Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “network baseline”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Towards GPS orbit accuracy of tens of centimeters

In this paper, CASA Uno orbit results are presented utilizing data from four continents. Refinements in orbit modeling, combined with the availability of a worldwide tracking network and the dense distribution of tracking sites in North and South America, have improved orbit determination precision to about 60 cm (per component) for four of the seven GPS satellites tracked in CASA Uno. The orbit results are consistent with California baseline repeatabilities, which are at the few mm level in horizontal and length, and 1-2 cm in the vertical. Baseline comparisons with VLBI provide a measure of orbit accuracy, showing sub-cm agreement in length and 1.5 cm agreement in the horizontal.

Lichten, Stephen M.↗

Modeling preparation costs for space missions by using major cost drivers

A model is suggested for making long range planning cost estimates for Deep Space Network (DSN) support of future space missions. The model is a function of major mission cost drivers, such as maintenance and operations, downlink frequency upgrade, uplink frequency upgrade, telemetry upgrade, antenna gain/noise temperature, radiometric accuracy upgrade, radio science upgrade, and very long baseline interferometry. The model is derived from actual cost data from three space missions: Voyager (Uranus), Voyager (Neptune), and Magellan. The model allows one to estimate the total cost and the cost over time of a similar future space mission. The model was back tested against the three projects and gave cost estimates that range from 17 pct. below to 19 pct. above actual mission preparation costs. The model was also compared with two other independent projects: Mariner Jupiter/Saturn (MJS later became Voyager) and Viking. The model gave total preparation cost estimates that range from 15 pct. above to 4 pct. below actual total preparation costs for MJS and Viking, respectively.

Sherif, J. S.↗

DNN-based Signal Processing for Liquid Argon Time Projection Chambers

We investigate a deep learning-based signal processing for liquid argon time projection chambers (LArTPCs), a leading detector technology in neutrino physics. Identifying regions of interest (ROIs) in LArTPCs is challenging due to signal cancellation from bipolar responses and various detector effects observed in real data. We approach ROI identification as an image segmentation task, and employ a U-ResNet architecture. The network is trained on samples that incorporate detector geometry information and include a range of detector variations. Our approach significantly outperforms traditional methods while maintaining robustness across diverse detector conditions. This method has been adopted for signal processing in the Short-Baseline Neutrino program and provides a valuable foundation for future experiments such as the Deep Underground Neutrino Experiment.

Bhat, Avinay [Chicago U.]↗

The effect of the dynamic wet troposphere on VLBI measurements

Calculations using a statistical model of water vapor fluctuations yield the effect of the dynamic wet troposphere on Very Long Baseline Interferometry (VLBI) measurements. The statistical model arises from two primary assumptions: (1) the spatial structure of refractivity fluctuations can be closely approximated by elementary (Kolmogorov) turbulence theory, and (2) temporal fluctuations are caused by spatial patterns which are moved over a site by the wind. The consequences of these assumptions are outlined for the VLBI delay and delay rate observables. For example, wet troposphere induced rms delays for Deep Space Network (DSN) VLBI at 20-deg elevation are about 3 cm of delay per observation, which is smaller, on the average, than other known error sources in the current DSN VLBI data set. At 20-deg elevation for 200-s time intervals, water vapor induces approximately 1.5 x 10 to the minus 13th power s/s in the Allan standard deviation of interferometric delay, which is a measure of the delay rate observable error. In contrast to the delay error, the delay rate measurement error is dominated by water vapor fluctuations. Water vapor induced VLBI parameter errors and correlations are calculated. For the DSN, baseline length parameter errors due to water vapor fluctuations are in the range of 3 to 5 cm. The above physical assumptions also lead to a method for including the water vapor fluctuations in the parameter estimation procedure, which is used to extract baseline and source information from the VLBI observables.

