Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “met”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 559 records · Page 31

Aerosol Inlets for a Mid-Sized Uncrewed Aerial System (UAS)

The purpose of this technical report is to document the efforts to design and test two inlet systems for aerosol sampling suitable for deployment on a medium-sized fixed-wing Uncrewed Aerial System (UAS). This work, which was supported by the U.S. Department of Energy’s Atmospheric Radiation Measurement (ARM) user facility, was conducted at the Pacific Northwest National Laboratory (PNNL) for the ARM Aircraft Facility (AAF) starting in November 2017. The current work is a part of AAF efforts to instrument the ArcticShark (a mid-sized UAS owned and operated by the AAF) for atmospheric research and develop a scientific payload for deployment on a similar-sized UAS with minimal adaptation and integration. An aerosol inlet system is necessary to sample and transport ambient air sample to the scientific instrumentation with minimal distortions to the aerosols. Two isokinetic aerosol inlets were designed: the first is a simple passive system for a single instrument suitable to be installed in a wing pylon; the second is a system with active control designed to sample and distribute air among several heterogeneous instruments and to provide basic humidity control of the air sample so that the measured aerosol parameters should correspond to “dry” conditions (a common requirement). Both systems could be easily adapted for deployment on another platform and/or with a different set of instrumentation. Several conducted flight tests showed that the inlets’ performance met our design goals.

54 ENVIRONMENTAL SCIENCES↗

Micro-Environmental Control System (Final Report)

This project developed an innovative micro-environmental control system (µX) that enables office buildings to reduce energy used for heating and cooling by 15% or more. The µX is a compact, quiet, and ergonomic device that is designed to be installed under an office workstation; it is designed to maintain occupant comfort when room thermostat setpoints are incremented by 4°F or more (warmer in the summer and cooler in the winter) to save energy. When ambient room temperatures are outside of the usual comfort range, the µX maintains occupant comfort by delivering personalized cooling or heating locally to each office worker. The µX provides personalized cooling using a micro vapor compression system that includes a new high-performance micro-scroll compressor and a novel thermal storage unit. The vapor compression system operates at night to freeze a phase-change material (PCM). During the workday, the cooling stored in the PCM is released as a cool breeze of air to make occupants more comfortable. The micro-scroll compressor was developed specifically for this application; it is smaller than any of its type, minimizing the amount of power needed. In heating mode, the µX maintains occupant comfort using a foot heating mat with an infrared reflective box. The µX R&D project was conducted by Syracuse University in collaboration with United Technologies Research Center, Air Innovations, Bush Technical, and Cornell University. Over the course of the initial three-year project, the team developed and evaluated four versions of the unit, advancing the concept to Technology Readiness Level 6. The capabilities of individual proof-of-concept prototypes were verified in tests that were conducted with: 1) units in psychrometric chambers, 2) an instrumented manikin in a laboratory, and 3) human subjects in laboratories that simulate office environments. The tests verified that the µX prototypes met or exceeded all performance targets required to enable office buildings to reduce energy used for heating and cooling by 15% or more by maintaining occupant comfort when thermostat setpoints are incremented by 4°F or more.

25 ENERGY STORAGE↗

H2@Airports (Workshop Summary Report)

This report serves as the proceedings of the H2@Airports Workshop held virtually by the U.S. Department of Energy (DOE) in collaboration with the U.S. Department of Transportation (DOT) and Department of Defense (DOD), November 4-6, 2020. Presentations from the workshop can be found at H2@Airports Workshop: https://www.energy.gov/eere/fuelcells/h2airports-workshop. The workshop was held to assess the state of the art for electric aircraft and airport applications specifically using hydrogen fuel cells, to discuss operational requirements and lessons learned on early fuel cell aviation and airport projects, to understand current technology gaps, to identify collaborative research and development (R&D) opportunities, to highlight codes, standards, safety, and regulatory challenges, and to identify potential actions that address them. Experts and stakeholders from industry, government, and academia met to discuss the current state of the art of hydrogen and fuel cell technologies and the requirements for using these technologies in aviation applications and land-based applications at airports. This report summarizes the discussions and diverse opinions expressed at the workshop.

