Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance contracting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

A Comprehensive Plan for the Long-Term Calibration and Validation of Oceanic Biogeochemical Satellite Data

The primary objective of this planning document is to establish a long-term capability and validating oceanic biogeochemical satellite data. It is a pragmatic solution to a practical problem based primarily o the lessons learned from prior satellite missions. All of the plan's elements are seen to be interdependent, so a horizontal organizational scheme is anticipated wherein the overall leadership comes from the NASA Ocean Biology and Biogeochemistry (OBB) Program Manager and the entire enterprise is split into two components of equal sature: calibration and validation plus satellite data processing. The detailed elements of the activity are based on the basic tasks of the two main components plus the current objectives of the Carbon Cycle and Ecosystems Roadmap. The former is distinguished by an internal core set of responsibilities and the latter is facilitated through an external connecting-core ring of competed or contracted activities. The core elements for the calibration and validation component include a) publish protocols and performance metrics; b) verify uncertainty budgets; c) manage the development and evaluation of instrumentation; and d) coordinate international partnerships. The core elements for the satellite data processing component are e) process and reprocess multisensor data; f) acquire, distribute, and archive data products; and g) implement new data products. Both components have shared responsibilities for initializing and temporally monitoring satellite calibration. Connecting-core elements include (but are not restricted to) atmospheric correction and characterization, standards and traceability, instrument and analysis round robins, field campaigns and vicarious calibration sites, in situ database, bio-optical algorithm (and product) validation, satellite characterization and vicarious calibration, and image processing software. The plan also includes an accountability process, creating a Calibration and Validation Team (to help manage the activity), and a discussion of issues associated with the plan's scientific focus.

Hooker, Stanford B.↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration s (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Cargo Vehicle s first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd↗

NASA's Space Launch System: A Flagship for Exploration Beyond Earth's Orbit

The National Aeronautics and Space Administration's (NASA) Space Launch System (SLS) Program, managed at the Marshall Space Flight Center, is making progress toward delivering a new capability for exploration beyond Earth orbit in an austere economic climate. This fact drives the SLS team to find innovative solutions to the challenges of designing, developing, fielding, and operating the largest rocket in history. To arrive at the current SLS plan, government and industry experts carefully analyzed hundreds of architecture options and arrived at the one clear solution to stringent requirements for safety, affordability, and sustainability over the decades that the rocket will be in operation. This paper will explore ways to fit this major development within the funding guidelines by using existing engine assets and hardware now in testing to meet a first launch by 2017. It will explain the SLS Program s long-range plan to keep the budget within bounds, yet evolve the 70 metric ton (t) initial lift capability to 130-t lift capability after the first two flights. To achieve the evolved configuration, advanced technologies must offer appropriate return on investment to be selected through a competitive process. For context, the SLS will be larger than the Saturn V that took 12 men on 6 trips for a total of 11 days on the lunar surface over 4 decades ago. Astronauts train for long-duration voyages on the International Space Station, but have not had transportation to go beyond Earth orbit in modern times, until now. NASA is refining its mission manifest, guided by U.S. Space Policy and the Global Exploration Roadmap. Launching the Orion Multi-Purpose Crew Vehicle s (MPCV s) first autonomous certification flight in 2017, followed by a crewed flight in 2021, the SLS will offer a robust way to transport international crews and the air, water, food, and equipment they need for extended trips to asteroids, Lagrange Points, and Mars. In addition, the SLS will accommodate high-priority science experiments. SLS affordability initiatives include streamlining interfaces, applying risk-based insight into contracted work, centralizing systems engineering and integration, and nurturing a learning culture that continually benchmarks its performance against successful ventures. As this paper will explain, the SLS is making measurable progress toward becoming a global infrastructure asset for robotic and human scouts of all nations by harnessing business and technological innovations to deliver sustainable solutions for space exploration.

