Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operator complexity”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

The design and implementation of the Technical Facilities Controller (TFC) for the Goldstone deep space communications complex

The Technical Facilities Controller is a microprocessor-based energy management system that is to be implemented in the Deep Space Network facilities. This system is used in conjunction with facilities equipment at each of the complexes in the operation and maintenance of air-conditioning equipment, power generation equipment, power distribution equipment, and other primary facilities equipment. The implementation of the Technical Facilities Controller was completed at the Goldstone Deep Space Communications Complex and is now operational. The installation completed at the Goldstone Complex is described and the utilization of the Technical Facilities Controller is evaluated. The findings will be used in the decision to implement a similar system at the overseas complexes at Canberra, Australia, and Madrid, Spain.

Killian, D. A.↗

Best Practices for Operations of Satellite Constellations

This paper presents the best practices used by several commercial and government operators of satellite constellations. These best practices were identified through a series of seminars and discussions held at NASA Goddard Space Flight Center (GSFC). The best practices are arrived through many years of experience and improvements made in the operations procedures and the operational systems with the primary drivers as mission safety and cost effectiveness. This paper discusses the operational aspects associated with how different organizations manage complexities of constellation operations. For the purposes of this paper, satellite constellations are groups of similar spacecraft with more than one spacecraft needed to fully accomplish the constellation's mission

Howard, Joseph↗

Understanding Community Microgrids

Increasing need for distribution circuit reliability and resilience prompt a clearer understanding of community microgrid interconnection and operational requirements. While customer-owned, behind-the-meter microgrid implementation is not always simple, increasing demand for reliability has commercialized many installation approaches. This rapid commercialization has broadened industry understanding of single-customer microgrid integration. Moreover, off-grid behaviors of such microgrids are not required to meet utility standard interconnection requirements. However, multi-customer community microgrids (utility- or third-party operated), are less well explored and introduce more complex design and operational challenges. The control of DER along with distribution automation devices, unmanned operation, protection coordination, and other aspects makes community microgrids challenging to implement and operate in both on-grid and off-grid modes. This whitepaper is a technical primer for understanding community microgrids. It provides a foundation for understanding the components, configurations, design, and operational considerations for community microgrids.

14 SOLAR ENERGY↗

A Methodology for Training International Space Station Crews to Respond to On-Orbit Emergencies

Most spaceflight crewmembers agree that emergency training is among the most important training they receive. If an emergency event occurs on-orbit crewmembers want to be able to rely on a thorough and proficient knowledge of emergency operations and procedures. The inherent complexity of ISS and the international nature of the onboard operations have resulted in emergency procedures that are complex by any measure; as a result, a very robust apparatus has been developed to give crewmembers initial training on emergency procedures and ensure proficiency up to (and even after) launch. One of the most important aspects of complex onboard operations in general, and emergency operations specifically, is learning how to coordinate roles and responsibilities with fellow crewmembers. A primary goal of NASA s emergency training program is to allow the crewmembers who will actually be together on-orbit to practice executing the emergency responses together before they fly. As with any operation that includes the use of software and hardware, the fidelity of the simulation environment is a critical element to successful training. The NASA training division has spent considerable time and effort to develop a simulator that addresses the most important aspects of emergency response, working within very difficult space and budgetary constraints.

Balmain, Clinton↗

Shockwaves from the operator product expansion

We clarify and further explore the CFT dual of shockwave geometries in Anti-de Sitter. The shockwave is dual to a CFT state produced by a heavy local operator inserted at a complex point. It can also be created by light operators, smeared over complex positions. We describe the dictionary in both cases, and compare to various calculations, old and new. In CFT, we analyze the operator product expansion in the Regge limit, and find that the leading contribution is exactly the shockwave operator, ∫ duh uu , localized on a bulk geodesic. For heavy sources this is a simple consequence of conformal invariance, but for light operators it involves a smearing procedure that projects out certain double-trace contributions to the OPE. We revisit causality constraints in large- N CFT from this perspective, and show that the chaos bound in CFT coincides with a bulk condition proposed by Engelhardt and Fischetti. In particular states, this reproduces known constraints on CFT 3-point couplings, and confirms some assumptions about double-trace operators made in previous work.