08 HYDROGEN↗

Stepping Up to the Challenge Together (Progress Report, 2022)

This annual report from the Better Buildings Initiative contains information about partner projects, energy and cost savings, and new program initiatives. The 2022 Progress Report also recognizes the latest group of Better Buildings Goal Achievers - organizations who have met their energy, water, and/or financing commitments under the Better Buildings or Better Plants Challenge.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Hanford Waste Treatment Plant LAB Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Waste Treatment Plant laboratory (LAB) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAB stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAB stacks are 625 to 47,237 scfm for LB-C2, 1,704 to 103,131 scfm for LB-S1, and 467 to 18,088 scfm for LB-S2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAB facility. Flow angle results were primarily less than 10 degrees, except for the LB-C2 Fan A results, which were an average of 17.6 degrees; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition averaged between 1.5 and 3.5% COV, which were all within the range of the target %COV values from the scale model tests. Based on these stack verification test results, the three LAB filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan as well as dual-fan operations for LB-C2, each of the dual-fan operating conditions for LB-S1, and each single-fan operating condition for LB-S2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Hanford Waste Treatment Plant Low Activity Waste Facility Stack Effluent Monitoring - Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant low activity waste (LAW) facility stack monitor locations were qualified using scale model stacks to mitigate the risk of identifying that sampling locations do not meet the qualification criteria on the full-scale stack. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale model and its sampling location were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the LAW stacks were performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of conditions for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on these DV values, the corresponding stack flow rates for each of the LAW stacks are 815–55,758 scfm for LV-S1, 980–112,078 scfm for LV-S2, 264–22,901 scfm for LV-S3, and 981–79,832 scfm for LV-C2. The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack tests at the LAW facility. Flow angle results were primarily less than 10°, except for one LV-S2 Fan A result, which was 13.2°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 1.5 COV and 9.2% COV, which were all within the range of the target % COV values from the scale model tests. Based on these stack verification test results, the four LAW filtered exhaust stack sampling locations meet the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes single-fan operating conditions for LV-S1 and LV-S2, dual-fan operations for LV-S3 at both the continuous air monitor and record sampler locations, and both the single-fan as well as the dual-fan operations for LV-C2. Further changes to the system configuration or operating conditions that are outside the bounds described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

3013 Inner Container Closure Weld Region (ICCWR) Characterization by Wide Area 3D Measurement System (WAMS) Analysis (FY21 Progress Report)

As part of the 3013 Surveillance Program, through-wall penetration from stress corrosion cracking (SCC) of the 3013 inner containers has been identified as the most credible condition for failure withing the 50- years lifetime. Chlorides contained in Pu-bearing material, together with intra-canister humidity levels, metallurgical conditions, and internal stresses have been found to produce corrosion in the Inner Container Closure Weld Region (ICCWR) of the 3013 canister system. A Laser Confocal Microscope (LCM) is used as part of the 3013 Surveillance Program protocol to identify the prevalence of corrosion and corrosionrelated cracking in the ICCWR2. With the LCM, a close visual examination is made of the ICCWR surface along with measurements of corrosion-related features. LCM inspections produce immense amounts of image data that is time intensive to analyze. There is also a 9-year backlog of images, with approximately 49 canisters that must be evaluated. To expedite data analysis and reduce the amount of generated data, a Wide Area 3D Measurement System (WAMS) microscope has been added to the examination protocol. Although WAMS is a lower resolution microscope, small features of interest can be still identified. The advantage of collecting data for the full circumference using the WAMS is that it can take about 1/16 of the time needed with the LCM. Both systems offer capabilities that combined can be utilized to expedite the examination of the ICCWR. The WAMS is an efficient system for screening and identification of corrosion features while the LCM can be utilized to obtain higher resolution images areas identified by the WAMS. This report explains and justifies the data collection methods used with the WAMS. It includes a summary of the data generated by WAMS in FY21. The goals set for data collection in FY21 were met. A total of twenty-two DE’s were imaged, and analysis was carried out on eleven samples. The analyzed samples showed large numbers of potential cracks and pits distributed throughout the surfaces. Lastly, to explain the advantages of the WAMS, its capabilities were compared to those of a simpler microscope. Micrographs of the samples imaged in FY21 and those analyzed are included in the appendices.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Midland College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In April of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and Midland College for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

97 MATHEMATICS AND COMPUTING↗

McLennan Community College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. In March of 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and McLennan Community College (MCC) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