May, Todd A.↗

Dynamic Radioisotope Power Systems Development Status and Path to Flight

Dynamic power conversion offers the potential to produce Radioisotope Power Systems (RPS) that generate higher power outputs and utilize the Pu-238 radioisotope more efficiently. Additionally, dynamic power conversion offers the potential of producing generators with minimal degradation resulting in more power at the end of the mission, when the power is needed. Dynamic power conversion technologies being developed for space applications include the Stirling and Brayton thermodynamic cycle machines. Machines can be built based on these cycles while eliminating wear mechanisms of the moving components, enabling long design life necessary for space missions. The Dynamic Radioisotope Power Systems (DRPS) project at NASA Glenn Research Center (Glenn Research Center) is pursuing the realization of this type of power source on a flight mission. The project currently has three convertor development contracts that will deliver prototype hardware in 2020. This hardware will undergo a gamut of experimental performance verification efforts at NASA GRC. In parallel, the project has also initiated generator design efforts based on these underlying convertor options, and is also on track to build an in-house version of a generator for laboratory system-level testing. The project is also funding control electronics technology, which are necessary to convert alternating current from the dynamic devices to direct current for use by a spacecraft. A lunar mission is being targeted as the first use of this new technology, as DRPS enables a wide range of high-return scientific missions on the moon, while the mission being short in duration (2 years rather than 10 years for an outer planets mission).

Salvatore M Oriti↗

Dynamic Radioisotope Power Systems Status and Path to Flight

Dynamic power conversion offers the potential to produce Radioisotope Power Systems (RPS) that generate higher power outputs and utilize the Pu-238 radioisotope more efficiently. Additionally, dynamic power conversion offers the potential of producing generators with minimal degradation resulting in more power at the end of the mission, when the power is needed. Dynamic power conversion technologies being developed for space applications include the Stirling and Brayton thermodynamic cycle machines. Machines can be built based on these cycles while eliminating wear mechanisms of the moving components, enabling long design life necessary for space missions. The Dynamic Radioisotope Power Systems (DRPS) project at NASA Glenn Research Center (Glenn Research Center) is pursuing the realization of this type of power source on a flight mission. The project currently has three convertor development contracts that will deliver prototype hardware in 2020. This hardware will undergo a gamut of experimental performance verification efforts at NASA GRC. In parallel, the project has also initiated generator design efforts based on these underlying convertor options, and is also on track to build an in-house version of a generator for laboratory system-level testing. The project is also funding control electronics technology, which are necessary to convert alternating current from the dynamic devices to direct current for use by a spacecraft. A lunar mission is being targeted as the first use of this new technology, as DRPS enables a wide range of high-return scientific missions on the moon, while the mission being short in duration (2 years rather than 10 years for an outer planets mission).

Salvatore Oriti↗

Development of Stirling Convertors for Radioisotope and Fission Power Systems

NASA has been developing free-piston Stirling-cycle power convertors over the past 22 years for use in nuclear power systems that would provide electricity for space science missions to dark, dusty, or distant destinations where solar power is not practical. These nuclear power systems would generate heat from either the radioactive decay of isotopes or fission nuclear reactors. That heat would be converted to usable electricity using highly efficient Stirling convertors for a wide range of power needs needing 10s of watts to 50 kWe. NASA’s Radioisotope Power Systems (RPS) Program is maturing advanced thermoelectric and dynamic conversion technologies that would increase the system efficiency beyond what is currently possible using heritage systems to enable a larger number of robotic missions or higher power missions to solar system bodies of interest. The Dynamic Radioisotope Power Systems (DRPS) Project has matured prototype Stirling convertors to sufficiently increase the technology readiness level for infusion into flight development. Flexure and gas-bearing free-piston Stirling convertors were developed under contract by commercial partners and delivered to enable government evaluation. Gas-bearing designs have met performance and robustness requirements and were selected for flight development. This paper provides the status of SRSC test campaign and maturity level.

