNTuple I/O subsystem has been designed to address performance bottlenecks and other shortcomings of TTree. Specifically, RNTuple comes with an updated, more compact binary data format that can be stored both in ROOT files and natively in object stores. It is designed for modern storage hardware (e.g. high-throughput low-latency NVMe SSDs), and provides robust and easy to use interfaces. The binary format of RNTuple is scheduled to become production grade in 2024, and recently has become mature enough to start exploring the integration into software used by HEP experiments. In this contribution, we discuss the developments to support the features as required by the ATLAS analysis Event Data Model (EDM) in RNTuple, which will enable its integration into the Athena software framework. With these developments in place, we evaluate the performance of the current most recent versions of RNTuple-based ATLAS data sets and compare this to that of TTree.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Problems related to the integration of fault tolerant aircraft electronic systems

Problems related to the design of the hardware for an integrated aircraft electronic system are considered. Taxonomies of concurrent systems are reviewed and a new taxonomy is proposed. An informal methodology intended to identify feasible regions of the taxonomic design space is described. Specific tools are recommended for use in the methodology. Based on the methodology, a preliminary strawman integrated fault tolerant aircraft electronic system is proposed. Next, problems related to the programming and control of inegrated aircraft electronic systems are discussed. Issues of system resource management, including the scheduling and allocation of real time periodic tasks in a multiprocessor environment, are treated in detail. The role of software design in integrated fault tolerant aircraft electronic systems is discussed. Conclusions and recommendations for further work are included.

Bannister, J. A.↗

NASA X-34 Technology in Motion

The X-34 technology development program is a joint industry/government project to develop, test, and operate a small, fully-reusable hypersonic flight vehicle. The objective is to demonstrate key technologies and operating concepts applicable to future reusable launch vehicles. Integrated in the vehicle are various systems to assure successful completion of mission objectives, including the Main Propulsion System (MPS). NASA-Marshall Space Flight Center (MSFC) is responsible for developing the X-34's MPS including the design and complete build package for the propulsion system components. The X-34 will be powered by the Fastrac Engine, which is currently in design and development at NASA-MSFC. Fastrac is a single-stage main engine, which burns a mixture of liquid oxygen (LOX) and kerosene(RP-1). The interface between the MPS and Fastrac engine are critical for proper system operation and technologies applicable to future reusable launch vehicles. Deneb's IGRIP software package with the Dynamic analysis option provided a key tool for conducting studies critical to this interface as well as a mechanism to drive the design of the LOX and RP-1 feedlines. Kinematic models were created for the Fastrac Engine and the feedlines for various design concepts. Based on the kinematic simulation within Envision, design and joint limits were verified and system interference controlled. It was also critical to the program to evaluate the effect of dynamic loads visually, providing a verification tool for dynamic analysis and in some cases uncovering areas that had not been considered. Deneb's software put the X-34 technology in motion and has been a key factor in facilitating the strenuous design schedule.

Beech, Geoffrey↗

IMPaCT - Integration of Missions, Programs, and Core Technologies

IMPaCT enables comprehensive information on current NASA missions, prospective future missions, and the technologies that NASA is investing in, or considering investing in, to be accessed from a common Web-based interface. It allows dependencies to be established between missions and technology, and from this, the benefits of investing in individual technologies can be determined. The software also allows various scenarios for future missions to be explored against resource constraints, and the nominal cost and schedule of each mission to be modified in an effort to fit within a prescribed budget.