99 GENERAL AND MISCELLANEOUS↗

South Plains College Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between October 2021 and January 2022, staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from LEARN and South Plains College (SPC) for the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

99 GENERAL AND MISCELLANEOUS↗

Destructive Examination of Shipping Package 9975-02731

Destructive and non-destructive examinations were performed on the components of the package 9975-02731 as part of a comprehensive Savannah River Site surveillance program for plutonium materials stored in the K-Area Complex (KAC). The package stored nuclear materials in KAC for 13.8 years. Inspection of the package during opening in KAC noted one non-conforming condition: a large discolored area on the upper fiberboard subassembly. The package was subsequently transferred to Savannah River National Laboratory for more detailed examination. In addition to the observation noted in KAC, the following conditions were observed: (1) Axial gap of 1.021 inch slightly exceeded the 1 inch maximum criterion, and (2) Lead shield height exceeded drawing tolerance of 24.7 inch by 0.019 inch. Visual examination of the upper fiberboard assembly and analysis of the discolored fiberboard indicate the discoloration was due to wood glue residue. The physical, thermal, and mechanical properties of the fiberboard met the acceptance criteria and/or were within the range of previously tested fiberboard and baseline samples. The visual, microscopic and tensile testing results were consistent with previous O-ring and baseline Viton results. The lead shield surface was covered with corrosion product as observed on other shields but there was no evidence of excessive blistering, flaking, or spalling. Besides minor and expected corrosion, no evidence of a degraded condition was found in this package. Examination of the 9975-02731 corroborates existing evidence that the 9975 package is robust and the components can perform their expected functions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Syracuse University Industrial Assessment Center (Final Report)

Syracuse University Industrial Assessment Center (SU-IAC) project is focused on the two primary objectives: (i) educate undergraduate and graduate students in engineering and associated disciplines on the concepts of energy sustainability and to provide hands-on training by performing energy assessment at industrial facilities to become future energy efficiency experts, and (ii) offer energy assessments to small and mid-sized manufacturing companies in SU-IAC 2 the greater New York State region, perform analytical engineering work in support of assessment recommendations, and to report the results of those analyses to the client companies, to DOE, and to Field office personnel Through this project period, SU-IAC successfully trained 77 engineering students who were undergraduate or graduate students at Syracuse University College of Engineering, or at SU- IAC’s satellite center at Clarkson University. Each of these students received comprehensive ‘in-class’ technical training, safety training, and hands-on field training. The students performed various tasks related to energy assessment at the manufacturing facilities, including billing analysis, energy use reduction recommendations, and report preparation. Through this project period, a total of 34 students have completed all requirements of the SU-IAC program and have received the US DoE Certificate on Energy Efficiency, with the remaining students continuing at various stages of field work or training. During this project period, due to Covid-related measures in New York State, Syracuse University campus and most of the manufacturing facilities were completely closed or were under severe restrictions for access, for an extended period from March 2020 through April 2021. The closures affected our project execution, with the project Sponsor offering structured relief to carry-out a modified project during the affected budget periods. During this project period, SU-IAC student teams, led by its Director, completed a total of 77 energy assessments at small- and medium-scale manufacturing facilities located in New York State. For these facilities, SU-IAC prepared and presented details for 569 assessment recommendations (ARs). The facilities implemented a total of 258 of these ARs, realizing annual average energy savings in the range of $\$ $3,300 to $\$ $55,000 per facility. Cumulatively, these facilities have reduced their “first year after implementation” energy use by a total of 4.37 million kwh, and fuel use by a total of 27.7 billion BTU. SU-IAC project has successfully met the two primary objectives (and the associated sub objectives) and helped the manufacturing facilities in New York State achieve quantitative energy use reductions as a result of this project.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Produced Water and Waste Heat-aided Blowdown Water Treatment: Using Chemical and Energy Synergisms for Value Creation