Dynamic↗

Development of Stirling Convertors for Radioisotope and Fission Power Systems

NASA has been developing free-piston Stirling-cycle power convertors over the past 22 years for use in nuclear power systems that would provide electricity for space science missions to dark, dusty, or distant destinations where solar power is not practical. These nuclear power systems would generate heat from either the radioactive decay of isotopes or fission nuclear reactors. That heat would be converted to usable electricity using highly efficient Stirling convertors for a wide range of power needs needing 10s of watts to 50 kWe. NASA’s Radioisotope Power Systems (RPS) Program is maturing advanced thermoelectric and dynamic conversion technologies that would increase the system efficiency beyond what is currently possible using heritage systems to enable a larger number of robotic missions or higher power missions to solar system bodies of interest. The Dynamic Radioisotope Power Systems (DRPS) Project has matured prototype Stirling convertors to sufficiently increase the technology readiness level for infusion into flight development. Flexure and gas-bearing free-piston Stirling convertors were developed under contract by commercial partners and delivered to enable government evaluation. Gas-bearing designs have met performance and robustness requirements and were selected for flight development. This paper provides the status of SRSC test campaign and maturity level.

Dynamic↗

Operating The Central Process Systems At Glenn Research Center

As a research facility, the Glenn Research Center (GRC) trusts and expects all the systems, controlling their facilities to run properly and efficiently in order for their research and operations to occur proficiently and on time. While there are many systems necessary for the operations at GRC, one of those most vital systems is the Central Process Systems (CPS). The CPS controls operations used by GRC's wind tunnels, propulsion systems lab, engine components research lab, and compressor, turbine and combustor test cells. Used widely throughout the lab, it operates equipment such as exhausters, chillers, cooling towers, compressors, dehydrators, and other such equipment. Through parameters such as pressure, temperature, speed, flow, etc., it performs its primary operations on the major systems of Electrical Dispatch (ED), Central Air Dispatch (CAD), Central Air Equipment Building (CAEB), and Engine Research Building (ERB). In order for the CPS to continue its operations at Glenn, a new contract must be awarded. Consequently, one of my primary responsibilities was assisting the Source Evaluation Board (SEB) with the process of awarding the recertification contract of the CPS. The job of the SEB was to evaluate the proposals of the contract bidders and then to present their findings to the Source Selecting Official (SSO). Before the evaluations began, the Center Director established the level of the competition. For this contract, the competition was limited to those companies classified as a small, disadvantaged business. After an industry briefing that explained to qualified companies the CPS and type of work required, each of the interested companies then submitted proposals addressing three components: Mission Suitability, Cost, and Past Performance. These proposals were based off the Statement of Work (SOW) written by the SEB. After companies submitted their proposals, the SEB reviewed all three components and then presented their results to the SSO. While the SEB does not select the company receiving the contract, they can make recommendations based on their findings to the SSO, who actually awards the contract. The SEB began work for this contract in July 2003 by writing the SOW and the selection will tentatively occur July 30, 2004. Contract awarding will take place Aug. 15. Following the awarding, the winning company has a 30-day Phase-in Period beginning Sept. 1,2004 and full performance will begin October 1.

Weiler, Carly P.↗

Onsite 40-kilowatt fuel cell power plant manufacturing and field test program

A joint Gas Research Institute and U.S. Department of Energy Program was initiated in 1982 to evaluate the use of fuel cell power systems for on-site energy service. Forty-six 40 kW fuel cell power plants were manufactured at the United Technologies Corporation facility in South Windsor, Connecticut, and are being delivered to host utilities and other program participants in the United States and Japan for field testing. The construction of the 46 fully-integrated power plants was completed in January 1985 within the constraints of the contract plan. The program has provided significant experience in the manufacture, acceptance testing, deployment, and support of on-site fuel cell systems. Initial field test results also show that these experimental power plants meet the performance and environmental requirements of a commercial specification. This Interim Report encompasses the design and manufacturing phases of the 40 kW Power Plant Manufacturing and Field Test program. The contract between UTC and NASA also provides UTC field engineering support to the host utilities, training programs and associated manuals for utility operating and maintenance personnel, spare parts support for a defined test period, and testing at UTC of a power plant made available from a preceding program phase. These activities are ongoing and will be reported subsequently.