Treuhaft, R. N.↗

Informing Plant Asset Reliability and Availability Through AI-Driven Analysis of Operator Logs

The availability and reliability of nuclear power plant (NPP) structures, systems, and components (SSCs) are critical parameters for NPP safety. Tracking these parameters is necessary but costly and labor-intensive, requiring the collection and evaluation of SSC event data such as shutdowns, startups, and failures. To show how these events are needed for the parameters an example is given: one measure of reliability is based on the number of equipment failure events and the number of run hours (i.e., the time from a startup event to a shutdown event). Here, this work investigates using artificial intelligence (AI) to mine NPP operator log entry texts for SSC event data. Four AI approaches were explored for identifying these events, including natural language processing (NLP) methods, generative AI, generative AI combined with NLP, and topic modeling. A key challenge addressed with all four approaches is the brevity of operator log entries. Among these four a neural network–based NLP method was shown to be the most promising for this application, achieving F1 scores of 86.0% for shutdowns, 92.2% for startups, and 80.4% for failures on a subject-matter-expert-curated dataset from NPP operator logs, compared to a baseline of 66.6% for a random classifier. This shows that NLP methods can perform better than generative AI. Additionally, the NLP methods combined with generative AI were shown to perform better than generative AI alone. Generative AI was most successful at providing the background information for the NLP methods to use. This work demonstrates the potential to use AI to automate parameter collection from NPP operator log entries and other records.

97 - MATHEMATICS AND COMPUTING↗

Development and Assessment of the SMAP Enhanced Passive Soil Moisture Product

Launched in January 2015, the National Aeronautics and Space Administration (NASA) Soil Moisture Active Passive (SMAP) observatory was designed to provide frequent global mapping of high-resolution soil moisture and freeze-thaw state every two to three days using a radar and a radiometer operating at L-band frequencies. Despite a hardware mishap that rendered the radar inoperable shortly after launch, the radiometer continues to operate nominally, returning more than two years of science data that have helped to improve existing hydrological applications and foster new ones.Beginning in late 2016 the SMAP project launched a suite of new data products with the objective of recovering some high-resolution observation capability loss resulting from the radar malfunction. Among these new data products are the SMAP Enhanced Passive Soil Moisture Product that was released in December 2016, followed by the SMAPSentinel-1 Active-Passive Soil Moisture Product in April 2017.This article covers the development and assessment of the SMAP Level 2 Enhanced Passive Soil Moisture Product (L2_SM_P_E). The product distinguishes itself from the current SMAP Level 2 Passive Soil Moisture Product (L2_SM_P) in that the soil moisture retrieval is posted on a 9 km grid instead of a 36 km grid. This is made possible by first applying the Backus-Gilbert optimal interpolation technique to the antenna temperature (TA) data in the original SMAP Level 1B Brightness Temperature Product to take advantage of the overlapped radiometer footprints on orbit. The resulting interpolated TA data then go through various correctioncalibration procedures to become the SMAP Level 1C Enhanced Brightness Temperature Product (L1C_TB_E). The L1C_TB_E product, posted on a 9 km grid, is then used as the primary input to the current operational SMAP baseline soil moisture retrieval algorithm to produce L2_SM_P_E as the final output. Images of the new product reveal enhanced visual features that are not apparent in the standard product. Based on in situ data from core validation sites and sparse networks representing different seasons and biomes all over the world, comparisons between L2_SM_P_E and in situ data were performed for the duration of April 1, 2015 October 30, 2016. It was found that the performance of the enhanced 9 km L2_SM_P_E is equivalent to that of the standard 36 km L2_SM_P, attaining a retrieval uncertainty below 0.040 m(exp 3)/m(exp 3) unbiased root-mean-square error (ubRMSE) and a correlation coefficient above 0.800. This assessment also affirmed that the Single Channel Algorithm using the V-polarized TB channel (SCA-V) delivered the best retrieval performance among the various algorithms implemented for L2_SM_P_E, a result similar to a previous assessment for L2_SM_P.

Enhanced↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment and Plans

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of tHe main precipitation systems in Brazil: A contribUtion to cloud resolVing modeling and to the GPM (GlobAl Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luz Paraitinga intensive operation period (IOP) in December 2011-January 2012, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sa Luz Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sa Jos dos Campos.