The project objective was to develop a cooling blowdown water (BDW) treatment process utilizing produced water (PW) and low-grade heat to maximize water reuse and saleable by-product generation while reducing chemical and energy footprints of the treatment. The proposed treatment process consists of mixing, softening, organics and suspended solids removal, reverse osmosis (RO), thermal desalination, and brine electrolysis. BDW samples collected from a local coal-fired power plant and PW samples from two shale gas production wells were used in this study. Each treatment unit was first designed and tested to quantify its treatment efficiency, and its chemical and energy requirements. In addition, a process model was developed and model simulations were conducted based on the experimental results and literature data to optimize the treatment process. A techno-economic analysis was conducted to quantify chemical and energy savings as well as production of 10-lb brine as a saleable product. With the field-collected BDW and PW samples, mixing experiments determined a volumetric mixing ratio 10:1 (BDW:PW) resulted in the best performance of multivalent ions removal and largest chemical savings for softening. Softening of the BDW/PW mixtures using alkaline chemicals (Na 2 CO 3 and NaOH) achieved 95%-100% removal of scaling-forming cations (Ca, Mg, Fe, Ba, Sr) and 60% of silicon, and 10% of total organic carbon (TOC). The mixing and softening treatments yielded an effluent with total dissolved solids (TDS) concentration of 23 g/L. Activated carbon (AC) filtration removed TOC to a low level (< 3 mg/L) and further removed remaining scale-forming divalent metals and silica from the softened water. The AC filtration resulted in a slight reduction of TDS from 23 g/L to 20 g/L, leaving behind only mostly monovalent ions (i.e., sodium and chloride) in the filtered water. These pretreatments yielded a feed water that met the criteria of the downstream reverse osmosis (RO) to prevent membrane fouling. A cross-flow RO system was used to further concentrate the TDS of the AC effluent. Various factors including TDS, pH, and applied pressure were examined and optimal conditions were determined for the co-treatment process. An integrated process consisting of mixing, softening, AC filtration and RO was used to treat a continuous flow (0.25 – 1.2 L/min, or 0.07 – 0.32 gpm) and successfully generated RO permeate as product water (TDS < 0.5 g/L) for reuse in cooling operation, and a concentrate (TDS ~ 45 g/L) to be further treated in a thermal desalination unit. These flow rates meet the FOA’s criterion of 0.01 – 1 gpm. Overall, the co-treatment of BDW/PW allowed shorter ramp-up time compared to treatment of BDW alone. It resulted in 40% and 55% savings of Na 2 CO 3(s) and NaOH, respectively, compared to treating the BDW and PW individually for the same level of softening. The co-treatment also resulted in a 29% energy saving compared to treatment of BDW only for the level of TDS concentration. A thermal desalination system was designed using CFD simulations and manufactured in the WVU Innovation Hub for further treatment of the RO concentrate to generate 10-lb brine. The system has a design flow rate of 2 gpm and has been successfully tested. A bench-scale brine electrolysis system was developed for on-site generation of chlorine/hypochlorite (Cl 2 /OCl - ) and caustic soda (NaOH) as useful chemicals for the co-treatment process. Using salt solutions (0.5 M and 1 M), the system achieved faradaic efficiencies of 93%-97% and 70%-77% for caustic soda and chlorine/hypochlorite generation, respectively. An economic analysis showed that the electricity costs for on-site generation of these chemicals were significantly lower than the chemical prices offered by suppliers. An industrial-scale process model consisting of mixing, softening, AC filtration, RO, thermal desalination, and brine electrolysis was developed using the Aspen Plus V9 in conjunction with Aspen Custom Modeler V9. The model serves as a solvable Aspen Plus model and as basis to form the costing infrastructure. In addition, techno-economic analysis considering capital, operating, and transportation costs was conducted. An optimization solution showed that produced water for mixing is still advantageous in low quantities. The optimum solution approaches a leveled cost of water (LCW) of 2 $/m 3 which becomes cost competitive with nominal water treatment prices.