Source record↗

A CFD Case Study of a Fan Stage with Split Flow Path Subject to Total Pressure Distortion Inflow

This report is the documentation of the work performed under the Hypersonic Project of the NASA's Fundamental Aeronautics Program. It was funded through Task Number NNC10E444T under GESS-2 Contract NNC06BA07B. The objective of the task is to develop advanced computational tools for the simulation of multi-stage turbomachinery in support of aeropropulsion. This includes work elements in extending the TURBO code and validating the multi-stage URANS (Unsteady Reynolds Averaged Navier Stokes) simulation results with the experimental data. The unsteady CFD (Computation Fluid Dynamics) calculations were performed in full wheel mode with and without screen generated total pressure distortion at the computational inflow boundary, as well as in single passage phase lag mode for uniform inflow. The experimental data were provided by NASA from the single stage RTA (Revolutionary Turbine Accelerator) fan test program.Significant non-uniform flow condition at the fan-face of the aeropropulsion system is frequentlyencountered in many of the advanced aerospace vehicles. These propulsion systems can be eithera podded or an embedded design employed in HWB (Hybrid Wing Body) airframe concept. It isalso a topic of interest in military applications, in which advanced air vehicles have already deployedsome form of embedded propulsion systems in their design because of the requirementsof compact and low observable inlets. Even in the conventional airframe/engine design, the fancould operate under such condition when the air vehicle is undergoing rapid maneuvering action.It is believed that a better understanding of the fan’s aerodynamic and aeromechanical responseto this type of operating condition or off design operation would be beneficial to designing distortiontolerant blades for improved engine operability.The objective for this research is to assess the capability of turbomachinery code as an analysistool in understanding the effects and evaluating the impact of flow distortion on the aerodynamicand aeromechanical performance of the fan in advanced propulsion systems. Results from thetesting of an advanced fan stage released by NASA are available and will be used here for CFDcode validation. The experiment was performed at NASA’s high speed compressor facility aspart of the RTA (Revolutionary Turbine Accelerator) demonstration project, a joint effort ofNASA Glenn Research Center and GE Aircraft Engines in developing an advanced Mach 4TBCC (Turbine Based Combined Cycle) turbofan/ramjet engine for access to space. Part of thetest was to assess the aerodynamic performance and operability of the fan stage under nonuniforminflow condition. Various flow distortion patterns were created at the fan-face by manipulatingsets of screens placed upstream of the wind tunnel. Measurements at the fan-face willprovide the necessary distortion flow information as the inflow boundary condition for the CFDin a full wheel simulation. Therefore the purpose of this work is to demonstrate the NASA supportedmulti-stage turbomachinery code, TURBO [1-5], in the aerodynamic performance analysisof a modern fan design operating under off design condition, and in particular to validate theCFD results with the RTA fan test data.A brief description of the RTA fan rig configuration is given in the next section, explaining onhow flow distortion were measured in the test and constructed for the CFD at the fan-face. It isfollowed by a section summarizing previous CFD work performed at NASA relevant to the currentfan configuration. A short description of the TURBO code is given next, followed by detailsin the computational model of the fan rig, the required computing resources, and the numericalprocedure for the simulations. The CFD results are presented in the discussion section and finallyconcluding remarks are summarized.

Fan Stage↗

Strutjet RBCC Engine Performance

In the past two years Strutjet Rocket Based Combined Cycle (RBCC) engine has been tested extensively under the Advanced Reusable Technology (ART) contract from NASA MSFC. RBCC Engines combine the high thrust to weight of the rocket with the high efficiency of the ramjet engine. This propulsion system has the potential to reduce the cost of launching payloads to orbit by up to a factor of 100. In the ART program we have conducted over 100 hot fire tests. The propellants have been hydrogen and oxygen. The Modes tested have included the Air Augmented Rocket (AAR) from M = 0 to 2.4, the Ramjet at M = 2.4 & 6, Scramjet at M = 6 & 8, Scram/Rocket at Mach 8 and Ascent Rocket in Vacuum. This invited paper will present an overview of these test results and plans for future development of this propulsion cycle.