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

Improving the prediction of daily reservoir releases over the CONUS using conditioned LSTM

Reservoirs play a vital role in regulating streamflow timing and variability for hydroelectricity, flood control, water supply, irrigation, and recreation. Despite their importance, many reservoirs lack comprehensive operational guidelines, making their management complex due to conflicting operational objectives. Hence traditional policy-based reservoir models often fail to capture real-world conditions accurately and they depend on perfect streamflow predictions, which are not always available. In contrast, data-driven models like Long Short-Term Memory (LSTM) networks offer a robust alternative. This study introduces an approach that integrates reservoir characteristics—such as main use, climate, and maximum capacity—into the LSTM model to enhance reservoir release predictions. Using data from nearly 200 reservoirs in the contiguous United States (CONUS), our conditioned LSTM model (LSTM_cond) was compared with both the vanila LSTM and a traditional policy-based approach. Furthermore, our results show that while both LSTM_cond and LSTM perfoms better than the policy-based approach, LSTM_cond consistently outperforms LSTM for hydroelectric, water supply, irrigation, and recreation reservoirs. The KGE median values for LSTM_cond for out-sample reservoirs are 0.764, 0.565, 0.821, and 0.779, respectively, for the aforementioned reservoir types, which are consistently higher that the corresponding KGE values of 0.737, 0.413, 0.775, and 0.713 of LSTM, demonstrating its advantages in improving generalizability.

CONUS↗

Near-Earth Object Exploration and Marco Polo-R

A major goal for NASA's human spaceflight program is to send astronauts to near-Earth asteroids (NEAs) in the coming decades. Missions to NEAs would undoubtedly provide a great deal of technical and engineering data on spacecraft operations for future human space exploration while conducting in-depth scientific examinations of these primitive objects. However, prior to sending human explorers to NEAs, robotic investigations of these bodies would be required in order to maximize operational efficiency and reduce mission risk. These precursor missions to NEAs would fill crucial strategic knowledge gaps concerning their physical characteristics that are relevant for human exploration of these relatively unknown destinations. Therefore robotic investigations of NEAs, such as ESA's Marco Polo-R sample return mission to 2008 EV5, would allow NASA and its international partners to gain critical operational experience in performing complex tasks (e.g., close proximity operations, surface sample collection, etc.) under microgravity conditions at or near the surface of a potential human destination. This would provide an important synergy between the worldwide Science and Exploration communities, which will be crucial for development of future international deep space exploration architectures and has potential benefits for future exploration of other destinations beyond low-Earth orbit.

Abell, Paul↗

Launch Complex 34, SWMU CCO542022 DNAPL Source Zone Operations, Maintenance, and Monitoring, Site-Wide Long-Term Monitoring, and Hot Spot 6 Air Sparge System Annual Performance Monitoring Report Cape Canaveral Space Force Station, Florida