Bailey, J. C.↗

A machine learning approach to water quality forecasts and sensor network expansion: Case study in the Wabash River Basin, United States

Abstract Midwestern cities require forecasts of surface nitrate loads to bring additional treatment processes online or activate alternative water supplies. Concurrently, networks of nitrate monitoring stations are being deployed in river basins, co‐locating water quality observations with established stream gauges. However, tools to evaluate the future value of expanded networks to improve water quality forecasts remains challenging. Here, we construct a synthetic data set of stream discharge and nitrate for the Wabash River Basin—one of the United States’ most nutrient polluted basins—using the established Agro‐IBIS and THMB models. Synthetic data enables rapid, unbiased and low‐cost assessment of potential sensor placements to support management objectives, such as near‐term forecasting. Using the synthetic data, we established baseline 1‐day forecasts for surface water nitrate at 12 cities in the basin using support vector machine regression (SVMR; RMSE 0.48–3.3 ppm). Next, we used the SVMRs to evaluate the improvement in forecast performance associated with deployment of additional nitrate sensors. We identified the optimal sensor placement to improve forecasts at each city, and the relative value of sensors at each candidate location. Finally, we assessed the co‐benefit realized by other cities when a sensor is deployed to optimize a forecast at one city, finding significant positive externalities in all cases. Ultimately, our study explores the potential for machine learning to make near‐term predictions and critically evaluate the improvement realized by expanding a monitoring network. While we use nitrate pollution in the Wabash River Basin as a case study, this approach could be readily applied to any problem where the future value of sensors and network design are being evaluated.

54 ENVIRONMENTAL SCIENCES↗

Sao Paulo Lightning Mapping Array (SP-LMA): Deployment, Operation and Initial Data Analysis

An 8-10 station Lightning Mapping Array (LMA) network is being deployed in the vicinity of Sao Paulo to create the SP-LMA for total lightning measurements in association with the international CHUVA [Cloud processes of the main precipitation systems in Brazil: A contribution to cloud resolving modeling and to the GPM (Global Precipitation Measurement)] field campaign. Besides supporting CHUVA science/mission objectives and the Sao Luiz do Paraitinga intensive operation period (IOP) in November-December 2011, the SP-LMA will support the generation of unique proxy data for the Geostationary Lightning Mapper (GLM) and Advanced Baseline Imager (ABI), both sensors on the NOAA Geostationary Operational Environmental Satellite-R (GOES-R), presently under development and scheduled for a 2015 launch. The proxy data will be used to develop and validate operational algorithms so that they will be ready for use on "day1" following the launch of GOES-R. A preliminary survey of potential sites in the vicinity of Sao Paulo was conducted in December 2009 and January 2010, followed up by a detailed survey in July 2010, with initial network deployment scheduled for October 2010. However, due to a delay in the Sao Luiz do Paraitinga IOP, the SP-LMA will now be installed in July 2011 and operated for one year. Spacing between stations is on the order of 15-30 km, with the network "diameter" being on the order of 30-40 km, which provides good 3-D lightning mapping 150 km from the network center. Optionally, 1-3 additional stations may be deployed in the vicinity of Sao Jos dos Campos.

Blakeslee, R.↗

Estimating CO 2 fluxes through integrating spatial and temporal input layers via deep learning algorithms