20 FOSSIL-FUELED POWER PLANTS↗

A MEMS Gyroscope for Reliable Long Duration Measurement While Drilling at 300°C

The 300°C Microelectromechanical system (MEMS) gyroscope project aims to contribute to DOE’s goal of increased geothermal drilling efficiency by 2025 through the development of a 300°C MEMS gyroscope for Measurement While Drilling (MWD). At the conclusion of the 2-year project, the team will develop a 300°C capable MEMS gyroscope containing GE’s patented Multi-Ring Gyroscope Transducer (MRGT) design, custom Silicon-On-Insulator (SOI) based frontend and feedback control electronics, and with demonstrated functionality and lifetime beyond 1000 hours. The project is divided into two budget periods with Go/No-Go decision at the end of the first budget period. The goal for the first budget period is to establish the feasibility of the MRGT and electronics design for meeting the 300°C performance requirements. The goal for the second budget period is to integrate the MRGT with the SOI-based application specific integrated circuit (ASIC) and demonstrate capability to operate at 300°C for 1000 hours. In Budget Period 1 we met the phase 1 goal. We successfully validated the combined MRG, electronics and packaging capability entitlement to achieving 0.5 degrees azimuth uncertainty while enabling operation at significantly higher temperatures than the state-of-the-art. In Budget Period 2, we successfully completed the integration of the MRGT and ASIC with associated high temperature, high reliability packaging to demonstrate the performance and functionality of the integrated gyroscope across the temperature range from room temperature to at 300°C. Furthermore, the team demonstrated operating life of >1,000 hours at 300°C, thus providing a validation of application-relevant lifetime capability.

15 GEOTHERMAL ENERGY↗

Hanford Waste Treatment Plant Effluent Management Facility Stack Effluent Monitoring: Sampling Probe Location Qualification Evaluation

The Hanford Tank Waste Treatment and Immobilization Plant Effluent Management facility (EMF) stack monitor location was qualified using the LV-S1 scale model stack as a baseline, augmented by the LB-S1 and LV-S2 scale model stacks to address the Direct Feed Low Activity Waste Effluent Management Facility Vessel Vent Process (DVP) injection into the main Active Confinement Ventilation (ACV) system duct. As required by the American National Standards Institute/Health Physics Society (ANSI/HPS) N13.1-1999 standard, the scale models and its sampling locations were geometrically similar to the actual stack and the Reynolds numbers for both the actual and model stacks were >10,000. An additional criterion is that the product of the hydraulic diameter and mean velocity (DV) of the full-scale stack must be between 1/6 DV and 6 DV of the scale model stack tests. Verification tests of the EMF stack was performed at normal operating conditions. The minimum 1/6 DV value, along with the maximum 6 DV value from the scale model testing determines the range of stack flow rates for which the full-scale stack may be operated and remain in compliance with the stack verification criterion. Based on the LV-S1 scale model test DV values, the corresponding stack flow rates for the EMF stack are as listed in Table S1. Table S1. Effluent Management Facility Stack Qualified Flow Range. Stack Parameter EM-1 Minimum Qualified Stack Flow (scfm) 781 Maximum Qualified Stack Flow (scfm) 53,432 The remaining criteria for the stack verification to be considered valid involve the flow angle and velocity uniformity results. First, the flow angle at the full-scale stack must be =20°. Second, the velocity uniformity at the full-scale stack must be =20% coefficient of variance (COV). Finally, the velocity uniformity results for the actual and scale model stack tests must agree within 5% COV. These criteria were met through the full-scale stack test at the EMF. Flow angle results were less than 5°; all flow angle results were within the =20° criterion. The velocity uniformity results for each test condition ranged between 2.2% COV and 4.3% COV, which were all within the range of the target % COV values from the scale model tests on the LV-S1, LB-S1, and LV S2 scale models. Based on these stack verification test results, the EMF filtered exhaust stack sampling location meets the qualification criteria provided in the ANSI/HPS N13.1-1999 standard for all fan operating configurations. This includes each combination of ACV fan with the DVP exhausters. Further changes to the system configuration or operating conditions that are outside the qualified flow rates described in this report may require additional tests or analyses to determine compliance with the standard.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sinclair Community College and OARnet Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between October 2021 and March 2022 staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from Sinclair Community College (SCC) and OARnet with the purpose of performing a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

San Diego State University Requirements Analysis Report

EPOC uses the Deep Dive process to discuss and analyze current and planned science, research, or education activities and the anticipated data output of a particular use case, site, or project to help inform the strategic planning of a campus or regional networking environment. This includes understanding future needs related to network operations, network capacity upgrades, and other technological service investments. A Deep Dive comprehensively surveys major research stakeholders’ plans and processes in order to investigate data management requirements over the next 5–10 years. Between December 2021 and April 2022 staff members from the Engagement and Performance Operations Center (EPOC) met with researchers and staff from San Diego State University (SDSU) the purpose of a Deep Dive into scientific and research drivers. The goal of this activity was to help characterize the requirements for a number of campus use cases, and to enable cyberinfrastructure support staff to better understand the needs of the researchers within the community.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