This Annual Performance Monitoring Report (PMR) for the Dense Non-Aqueous Phase Liquid (DNAPL) Source Zone (DSZ), Site-Wide Long-Term Monitoring (LTM), and Hot Spot (HS) 6 Air Sparge (AS) System presents the results of Year 13 operation of the hydraulic containment (HC) Interim Measure (IM), the results of performance monitoring direct-push technology (DPT) sampling and monitoring well sampling conducted in the DSZ, results of the biennial site-wide LTM event, and the results of operations and performance sampling of the HS 6 AS IM at Launch Complex 34 (LC34), located at Cape Canaveral Space Force Station (CCSFS), Florida. This site has been designated Solid Waste Management Unit (SWMU) CC054 under the Kennedy Space Center (KSC) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. For the site-wide biennial LTM event, a total of 55 monitoring wells were sampled for volatile organic compounds (VOCs) in February 2023 and one well was sampled for polychlorinated biphenyls (PCBs) in December 2022. One well planned for VOC sampling was found to be destroyed and could not be sampled (CW0002). The LTM wells are screened in two lithologic zones: Layer 1 (0 to 25 feet below land surface [bls]) and Layer 2 (25 to 30 ft bls), and are located in the outlying areas of LC34 to monitor groundwater conditions within the Low-Concentration Plume (LCP), defined as concentrations exceeding Groundwater Cleanup Target Levels (GCTLs), and the High-Concentration Plume (HCP), defined as concentrations exceeding Natural Attenuation Default Concentrations (NADCs). Results from the biennial sampling event indicated overall plume stability and delineation for the plume, which extends over 300 acres. The operational period for Year 13 of the HCS was from April 1, 2022 to March 31, 2023. Operational runtime for the system was 90 percent during Year 13, with downtime events attributed to planned maintenance, system repairs, and power outages. As of March 31, 2023, a total of 313,673,241 cumulative gallons of groundwater containing 88,337 pounds of VOCs have been removed by the HCS. Influent concentrations of trichloroethene (TCE) have decreased since startup from approximately 280,000 μg/L (January 2010) to 12,000 μg/L (March 2023). During the reporting period, all effluent concentrations from the HCS (aqueous and vapor) were below regulatory reporting limits, indicating the system continues to operate as intended. Performance monitoring was conducted in December 2022 within the DSZ to evaluate TCE contamination. Groundwater samples were collected via DPT at nine locations, consistent with previous events between 2017 and 2021. Full vertical profile sampling was completed at each DPT from 8 to 98 feet bls, at 5-foot intervals. The DPT performance monitoring results are summarized in this PMR. The results revealed TCE remains at concentrations greater than 11,000 μg/L in the DSZ (1-percent solubility, indicative of DNAPL) at eight of the nine DPT locations and at depths ranging from 8 to 98 feet bls. In addition to DPT sampling, groundwater samples were collected from deep monitoring wells in the DSZ area (Layers 7 and 8) in December 2022 to verify vertical delineation. Layer 7/8 monitoring well results were non-detect in December 2022, with exception of three wells (IW0162, IW043D2, and IW044D2), where TCE, cis-1,2-dichloroethene (cDCE), and/or vinyl chloride (VC) were detected above GCTLs. These wells are screened 105 to 115 feet bls, which is below the existing recovery well capture zone. TCE was first detected in IW0162 in December 2021 and has since been sampled at least monthly to monitor TCE concentrations. The maximum TCE concentration during this operational period was 15,000 μg/L at IW0162 in March 2023. Because of the increased TCE concentrations in this well, a new recovery well (RW21D), screened 86 to 106 feet bls, was installed in January 2023 and incorporated into existing HCS operations. The HS 6 AS IM was initiated in 2018 with 160 AS wells, and expanded in 2019 with an additional 140 AS wells. Quarterly performance monitoring was reduced to semi-annual in 2020. The HS 6 AS system remained operational during the reporting period covered under this report. The results of the HS 6 system operation and semi-annual performance monitoring are summarized in this report. Semi-annual monitoring results collected in April and October 2022 show concentrations of contaminants of concern (cDCE, trans-1,2-dichloroethene, and vinyl chloride) are generally decreasing and not impacting the surface water drainage canal, indicating the HS 6 IM is meeting objectives. A Phase Two Expansion of the HS 6 AS IM was recently completed. As of the date of this report, the expansion became operational in August 2023 and the first quarter of monitoring was conducted in November 2023. Details of the construction, start-up, and performance monitoring will be included in a future Annual PMR. Overall, the tasks associated with Year 13 operation of the HC IM, operation of the HS 6 AS IM, and biennial site-wide sampling were performed in accordance with recommendations included in the previous 2021 LC34 (Year 12) annual report. Evaluation of results from the HC IM and HS 6 IM show that these systems are operating as designed and meeting performance objectives. Results from the site-wide biennial LTM program also show that the overall network of monitoring wells is adequate to continue monitoring plume-wide conditions.