Background Accurate estimation of net ecosystem exchange of CO 2 fluxes (Fc) is essential for understanding carbon cycle processes and assessing ecosystem carbon budgets. However, conventional modeling approaches often emphasize temporal dynamics while overlooking the pronounced spatial heterogeneity within the footprint of eddy covariance (EC) towers, potentially limiting predictive accuracy and interpretability of Fc estimates. To address this challenge, we developed a spatiotemporal model that integrates high-resolution footprint-weighted spatial information with sequential environmental drivers. Results The integrated model combines a deeper graph convolutional network to characterize fine-scale spatial variability within EC footprints and a gated recurrent unit network to capture temporal dependencies in biophysical conditions. Using multi-year flux tower observations, remote sensing vegetation indices and footprint modeling, we evaluate the proposed method across three land cover types. This spatiotemporal model consistently outperforms temporal-only and spatial-only baselines, achieving the highest overall accuracy (R 2 = 0.9569) and the lowest RMSE (1.8128 μmol m −2 s −1 ) and MAE (1.1939 μmol m −2 s −1 ). Performance gains are particularly evident in ecosystems with strong vegetation heterogeneity, where spatial structure substantially modulates Fc variability. Conclusions This study demonstrates the importance of joint modeling spatial heterogeneity and temporal dynamics for improving Fc estimation and provides a robust method for advancing footprint-based Fc estimates across diverse ecosystems, supporting refined assessments of terrestrial carbon fluxes, and enhancing scientific foundations for carbon studies.

CO2 flux estimate↗

Geodetic Results from Mark 4 VLBI

We present geodetic results of a series of 30 VLBI experiments recorded in Mark 4 mode at rates of 128 and 256 Mbps. The formal uncertainties of UT1, polar motion, and nutation offsets derived from these experiments are better than the corresponding uncertainties from NEOS-A experiments by a factor of 1.3-2. Baseline length repeatability for the series of 32 experiments over a period of one year is about 0.9 ppb. For comparison, NEOS-A length repeatability is about 1.4 ppb. We will discuss optimal use of Mark 4 in the design of future observing networks.

MacMillan, Daniel↗

Scheduling with Automatic Resolution of Conflicts

DSN Requirement Scheduler is a computer program that automatically schedules, reschedules, and resolves conflicts for allocations of resources of NASA s Deep Space Network (DSN) on the basis of ever-changing project requirements for DSN services. As used here, resources signifies, primarily, DSN antennas, ancillary equipment, and times during which they are available. Examples of project-required DSN services include arraying, segmentation, very-long-baseline interferometry, and multiple spacecraft per aperture. Requirements can include periodic reservations of specific or optional resources during specific time intervals or within ranges specified in terms of starting times and durations. This program is built on the Automated Scheduling and Planning Environment (ASPEN) software system (aspects of which have been described in previous NASA Tech Briefs articles), with customization to reflect requirements and constraints involved in allocation of DSN resources. Unlike prior DSN-resource- scheduling programs that make single passes through the requirements and require human intervention to resolve conflicts, this program makes repeated passes in a continuing search for all possible allocations, provides a best-effort solution at any time, and presents alternative solutions among which users can choose.

Clement, Bradley↗

Reference Guide for Project-Control Account Managers

The purpose of this guide is intended to be a quick reference for a Project-Control Account Manager (P-CAM) or technical manager empowered with a project’s cost, schedule, and technical responsibilities of a control account(s) when Earned Value Management (EVM) is required. The overall objective is to support the P-CAM in performing their responsibilities as they relate to EVM. In addition, the reference guide describes at a summary level how the scope, schedule, and budget of a project integrate for optimal planning and control of prime contracts and in-house projects. Because NASA implements a diverse and unique portfolio of projects, those projects have traditionally created project-specific systems to manage planning and performance analysis. However, establishment and implementation of a project management system that is common across all centers and mission directorates will facilitate the adoption of best business practices. In addition, the application of timely and predictive analysis, as well as, providing all stakeholders with greater insight into project performance will enhance opportunities for project success. For more detailed information, refer to the NASA EVM System Description; Integrated Baseline Review (IBR) Handbook; EVM Implementation Handbook; Schedule Management Handbook; Work Breakdown Structure (WBS) Handbook; and other agency/industry documentation. In addition, you may contact your local center’s EVM Focal Points. All this information and more can be found at and/or the NASA Engineering Network located at https://nen.nasa.gov/web/pm.