Balacuit, Carlos P.↗

Progress on the International Space Station - We're Part Way up the Mountain

The first phase of the International Space Station construction has been completed, and research has begun. Russian, U.S., and Canadian hardware is on orbit, and Italian logistics modules have visited often. With the delivery of the U.S. Laboratory, Destiny, significant research capability is in place, and dozens of U.S. and Russian experiments have been conducted. Crew members have been on orbit continuously since November 2000. Several "bumps in the road" have occurred along the way, and each has been systematically overcome. Enormous amounts of hardware and software are being developed by the International Space Station partners and participants around the world and are largely on schedule for launch. Significant progress has been made in the testing of completed elements at launch sites in the United States and Kazakhstan. Over 250,000 kilograms of flight hardware have been delivered to the Kennedy Space Center and integrated testing of several elements wired together has progressed extremely well. Mission control centers are fully functioning in Houston, Moscow, and Canada, and operations centers Darmstadt, Tsukuba, Turino, and Huntsville will be going on line as they are required. Extensive coordination efforts continue among the space agencies of the five partners and two participants, involving 16 nations. All of them continue to face their own challenges and have achieved significant successes. This paper will discuss the contributions of the International Space Station partners and participants, their accomplished milestones, and upcoming events. The International Space Station program, the largest and most complicated peacetime project in history, has progressed part way up the mountain, and the partners are continuing their journey to the top. The International Space Station (ISS) is unprecedented in its technological, engineering, and management complexity, and is one of the largest international collaborations ever undertaken. The ISS is a dramatic example of the ability of nations to work together as a team toward common goals and dreams. The challenges encountered and overcome by the international ISS team have been likened to climbing a mountain. Construction of the ISS has progressed rapidly in the past year. ISS is now a functioning microgravity laboratory in space hosting a permanent human presence, prompting the characterization that we are "part way up the mountain, and the team continues its climb."

Fortenberry, Lindy↗

A Flexible Control Center Architecture for Support of Diverse Spaceflight Missions

The Ames Multi-Mission Operations Center (MMOC) enables and supports flight and science operations for Ames' spaceflight missions. The MMOC is composed of the facilities, networks, information technology equipment, software, and system administration services needed by flight projects to effectively and efficiently perform all mission functions, including planning, scheduling, command, telemetry processing, and science analysis. The MMOC's ready-to-use services reduce start-up time, shorten procurement and provisioning and allow mission planning efforts to focus more on science and less on infrastructure. The architecture of the MMOC was designed from the start for flexibility, so that it can readily support multiple missions of greatly varying size and complexity while simultaneously keeping costs low.

Differding, Joan C.↗

High Performance Computing - Power Application Programming Interface Specification

Achieving practical exascale supercomputing will require massive increases in energy efficiency. The bulk of this improvement will likely be derived from hardware advances such as improved semiconductor device technologies and tighter integration, hopefully resulting in more energy efficient computer architectures. Still, software will have an important role to play. With every generation of new hardware, more power measurement and control capabilities are exposed. Many of these features require software involvement to maximize feature benefits. This trend will allow algorithm designers to add power and energy efficiency to their optimization criteria. Similarly, at the system level, opportunities now exist for energy-aware scheduling to meet external utility constraints such as time of day cost charging and power ramp rate limitations. Finally, future architectures might not be able to operate all components at full capability for a range of reasons including temperature considerations or power delivery limitations. Software will need to make appropriate choices about how to allocate the available power budget given many, sometimes conflicting considerations.

97 MATHEMATICS AND COMPUTING↗

Space Telescope Fine Guidance Sensor Bearing Anomaly

Early in 1993, a servo motor within one of three Fine Guidance Sensors (FGS) aboard the Hubble Space Telescope (HST) reached stall torque levels on several occasions. Little time was left to plan replacement during the first servicing mission, scheduled at the end of '93. Accelerated bearing life tests confirmed that a small angle rocking motion, known as Coarse Track (CT), accelerated bearing degradation. Saturation torque levels were reached after approximately 20 million test cycles, similar to the flight bearings. Reduction in CT operation, implemented in flight software, extended FGS life well beyond the first servicing mission. However in recent years, bearing torques have resumed upward trends and together with a second, recent bearing torque anomaly has necessitated a scheduled FGS replacement during the upcoming second servicing mission in '97. The results from two series of life tests to quantify FGS bearing remaining life, discussion of bearing on-orbit performance, and future plans to service the FGS servos are presented in this paper.