Complex 34↗

Fault Management Techniques in Human Spaceflight Operations

This paper discusses human spaceflight fault management operations. Fault detection and response capabilities available in current US human spaceflight programs Space Shuttle and International Space Station are described while emphasizing system design impacts on operational techniques and constraints. Preflight and inflight processes along with products used to anticipate, mitigate and respond to failures are introduced. Examples of operational products used to support failure responses are presented. Possible improvements in the state of the art, as well as prioritization and success criteria for their implementation are proposed. This paper describes how the architecture of a command and control system impacts operations in areas such as the required fault response times, automated vs. manual fault responses, use of workarounds, etc. The architecture includes the use of redundancy at the system and software function level, software capabilities, use of intelligent or autonomous systems, number and severity of software defects, etc. This in turn drives which Caution and Warning (C&W) events should be annunciated, C&W event classification, operator display designs, crew training, flight control team training, and procedure development. Other factors impacting operations are the complexity of a system, skills needed to understand and operate a system, and the use of commonality vs. optimized solutions for software and responses. Fault detection, annunciation, safing responses, and recovery capabilities are explored using real examples to uncover underlying philosophies and constraints. These factors directly impact operations in that the crew and flight control team need to understand what happened, why it happened, what the system is doing, and what, if any, corrective actions they need to perform. If a fault results in multiple C&W events, or if several faults occur simultaneously, the root cause(s) of the fault(s), as well as their vehicle-wide impacts, must be determined in order to maintain situational awareness. This allows both automated and manual recovery operations to focus on the real cause of the fault(s). An appropriate balance must be struck between correcting the root cause failure and addressing the impacts of that fault on other vehicle components. Lastly, this paper presents a strategy for using lessons learned to improve the software, displays, and procedures in addition to determining what is a candidate for automation. Enabling technologies and techniques are identified to promote system evolution from one that requires manual fault responses to one that uses automation and autonomy where they are most effective. These considerations include the value in correcting software defects in a timely manner, automation of repetitive tasks, making time critical responses autonomous, etc. The paper recommends the appropriate use of intelligent systems to determine the root causes of faults and correctly identify separate unrelated faults.

O'Hagan, Brian↗

The Virtual Mission Operations Center

Spacecraft management is becoming more human intensive as spacecraft become more complex and as operations costs are growing accordingly. Several automation approaches have been proposed to lower these costs. However, most of these approaches are not flexible enough in the operations processes and levels of automation that they support. This paper presents a concept called the Virtual Mission Operations Center (VMOC) that provides highly flexible support for dynamic spacecraft management processes and automation. In a VMOC, operations personnel can be shared among missions, the operations team can change personnel and their locations, and automation can be added and removed as appropriate. The VMOC employs a form of on-demand supervisory control called management by exception to free operators from having to actively monitor their system. The VMOC extends management by exception, however, so that distributed, dynamic teams can work together. The VMOC uses work-group computing concepts and groupware tools to provide a team infrastructure, and it employs user agents to allow operators to define and control system automation.

Moore, Mike↗

Understanding Current Safety Issues for Trajectory Based Operations

Increases in procedural complexity were investigated as a possible contributor to flight path deviations in airline operations. Understanding current operational issues and their causes must be embraced to maintain current safety standards while increasing future functionality. ASRS data and expert narratives were used to discover factors relating to pilot deviations. Our investigation pointed to ATC intervention, automation confusion, procedure design, and mixed equipment as primary issues. Future work will need to include objective data and mitigation strategies.