Bulman, Mel↗

The role of scientists in developing Hubble Space Telescope

The objective of the Hubble Space Telescope Program is to build and operate a high-performance, fully-instrumented and long-lived optical observatory in earth orbit. Key Program elements are (1) a logistic strategy of Shuttle launch/maintenance and TDRSS communications, (2) overall responsibility at the MSFC Project for developing both the flight and ground systems, and (3) scientific participation in ST development and responsibility after launch for conducting the observing program. The ST Project is a management structure with a budget and schedule for delivering an ST system capable of achieving its established scientific objectives. The Project distributes through contracts the responsibility for supplying particular components, but retains the responsibility for system-level integrity. Scientists have set the performance objectives and now support the Project during the development stage by providing (1) PI management of the five Science Instruments, (2) continuing translations of scientific requirements into engineering specifications, (3) oversight of designs and performance tests, and (4) specific expertise on technical concerns.

Brown, R. A.↗

Performance Assessment of Baseline Cells for the High Efficiency Space Power Systems Project

The Enabling Technology Development and Demonstration (ETDD) Program High Efficiency Space Power Systems (HESPS) Project, formerly the Exploration Technology Development Program (ETDP) Energy Storage Project is tasked with developing advanced lithium-ion cells for future NASA Exploration missions. Under this project, components under development via various in-house and contracted efforts are delivered to Saft America for scale-up and integration into cells. Progress toward meeting project goals will be measured by comparing the performance to these cells with cells of a similar format with Saft s state-of-the-art aerospace chemistry. This report discusses the results of testing performed on the first set of baseline cells delivered by Saft to the NASA Glenn Research Center. This build is a cylindrical "DD" geometry with a 10 Ah nameplate capacity. Testing is being performed to establish baseline cell performance at conditions relevant to ETDD HESPS Battery Key Performance Parameter (KPP) goals including various temperatures, rates, and cycle life conditions. Data obtained from these cells will serve as a performance baseline for future cell builds containing optimized ETDD HESPSdeveloped materials. A test plan for these cells was developed to measure cell performance against the high energy cell KPP goals. The goal for cell-level specific energy of the high energy technology is 180 Wh/kg at a C/10 discharge rate and 0 C. The cells should operate for at least 2000 cycles at 100 percent DOD with 80 percent capacity retention. Baseline DD cells delivered 152 Wh/kg at 20 C. This number decreased to 143.9 Wh/kg with a 0 C discharge. This report provides performance data and summarizes results of the testing performed on the DD cells.

Schneidegger, Brianne T.↗

NASA. Lewis Research Center Advanced Modulation and Coding Project: Introduction and overview

The Advanced Modulation and Coding Project at LeRC is sponsored by the Office of Space Science and Applications, Communications Division, Code EC, at NASA Headquarters and conducted by the Digital Systems Technology Branch of the Space Electronics Division. Advanced Modulation and Coding is one of three focused technology development projects within the branch's overall Processing and Switching Program. The program consists of industry contracts for developing proof-of-concept (POC) and demonstration model hardware, university grants for analyzing advanced techniques, and in-house integration and testing of performance verification and systems evaluation. The Advanced Modulation and Coding Project is broken into five elements: (1) bandwidth- and power-efficient modems; (2) high-speed codecs; (3) digital modems; (4) multichannel demodulators; and (5) very high-data-rate modems. At least one contract and one grant were awarded for each element.