Loewenthal, S.↗

Austin Sustainable and Holistic Integration of Energy Storage and Solar PV [Austin SHINES]. Final Report, Version 2

The Austin SHINES project and solution is a software management platform, for an electric grid with a high penetration of dispersed photovoltaic (PV) solar generation sites, which maintains the traditional power quality and reliability associated with grid service. This project developed and deployed the platform as a Distributed Energy Resource Management System (DERMS), engaging multiple advanced controls, to evaluate operation and optimization of a fleet of diverse DER assets, installed at several locations among Austin Energy’s customers and distribution system. The project also produced a methodology to create a replicable DERMS template, adaptable to other regions and market structures. Last, Austin SHINES aimed to demonstrate the solution’s methodology would enable the DER grid ecosystem to serve load at a technical cost (System Levelized Cost of Electricity, or System LCOE) of less than the U.S. Department of Energy SHINES program metric of $0.14/kWh, in a defined boundary, while enabling a high penetration of distributed PV. Research was categorized in 6 reports (Final Deliverables = FD) listed below, with titles and descriptions indicating which area of understanding was investigated: FD-1: System Levelized Cost of Electricity (System LCOE) Methodology The creation and use of the System LCOE to Serve Load metric that encompasses the holistic, system-level costs and benefits of all resources, and enables them to be evaluated based on their ability to support an efficient and low-cost integrated grid ecosystem. FD-2: Software Platform Product Description The creation of new DER control methodologies deployable within a utility-grade software platform that enable DER's to maximize their benefit within a grid, that is capable of serving load enabling a high penetration of distributed PV generation. FD-3: Optimal Design Methodology Optimal design methodologies for individual DER installations that enable utilities to determine the optimal combinations and sizing for individual DER sites. FD-4: Austin SHINES Ownership and Operation Models for DER System Performance A comparison of multiple DER aggregation and ownership methodologies including direct utility control, third-party aggregator, and autonomous. FD-5: Economic Modeling & Optimization A comparison of multiple DER technology mixes and configurations within the distribution system, providing insight into an optimal blend of technologies that best enable the distribution system to serve load at the lowest cost at high penetrations of solar. FD-6: Fielded Assets Deployed DER assets within the Austin Energy SHINES circuits. Austin SHINES provided an opening for state-of-the-art technology products to be deployed, providing a rich opportunity for improving how each of the products perform as stand-alone products, and in concert with other complementary products. The Austin SHINES project comprised of two key metrics for System LCOE: SystemLCOE_SHINES<$0.14/kWh Modeled ΔSystemLCOE_SHINES/ΔSystemLCOE_Base≥20% at same solar penetration The System LCOE calculation uses the costs of the utility-owned infrastructure as it exists today, the cost of the DERs that exist in the system today, and the cost of the purchase of energy from ERCOT wholesale markets over the course of the calendar year. All costs are on an annualized basis. The capital and operating costs are derived from the rate case, which produces a yearly cost. The net cost of energy and services imported to the system is integrated over the test year, as is the load served and solar penetration. The first metric was easily achieved by every scenario considered. The goal was set when the Department of Energy’s SHINES Funding Opportunity Announcement was written in 2015 and was a more difficult target at the time. Due mostly to rapidly declining costs for DERs and the significant decrease in the Electric Reliability Council of Texas (ERCOT) energy market prices, which results in lower net cost of energy purchases, the System LCOE is well below this target for all scenarios considered. A fleet of DERs can assume different mixtures, each of which serves the load at a different LCOE. The optimal mixture of DERs serves load at the smallest System LCOE. The second metric (hereinafter %delta metric) asks that the holistic DERMS controls reduce the incremental cost above the baseline of going to a high solar penetration future by at least 20% as compared to the case of a DER deployment with no sophisticated controls (autonomous). Many comparison sets were created throughout this project. Physical technology was installed for informing utility engineering and testing several types of operational control schemes, through the DERMS. The types of operational control which were compared for valuation of the System LCOE Metric were: Holistic control = using the full suite of the DERMS platform to decide and optimize how/why the systems operate depending on weather, market, and reliability signal input. Autonomous control = a local mode at the asset site, wherein a schedule operates the asset, with visibility into performance only No control = the baseline for comparing value against the other two types of control The types of ownership control included: Direct Utility control = the utility dispatches a signal to each asset Third-Party Aggregator = a third party aggregates a fleet of assets and the utility dispatches one signal for all Autonomous = a local mode is set for operation at the asset site, wherein a schedule operates the asset, with visibility into performance only The types of control methodologies deployable within a utility-grade software platform included: Utility Peak Load Reduction = Lower transmission cost obligation Day-Ahead Energy Arbitrage = Realize economic value through price differential Real-Time Price Dispatch = Realize economic value from real-time price spikes Voltage support = Reduce losses and increase solar generation Distribution Congestion Management = Increase local grid reliability Demand Charge Reduction = Lower customer bills and realize system benefit The fielded assets deployed for the project were: Utility Scale Kingsbery Energy Storage System: 1.5 MW / 3 MWh Li-Ion battery storage Mueller Energy Storage System: 1.75 MW / 3.2 MWh Li-Ion battery storage, 7 Energy Storage Units (250 kW each) La Loma Community Solar: 2.6 MW Commercial Scale Aggregated storage installations at 3 sites, with existing solar (300+ kW): One 18 kW / 36 kWh Li-Ion battery storage Two 72 kW / 144 kWh Li-Ion battery storage Residential Scale Aggregated storage installations: -Six stationary battery storage systems (10 kWh each) at homes with existing solar -One Electric Vehicle installed as Vehicle-to-Grid (V2G) Utility-Controlled Solar via Smart Inverters at 12 homes Autonomously-Controlled Smart Inverters at 6 homes Over the course of the project, Austin SHINES undertook installing more than 3 MW of distributed battery energy storage, smart PV inverters, a DER control platform, and other enabling technologies utilizing customer and utility locations and aggregation models. All of these resources were to be integrated and optimized at the utility level. DER assets and control methodologies were designed to achieve a credible pathway to a System LCOE for energy delivered to load of $0.14//kWh or less by 2020, while maximizing distributed solar generation and maintaining acceptable standards of power quality. The project also established a template for other regions to follow, to maximize the adoption of distributed solar PV in support of an economic and efficient grid. In total, the Austin SHINES project added value to the DER subject area in each layer of integration. From utility, to commercial to residential scales, the sheer hierarchy of communication and coordination was a significant accomplishment in addition to learnings from what these communications revealed was unique to each. Economically, the most effective method demonstrated was the criticality of planning phases. Contingencies and multiple projection scenarios helped guide the project to deploy optimal design as close as feasible, in real world conditions. The project and reports will serve public benefit by outlining specific areas of DER strategy and installation where many stakeholders and needs can be addressed with improved efficiency. Overall, communities and utilities should use the results to guide the increasing options available for powering the grid with DER, renewables, and carbon considerate energy.