RNAV STAR↗

Operating Small Sat Swarms as a Single Entity: Introducing SODA

Swarm concepts are a growing topic of interest in the small satellite community. Compared to a small satellite constellation, a swarm has the distinction of being multiple spacecraft in close proximity, in approximately the same orbit. Furthermore, we envision swarms to have capabilities for cross-link communication and station-keeping. Of particular interest is a means to maintain operator-specified geometry, alignment, and/or separation.From NASA's decadal survey, it is clear that simultaneous measurements from a 3D volume of space are desired for a variety of Earth scientific studies. As this mission concept is ultimately extended to deep space, some degree of local control for the swarm to self-correct its configuration is required. We claim that the practicality of ground commanding each individual satellite in the swarm is simply not a feasible concept of operations. In other words, the current state-of-practice does not scale to very large swarms (e.g. 100 spacecraft or more) without becoming cost prohibitive. To contain the operations costs and complexity, a new approach is required: the swarm must be operated as a unit, responding to high-level specifications for relative position and velocity.The Mission Design Division at NASA Ames Research Center is looking to the near future for opportunities to develop satellite swarm technology. As part of this effort, we are developing SODA (Swarm Orbital Dynamics Advisor), a tool that provides the orbital maneuvers required to achieve a desired type of relative swarm motion. The purpose of SODA is two-fold. First, it encompasses the algorithms and orbital dynamics model to enable the desired relative motion of the swarm satellites. The process starts with the user specifying the properties of a swarm configuration. This could be as simple as varying in-track spacing of the swarm in one orbit, or as complex as maintaining a specified 3D geometrical orientation. We presume that science objectives will drive this choice. Given these inputs, the tool provides the most efficient maneuver(s) to achieve the objective.Second, SODA provides a variety of visualization tools. We acknowledge that the relationship between a desired relative motion amongst the swarm, and the corresponding orbital parameters for each individual satellite may not be immediately apparent for ground controllers and mission planners. The purpose of SODA's visualization tools is to illustrate this concept clearly with a variety of graphics and animations. After computing the optimal orbital maneuvers to modify the swarm, these results are simulated to demonstrate successful swarm control.Our emphasis in this paper is on the importance of relating the desired motion of the swarm satellites relative to one another with the required orbital element changes. One cannot joystick a drifting swarm satellite back into position; the underlying orbital mechanics dictate the most efficient recovery maneuvers. To illustrate this point, results from several case study simulations are presented. We conclude with our forward work for ongoing SODA development and potential science applications.

small satellites↗

Attention and its role in the operator's work

A complex attentiometer investigation of the distribution, redirection, and concentration of attention during an operator's work notes the following stages: (1) General attentiveness is still not adequately expressed in the beginning; and (2) operator self-control of actions develops and gradually decreases errors in redirecting and distributing attention. A definite relationship is found between the improvement of concentration, distribution and redirection of attention and automation of sensorimotor performance. Excercises prove less effective in redirection of attention.

Shvetsov, O. P.↗

Intelligent tutoring and aiding in satellite ground control

In supervisory control systems such as satellite ground control, there is a need for human-centered automation where the focus is to understand and enhance the human-system interaction experience in the complex task environment. Operator support in the form of off-line intelligent tutoring and on-line intelligent aiding is one approach towards this effort. The tutor/aid paradigm is proposed here as a design approach that integrates the two aspects of operator support in one system for technically oriented adults in complex domains. This paper also presents GT-VITA, a proof-of-concept graphical, interactive, intelligent tutoring system that is a first attempt to illustrate the tutoring aspect of the tutor/aid paradigm in the domain of satellite ground control. Evaluation on GT-VITA is conducted with NASA personnel with very positive results. GT-VITA is presented being fielded as it is at Goddard Space Flight Center.