Christopher Lewis Sadler↗

Microreactor System Design for a NASA In Situ Propellant Production Plant on Mars

The NASA In Situ Resource Utilization (ISRU) program is planning near-term missions to Mars that will include chemical processes for converting the carbon dioxide (CO2) and possibly water from the Martian environment to propellants, oxygen, and other useful chemicals. The use of indigenous resources reduces the size and weight of the payloads from Earth significantly, representing enormous cost savings that make human exploration of Mars affordable. Extraterrestrial chemical processing plants will need to be compact, lightweight, highly efficient under reduced gravity, and extraordinarily reliable for long periods. Microchemical and thermal systems represent capability for dramatic reduction in size and weight, while offering high reliability through massive parallelization. In situ propellant production (ISPP), one aspect of the ISRU program, involves collecting and pressurizing atmospheric CO2, conversion reactions, chemical separations, heat exchangers, and cryogenic storage. A preliminary system design of an ISPP plant based on microtechnology has demonstrated significant size, weight, and energy efficiency gains over the current NASA baseline. Energy management is a strong driver for Mars-based processes, not only because energy is a scarce resource, but because heat rejection is problematic; the low pressure environment makes convective heat transfer ineffective. Energy efficiency gains are largely achieved in the microchemical plant through extensive heat recuperation and energy cascading, which has a small size and weight penalty because the added micro heat exchangers are small. This leads to additional size and weight gains by reducing the required area of waste heat radiators. The microtechnology-based ISPP plant is described in detail, including aspects of pinch analysis for optimizing the heat exchanger network. Three options for thermochemical compression Of CO2 from the Martian atmosphere, adsorption, absorption, and cryogenic freezing, are presented, as well as three options for water decomposition, low temperature electrolysis, high temperature electrolysis, and thermochemical decomposition. Other elements of the plant include Sabatier and reverse water gas shift reactors, water recovery, chemical separations, and cryogenic storage. Data are presented supporting preliminary sizing of components, and results of the system design are compared to the existing NASA baseline that is based on conventional technologies.

TeGrotenhuis, W. E.↗

Integration of Decentralized Graph-Based Multi-Agent Reinforcement Learning with Digital Twin for Traffic Signal Optimization

Machine learning (ML) methods, particularly Reinforcement Learning (RL), have gained widespread attention for optimizing traffic signal control in intelligent transportation systems. However, existing ML approaches often exhibit limitations in scalability and adaptability, particularly within large traffic networks. This paper introduces an innovative solution by integrating decentralized graph-based multi-agent reinforcement learning (DGMARL) with a Digital Twin to enhance traffic signal optimization, targeting the reduction of traffic congestion and network-wide fuel consumption associated with vehicle stops and stop delays. In this approach, DGMARL agents are employed to learn traffic state patterns and make informed decisions regarding traffic signal control. The integration with a Digital Twin module further facilitates this process by simulating and replicating the real-time asymmetric traffic behaviors of a complex traffic network. The evaluation of this proposed methodology utilized PTV-Vissim, a traffic simulation software, which also serves as the simulation engine for the Digital Twin. The study focused on the Martin Luther King (MLK) Smart Corridor in Chattanooga, Tennessee, USA, by considering symmetric and asymmetric road layouts and traffic conditions. Comparative analysis against an actuated signal control baseline approach revealed significant improvements. Experiment results demonstrate a remarkable 55.38% reduction in Eco_PI, a developed performance measure capturing the cumulative impact of stops and penalized stop delays on fuel consumption, over a 24 h scenario. In a PM-peak-hour scenario, the average reduction in Eco_PI reached 38.94%, indicating the substantial improvement achieved in optimizing traffic flow and reducing fuel consumption during high-demand periods. These findings underscore the effectiveness of the integrated DGMARL and Digital Twin approach in optimizing traffic signals, contributing to a more sustainable and efficient traffic management system.

actuated signal control↗

Integration of Decentralized Graph-Based Multi-Agent Reinforcement Learning with Digital Twin for Traffic Signal Optimization