14 SOLAR ENERGY↗

On-demand Command and Control of ASTERIA with Cloud-based Ground Station Services

ASTERIA (Arcsecond Space Telescope Enabling Research in Astrophysics) was a 6-unit CubeSat technology demonstration mission that deployed from the International Space Station on November 20th, 2017. After successfully completing its 90-day primary mission that demonstrated arcsecond-level line-of-sight pointing and focal plane thermal stability for exoplanet detection, it entered an extended mission performing onboard software demonstrations to mature technology both in space and on the ground. One of the technologies was a completely cloud-based ground system leveraging Amazon Web Services (AWS) Ground Station service. Announced in December 2018 and launched in May 2019, AWS Ground Station is a fully managed ground station service that aims to reduce the overhead associated with developing and maintaining ground system infrastructure throughout the mission lifecycle. AWS Ground Station makes available the suite of features required for any ground system in support of low-Earth orbit (LEO) and medium-Earth Orbit (MEO) satellite operations on-demand and without setting up or maintaining long-term contracts. Charges are incurred on a per-minute basis for antenna usage during scheduled tracks. Support is available for S-band uplink and downlink, along with X-band narrowband and wideband downlink. Missions that use the service may reserve tracks with any licensed AWS Ground Station antennas located across each service region and have direct access to any AWS services in support of mission operations. The cloud-based architecture built around the AWS Ground Station service greatly enhanced ASTERIA mission operations by enabling end-to-end pass automation, on-demand contact scheduling and contingency planning, along with more efficient data downlink through station availability and station-tostation handovers. It incorporated open-source software, particularly NASA's AMMOS Instrument Toolkit (AIT) and Open Mission Control Technologies (OpenMCT), along with the AWS application programming interfaces (API) to the Ground Station, Elastic Compute Cloud (EC2) and Simple Storage Service (S3) services. After showcasing operability in August 2019, the team continued using and improving this novel ground system architecture until the end of mission in December 2019. This paper describes the cloud-based ground system, how it was designed, tested, and evaluated with an inorbit spacecraft, the operational capabilities that it enabled, along with lessons learned and recommendations for future missions.