Budinger, James M.↗

Liquid Engine Design: Effect of Chamber Dimensions on Specific Impulse

Which assumption of combustion chemistry - frozen or equilibrium - should be used in the prediction of liquid rocket engine performance calculations? Can a correlation be developed for this? A literature search using the LaSSe tool, an online repository of old rocket data and reports, was completed. Test results of NTO/Aerozine-50 and Lox/LH2 subscale and full-scale injector and combustion chamber test results were found and studied for this task. NASA code, Chemical Equilibrium with Applications (CEA) was used to predict engine performance using both chemistry assumptions, defined here. Frozen- composition remains frozen during expansion through the nozzle. Equilibrium- instantaneous chemical equilibrium during nozzle expansion. Chamber parameters were varied to understand what dimensions drive chamber C* and Isp. Contraction Ratio is the ratio of the nozzle throat area to the area of the chamber. L is the length of the chamber. Characteristic chamber length, L*, is the length that the chamber would be if it were a straight tube and had no converging nozzle. Goal: Develop a qualitative and quantitative correlation for performance parameters - Specific Impulse (Isp) and Characteristic Velocity (C*) - as a function of one or more chamber dimensions - Contraction Ratio (CR), Chamber Length (L ) and/or Characteristic Chamber Length (L*). Determine if chamber dimensions can be correlated to frozen or equilibrium chemistry.

Hoggard, Lindsay↗

Earth Observing System (EOS)/Advanced Microwave Sounding Unit-A (AMSU-A)

This is the thirty-first monthly report for the Earth Observing System (EOS)/Advanced Microwave Sounding Unit- A (AMSU-A), Contract NAS5-32314, and covers the period from 1 July 1995 through 31 July 1995. This period is the nineteenth month of the Implementation Phase which provides for the design, fabrication, assembly, and test of the first EOS/AMSU-A, the Protoflight Model. Included in this report is the Master Program Schedule (Section 2), a report from the Product Team Leaders on the status of all major program elements (Section 3), Drawing status (Section 4), Weight and Power Budgets (CDRL) 503 (Section 5), Performance Assurance (CDRL 204) (Section 6), Configuration Management Status Report (CDRL 203) (Section 7), Documentation/Data Management Status Report (Section 8), and Contract Status (Section 9).

Mullooly, William↗

NASA's Space Launch System Advanced Booster Engineering Demonstration and/or Risk Reduction Efforts

The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters (SRBs) for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, with a stated intent to reduce risks leading to an affordable advanced booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the advanced boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the advanced boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit (BEO), opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable advanced booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an advanced booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned advanced booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

Crumbly, Christopher M.↗

NASA's Space Launch System Advanced Booster Engineering Demonstration and Risk Reduction Efforts

The National Aeronautics and Space Administration (NASA) formally initiated the Space Launch System (SLS) development in September 2011, with the approval of the program s acquisition plan, which engages the current workforce and infrastructure to deliver an initial 70 metric ton (t) SLS capability in 2017, while using planned block upgrades to evolve to a full 130 t capability after 2021. A key component of the acquisition plan is a three-phased approach for the first stage boosters. The first phase is to complete the development of the Ares and Space Shuttle heritage 5-segment solid rocket boosters for initial exploration missions in 2017 and 2021. The second phase in the booster acquisition plan is the Advanced Booster Risk Reduction and/or Engineering Demonstration NASA Research Announcement (NRA), which was recently awarded after a full and open competition. The NRA was released to industry on February 9, 2012, and its stated intent was to reduce risks leading to an affordable Advanced Booster and to enable competition. The third and final phase will be a full and open competition for Design, Development, Test, and Evaluation (DDT&E) of the Advanced Boosters. There are no existing boosters that can meet the performance requirements for the 130 t class SLS. The expected thrust class of the Advanced Boosters is potentially double the current 5-segment solid rocket booster capability. These new boosters will enable the flexible path approach to space exploration beyond Earth orbit, opening up vast opportunities including near-Earth asteroids, Lagrange Points, and Mars. This evolved capability offers large volume for science missions and payloads, will be modular and flexible, and will be right-sized for mission requirements. NASA developed the Advanced Booster Engineering Demonstration and/or Risk Reduction NRA to seek industry participation in reducing risks leading to an affordable Advanced Booster that meets the SLS performance requirements. Demonstrations and/or risk reduction efforts were required to be related to a proposed booster concept directly applicable to fielding an Advanced Booster. This paper will discuss, for the first time publicly, the contract awards and how NASA intends to use the data from these efforts to prepare for the planned Advanced Booster DDT&E acquisition as the SLS Program moves forward with competitively procured affordable performance enhancements.

Crumbly, Christopher M.↗