Machine learning (ML) methods, particularly Reinforcement Learning (RL), have gained widespread attention for optimizing traffic signal control in intelligent transportation systems. However, existing ML approaches often exhibit limitations in scalability and adaptability, particularly within large traffic networks. This paper introduces an innovative solution by integrating decentralized graph-based multi-agent reinforcement learning (DGMARL) with a Digital Twin to enhance traffic signal optimization, targeting the reduction of traffic congestion and network-wide fuel consumption associated with vehicle stops and stop delays. In this approach, DGMARL agents are employed to learn traffic state patterns and make informed decisions regarding traffic signal control. The integration with a Digital Twin module further facilitates this process by simulating and replicating the real-time asymmetric traffic behaviors of a complex traffic network. The evaluation of this proposed methodology utilized PTV-Vissim, a traffic simulation software, which also serves as the simulation engine for the Digital Twin. The study focused on the Martin Luther King (MLK) Smart Corridor in Chattanooga, Tennessee, USA, by considering symmetric and asymmetric road layouts and traffic conditions. Comparative analysis against an actuated signal control baseline approach revealed significant improvements. Experiment results demonstrate a remarkable 55.38% reduction in Eco_PI, a developed performance measure capturing the cumulative impact of stops and penalized stop delays on fuel consumption, over a 24 h scenario. In a PM-peak-hour scenario, the average reduction in Eco_PI reached 38.94%, indicating the substantial improvement achieved in optimizing traffic flow and reducing fuel consumption during high-demand periods. These findings underscore the effectiveness of the integrated DGMARL and Digital Twin approach in optimizing traffic signals, contributing to a more sustainable and efficient traffic management system.

42 ENGINEERING↗

GPS orbit determination at the National Geodetic Survey

The National Geodetic Survey (NGS) independently generates precise ephemerides for all available Global Positioning System (GPS) satellites. Beginning in 1991, these ephemerides were produced from double-differenced phase observations solely from the Cooperative International GPS Network (CIGNET) tracking sites. The double-difference technique combines simultaneous observations of two satellites from two ground stations effectively eliminating satellite and ground receiver clock errors, and the Selective Availability (S/A) signal degradation currently in effect. CIGNET is a global GPS tracking network whose primary purpose is to provide data for orbit production. The CIGNET data are collected daily at NGS and are available to the public. Each ephemeris covers a single week and is available within one month after the data were taken. Verification is by baseline repeatability and direct comparison with other ephemerides. Typically, an ephemeris is accurate at a few parts in 10(exp 7). This corresponds to a 10 meter error in the reported satellite positions. NGS is actively investigating methods to improve the accuracy of its orbits, the ultimate goal being one part in 10(exp 8) or better. The ephemerides are generally available to the public through the Coast Guard GPS Information Center or directly from NGS through the Geodetic Information Service. An overview of the techniques and software used in orbit generation will be given, the current status of CIGNET will be described, and a summary of the ephemeris verification results will be presented.

M. S. Schenewerk↗

Vehicular Re-Identification from Uncontrolled Multiple Views

Vehicle re-identification (re-ID) across disparate sensing modalities remains a fundamental challenge for transportation research. In this work, we introduce a deep multi-view vehicle re-ID framework that leverages Siamese networks to compare pairs of vehicle images and produce matching scores, enabling robust association across drastically different viewpoints such as those from UAVs, surveillance cameras, and ground sensors. The model exploits convolutional neural networks to learn features that remain discriminative under changes in angle, distance, and illumination, supporting more generalizable re-ID performance. As part of this effort, we also developed an automated pipeline to synchronize roadside and UAV video streams, producing a multi-perspective dataset that complements preexisting real collections and a synthetic dataset generated in this study. Together, these contributions advance the capability to re-identify vehicles across wide viewing baselines; establish a foundation for scalable, reproducible research in vehicle re-ID; and open pathways for future applications, such as inferring routine behaviors, movement patterns, and daily habits of the individual associated with the vehicle.

convolutional neural networks↗