Fesq, Lorraine↗

Using CCSDS Standards to Reduce Mission Costs

NASA's open source Core Flight System (cFS) software framework has been using several Consultative Committee for Space Data Systems (CCSDS) standards since its inception. Recently developed CCSDS standards are now being applied by NASA, ESA and other organizations to streamline and automate aspects of mission development, test, and operations, speeding mission schedules and reducing mission costs. This paper will present the new CCSDS Spacecraft Onboard Interfaces Services (SOIS) Electronic Data Sheet (EDS) standards and show how they are being applied to data interfaces in the cFS software framework, tool chain, and ground systems across a range of missions at NASA. Although NASA is focusing on the cFS, it expected that these technologies are well suited for use in other system architectures and can lower costs for a wide range of both large and small satellites.

Wilmot, Jonathan↗

Preparation of the Multi-Site Data Processing at the Vera C. Rubin Observatory

The Vera C. Rubin Observatory’s Legacy Survey of Space and Time (LSST) Camera is scheduled to start taking data in the summer of 2025. The Data Release Production will run the LSST Science Pipe software at data facilities in the US, France and the UK. The LSST Science Pipeline consists of complex directed acyclic graphs (DAGs) of tasks. Rubin will use the Production and Distributed Analysis (PanDA) workflow and workload management system to orchestrate this complex workflow and the distribution of workloads to the data facilities. When run end-to-end by a team of data production staff, this processing (the Science Pipelines, distributed by the workflow and workload management system) is referred to as a 'campaign'. This paper describes the central services and data facility specific services that support this multi-site data process model, including the service deployment infrastructure, the workload and workflow system, the Campaign Management tools, and connection to Rubin Data Management. This paper will also mention the experience of processing the Rubin Commissioning Camera data. All these are part of the effort to scale up the processing capabilities for the expected very large data volume from the LSST Camera.

Yang, Wei [SLAC]↗

Exploring the Use of Novel Spatial Accelerators in Scientific Applications

Driven by the need to find alternative accelerators which can viably replace GPUs in next-generation Supercomputing systems, this paper proposes a methodology to enable agile application/hardware co-design. The application-first methodology provides the ability to come up with design of accelerators while working with real-world workloads, available accelerators, and system software. The iterative design process targets a set of kernels in a workload for performance estimates that can prune the design space for later phases of detailed architectural evaluations. To this effect, in this paper, a novel data-parallel device model is introduced that simulates the latency of performance-sensitive operations in an accelerator including data transfers and kernel computation using multi-core CPUs. The use of off-the-shelf simulators, such as pre-RTL simulator Aladdin or multiple tools available for exploring the design of deep neural network accelerators (e.g., Timeloop) is demonstrated for evaluation of various accelerator designs using applications with realistic inputs. Examples of multiple device configurations that are instantiable in a system are explored to evaluate the performance benefit of deploying novel accelerators. The proposed device is integrated with a programming model and system software to potentially explore the impacts of high-level programming languages/compilers and low-level effects such as task scheduling on multiple accelerators. We analyze our methodology for a set of applications that represent high-performance computing (HPC) and graph analytics. The applications include a computational chemistry kernel realized using tensor contractions, triangle counting, GraphSAGE and Breadth-first Search. These applications include kernels such as dense matrix-dense matrix multiplication, sparse matrix-spare matrix multiplication, and sparse matrix-dense vector multiplication. Our results indicate potential performance benefits and insights for system design by including accelerators that realize these kernels along-side general purpose accelerators.

AI, codesign, Accelerated Computing, Modeling and ↗