Chu, Rose W.↗

A new technology for manufacturing scheduling derived from space system operations

A new technology for producing finite capacity schedules has been developed in response to complex requirements for operating space systems such as the Space Shuttle, the Space Station, and the Deep Space Network for telecommunications. This technology has proven its effectiveness in manufacturing environments where popular scheduling techniques associated with Materials Resources Planning (MRPII) and with factory simulation are not adequate for shop-floor work planning and control. The technology has three components. The first is a set of data structures that accommodate an extremely general description of a factory's resources, its manufacturing activities, and the constraints imposed by the environment. The second component is a language and set of software utilities that enable a rapid synthesis of functional capabilities. The third component is an algorithmic architecture called the Five Ruleset Model which accommodates the unique needs of each factory. Using the new technology, systems can model activities that generate, consume, and/or obligate resources. This allows work-in-process (WIP) to be generated and used; it permits constraints to be imposed or intermediate as well as finished goods inventories. It is also possible to match as closely as possible both the current factory state and future conditions such as promise dates. Schedule revisions can be accommodated without impacting the entire production schedule. Applications have been successful in both discrete and process manufacturing environments. The availability of a high-quality finite capacity production planning capability enhances the data management capabilities of MRP II systems. These schedules can be integrated with shop-floor data collection systems and accounting systems. Using the new technology, semi-custom systems can be developed at costs that are comparable to products that do not have equivalent functional capabilities and/or extensibility.

Hornstein, R. S.↗

FNAL PIP-II Accumulator Ring

The FNAL accelerator complex is poised to reach MW neutrino beams on target for the exploration of the dark sector physics and rare physics program spaces. Future operations of the complex will include CW linac operations at beam intensities that have not been seen before \cite{PIP2,RCS_LOI}. The ambitious beam program relies on multi-turn H$^{-}$ injection into the FNAL Booster and then extracted into delivery rings or the Booster Neutrino Beam (BNB) 8 GeV HEP program. A new rapid-cycling synchrotron (RCS) will be required to reach the LBNF goal of 2.4 MW because of intense space-charge limitations. There are many accelerator engineering challenges that are already known and many that will be discovered. This proposal calls for an intermediate step that will both facilitate the operation of Booster in the PIP-II era and gain operational experience associated with high power injection rings. This step includes the design, construction and installation of a 0.8 GeV accumulator ring (upgradeable to 1+ GeV) to be located in the PIP-II Booster Transfer Line (BTL). The PIP-II accumulator ring (PAR) may be primarily designed around permanent magnets or use standard iron core magnet technology with an aperture selected to accommodate the desired high intensity protons at 0.8 GeV.

43 PARTICLE ACCELERATORS↗

PILOT: An intelligent distributed operations support system

The Real-Time Data System (RTDS) project is exploring the application of advanced technologies to the real-time flight operations environment of the Mission Control Centers at NASA's Johnson Space Center. The system, based on a network of engineering workstations, provides services such as delivery of real time telemetry data to flight control applications. To automate the operation of this complex distributed environment, a facility called PILOT (Process Integrity Level and Operation Tracker) is being developed. PILOT comprises a set of distributed agents cooperating with a rule-based expert system; together they monitor process operation and data flows throughout the RTDS network. The goal of PILOT is to provide unattended management and automated operation under user control.

Rasmussen, Arthur N.↗

A Fast and Accurate Transient Stability Assessment Method Based on Deep Learning: WECC Case Study

Transient stability is one of the critical aspects of power system stability assessment. The increasing integration of inverter-based resources and the retirement of conventional synchronous generators result in the decreasing system inertia and growing complexity of system operating conditions. Using a few selected typical operating conditions cannot guarantee system transient stability in all operating conditions, and the time-domain simulation of all operating conditions requires tremendous time and is often infeasible. This paper proposes a more efficient transient stability assessment method based on deep learning. The binary search method is used to determine the critical clearing time (CCT) in creating training databased by time-domain simulation. This method is fast and accurate with 1 ms resolution. The buses whose CCTs are lower than 200 ms are considered critical buses. Buses close to each other are grouped based on their mutual admittance matrix to reduce the search space of the critical buses. This paper also proposes the generator feature normalization based on the physical model. Case study on the reduced 240-bus WECC system model demonstrates that the proposed method can predict CCT accurately and efficiently.

critical clearing time↗